HomeMy WebLinkAboutFile Documents.802 W Main St.0170.2018 (30).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
The following criteria must also be met with construction:
Ø A construction fence must be erected along the entire dripline of
all trees on site and any tree canopy from neighboring property.
This will serve as the tree protection zone (TPZ). This fence is to
be constructed in such a manner that the area inside the dripline is
protected. AN INSPECTION OF THIS FENCE MUST BE
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION
ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION
WITH BEN CARLSEN AT 429-2034.
Ø No materials may be stored in the TPZ, including but not limited
to, construction backfill, construction traffic, or any other
construction materials.
Ø No excavation, grading or trenching may occur within the TPZ
without the consent of the City of Aspen Forester or his designee.
Ø No parking of vehicles or equipment may occur in the TPZ.
Ø No dumping of any waste products may occur in the TPZ.
Ø Any roots cut during excavation shall be pruned with sharp
loppers/pruners back to the soil line. The roots will further be
protected by burlap draped over the side of the excavation
covering the exposed roots. This burlap shall be kept moist until
the excavation is backfilled.
Ø Pruning to provide clearance for construction activities shall only
be done under the direction of an arborist.
Ø Site inspections shall be performed on a weekly basis, to ensure
the above listed conditions are met.
Ø Any unapproved improvements or activities outside of those
approved within this permit will be subject to mitigation in the form
of restoration.
Ø This permit must be posted on site during the construction
process.
City of Aspen - Tree Planting Specifications
Trunk caliper shall
meet ANSI Z60 current
edition for root ball size.
Modified soil. Depth
varies. (See soil preparation
plan).
Finished grade.
Bottom of root ball rests on
existing or recompacted
soil.
Central leader. (See crown
observations detail).
SECTION VIEW
Remove 1/3 of
burlap and basket
wire.
Round-topped
soil berm 4" high x 8" wide
above root ball surface
shall be constructed around
the root ball. Berm shall
begin at root ball periphery.
Top of root ball shall be flush with
finished grade.
Prior to mulching, lightly tamp soil
around the root ball in 6" lifts to
brace tree. Do not over compact.
When the planting hole has been
backfilled, pour water around the
root ball to settle the soil.
4" layer of mulch.
No more than 1" of mulch on
top of root ball. (See
specifications for mulch).
Notes:
1- Trees shall be of quality
prescribed in crown
observations and root
observations details and
specifications.
2- See specifications for
further requirements related to
this detail.
Existing soil.
TP-1
s >5
1/ iT\ 1//0/1>/1'/1';;; /1'/1
\ */ ’ \ */ \ */ \ */ \ */ \
"-'i .-..t ■ 1 'i.i-i 1 i- -i-- V »
I.v '/ O'/' \ '/ ' '/ O'/' O/
^ i'l —I r i'l [v-
I yqTTE3TTr=rrfSSvSOI ItFFt
Tr TT
A
LJ
The City of Aspen
Tree protection fencing is required at the driplines of all trees shown.
There is NO activity allowed within this fenced area, including, but not
limited to: digging, storage of material, equipment, machinery, foot or
vehicle traffic.
Please contact the City Forester or his designee at 920-5120 for an
inspection of this fencing Prior to any activity.
If the need arises to perform any activity in the tree protection area , please
contact the City Forester and you will be given specific instructions as to
how to proceed to minimize impacts to the tree root zone.
City of Aspen - Tree Protection Zone
Crown drip line or other limit of Tree Protection area. See
tree preservation plan for fence alignment.
4'
-
0
"
Maintain existing
grade with the tree
protection fence
unless otherwise
indicated on the
plans.
2" x 6' steel posts
or approved equal.
Tree Protection
fence: High density
polyethylene fencing
with 3.5" x 1.5"
openings; Color-
orange. Steel posts
installed at 8' o.c.
5" thick
layer of mulch.
Notes:
1- See specifications for additional tree
protection requirements.
2- If there is no existing irrigation, see
specifications for watering requirements.
3- No pruning shall be performed except
by approved arborist.
