Loading...
HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (62).ARBKEngineering 2_0056.2019.ARBK_210 W Main St Page: [3] 210 W Main-C300 Author: pjm File Name: CIVIL_210 W Main_Plans_20190702.pdf In Appendix F, include the design procedure calculations outlined in the URMP section 8.5.1.5 for green roof capacity. CIVIL_210 W Main_Plans_20190702.pdf (4) Page: [3] 210 W Main-C300 Author: pjm File Name: CIVIL_210 W Main_Plans_20190702.pdf It appears shoring plans were not provided with the resubmittal that addressed previous comments: 1. Where micorpiles are not used, what technique will be used? 2. How will utilities be accomodated through the micropile walls? 3. Show the surcharge restriction areas on the plans. Page: [4] 210 W Main ESC DETAILS-C504 DETAILS 4 Author: pjm File Name: CIVIL_210 W Main_Plans_20190702.pdf Verify that the Hydrotech's media contains a minimum of 10% organic material. Call out percent of sand used in this growing media. Page: [5] 210 W Main-C600 Author: pjm File Name: CIVIL_210 W Main_Plans_20190702.pdf If this transformer required an upgrade, City standards require the upgrade to be located out of the ROW on the projects property. Is this transformer out of the ROW? Will there be room to upgrade if necessary? REPLACE CURB & GUTTER MAIN WATE R M A I N EX W A T E R SE R V I C E ADJAC E N T CURB C U T & SIDEW A L K T O REMAI N . PHONE & CABLE: PROVIDE NEW PEDESTALS ONSITE. ROOF GREEN R O O F CIR C U L A T I O N W A L K W A Y S AR E A : 4 2 0 S F PERVIOUS PATIO AREA=90 SF CIRCULATION PIPED INTO SUBSTRATE 420 SF / 90 SF=4.67:1 7894.93 7894.97 7895.09 7895.11 7895.18 7895.30 7895.30 7895.30 7895.30 7895.30 7895.30 7895.30 7895.30 7895.25 7895.20 7895.30 7895.28 7895.28 7895.30 7895.29 7895.307895.30 7895.307895.30 7895.30 7895.30 7895.30 7895.30 7895.307895.30 7895.30 7895.07 7895.10 7895.07 7895.09 7895.12 7895.30 7895.30 7895.30 7895.307895.24 7895.307895.30 7895.20 7895.20 7895.10 7895.16 CLEANOUT 1RIM:7895.30INV IN:7893.97 4" PVCINV OUT:7893.97 4" PVC CLEANOUT 2RIM:7895.28INV IN:7893.87 4" PVC INLET - 8RIM:7895.26N:7894.20 4" PVCT:7894.20 4" PVC NLET - 7M:7895.26.32 4" PVC INLET - 5RIM:7895.26INV OUT:7894.36 4" PVC PIPE A4 7.13' of 4" PVC @ 0.84% PIPE B28.24' of 4" PVC @ 1.00% PIPE C216.73' of 4" PVC @ 1.00% PIPE C14" PVC @ 1.00% DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE PIPE B13.06' of 4" PVC @ 1.00% PIPE A310.56' of 4" PVC @ 1.00% INLET - 4 RIM:7895.26INV IN:7894.03 4" PVCINV IN:7894.03 4" PVCINV OUT:7894.03 4" PVC DISCHARGE ROOF DRAIN TO PIPE C GRASS FLOWLINE HP: 7895.20 16.64 FT 18.81 FT 7895.19 NEW T R E E PERFORATED PIPE 10.14' of 4" PVC @ 1.00% -0.2% -3. 5 % -2. 5 % -4. 1 % In Appendix F, include the design procedure calculations outlined in the URMP section 8.5.1.5 for green roof capacity. It appears shoring plans were not provided with the resubmittal that addressed previous comments: 1. Where micorpiles are not used, what technique will be used? 2. How will utilities be accomodated through the micropile walls? 3. Show the surcharge restriction areas on the plans. Verify that the Hydrotech's media contains a minimum of 10% organic material. Call out percent of sand used in this growing media. TRANS- FORMER If this transformer required an upgrade, City standards require the upgrade to be located out of the ROW on the projects property. Is this transformer out of the ROW? Will there be room to upgrade if necessary?