Loading...
HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0142.2018 (26).ARBKDATE Date: Scale: Drawn by: REVISIONS Z4A WWW.ZONE4ARCHITECTS.COM SD PACKAGEZ4A 03.30.2018 Z:\Sh a r e d \Da t a \_ Z4 Pr o j e c t s \18 0 6 54 6 Mc S k i m m i n g \Mo d e l \18 0 6 _Mc S k i m m i n g _v21 .pl n BY A206 4/11/2018 AS NOTED LOWER LEVEL DEMOLITION PLAN 1" ACTUAL ZO N E 4 AR C H I T E C T S IS NO T LI A B L E OR RE S P O N S I B L E AT AN Y TI M E FO R AN Y CH A N G E S TO TH E S E DR A W I N G S OR SP E C I F I C A T I O N S WI T H O U T PR I O R WR I T T E N AU T H O R I Z A T I O N . c 20 1 5 ZO N E 4 AR C H I T E C T S , LL C . TH E IN F O R M A T I O N AN D DE S I G N IN T E N T CO N T A I N E D ON TH I S DO C U M E N T IS TH E PR O P E R T Y OF ZO N E 4 AR C H I T E C T S LL C . NO PA R T OF TH I S IN F O R M A T I O N MA Y BE US E D OR CO P I E D WI T H O U T TH E PR I O R WR I T T E N PE R M I S S I O N OF ZO N E 4 AR C H I T E C T S LL C . ZO N E 4 AR C H I T E C T S LL C . SH A L L RE T A I N AL L CO M M O N LA W ST A T U T O R Y AN D AL L OT H E R RE S E R V E D RI G H T S , IN C L U D I N G CO P Y R I G H T TH E R E T O . AL L RI G H T S RE S E R V E D 54 6 MC S K I M M I N G RO A D AS P E N , CO M C S K I M M I N G R E S I D E N C E -DR A F T - 03 .30 .18 WD 64'-3" 3' - 1 0 1/ 4 " 6' - 2 3/ 4 " 3' - 1 1 1/ 2 " 14 ' - 5 " 16 ' - 5 1/ 2 " 44 ' - 1 1 " 15'-3 1/2"14'-8 1/2"12'-2"6'-5"11'-11 1/2"3'-8 1/2" 002 FAMILY ROOM 006 LAUNDRY005 BATH #2 008 BATH #1 BEDROOM #1 003 MECH. 001 HALL 007 HALL UP 010 CRAWLSPACE 011 STORAGE BEDROOM #2 004 009 EXISTING WINDOWS AND DOOR TO BE REMOVED EXISTING MECHANICAL CLOSET TO BE RELOCATED 2 2 6 6 A A B B C C 4 4 5 5 F 1 1 D D D.1 3 3 E E Existing Wall, Door / Window, Appliances, Plumbing to Remain Existing Wall, Door / Window, Appliances, Plumbing to be Removed WALL LEGEND 01 LOWER LEVEL DEMO 1/4" = 1'-0" need to do interior remodel calculations 83 sf 73 sf 184 sf 30 sf 1,308 sf 30 sf interior remodel calc determination per meeting on 04.13.18 with jack dannenberg from the enegineering department create seperate sheets for interior remodel calcs less than 50% 05/17/2018 DATE Date: Scale: Drawn by: REVISIONS Z4A WWW.ZONE4ARCHITECTS.COM SD PACKAGEZ4A 03.30.2018 Z:\Sh a r e d \Da t a \_ Z4 Pr o j e c t s \18 0 6 54 6 Mc S k i m m i n g \Mo d e l \18 0 6 _Mc S k i m m i n g _v21 .pl n BY A207 4/11/2018 AS NOTED MAIN LEVEL DEMOLITION PLAN 1" ACTUAL ZO N E 4 AR C H I T E C T S IS NO T LI A B L E OR RE S P O N S I B L E AT AN Y TI M E FO R AN Y CH A N G E S TO TH E S E DR A W I N G S OR SP E C I F I C A T I O N S WI T H O U T PR I O R WR I T T E N AU T H O R I Z A T I O N . c 20 1 5 ZO N E 4 AR C H I T E C T S , LL C . TH E IN F O R M A T I O N AN D DE S I G N IN T E N T CO N T A I N E D ON TH I S DO C U M E N T IS TH E PR O P E R T Y OF ZO N E 4 AR C H I T E C T S LL C . NO PA R T OF TH I S IN F O R M A T I O N MA Y BE US E D OR CO P I E D WI T H