4- No equipment shall operate inside the
protective fencing including during fence
installation and removal.
5- See site preparation plan for any
modifications with the Tree Protection
area.
SECTION VIEW
KEEP OUT
TREE
PROTECTION
AREA
8.5" x 11"
sign
laminated in
plastic spaced
every 50'
along the
fence.
URBAN TREE FOUNDATION
OPEN SOURCE FREE TO USETPZ-1
NFPA 13 (not 13R)
sprinkler system required
throughout entire building
to allow for reduced travel
distance in basement
storage (2015 IBC table
1006.3.2(2).
FIRE
SPRINKLERS
REQUIRED
ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: _____________________________________________
o Your Name (Person Completing Part A): ____________________________________________
o Your Company: ________________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
802 WEST MAIN ST.
BRIAN BEAZLEY
DAVID JOHNSTON ARCHITECTS
100'-0"=7928.21'
7928.50'
06/15/2018
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
802 WEST MAIN ST.0170.2018.ARBK
970-925-3444BRIAN BEAZLEY BRIAN@DJARCHITECTS.COM
970-920-5000CITY OF ASPEN
130 S. GALENA ST.ASPEN CO 81611
970-319-9298JASON BRADSHAW
228 EASTWOOD DRIVE ASPEN CO 81611
JEBRADSHAW@MAC.COM
SAME AS ARCHITECT
970-925-3444DAVID JHONSTON ARCHITECTS
119 S. SPRING ST.ASPEN CO 81611
BRIAN@DJARCHITECTS.COM
970-340-4130ROARING FORK ENGINEERING
592 HIGHWAY 133 CARBONDALE CO 81623
RICHARDG@RFENG.BIZ
970-927-5174KL&A
215 N. 12th St.CARBONDALE CO 81623
DDOHERTY@KLAA.COM
970-248-2610SHAW CONSTRUCTION
760 HORIZON DRIVE, #201 GRAND JUNCTION CO 81506
JAMISONNEYERS@SHAWCONSTRUCTION.NET
5/25/2018
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
12/
1
2
/
2
0
1
8
ni
c
k
t
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
0170.2018.ARBK 12/12/18
0
0
0
NT
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
0170.2018.ARBK
concrete
0
A units: 6908,247 SF
10 units, each with:
total: 33
2
1 1
1
(1) STORAGE AREA/ (1) MECH. ROOM
(5) 1-BEDROOM APARTMENTS - ALL TYPE B ACCESSIBLE
(5) 1-BEDROOM APARTMENTS - NOT ACCESSIBLE
NT 6/21/18
NFPA 13 required to allow single exit travel path
distance from basement storage.
2
B units: 630
X
10,537sqft
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
05-25-18 0170.2018.ARBK
802 WEST MAIN ST.273512308005
Q,R,&S 12
CITY OF ASPEN 970-920-5000
JASON BRADSHAW 970-319-9298 JEBRADSHAW@MAC.COM
10 Unit Apratment building/2 story building plus basement (10)1-bedroom units/trash enclosure
3,330,467
10,340 SF
10,340 SF
9,000
10,340 SF
8,247 SF
KH 6/15/18X
X CS 10/19/2018
X NT 12/12/18
X NT 12/12/18
X
X
X
X
X PM 6/25/18
X
X
X
831-718-480
X
X
X
Dr 7/12/18
sw 10/15
DR 7/12/18
LC 12/19/18
AR 6/27/18
TK 7/13/18
PJM 12/19/18
DAM 12/19/18
0170.2018.ARBK
CITY OF ASPEN
802 WEST MAIN
273512308005
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
2.
4.
1
802 W Main St 0170.2018.ARBK
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
David Johnston Architects D. Brian Beazley 04-20-18
11/15/18Jason Bradshaw802 W. Main, LLC
12/06/2018
802 W Main St 0170.2018.ARBK
12/06/2018
802 W Main St 0170.2018.ARBK
12/06/2018
Nick Thompson 12/6/18
802 W Main St 0170.2018.ARBK
12
/
1
2
/
2
0
1
8
ni
c
k
t