Loading...
HomeMy WebLinkAboutFile Documents.1448 Crystal Lake Rd.0214.2018 (3).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 08/01/2018 08/01/2018 08/01/2018 08/01/2018 08/01/2018 08/01/2018 0208.2018.ARBK CG CRYSTAL LAKE HOLDINGS LLC 1449 CRYSTAL LAKE RD 273718132012 Per City IFFR Policy: - No studs or other structural material may be altered as a part of this permit. -Pre-work, mid-progess, and final inspections are required. 08/01/2018 IFFR. See narrative for details. X X X X X SV 08/01 SV 08/01 SV 08/01 SV 08/01 25.00 100.69 100.69 0208.2018.ARBK 434 PH 08/10 325.00 DAM 8/16/18