O U T TH E PR I O R WR I T T E N PE R M I S S I O N OF ZO N E 4 AR C H I T E C T S LL C . ZO N E 4 AR C H I T E C T S LL C . SH A L L RE T A I N AL L CO M M O N LA W ST A T U T O R Y AN D AL L OT H E R RE S E R V E D RI G H T S , IN C L U D I N G CO P Y R I G H T TH E R E T O . AL L RI G H T S RE S E R V E D 54 6 MC S K I M M I N G RO A D AS P E N , CO M C S K I M M I N G R E S I D E N C E -DR A F T - 03 .30 .18 F 44 ' - 1 1 " 3' - 1 0 1/ 4 " 6' - 2 3/ 4 " 3' - 1 1 1/ 2 " 14 ' - 5 " 16 ' - 5 1/ 2 " 15'-3 1/2"14'-8 1/2"12'-2"18'-4 1/2" 64'-3" 15'-3 1/2"14'-8 1/2"12'-2"6'-5"11'-11 1/2"3'-8 1/2" UP DN 102 LIVING ROOM 101 KITCHEN 104 POWDER 103 HALL 105 MASTER BEDROOM 106 MASTER CLOSET 107 MASTER BATH 100 ENTRY 108 GARAGE EXISTING DECK AND RAILING TO BE REMOVED EXISTING STAIR AND RAILING TO BE REMOVED EXISTING MAN DOOR TO BE REMOVED 2 2 6 6 A A B B C C 4 4 5 5 F 1 1 D D D.1 3 3 E E Existing Wall, Door / Window, Appliances, Plumbing to Remain Existing Wall, Door / Window, Appliances, Plumbing to be Removed WALL LEGEND 01 MAIN LEVEL DEMO 1/4" = 1'-0" 245 sf 1,737 sf 33 sf 05/17/2018 DATE Date: Scale: Drawn by: REVISIONS Z4A WWW.ZONE4ARCHITECTS.COM SD PACKAGEZ4A 03.30.2018 Z:\Sh a r e d \Da t a \_ Z4 Pr o j e c t s \18 0 6 54 6 Mc S k i m m i n g \Mo d e l \18 0 6 _Mc S k i m m i n g _v21 .pl n BY A208 4/11/2018 AS NOTED UPPER LEVEL DEMOLITION PLAN 1" ACTUAL ZO N E 4 AR C H I T E C T S IS NO T LI A B L E OR RE S P O N S I B L E AT AN Y TI M E FO R AN Y CH A N G E S TO TH E S E DR A W I N G S OR SP E C I F I C A T I O N S WI T H O U T PR I O R WR I T T E N AU T H O R I Z A T I O N . c 20 1 5 ZO N E 4 AR C H I T E C T S , LL C . TH E IN F O R M A T I O N AN D DE S I G N IN T E N T CO N T A I N E D ON TH I S DO C U M E N T IS TH E PR O P E R T Y OF ZO N E 4 AR C H I T E C T S LL C . NO PA R T OF TH I S IN F O R M A T I O N MA Y BE US E D OR CO P I E D WI T H O U T TH E PR I O R WR I T T E N PE R M I S S I O N OF ZO N E 4 AR C H I T E C T S LL C . ZO N E 4 AR C H I T E C T S LL C . SH A L L RE T A I N AL L CO M M O N LA W ST A T U T O R Y AN D AL L OT H E R RE S E R V E D RI G H T S , IN C L U D I N G CO P Y R I G H T TH E R E T O . AL L RI G H T S RE S E R V E D 54 6 MC S K I M M I N G RO A D AS P E N , CO M C S K I M M I N G R E S I D E N C E -DR A F T - 03 .30 .18 3' - 1 0 1/ 4 " 6' - 2 3/ 4 " 3' - 1 1 1/ 2 " 14 ' - 5 " 16 ' - 5 1/ 2 " 44 ' - 1 1 " 64'-3" 15'-3 1/2"14'-8 1/2"12'-2"6'-5"11'-11 1/2"3'-8 1/2" DN 200 BEDROOM #3 202 BATH #3 DECK 201 CLOSET EXISTING DECK RAILING TO BE REMOVED EXISTING GARAGE ROOF TO BE REMOVED EXISTING RAILING TO BE REMOVED CLERESTORY WINDOWS TO BE REMOVED EXISTING STAIR TO BE REMOVED EXISTING WINDOWS TO BE REMOVED 2 2 6 6 A A B B C C 4 4 5 5 F 1 1 D D D.1 3 3 E E Existing Wall, Door / Window, Appliances, Plumbing to Remain Existing Wall, Door / Window, Appliances, Plumbing to be Removed WALL LEGEND 01 UPPER LEVEL DEMO 1/4" = 1'-0" 45 sf 128 sf 502 sf 05/17/2018