HomeMy WebLinkAboutFile Documents.802 W Main St.0170.2018 (30).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK The following criteria must also be met with construction: Ø A construction fence must be erected along the entire dripline of all trees on site and any tree canopy from neighboring property. This will serve as the tree protection zone (TPZ). This fence is to be constructed in such a manner that the area inside the dripline is protected. AN INSPECTION OF THIS FENCE MUST BE PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION WITH BEN CARLSEN AT 429-2034. Ø No materials may be stored in the TPZ, including but not limited to, construction backfill, construction traffic, or any other construction materials. Ø No excavation, grading or trenching may occur within the TPZ without the consent of the City of Aspen Forester or his designee. Ø No parking of vehicles or equipment may occur in the TPZ. Ø No dumping of any waste products may occur in the TPZ. Ø Any roots cut during excavation shall be pruned with sharp loppers/pruners back to the soil line. The roots will further be protected by burlap draped over the side of the excavation covering the exposed roots. This burlap shall be kept moist until the excavation is backfilled. Ø Pruning to provide clearance for construction activities shall only be done under the direction of an arborist. Ø Site inspections shall be performed on a weekly basis, to ensure the above listed conditions are met. Ø Any unapproved improvements or activities outside of those approved within this permit will be subject to mitigation in the form of restoration. Ø This permit must be posted on site during the construction process. City of Aspen - Tree Planting Specifications Trunk caliper shall meet ANSI Z60 current edition for root ball size. Modified soil. Depth varies. (See soil preparation plan). Finished grade. Bottom of root ball rests on existing or recompacted soil. Central leader. (See crown observations detail). SECTION VIEW Remove 1/3 of burlap and basket wire. Round-topped soil berm 4" high x 8" wide above root ball surface shall be constructed around the root ball. Berm shall begin at root ball periphery. Top of root ball shall be flush with finished grade. Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace tree. Do not over compact. When the planting hole has been backfilled, pour water around the root ball to settle the soil. 4" layer of mulch. No more than 1" of mulch on top of root ball. (See specifications for mulch). Notes: 1- Trees shall be of quality prescribed in crown observations and root observations details and specifications. 2- See specifications for further requirements related to this detail. Existing soil. TP-1 s >5 1/ iT\ 1//0/1>/1'/1';;; /1'/1 \ */ ’ \ */ \ */ \ */ \ */ \ "-'i .-..t ■ 1 'i.i-i 1 i- -i-- V » I.v '/ O'/' \ '/ ' '/ O'/' O/ ^ i'l —I r i'l [v- I yqTTE3TTr=rrfSSvSOI ItFFt Tr TT A LJ The City of Aspen Tree protection fencing is required at the driplines of all trees shown. There is NO activity allowed within this fenced area, including, but not limited to: digging, storage of material, equipment, machinery, foot or vehicle traffic. Please contact the City Forester or his designee at 920-5120 for an inspection of this fencing Prior to any activity. If the need arises to perform any activity in the tree protection area , please contact the City Forester and you will be given specific instructions as to how to proceed to minimize impacts to the tree root zone. City of Aspen - Tree Protection Zone Crown drip line or other limit of Tree Protection area. See tree preservation plan for fence alignment. 4' - 0 " Maintain existing grade with the tree protection fence unless otherwise indicated on the plans. 2" x 6' steel posts or approved equal. Tree Protection fence: High density polyethylene fencing with 3.5" x 1.5" openings; Color- orange. Steel posts installed at 8' o.c. 5" thick layer of mulch. Notes: 1- See specifications for additional tree protection requirements. 2- If there is no existing irrigation, see specifications for watering requirements. 3- No pruning shall be performed except by approved arborist. 4- No equipment shall operate inside the protective fencing including during fence installation and removal. 5- See site preparation plan for any modifications with the Tree Protection area. SECTION VIEW KEEP OUT TREE PROTECTION AREA 8.5" x 11" sign laminated in plastic spaced every 50' along the fence. URBAN TREE FOUNDATION ‹ OPEN SOURCE FREE TO USETPZ-1 NFPA 13 (not 13R) sprinkler system required throughout entire building to allow for reduced travel distance in basement storage (2015 IBC table 1006.3.2(2). FIRE SPRINKLERS REQUIRED ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08 Verification of Building Location by Building Contractor For Building and Permit Information, please refer to our website at: http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building / Job Address or Location: _____________________________________________ o Your Name (Person Completing Part A): ____________________________________________ o Your Company: ________________________________________________________________ o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary. Are building ties shown? (circle one) ‘Yes’ ‘No’ o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? _________________________________ o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’ o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation: (i.e., 100’ first floor elev = 7962.50’) _______________________________ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’ o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________ o According to the building plans, what was the design elevation for the same place on the foundation wall? ______________________________ o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’ o If yes, why? ________________________________________________ The undersigned qualified individual certifies that the information in Part B is accurate - Signature: Date: _ Printed Name: Contact ph. # : ____________________ Company: ______________________________________________________________ 802 WEST MAIN ST. BRIAN BEAZLEY DAVID JOHNSTON ARCHITECTS 100'-0"=7928.21' 7928.50' 06/15/2018 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 802 WEST MAIN ST.0170.2018.ARBK 970-925-3444BRIAN BEAZLEY BRIAN@DJARCHITECTS.COM 970-920-5000CITY OF ASPEN 130 S. GALENA ST.ASPEN CO 81611 970-319-9298JASON BRADSHAW 228 EASTWOOD DRIVE ASPEN CO 81611 JEBRADSHAW@MAC.COM SAME AS ARCHITECT 970-925-3444DAVID JHONSTON ARCHITECTS 119 S. SPRING ST.ASPEN CO 81611 BRIAN@DJARCHITECTS.COM 970-340-4130ROARING FORK ENGINEERING 592 HIGHWAY 133 CARBONDALE CO 81623 RICHARDG@RFENG.BIZ 970-927-5174KL&A 215 N. 12th St.CARBONDALE CO 81623 DDOHERTY@KLAA.COM 970-248-2610SHAW CONSTRUCTION 760 HORIZON DRIVE, #201 GRAND JUNCTION CO 81506 JAMISONNEYERS@SHAWCONSTRUCTION.NET 5/25/2018 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 12/ 1 2 / 2 0 1 8 ni c k t External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0170.2018.ARBK 12/12/18 0 0 0 NT Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 BUILDING CODE INFORMATION 2015 IRC Existing?NFPA 13 NFPA 13 R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # 3/4 Baths ______ # 1/2 Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 13 D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviewed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ 2nd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ 3rd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION YesNo PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) _________________ _________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing + New) A__B B (A <50) F__ H__ I __ E R__ S__ U M IRC IBC 2015 IBC (As Adopted and Amended) Yes No Required?Yes No Type January 2018 2015 IEBC (As Adopted and Amended) Other _____________ Gross Area of Building: __________ Gross Area of Unit: __________ Occupant Load: ___________ 0170.2018.ARBK concrete 0 A units: 6908,247 SF 10 units, each with: total: 33 2 1 1 1 (1) STORAGE AREA/ (1) MECH. ROOM (5) 1-BEDROOM APARTMENTS - ALL TYPE B ACCESSIBLE (5) 1-BEDROOM APARTMENTS - NOT ACCESSIBLE NT 6/21/18 NFPA 13 required to allow single exit travel path distance from basement storage. 2 B units: 630 X 10,537sqft COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ ______________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT DISTURBEDEXTERIOR AREA SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Engineering Zoning (50%)School Ded. Zoning (50%)CMP (50%)TDM Impact Energy Code REMP Ped. Amenity CMP (50%)Plan Check (Hourly)Housing Cash in Lieu Parks Review Zoning (Hourly)Stormwater Utility Review Engineering (Hourly)City Use Tax GIS County Use Tax SUBMITTAL FEES ISSUANCE FEES _________Lot Area _________Deed Restricted _________Census Code _________# of Dwellings _________Plans Location APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans ____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment Re-viewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work. DO YOU LIKE DOGS? December 2017 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ ZONE DISTRICT NeedsReview DE F I N I T I O N S 05-25-18 0170.2018.ARBK 802 WEST MAIN ST.273512308005 Q,R,&S 12 CITY OF ASPEN 970-920-5000 JASON BRADSHAW 970-319-9298 JEBRADSHAW@MAC.COM 10 Unit Apratment building/2 story building plus basement (10)1-bedroom units/trash enclosure 3,330,467 10,340 SF 10,340 SF 9,000 10,340 SF 8,247 SF KH 6/15/18X X CS 10/19/2018 X NT 12/12/18 X NT 12/12/18 X X X X X PM 6/25/18 X X X 831-718-480 X X X Dr 7/12/18 sw 10/15 DR 7/12/18 LC 12/19/18 AR 6/27/18 TK 7/13/18 PJM 12/19/18 DAM 12/19/18 0170.2018.ARBK CITY OF ASPEN 802 WEST MAIN 273512308005 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 2. 4. 1 802 W Main St 0170.2018.ARBK 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. 2. 3. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. 2. 3. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. 2. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 David Johnston Architects D. Brian Beazley 04-20-18 11/15/18Jason Bradshaw802 W. Main, LLC 12/06/2018 802 W Main St 0170.2018.ARBK 12/06/2018 802 W Main St 0170.2018.ARBK 12/06/2018 Nick Thompson 12/6/18 802 W Main St 0170.2018.ARBK 12 / 1 2 / 2 0 1 8 ni c k t