HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (35).ARBK0010.2018.ARBK_834 W Hallam St_Engineering1 Page: C.3 SITE PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf It appears no snowmelt is proposed on the site. Please confirm. PermitSet.834WHallam.2018.02.pdf (36) Page: C.3 SITE PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf The COA Hallam St project will be running new electric to this transformer. Projects will need to coordinate timing so that alley is clear. The draft COA schedule has this work happening in August. Page: C.3 SITE PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf All utility cuts need to happen prior to the improvements which are a part of the COA Hallam St project. As a part of that project 8th St will be repaved to approximately the midpoint of the lot. There will be a new sidewalk, curb and gutter, pervious pavers, and bike share station on 8th St. Please coordinate with COA Engineering to ensure service line utility cuts happen first. The current COA schedule has 8th St demo happening in August, paving happening in September. Page: C.3 SITE PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Per COA Hallam plans the slope will be 16% from new sidewalk to existing grade at the Property line. Look at chasing grade back within the property to create a straight graded walkway and ensure proper drainage away from the buildings. Page: C.5 Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Permission from the neighboring property is required for the work that will take place beyond the property boundary. Please provide agreement to the city. X X It appears no snowmelt is proposed on the site. Please confirm. E > > > > > > > EXISTING TRANSFOR (MAINTAIN CLEARANC INSTALL STATIONARY BOLLARD (SEE DETAIL) 4) Alley Bl o c k 1 0 21.07' R. O . W . EXISTING SAN SEWER MANH The COA Hallam St project will be running new electric to this transformer. Projects will need to coordinate timing so that alley is clear. The draft COA schedule has this work happening in August. WV WV E E W W W W W W HY D W W W EXISTING FIRE HYDRANT All utility cuts need to happen prior to the improvements which are a part of the COA Hallam St project. As a part of that project 8th St will be repaved to approximately the midpoint of the lot. There will be a new sidewalk, curb and gutter, pervious pavers, and bike share station on 8th St. Please coordinate with COA Engineering to ensure service line utility cuts happen first. The current COA schedule has 8th St demo happening in August, paving happening in September. X X X X X X 3' W A L K PROPER T Y L I N E Per COA Hallam plans the slope will be 16% from new sidewalk to existing grade at the Property line. Look at chasing grade back within the property to create a straight graded walkway and ensure proper drainage away from the buildings. Permission from the neighboring property is required for the work that will take place beyond the property boundary. Please provide agreement to the city. Correct, no snowmelt is proposed. BUI has included this in Note #3 on Sheet C.2. BUI has indicated this on Sheets C.2, C.3 & C.7. The City raised the elevation of Hallam St. by about 18" which prevents a straight grade that is ADA compliant. BUI has adjusted the grading using ramp runs under 8% and 2% landings. Per discussions with COA staff, there is a prescriptive easement which allows this work to be completed. 04/13/2018 Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Cuts through the existing ditch are not permitted. The open channel portion of the ditch shall remain undisturbed. Existing ditches are stable and do not leak, any disturbance increases the likelyhood of the ditch leaking, which would negatively impact the building foundation. Please revise the service line location. Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Storm inlet and trench drain calculations utilizing a clogging factor of 50% could not be found. Please submit or indicate where they are located in the report. Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Show utility easement for work on neighboring property. Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Demonstrate in the drainage report the proposed storm pipes convey the expected runoff rate at less than 80% capacity. Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Provide documentation of Si Johnson Ditch Company approval for alterations to the ditch. UE UE UE WV U E UE TELECOM X X E UT UT UT UT UT UT UT UT UT UT UT UT W W UE 2''W 2''W 2''W 2''W 2''W 2''W W S O > > > >W SO PR O 5' S E IN SH 7917 Cuts through the existing ditch are not permitted. The open channel portion of the ditch shall remain undisturbed. Existing ditches are stable and do not leak, any disturbance increases the likelyhood of the ditch leaking, which would negatively impact the building foundation. Please revise the service line location. X X X X X X D 4''S D 4''S D D 4''SD 4''SD 4''SD6''SS 6''SS 6''SS 6''SS 6''SS 6 ET ETC ETC ETC C/O C/ O DS DS 44.1 L F 6.8 LFLF 29.2 LF 10 . 