Loading...
HomeMy WebLinkAboutFile Documents.401 Eagle Park Dr.0127.2018 (5).ACBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 12/03/2018 0127.2018.ACBK X PL 12/3/2018 X X16.50 16.25 6.25 16.50 X 25.00 437 CC JRB 12/28/180 0 0 0 0 TF TF 1/4/19 1/4/19 DAM 2/11/19 12/03/2018 0127.2018.ACBK DI LEONE 205 S MILL #101 27370738004