HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (40).ACBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
1
425 Rio Grande Place 0016.2019.ACBK
06/24/2019
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
2. Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
3. Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
2. Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2 06/24/2019
425 RIO GRANDE PLACE 0016.2019.ACBK
06/24/2019
NICK THOMPSON 7/22/19
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
2.28.19
425 RIO GRANDE PLACE ASPEN CO 81611 0016.2019.ACBK
970-925-5590RICH PAVCEK richp@cunniffe.com
205-447-0424BRIAN THOMAS brianthomas@shawconstruction.net
CITY OF ASPEN
970-925-5590Charles Cunniffe - Charles Cunniffe Architects
610 E Hyman Ave Aspen CO 81611
richp@cunniffe.com
970-925-5590RICH PAVCEK - Charles Cunniffe Architects
610 E HYMAN AVE ASPEN CO 81611
richp@cunniffe.com
970-925-5590Charles Cunniffe Architects
610 E HYMAN AVE ASPEN CO 81611
richp@cunniffe.com
970-340-4130ROARING FORK ENGINEERING, RICHARD GOULDING
592 HIGHWAY 133 CARBONDALE CO 81623
richardg@rfeng.biz
970-510-5701KL&A, DAN DOHERTY
215 N 12TH ST UNIT E CARBONDALE CO 81623
ddoherty@klaa.com
970-242-9236SHAW CONSTRUCTION, BRIAN THOMAS
760 HORIZON DR #201 GRAND JUNCTION CO 81506
brianthomas@shawconstruction.net
3/6/19
03/16/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Dedication
Zoning
Review (50%)
CMP (50%)TDM Impact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area
Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
3/5/2019 0016.2019.ACBK
425 RIO GRANDE PLACE ASPEN CO 81611 2737-073-06-851, 2737-073-06-852, 2737-073-06-854
1, 2, & 4 -RIO GRANDE SUBDIVISION
City of Aspen
RICH PAVCEK 970-618-885 richp@cunniffe.com
A NEW 3 STORY OFFICE ADDITION TO THE EXISTING RIO GRANDE PARKING GARAGE AND PITKIN COUNTY LIBARARY. CONNECTIONS WILL BE PROVIDED
TO THE PARKING GARAGE AND ADJACENT RIO GRANDE BUILDING. LANDSCAPING SCOPE TO INCLUDE IMPROVEMENTS ALONG RIO GRANDE PLACE AND A
PORTION OF THE EXISTING CIVIC PLAZA OVER THE PARKING GARAGE.
$19,000,000
18n
12
n
n
40,712 SF
193,941 SF
75,034 SF
3
42,842 SF
40,712 SF
44,090 SF
29,332 SF
PUB - PD
X JB 3/16/19
X
X
X
51276.88 78887.50 X
X
18922.29 21628.25 X
X
21628.25 4333.90 X
X
11833.12 X
4333.90 250 X
1125.51
03/16/2019
FIRE
SPRINKLERS
REQUIRED
EXCAVATION / STABILIZATION AND FOUNDATION
JPO 7/22/19
SUNRISE 7/22/19
DAM 7/22/19
0016.2019.ACBK
CITY OF ASPEN
427 RIO GRANDE PLACE
273707306851
Skylight U-factor
To document the chain of
custody, verification labels must
be affixed to the skylight units by
an accredited independent
inspection agency or a certificate,
affidavit or other evidence from
the manufacturer confirming
compliance with the NFRC-100
simulation or testing.
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
MANDATORY TESTING
REQUIRED
This construction project is required to
comply with the 2015 International
Energy Conservation Code.
Commercial projects will require a
blower door test performed in the
manner complying with section C402.5
of the 2015 IECC.
Maximum 0.40 cfm/sqft at 75 Pa.
Channel Glass U-factor
The channel glass is not approved.
This permit is issued with a place
holder U-factor of 0.30 for
the channel glass with the
understanding that you will either
provide sufficient documentation
of the actual channel glass
U-factor or will substitute for
another product, either of which
will be demonstrated to have a
U-factor of 0.30 or less.