3 L F UNDERGROUND THE ROOF GUTTER DOWNSPOUT COLLECTION PIPE AT THE NORTHEAST CORNER OF THE BUILDING PROPER T Y L I N E 5' SETBA C K INV:7911.3' INV:7912.4' INV:7912.2' INV:7912.51' INV:7912.46' INV:7912.39' INV:7911.95' SOLID 4"Ø SCH. 40 PVC @ 1.0% MIN. WITH HEAT TAPE CORE THE MANHOL AND INSTALL A NEW6"Ø SDR35 PVC SE SERVICE AT 1% MIN 37 LF TR E N C H D R A I N WQCV D R Y W E L L (SEE DE T A I L ) SH O R I N G SHORIN G LF Storm inlet and trench drain calculations utilizing a clogging factor of 50% could not be found. Please submit or indicate where they are located in the report. Show utility easement for work on neighboring property. X X X X X X X 2''W 2''W 4''S D 4''S D 4''S D 4'' 6''S D 6''S D 6''S D 6' ' S D SD ETC 6''S S 6''S S C/O C/O C/O DS DS DS DS DS D ETC Bank 6 . 9 L F 7.4 L F 32 . 4 L F 6 . 9 L F PR O P E R T Y L I N E 3' S E T B A C K ATTACH THE DOWNSPOUT COLLECTION PIPE TO THE BUILDING AND SLOPE TO THE NORTHEAST CORNER OF THE BUILDING AT 2% MIN. ROOF GUTTER DOWNSPOUT, TYP. V:7912.5' 7912.4' INV:7913.00' INV:7912.92' INV:7912.85' WITH N. O 8"Ø Building "C" SH O R I N G Demonstrate in the drainage report the proposed storm pipes convey the expected runoff rate at less than 80% capacity. UE UE UE 4' DS> >> INV SOLID 4"Ø SCH. 40 PVC @ 1.0% MIN. WITH HEAT TAPE FOUNDATIONDRYWELL Provide documentation of Si Johnson Ditch Company approval for alterations to the ditch. The Parks Dept. has forced the water services to be extended to the buildings from the Alley. In doing so, they have forced water services to be installed under sewer services. BUI has added for the water services to be wrapped in 30-mil PVC liner and the sewer piping to be C900 DR-18 PVC in hopes of protecting the water services from seeping sewage. BUI has enclosed a trench drain cut sheet with flow capacity information. Existing easements have been added to the survey and civil plans. The presence of existing utilities indicates the presence of prescriptive easements. BUI has enclosed a data sheet of the pipe flow capacity. FP Response: The ditch easement agreement which approves the ditch alterations has been included as a form. 04/13/2018 Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf No infrastructure can be placed within the ditch easement. Refer to section 3 of the easement agreement. Please revise. Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Show ditch easement. Page: C.7 UTILITY AND UNDERGROUND PIPING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Verify with Parks Department the proximity of the service line trench to the existing trees. All utility cuts shall stay out of tree roots to the greatest extent possible. Page: C.8 GRADING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Hallam Project ties into existing grade at the end of the existing sidewalk. Can the slop[e be brought down to 8.3% or does coordination between the two projects need to happen to chase grade and get the sidewalk into ADA compliance? Page: C.8 GRADING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Slope cannot exceed 8.3% or the slope of the road. Refer to ENG Standard 202H. UE UE UT UT UT U UT UE UE UE UEET C DET C ETC D 4 ' ' S D 4 ' ' S D 4''S D 1 7 . 5 L F 7.3 LF A INV:7911.4' INV:7911.0' INV:7911.8' INV:7913.0'14 LF TR E N C H D R A I N WQC FOUNDATIONDRYWELL SHORING 9.0 L F 4.4 L F 5.8 LF SAND & OIL INTERCEPTOR 7914 7913 791 2 79 1 1 No infrastructure can be placed within the ditch easement. Refer to section 3 of the easement agreement. Please revise. UT UT UT UT UE UE UE UE > > > > All 7910 7911 791 2 791 3 914 7913 2 Show ditch easement. UE UE UE UE W 2''W 2''W 2''W 2''W 2''W 2''W 2''W 2''W W S O DS DS > > > > > > > > > > > > > W S O W S O PR O P E R T Y L I N E 5' S E T B A C K INV:7912.7' Ø TYPE -K COPPER WATER MASTER WATER SHUTOFF THE SIDEWALK. BRANCH D ISOLATE EACH BUILDING ITIONAL SHUTOFF VALVE.DUAL METERS WITHIN THETY OF ASPEN WATER DEPT. DETAILS (ALSO SEE THEANS FOR ANY ADDITIONALCOMMENTS). B SH O R I N G Verify with Parks Department the proximity of the service line trench to the existing trees. All utility cuts shall stay out of tree roots to the greatest extent possible. UE UE UE W W W W (M 14 15 16 17 18 19 20 621 22 23 24 25 26 FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk 7916.08' 7916.02' 7915.95' 7916.01' 7916.06' 7916.06' 7915.87' 7915.94' 7915.94' 7915.74' 7915.73' 7915.89' 7915.95' 1022.29 1029.25 1028.41 1027.64 1027.14 1039.51 1041.42 1042.08 1039.51 1041.95 1041.48 1043.31 1046.36 1038.54 1036.98 1040.16 1043.06 1044.94 1048.36 1041.18 1038.15 1037.47 1028.22 1028.10 1021.17 1021.98 #694 7910.44' 11 . 