Loading...
HomeMy WebLinkAboutFile Documents.401 Eagle Park Dr.0127.2018 (4).ACBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 05/01/2019 Reviewed by Engineering 05/02/2019 9:45:00 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 01/25/2019 0027.2019.ACBK 0 BOOMERANG RD Aspen Highlands PUD / SKI BN 5/1/190 0 0 0 0 MH 5/2/19 DAM 5/3/19 JF 5/3/19 DAM 5/3/19 01/25/2019 0027.2019.ACBK ASPEN HIGHLANDS METRO DISTRICT 0 BOOMERANG SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S All snowmelt systems shall meet the following: - Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. - R10 insulation shall be installed under the area to be snowmelted or R5 insulation shall be installed under the slab edges. (Ordinance 11 Series 2011) - Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5) - Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2015 IECC R403.9 and C403.2.3.5) - Inspection by testing hydrostatically at 1.5 times max system design pressure, but not less than 100psi, for 15 minutes. (2015 IMC 1208.1)