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
x
0016.2019.ACBK 3/9/20
4754sf
0
0
M1.01, M1.02, M1.03, M8.02
95%
N/A
NT
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
0016.2019.ACBK
n
n n n
n n
n n n
n n
n
4754 SF 0 0
n n
n
192,179
1545
n
3 2
Library, Garge, MECHANICAL & STORAGE
Library, Garage, OFFICE
Library, Garage, OFFICE
Library, OFFICE & LARGE MEETING ROOMS (ACCESSORY ASSEMBLY), EXTERIOR PEDESTRIAN PLAZA
NT 3/9/20
03/16/2019
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
03/10/2020
This site will require
various
modifications,
additions, and
deletions of Erosion
Control BMPs
throughout the
project. The
Contractor and
Owner shall work
together to find and
implement these
changes in a timely
and efficient manner.
03/10/20
SUNRISE
NT 3/10/20
AR 11/17/19
SW 12/4/19
HG 11/17/19
CS 11/17/19
LC 11/17/19
DR 11/17/19
RM 11/17/19
COMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0016.2019.ACBK
Vertical Glazing / Wall Area:25%
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
425 Rio Grande Place
Aspen, CO 81611
Owner/Agent:
City of Aspen
130 S. Galena Street
Aspen, CO 81611
970-309-7638
jeff.pendarvis@cityofaspen.com
Designer/Contractor:
Shaw Construction
760 Horizon Drive
Suite 201
Grand Junction, CO 81506
970-242-9236
brianthomas@shawconstruction.net
Project Information
Energy Code:
Aspen City Office
1%Skylight / Roof Area
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Building Area Floor Area
1-City of Aspen Office Building (Office) : Nonresidential 35984
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1: Other Roof, [Bldg. Use 1 - City of Aspen Office Building] (b)2796 ------0.026 0.021
Roof 2: Insulation Entirely Above Deck, [Bldg. Use 1 - City of Aspen
Office Building]
6632 ---40.0 0.025 0.028
Roof 3: Attic Roof with Steel Joists, [Bldg. Use 1 - City of Aspen Office
Building]
8190 40.0 0.0 0.033 0.021
Roof 4: Attic Roof with Steel Joists, [Bldg. Use 1 - City of Aspen Office
Building]
58 40.0 0.0 0.033 0.021
Roof 5: Attic Roof with Steel Joists, [Bldg. Use 1 - City of Aspen Office
Building]
20 40.0 0.0 0.033 0.021
Roof 6: Attic Roof with Steel Joists, [Bldg. Use 1 - City of Aspen Office
Building]
528 30.0 10.0 0.029 0.021
Skylight: Metal Frame with Thermal Break:Glass, With Curb, Perf.
Specs.: Product ID Wasco Pinnacle 600 System, SHGC 0.28, [Bldg.
Use 1 - City of Aspen Office Building] (c)
106 ------0.230 0.500
Main Level (Floor 1): Steel Joist, [Bldg. Use 1 - City of Aspen Office
Building]
4489 20.0 20.0 0.025 0.033
Middle Level (Floor 2): Steel Joist, [Bldg. Use 1 - City of Aspen Office
Building]
1046 40.0 0.0 0.032 0.033
Middle Level (Floor 3): Steel Joist, [Bldg. Use 1 - City of Aspen Office
Building]
2139 40.0 0.0 0.032 0.033
Upper Level (Floor 4): Steel Joist, [Bldg. Use 1 - City of Aspen Office 1167 40.0 0.0 0.032 0.033
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
151 ofPage
03/09/2020
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Building]
Main Level - Trash Vestibule Floor (Floor 5): Steel Joist, [Bldg. Use 1 -
City of Aspen Office Building]
58 40.0 0.0 0.032 0.033
Middle Level - Bay Window Floor (Floor 6): Steel Joist, [Bldg. Use 1 -
City of Aspen Office Building]
20 40.0 0.0 0.032 0.033
NORTH
BASEMENT - Wall 02: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
Aspen Office Building]
388 ---22.0 0.042 0.085
BASEMENT - Wall 03: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
Aspen Office Building]
784 ---22.0 0.042 0.085
BASEMENT - Wall 05: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 13.8, Depth B.G. 13.8, [Bldg. Use 1 - City of
Aspen Office Building]
233 ---22.0 0.042 0.085
BASEMENT - Wall 07: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 13.8, Depth B.G. 13.8, [Bldg. Use 1 - City of
Aspen Office Building]
555 ---22.0 0.042 0.085
MAIN - Wall 02: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
604 21.0 10.0 0.048 0.064
Window 41: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, PF 2.60, [Bldg. Use 1 - City of Aspen
Office Building] (c)
174 ------0.260 0.290
MAIN - Wall 03: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
1001 21.0 10.0 0.048 0.064
Window 5: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.90, [Bldg. Use 1 - City of Aspen Office Building] (c)
298 ------0.260 0.290
MAIN - Wall 04: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
224 21.0 10.0 0.048 0.064
MAIN - Wall 05: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
172 21.0 10.0 0.048 0.064
Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID Manko, SHGC 0.30, PF 1.06, [Bldg. Use 1 - City of
