Loading...
HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (26).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 05/31/2018 Air Pollution Control Division – Indoor Environment Program – Asbestos/IAQ Air Unit 4300 Cherry Creek Drive South, APCD-IE-B1 Denver, Colorado 80246-1530 Phone: 303-692-3100 – Fax: 303-782-0278 E-mail: asbestos@state.co.us Colorado Department of Public Health and Environment Approval issued on: 6/26/2018 Record number: 138942 $60.00 Check number: 1525Notice Number: 18PI4052D For the location specified below: 834 Hallam 834 Hallam Aspen Pitkin County This notice has been issued to: Stutsman - Gerbaz Earthmoving Issued by: TS Asbestos Building Inspector: Inspection Date:05/31/2018 Fee Paid: 30376 Hwy 82 Snowmass, CO 81654 DEMOLITION APPROVAL NOTICE This approval notice is granted subject to Colorado Air Quality Control Commission Regulation No. 8, Part B, adopted December 21, 2007, and effective January 30, 2008 and the Colorado Air Pollution Prevention and Control Act C.R.S. (25-7-101 and 25-7-501 et seq). This notice signifies that the structure was inspected for asbestos, luminous exit signs (containing radioactive material), and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the Colorado Department of Public Health and Environment pursuant to Regulation No. 8, Part B. THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES. Immediately notify the Asbestos/IAQ Unit of project modifications by fax (number above) or e-mail (address above) and the appropriate county health department by fax. Project modifications include changes in the scope of work or the scheduled work dates, etc. This demolition approval notice is valid beginning 8/15/2018. The actual scheduled work dates are from 8/15/2018 through 8/17/2018. Please note that certain asbestos-containing materials (ACM) may remain in the structure during demolition. Therefore, any demolition debris left behind after the completion of post- demolition site cleanup may constitute a "reason to know of asbestos-contaminated soil" at the site, subject to the requirements of Section 5.5 of the Solid Waste Regulations (6 CCR 1007-2, Part 1). As a contractor, you may be subject to other demolition licenses and permits, depending on the requirements of the county and municipality in which the work is being performed. The Colorado Department of Public Health and Environment, Air Pollution Control Division, strongly suggests that you check with county and municipal authorities in order to determine any other local building/permitting requirements that must be met. Jim Baker 13437Cerification No.: FIRE SPRINKLERS REQUIRED COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION MASTER PERMIT: ______________________DATE:___________ CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ __________________________________________________________________________________ ____________________________________________________________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ PERMIT NUMBER: __________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT SQ FT OF LAND-SCAPE WORK SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Energy Code REMP School Ded. Zoning (50%)Plan Check (Hourly) TDM Impact Engineering Review Zoning (Hourly)Ped. Amenity CMP (50%)Engineering (Hourly) Housing Cash in Lieu Parks Review Zoning (50%)Stormwater Utility Review CMP (50%)City Use Tax Other Electrical County Use Tax Plumbing GIS Mechanical Sanitation SUBMITTAL FEES ISSUANCE FEES __________________PLANS LOCATION _________Lot Area _________Zone District _________Deed Restricted _________Census Code _________# of Dwellings APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans ____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist Zoning HPC Building Fire Engineering CMP Utilities Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials Call Assessor (970-920-5160) to verify NEW SQ FT Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS? August 2017 0010.2018.ARBK 834 West Hallam St. Aspen, CO 81611 273512304002 K and L 10 City and Townsite of Aspen Partial demolition of the existing building; moving the historic structure on site; and building proposed structures on the site. This will be 7 - multi-family, affordable housing units. Alexis Petre 970-615-0269 apetre@forumphi.com 834 West Hallam Associates LLC 1,935,000 14 13 14 0 7 7 2,044 6,957 6,722 6,010 0 0 0 6,631 127 7 0 7 0 0 0 x CS 6.1.18 $22,397.59 $29,453.19 $2,506.89 NA $0 6,010 MU yes 7 * 7 clothes washer hookups, but not actual fixtures 1/16/18 X BM 8/22/18 X BM 8/22/18 X AS 5/24/18 X HG 8/1/18 X TK 5/8/18 X X PM 2/22/18 X AR 6/5/18 RESIDENTIAL REFERENCES FROM 2015 IBC CV/CS = crawl space ventilation sec. 1203.4. 