3 % 11 . 3 % Hallam Project ties into existing grade at the end of the existing sidewalk. Can the slop[e be brought down to 8.3% or does coordination between the two projects need to happen to chase grade and get the sidewalk into ADA compliance? UE UE UE UE W W W W (MATCH) 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk 7917.62' 7917.38' 7917.44' 7917.62' 7917.62' 7917.42' 7917.36' 7916.14' 7916.91' 7916.08' 7916.02' 7915.95' 7916.01' 7916.06' 7916.06' 7915.87' 978.30 993.17 993.94 991.50 990.73 1000.81 1001.58 1021.53 1008.96 1022.29 1029.25 1028.41 1027.64 1027.14 1039.51 1041.42 1050.62 1054.56 1051.66 1030.38 1033.28 1035.95 1033.05 1041.44 1035.01 1038.54 1036.98 1040.16 1043.06 1044.94 1048.36 1041.18 791 1 #694 7910.44' #695 7909.78' #696 7909.57' 2.0% 2.0% 11 . 3 % 11 . 0 % 11 . 3 % 3. 3 % Slope cannot exceed 8.3% or the slope of the road. Refer to ENG Standard 202H. The drywell has been relocated outside the easement on the civil plans Easements have been added to the survey and civil plans. As discussed, the water service has been relocated. Design information for extending the 8th Street improvements with the COA Hallam Street Project have been provide in CAD format to the COA Engineering Dept. This civil plans have been revised to tie into those improvements. See the previous comment. 04/13/2018 Page: C.8 GRADING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Transitioning from 11.3% to 3.3% along the gutter is an abrupt grade break. Can this be smoothed out to a better transition? Page: C.8 GRADING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf This alley entrance needs to be further discussed with Engineering, a 24.1% slope greatly exceeds the design standard of 12% and cannot be approved. Provide a formal variance request. Follow the variance request format from Title 29 of the Municipal code. Provide an alley profile for the centerline and asphalt edges. The alley slope is steep to accommodate the west parking stall, not due to the ditch elevation constraints, as has been discussed in the past. Page: C.8 GRADING PLAN Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf The building entrances do not have 12" of elevation gain from the gutter flow line, and are not protected from street runoff. Provide discussion on what elevation gain is achieved and what the estimated runoff rate is for Hallam St in a 100 yr storm. Use elevation points from the proposed Hallam St design. Page: GRADE-2 Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Micropiles are not permitted within 5' of the centerline of the ditch. Please revise. Page: GRADE-2 Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf No structures are permitted within the ditch easement, remove proposed micropiles. Refer to section 3 of the 2017 easement agreement. UE UTUE W W W W FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk 7917.89' 7917.62' 7917.62' 7917.38' 7917.44' 7917.62' 7917.62' 7917.42' 7917.36' 7916.14' 7916.91' 7916.08' 1001.30 979.25 978.30 993.17 993.94 991.50 990.73 1000.81 1001.58 1021.53 1008.96 1022.29 1023.78 1047.77 1050.62 1054.56 1051.66 1030.38 1033.28 1035.95 1033.05 1041.44 1035.01 1038.54 #695 7909.78' #696 7909.57' 11 11 . 0 % 4. 6 % 11 3. 3 % 4. 6 % Transitioning from 11.3% to 3.3% along the gutter is an abrupt grade break. Can this be smoothed out to a better transition? UE UE UE UT UT UT UT UT UT UT UT U T UE UE UE UE UE UE UE E C 791 0 791 1 79 1 2 791 3 79 1 0 79 1 1 791 2 791 3 791 4 #688 7912.41' #691 908.99' #692 7909.55'#693 7911.02' #687 7914.10 #689 7911.58' #690 7910.25' 24.1% 18.1% 10.0% This alley entrance needs to be further discussed with Engineering, a 24.1% slope greatly exceeds the design standard of 12% and cannot be approved. Provide a formal variance request. Follow the variance request format from Title 29 of the Municipal code. Provide an alley profile for the centerline and asphalt edges. The alley slope is steep to accommodate the west parking stall, not due to the ditch elevation constraints, as has been discussed in the past. X X X X X PROPERTY LINE 7917 #601 7917.57' #602 7917.83' #604 7917.62' #607 7917.44' #608 7917.62' #609 7917.62' #702 7916.70' 2. 4 % The building entrances do not have 12" of elevation gain from the gutter flow line, and are not protected from street runoff. Provide discussion on what elevation gain is achieved and what the estimated runoff rate is for Hallam St in a 100 yr storm. Use elevation points from the proposed Hallam St design. 2+40 Micropiles are not permitted within 5' of the centerline of the ditch. Please revise. 