Aspen Office Building] (c)
48 ------0.260 0.770
MAIN - Wall 06: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
81 21.0 10.0 0.048 0.064
MAIN - Wall 07: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
290 21.0 10.0 0.048 0.064
Window 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
59 ------0.260 0.290
MAIN - Wall 08: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
41 21.0 10.0 0.048 0.064
MAIN - Wall 09: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
545 21.0 10.0 0.048 0.064
Window 8: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
78 ------0.260 0.290
Window 37: Metal Frame with Thermal Break:Operable, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
39 ------0.260 0.370
MAIN - Wall 10: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
252 21.0 10.0 0.048 0.064
Window 9: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
26 ------0.260 0.290
Window 38: Metal Frame with Thermal Break:Operable, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
13 ------0.260 0.370
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
152 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
MAIN - Wall 14: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
111 0.0 20.0 0.044 0.064
MAIN - Wall 15: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
238 0.0 20.0 0.044 0.064
Door 4: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
21 ------0.300 0.370
MIDDLE - Wall 02: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
947 21.0 10.0 0.048 0.064
Window 12: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
129 ------0.260 0.290
Window 13: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
197 ------0.260 0.290
Window 42: Metal Frame:Operable, Perf. Specs.: Product ID Manko,
SHGC 0.30, [Bldg. Use 1 - City of Aspen Office Building] (c)
64 ------0.260 0.370
MIDDLE - Wall 03: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
21 21.0 10.0 0.048 0.064
Window 41: Other Window:Fixed, Perf. Specs.: Product ID Pilkington,
SHGC 0.27, [Bldg. Use 1 - City of Aspen Office Building] (c)
21 ------0.300 0.290
MIDDLE - Wall 04: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
388 21.0 10.0 0.048 0.064
Window 40: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Pilkington, SHGC 0.41, [Bldg. Use 1 - City of Aspen Office
Building] (c)
388 ------0.300 0.290
MIDDLE - Wall 06: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
49 21.0 10.0 0.048 0.064
MIDDLE - Wall 07: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
22 21.0 10.0 0.048 0.064
MIDDLE - Wall 08: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
111 21.0 10.0 0.048 0.064
Window 17: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
47 ------0.260 0.290
MIDDLE - Wall 10: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
56 21.0 10.0 0.048 0.064
MIDDLE - Wall 12: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
372 21.0 10.0 0.048 0.064
Window 18: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
52 ------0.260 0.290
Window 40: Metal Frame with Thermal Break:Operable, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
24 ------0.260 0.370
MIDDLE - Wall 14: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
184 21.0 10.0 0.048 0.064
Window 20: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
67 ------0.260 0.290
MIDDLE - Wall 15: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
750 21.0 10.0 0.048 0.064
Window 21: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
427 ------0.260 0.290
MIDDLE - Wall 17: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
222 21.0 10.0 0.048 0.064
UPPER - Wall 02: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
240 21.0 10.0 0.048 0.064
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
153 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Window 23: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.70, [Bldg. Use 1 - City of Aspen Office Building] (c)
154 ------0.260 0.290
UPPER - Wall 03: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
809 21.0 10.0 0.048 0.064
Window 24: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 2.80, [Bldg. Use 1 - City of Aspen Office Building] (c)
498 ------0.260 0.290
Door 8: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen
Office Building] (c)
96 ------0.260 0.770
UPPER - Wall 05: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
135 21.0 10.0 0.048 0.064
Window 26: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 1.00, [Bldg. Use 1 - City of Aspen Office Building] (c)
117 ------0.260 0.290