18” x 24” access required 1209.1 EE = emergency escape required sec 1030 EU = enclosed usable space under stairs shall be 1-hr construction or stair enclosure rating. No access from stair enclosure. ½” gypsum permitted for stairs inside a single dwelling unit. 1011.7.3. RV = roof and rafter ventilation required 1203.2 A = Attic Access 20” x 30” 1209.2 SA = smoke alarm (NFPA 72) required sec 907.2.11 CO = carbon monoxide detector req. per Aspen Municipal Code 8.15 SG = safety glazing required sec 2406 V = mechanical ventilation required sec 1203.1 & IMC 403 (bath fans and whole house ventilation) GR = guards, 42” min ht, 4” max opening. Guards within dwelling unit 36” min ht sec 1015 HR = handrails 34”-38” ht sec 1014 DS = Draft stopping / fire blocking 718 RD = Roof drainage 1503.4 STC = Sound transmission class not less than 50 at dwelling separations, sec 1207 SI = Stairway Illumination 1205.4 PD = protect against decay, sec 2304.12 REFERENCES FROM 2015 IMC DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement fenestration shall not exceed 0.28 U-factor, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 Dwelling Separation Required - 2015 IBC -708 Fire Partitions, 711 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. Exhaust fans require ceiling radiation damper. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. 2015 IBC 601 Fire Resistive Requirements for Type of Construction: ____ Primary Structural Frame: ____hr (columns, beams, girders, etc) Exterior Bearing Walls: ____hr Interior Bearing Walls: ____hr Floors/Ceilings: ____hr Roof : ____hr Unless noted otherwise for occupancy separation or fire separation distance. External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. READ THIS OR FAIL YOUR INSPECTION! Furred & Dropped Ceilings, Soffits, and Walls 20015 IBC 803.13 This applies to the attachment of finishes or furring to any assemblies that are required to be either fire-rated or non-combustible and is separate from the fire-rated assembly requirement. Walls, Ceilings & Soffits: If furred 1 ¾ inches or less, do one of the following: 4.Fill spaces with Class A material. 5.Fill spaces with inorganic or non-combustible material. 6.Fire block 8 feet in all directions. Walls: If set out (furred) greater than 1 ¾ inches, do one of the following: 4.Use a Class A finish material (such as drywall). 5.Use non-combustible framing. 6.Protect both sides with fire sprinklers. Ceilings & Soffits: If dropped (furred) greater than 1 ¾ inches: Framing members, hangers, and other assembly members must be non-combustible. You may not use wood. In Type III and V construction only, you may use fire retardant treated wood or non-combustible framing. VB 0 0 0 0 0 0 0 0 Bonnie M 0010.2018.ARBK 8/22/18 XThe following criteria must also be met with construction: Ø A construction fence must be erected along the entire dripline of all trees on site and any tree canopy from neighboring property. This will serve as the tree protection zone (TPZ). This fence is to be constructed in such a manner that the area inside the dripline is protected. AN INSPECTION OF THIS FENCE MUST BE PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION WITH BEN CARLSEN AT 429-2034. Ø No materials may be stored in the TPZ, including but not limited to, construction backfill, construction traffic, or any other construction materials. Ø No excavation, grading or trenching may occur within the TPZ without the consent of the City of Aspen Forester or his designee. Ø No parking of vehicles or equipment may occur in the TPZ. Ø No dumping of any waste products may occur in the TPZ. Ø Any roots cut during excavation shall be pruned with sharp loppers/pruners back to the soil line. The roots will further be protected by burlap draped over the side of the excavation covering the exposed roots. This burlap shall be kept moist until the excavation is backfilled. Ø Pruning to provide clearance for construction activities shall only be done under the direction of an arborist. Ø Site inspections shall be performed on a weekly basis, to ensure the above listed conditions are met. Ø Any unapproved improvements or activities outside of those approved within this permit will be subject to mitigation in the form of restoration. Ø This permit must be posted on site during the construction process. City of Aspen - Tree Planting Specifications Trunk caliper shall meet ANSI Z60 current edition for root ball size. Modified soil. Depth varies. (See soil preparation plan). Finished grade. Bottom of root ball rests on existing or recompacted soil. Central leader. (See crown observations detail). SECTION VIEW Remove 1/3 of burlap and basket wire. Round-topped soil berm 4" high x 8" wide above root ball surface shall be constructed around the root ball. Berm shall begin at root ball periphery. Top of root ball shall be flush with finished grade. Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace tree. Do not over compact. When the planting hole has been backfilled, pour water around the root ball to settle the soil. 4" layer of mulch. No more than 1" of mulch on top of root ball. (See specifications for mulch). Notes: 1- Trees shall be of quality prescribed in crown observations and root observations details and specifications. 2- See specifications for further requirements related to this detail. Existing soil. TP-1 s >5 1/ iT\ 1//0/1>/1'/1';;; /1'/1 \ */ ’ \ */ \ */ \ */ \ */ \ "-'i .-..t ■ 1 'i.i-i 1 i- -i-- V » I.v '/ O'/' \ '/ ' '/ O'/' O/ ^ i'l —I r i'l [v- I yqTTE3TTr=rrfSSvSOI ItFFt Tr TT A LJ The City of Aspen City of Aspen - Tree Protection Zone Crown drip line or other limit of Tree Protection area. See tree preservation plan for fence alignment. 4' - 0 " Maintain existing grade with the tree protection fence unless otherwise indicated on the plans. 2" x 6' steel posts or approved equal. Tree Protection fence: High density polyethylene fencing with 3.5" x 1.5" openings; Color- orange. Steel posts installed at 8' o.c. 5" thick layer of mulch. Notes: 1- See specifications for additional tree protection requirements. 2- If there is no existing irrigation, see specifications for watering requirements. 3- No pruning shall be performed except by approved arborist. 4- No equipment shall operate inside the protective fencing including during fence installation and removal. 5- See site preparation plan for any modifications with the Tree Protection area. SECTION VIEW KEEP OUT TREE PROTECTION AREA 8.5" x 11" sign laminated in plastic spaced every 50' along the fence. URBAN TREE FOUNDATION ‹ OPEN SOURCE FREE TO USETPZ-1 Tree protection fencing is required at the driplines of all trees shown. There is NO activity allowed within this fenced area, including, but not limited to: digging, storage of material, equipment, machinery, foot or vehicle traffic. Please contact the City Forester or his designee at 920-5120 for an inspection of this fencing Prior to any activity. If the need arises to perform any activity in the tree protection area, please contact the City Forester and you will be given specific instructions as to how to proceed to minimize impacts to the tree root zone. SW 11/21/19 DAM 11/27/19 DR 11/21/19 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 834 W Hallam 0010.2018.ARBK 970-274-9598Ryan Walterscheid rwalterscheid@forumphi.com 312-644-4470Brad Hribar bhribar@centaurco.com 312-850-1680West Hallam Holdings, LLC 2001 N Halsted St, Suite 304 Chicago IL 60614 970-274-9598Ryan Walterscheid 715 W Main St., Suite 204 Aspen CO 81611 rwalterscheid@forumphi.com 970-274-9598Ryan Walterscheid 715 W Main St., Suite 204 Aspen CO 81611 rwalterscheid@forumphi.com 970-945-7988High Country Engineering, Deric Walter 1517 Blake Ave, Suite 101 Glenwood Springs CO 81601 deric@bu-inc.com 970-927-5174KL&A, Dan Doherty 215 North 12th St, Unit E Carbondale CO 81623 ddoherty@klaa.com Centaur Construction 312-714-8519 121 S Galena, Suite 200 Aspen CO 81611 bhribar@centaurco.com July 6, 2020 REScheck Software Version 4.6.4 Compliance Certificate Project Aspen Affordable Housing (7) apt Energy Code:2015 IECC Location:Aspen, Colorado Construction Type:Multi-family Project Type:New Construction Conditioned Floor Area:0 ft2 Glazing Area 9% Climate Zone:7 (9922 HDD) Permit Date: Construction Site:Owner/Agent:Designer/Contractor: Brent Wilson PE R&H Engineering Eagle, CO 970.328.2699 brentw@randhmechanical.com Permit Number: Compliance: Passes using UA trade-off 15.5% Better Than Code Maximum UA:1047 Your UA:885 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Ceiling 1: Flat Ceiling or Scissor Truss 3,540 34.4 0.0 0.032 113 Ceiling 2: Flat Ceiling or Scissor Truss 450 56.0 0.0 0.024 11 Wall 1: Wood Frame, 16" o.c.6,417 25.0 0.0 0.053 278 Window 2: Vinyl/Fiberglass Frame:Double Pane with Low-E 443 0.290 128 Door 1: Solid 723 0.130 94 Wall 1 copy 1: Wood Frame, 16" o.c.1,761 21.9 0.0 0.056 86 Window 4: Vinyl/Fiberglass Frame:Double Pane with Low-E 179 0.290 52 Door 2: Solid 42 0.130 5 Basement Wall 1: Solid Concrete or Masonry Wall height: 9.0' Depth below grade: 9.0' Insulation depth: 9.0' 3,439 21.9 10.0 0.028 94 Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 84 0.290 24 Project Title: Aspen Affordable Housing (7) apt Data filename: C:\Users\brentw\Documents\REScheck\Aspen Affordable Housing 7 apt.rck Page 1 of 10 04/12/18Report date:04/13/2018 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: Aspen Affordable Housing (7) apt Data filename: C:\Users\brentw\Documents\REScheck\Aspen Affordable Housing 7 apt.rck Page 2 of10 04/12/18Report date: Brent Wilson PE 4/12/18 4/12/2018 04/13/2018 Centaur Brad Hribar July 9 2020 bhribar@centaurco.com