2+80 Begin No structures are permitted within the ditch easement, remove proposed micropiles. Refer to section 3 of the 2017 easement agreement. See the previous comments. See the previous comments. BUI has analyzed the offsite basin for Hallam Street and found that the peak flow for the Major Storm Event does not overtop the curb and therefore, the building finish floor elevations do not need to be 12" above the adjacent street curb flowline. Updated Storm & Sanitary Analysis and Hydroflow Express data sheets have been enclosed. FP Response: Micropiles are revised. FP Response: No structure is within the ditch easement. 04/13/2018 Page: GRADE-2 Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf The shoring wall is designed for normal highway vehicle loading. No concrete trucks, or large stockpiles would be permitted in this area. Where will heavy loads be staged? Please verify alignment with CMP. Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Per section 5.8 of the Engineering Design Standards, a snow storage area equal to 30% of the impervious plowed area is required. Where will snow from the parking stalls be stored? Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf 974.59 sf Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Is this meant to depict the existing utility pedestals? No transformer currently exists and one is not proposed per the civil sheets. Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Snow removed from the private property cannot be stored in the public ROW. 0+40 Micropile Wall Turn Line 2 Micropile Wall Micropile Wall Turn Line 1 0+ 3 0 GR A D E - 5 The shoring wall is designed for normal highway vehicle loading. No concrete trucks, or large stockpiles would be permitted in this area. Where will heavy loads be staged? Please verify alignment with CMP. Per section 5.8 of the Engineering Design Standards, a snow storage area equal to 30% of the impervious plowed area is required. Where will snow from the parking stalls be stored? 974.59 sf Is this meant to depict the existing utility pedestals? No transformer currently exists and one is not proposed per the civil sheets. Snow removed from the private property cannot be stored in the public ROW. Snow storage has been removed from the plans. Appears to just be a measurement? Snow storage has been removed from the plans. FP Response: Shoring has been revised to accommodate. Revised 04/13/2018 Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Coordinate plantings with the proposed electric panel from the COA Hallam St project. Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf This parking configuration does not align with the civil sheets. Please revise. Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Verify all proposed plantings are outside of the site triangle of the alley. Page: L-300 OVERALL LANDSCAPE PLAN & PLANT SCHEDULE Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf 122.87 sf Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Show location of ditch culvert. Coordinate plantings with the proposed electric panel from the COA Hallam St project. This parking configuration does not align with the civil sheets. Please revise. Verify all proposed plantings are outside of the site triangle of the alley. 122.87 sf Show location of ditch culvert. Appears to just be a measurement? Revised Revised Revised Revised 04/13/2018 Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Is there an existing utility easement for the transformer and secondary electric line? If not, an easement needs to be recorded. Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Provide Title, Purpose and legal description at the top of the page. Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf A ditch easement 10' in width was recorded in 2017. Reception Number 638269. Show easement extents and call out reception number. Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf The demo plan on sheet C7 shows two existing water service lines that serve the property. Locate both water service lines and show on the survey. Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Show location of ditch culvert Is there an existing utility easement for the transformer and secondary electric line? If not, an easement needs to be recorded. Provide Title, Purpose and legal description at the top of the page. A ditch easement 10' in width was recorded in 2017. Reception Number 638269. Show easement extents and call out reception number. The demo plan on sheet C7 shows two existing water service lines that serve the property. Locate both water service lines and show on the survey. Show location of ditch culvert powerline easement now included on survey Revised. Revised Revised Revised 04/13/2018 Page: SURVEY Author: haileyg File Name: PermitSet.834WHallam.2018.02.pdf Locate water main in 8th St. Locate water main in 8th St.Located 04/13/2018