UPPER - Wall 11: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
92 21.0 10.0 0.048 0.064
UPPER - Wall 12: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
437 21.0 10.0 0.048 0.064
Window 29: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.08, [Bldg. Use 1 - City of Aspen Office Building] (c)
64 ------0.260 0.290
Window 30: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.08, [Bldg. Use 1 - City of Aspen Office Building] (c)
51 ------0.260 0.290
Door 10: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen
Office Building] (c)
62 ------0.260 0.770
UPPER LEVEL - THERMAL BRIDGING: Solid Concrete:12" Thickness,
Normal Density, Furring: None, [Bldg. Use 1 - City of Aspen Office
Building]
92 ---0.0 0.630 0.071
EAST
BASEMENT - Wall 04: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 13.8, Depth B.G. 13.8, [Bldg. Use 1 - City of
Aspen Office Building]
445 ---22.0 0.042 0.085
BASEMENT - Wall 06: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 13.8, Depth B.G. 13.8, [Bldg. Use 1 - City of
Aspen Office Building]
163 ---22.0 0.042 0.085
BASEMENT - Wall 08: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 13.8, Depth B.G. 13.8, [Bldg. Use 1 - City of
Aspen Office Building]
265 ---22.0 0.042 0.085
MAIN - Wall 11: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
753 0.0 20.0 0.044 0.064
MIDDLE - Wall 05: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
85 21.0 10.0 0.048 0.064
Window 16: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Pilkington, SHGC 0.41, [Bldg. Use 1 - City of Aspen Office
Building] (c)
85 ------0.300 0.290
MIDDLE - Wall 09: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
22 21.0 10.0 0.048 0.064
MIDDLE - Wall 11: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
39 21.0 10.0 0.048 0.064
MIDDLE - Wall 16: Wood-Framed, 24" o .c., [Bldg. Use 1 - City of
Aspen Office Building]
410 21.0 10.0 0.036 0.051
UPPER - Wall 04: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
93 21.0 10.0 0.048 0.064
Window 25: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.50, [Bldg. Use 1 - City of Aspen Office Building] (c)
81 ------0.260 0.290
UPPER - Wall 06: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
161 21.0 10.0 0.048 0.064
Window 27: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.09, [Bldg. Use 1 - City of Aspen Office Building] (c)
55 ------0.260 0.290
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
154 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Door 9: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen
Office Building] (c)
48 ------0.260 0.770
UPPER - Wall 08: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
44 21.0 10.0 0.048 0.064
UPPER - Wall 09: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
801 21.0 10.0 0.048 0.064
Window 28: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Pilkington, SHGC 0.41, [Bldg. Use 1 - City of Aspen Office
Building] (c)
761 ------0.300 0.290
UPPER - Wall 10: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
82 21.0 10.0 0.048 0.064
SOUTH
BASEMENT - Wall 09: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
Aspen Office Building]
1090 ---0.0 0.630 0.085
BASEMENT - Wall 11: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
Aspen Office Building]
645 ---22.0 0.042 0.085
MAIN - Wall 12: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
1440 0.0 20.0 0.044 0.064
Door 3: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
21 ------0.300 0.370
MAIN - Wall 16: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
111 0.0 20.0 0.044 0.064
MAIN - Wall 18: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
486 21.0 10.0 0.048 0.064
MIDDLE - Wall 23: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
163 0.0 20.0 0.044 0.064
MIDDLE - Wall 24: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
293 0.0 20.0 0.044 0.064
MIDDLE - Wall 26: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
1641 20.0 0.0 0.092 0.064
Door 5: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
42 ------0.300 0.370
MIDDLE - Wall 28: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
96 21.0 10.0 0.048 0.064
MIDDLE - Wall 30: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
102 21.0 10.0 0.048 0.064
MIDDLE - Wall 32: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
486 21.0 10.0 0.048 0.064
UPPER - Wall 07: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
135 21.0 10.0 0.048 0.064
UPPER - Wall 13: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
580 21.0 10.0 0.048 0.064
Window 31: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.08, [Bldg. Use 1 - City of Aspen Office Building] (c)
