Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (130).ARBKP.O. Box 3901 Eagle, Colorado 81631 YARNELL CONSULTING & CIVIL DESIGN, LLC (970) 323-7008 • 11/7/2018 229 Midland Ave. Basalt, Colorado 81621 0007.2018.Arbk_Engineering3_209 E Bleeker Page 1 of 1 PJ Murray City of Aspen Engineering Department 201 N. Mill Street, Suite 101 Aspen, Colorado 81611 PJ.Murray@CityOfAspen.com Subject: 0007.2018.ARBK_Engineering3_209 E Bleeker Comment Responses PJ: Thank you for your thorough review of our project. Please find your comments and the associated responses listed below for the above-referenced project. 1. Sheet C6.1 – Since access to the mechanical room for both units will be handled through a condominiumization of this property, no water service line work shall occur prior to the finalization of the condo plat. YCCD Response: Owner understands and acknowledges this requirement. 2. Sheet C6.1 – Provide easement language for the transformer. YCCD Response: The easement language is being included with the resubmittal. 3. Sheet C2.1 – Call out water service line size. Connection at the main shall follow COA Water Department standards for a 2" service line. YCCD Response: The label has been revised on Sheet C6.1 accordingly. Water Note 3 on Sheet C6.0 has also been revised relative to the 2-inch water service size. Sincerely, Justin J. Yarnell, PE Colorado PE Number 47241 11/15/2018