These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
05/01/2019
Reviewed by Engineering
05/02/2019 9:45:00 AM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen. The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements." The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.
01/25/2019
0027.2019.ACBK
0 BOOMERANG RD
Aspen Highlands PUD / SKI
BN 5/1/190
0
0
0
0
MH 5/2/19
DAM 5/3/19
JF 5/3/19
DAM 5/3/19
01/25/2019
0027.2019.ACBK
ASPEN HIGHLANDS METRO DISTRICT
0 BOOMERANG
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
All snowmelt systems shall meet the following:
- Any portions in the Right of Way must be on a separate zone. A ROW permit
and Permanent Encroachment License are required.
- R10 insulation shall be installed under the area to be snowmelted or R5 insulation
shall be installed under the slab edges. (Ordinance 11 Series 2011)
- Automatic controls installed for system shut off when pavement temperature is above
50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5)
- Automatic or manual controls installed for system shut off when outdoor temperature
is above 40°F. (2015 IECC R403.9 and C403.2.3.5)
- Inspection by testing hydrostatically at 1.5 times max system design pressure, but not
less than 100psi, for 15 minutes. (2015 IMC 1208.1)