53 ------0.260 0.290
Window 32: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, PF 0.08, [Bldg. Use 1 - City of Aspen Office Building] (c)
48 ------0.260 0.290
Door 11: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
18 ------0.300 0.370
UPPER - Wall 13a: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
73 20.0 0.0 0.092 0.064
UPPER - Wall 15: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
315 21.0 10.0 0.048 0.064
WEST
BASEMENT - Wall 01: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
195 ---22.0 0.042 0.085
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
155 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Aspen Office Building]
BASEMENT - Wall 10: Solid Concrete:12" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
Aspen Office Building]
269 ---22.0 0.042 0.085
BASEMENT - Wall 12: Solid Concrete:11" Thickness, Normal Density,
Furring: None, Wall Ht 16.2, Depth B.G. 16.2, [Bldg. Use 1 - City of
Aspen Office Building]
876 ---22.0 0.042 0.085
MAIN - Wall 01.1: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
652 21.0 10.0 0.048 0.064
Window 1: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
72 ------0.260 0.290
Window 2: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
72 ------0.260 0.290
Window 35: Metal Frame with Thermal Break:Operable, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
27 ------0.260 0.370
MAIN - Wall 01.2: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
503 21.0 10.0 0.048 0.064
Window 3: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
48 ------0.260 0.290
Window 36: Metal Frame with Thermal Break:Operable, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
18 ------0.260 0.370
Garage Door (Trash): Insulated Metal, Swinging, [Bldg. Use 1 - City of
Aspen Office Building]
72 ------0.300 0.370
MAIN - Wall 13: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
281 0.0 20.0 0.044 0.064
MAIN - Wall 17: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
204 21.0 10.0 0.048 0.064
MIDDLE - Wall 01: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
1066 21.0 10.0 0.048 0.064
Window 10: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
132 ------0.260 0.290
Window 11: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
168 ------0.260 0.290
Window 39: Metal Frame with Thermal Break:Operable, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
54 ------0.260 0.370
MIDDLE - Wall 13: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
20 21.0 10.0 0.048 0.064
Window 19: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen Office
Building] (c)
15 ------0.260 0.290
MIDDLE - Wall 25: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
294 0.0 20.0 0.044 0.064
MIDDLE - Wall 27: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
68 21.0 10.0 0.048 0.064
MIDDLE - Wall 29: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
156 21.0 10.0 0.048 0.064
MIDDLE - Wall 31: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
207 21.0 10.0 0.048 0.064
UPPER - Wall 01: Wood-Framed, 24" o .c., [Bldg. Use 1 - City of Aspen
Office Building]
694 21.0 10.0 0.036 0.051
Window 22: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC 190 ------0.260 0.290
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
156 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
0.30, PF 1.80, [Bldg. Use 1 - City of Aspen Office Building] (c)
Door 6: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID Manko, SHGC 0.30, [Bldg. Use 1 - City of Aspen
Office Building] (c)
98 ------0.260 0.770
Door 7: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
18 ------0.300 0.370
UPPER - Wall 14: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
420 21.0 10.0 0.048 0.064
Window 33: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, [Bldg. Use 1 - City of Aspen Office Building] (c)
190 ------0.260 0.290
Window 34: Metal Frame:Fixed, Perf. Specs.: Product ID Manko, SHGC
0.30, [Bldg. Use 1 - City of Aspen Office Building] (c)
41 ------0.260 0.290
UPPER - Wall 14a: Steel-Framed, 24" o.c., [Bldg. Use 1 - City of Aspen
Office Building]
308 20.0 0.0 0.092 0.064
CURVED CHANNEL GLASS AT ROOF: Steel-Framed, 24" o.c., [Bldg.
Use 1 - City of Aspen Office Building]
296 21.0 10.0 0.048 0.064
Window 43: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID Pilkington, SHGC 0.41, [Bldg. Use 1 - City of Aspen Office
Building] (c)
88 ------0.300 0.290
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)'Other' components require supporting documentation for proposed U-factors.
(c)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 1% better than code
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.425 Rio Grande Place.2020.03.09.cck
03/09/20Report date:
157 ofPage 03/10/2020
nickt
06/24/2019
06/27/2019
justinh
06/24/2019
06/27/2019
justinh
09/27/2019
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
425 Rio Grande Place
Aspen, CO 81611
Owner/Agent:
City of Aspen
130 S. Galena Street
Aspen, CO 81611
970-309-7638
jeff.pendarvis@cityofaspen.com
Designer/Contractor:
Shaw Construction
760 Horizon Drive
Suite 201
Grand Junction, CO 81506
970-242-9236
brianthomas@shawconstruction.net
Project Information
Energy Code:
Aspen City Offices at Galena
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Town Hall 35984 0.80 28823
28823Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-Town Hall
LED 1: A: 6" Downlight: Other:1 30 20 615
LED 2: B: Perimeter Fixture (per foot): Other:1 207 4 828
LED 3: C: 4' Strip: Other:1 102 32 3264
LED 4: D: 4' Stairwell: Other:1 13 48 624
LED 5: F: Narrow Depth Downlight: Other:1 6 15 90
LED 7: J: Stair Tape Light: Other:1 96 10 960
LED 6: Q: Pendant: Other:1 1 33 33
6414Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES: Design 78% better than code
Project Title:
Data filename:
Aspen City Offices at Galena
\\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall -
Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck
03/10/20Report date:
81 ofPage
Carrie Burgardt - Electrical Engineer 03/10/2020
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
425 Rio Grande Place
Aspen, CO 81611
Owner/Agent:
City of Aspen
130 S. Galena Street
Aspen, CO 81611
970-309-7638
jeff.pendarvis@cityofaspen.com
Designer/Contractor:
Shaw Construction
760 Horizon Drive
Suite 201
Grand Junction, CO 81506
970-242-9236
brianthomas@shawconstruction.net
Project Information
Energy Code:
Aspen City Offices at Galena
2 (Neighborhood business district)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Main entry 6 ft of door 20 Yes 120
Other door (not main entry)68 ft of door 20 Yes 1360
Stairway 1100 ft2 1 Yes 1100
Walkway < 10 feet wide 200 ft of 0.7 Yes 140
Entry canopy 850 ft2 0.25 Yes 212
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
2932
2932
600
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Main entry (6 ft of door width): Tradable Wattage
LED 4 copy 1: SD: All per foot: Other:1 10 15 150
Other door (not main entry) (68 ft of door width): Tradable Wattage
LED 1: SA: Other:1 18 27 486
Stairway (1100 ft2): Tradable Wattage
LED 3: SC: Step Light: Other:1 33 8 264
Walkway < 10 feet wide (200 ft of walkway length): Tradable Wattage
LED 2: SB: Other:1 15 11 165
Entry canopy (850 ft2): Tradable Wattage
LED 4: SD: All per foot: Other:1 154 15 2310
3375Total Tradable Proposed Watts =
Project Title:
Data filename:
Aspen City Offices at Galena
\\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall -
Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck
03/10/20Report date:
82 ofPage
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 4% better than code
Project Title:
Data filename:
Aspen City Offices at Galena
\\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall -
Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck
03/10/20Report date:
83 ofPage
Carrie Burgardt - Electrical Engineer 03/10/2020
03/10/2020
nickt
COMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0016.2019.ACBK
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
455 Rio Grande Place
Aspen, CO 81611
Owner/Agent:
City of Aspen
130 S. Galena Street
Aspen, CO 81611
970-309-7638
jeff.pendarvis@cityofaspen.com
Designer/Contractor:
Shaw Construction
760 Horizon Drive
Suite 201
Grand Junction, CO 81506
970-242-9236
brianthomas@shawconstruction.net
Project Information
Energy Code:
Aspen City Office
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Building Area Floor Area
1-City of Aspen Office Building (Office) : Nonresidential 148
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1: Attic Roof with Steel Joists, [Bldg. Use 1 - City of Aspen Office
Building]
141 40.0 0.0 0.033 0.021
NORTH
MAIN 2: Solid Concrete:8" Thickness, Medium Density, Furring: None,
[Bldg. Use 1 - City of Aspen Office Building]
152 ---20.0 0.045 0.071
Door 2: Uninsulated Single-Layer Metal, Non-Swinging, [Bldg. Use 1 -
City of Aspen Office Building]
25 ------0.300 0.179
EAST
MAIN 3: Solid Concrete:8" Thickness, Medium Density, Furring: None,
[Bldg. Use 1 - City of Aspen Office Building]
128 ---20.0 0.045 0.071
Door 3: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
24 ------0.300 0.370
SOUTH
MAIN 4: Solid Concrete:8" Thickness, Medium Density, Furring: None,
[Bldg. Use 1 - City of Aspen Office Building]
152 ---20.0 0.045 0.071
WEST
MAIN 1: Solid Concrete:8" Thickness, Medium Density, Furring: None,
[Bldg. Use 1 - City of Aspen Office Building]
128 ---20.0 0.045 0.071
Door 1: Insulated Metal, Swinging, [Bldg. Use 1 - City of Aspen Office
Building]
24 ------0.300 0.370
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.455 Rio Grande Place.2020.03.02.cck
03/02/20Report date:
91 ofPage
03/06/2020
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 15% better than code
Project Title:
Data filename:
Aspen City Office
\\DC3\Projects\1836 Aspen City Offices\2_Design\COMCheck Envelope CALCULATOR\COMcheck
Envelope.455 Rio Grande Place.2020.03.02.cck
03/02/20Report date:
92 ofPage
(Rio Grande Building side of fire wall)
03/10/2020
nickt