HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (38).ARBK0010.2018.ARBK_834 W Hallam St_Engineering2 Page: C.7 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf Where are drywell depths called out? Per the drainage report each should be 13' deep. Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf (10) Page: C.7 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf 10' of separation should be maintained between water lines and drywells to avoid freezing issues. Page: C.7 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf This water configuration essentially entends the main line and creates a dead end, which is not permitted in the City system. This configuration cannot be approved. The project will be permitted three standard taps off the existing main line. Page: C.7 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf The previous iterations showed one 2" tap was sufficient for the entire property. This iteration shows three 2" taps. Provide fire flow calcs which verify three taps are needed. Page: C.7 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf What's the separation distance of the water service and culvert? 6''SS 6''SS 6''SS 6 2'' W 2''W 2''W 2'' W 2''W 2''W TC ET C D D C/O 4''W 4''W 4''W 0 33 LF T R E N C H D R A I N WQCV D R Y W E L L (SEE DE T A I L ) SH O R I N G INV:7911.0' V:7912.5' INV:7912.4' NV:7913.0' 38.3 L F 5.4 LF W S O W S O W S OWhere are drywell depths called out? Per the drainage report each should be 13' deep. 6''SS 6''SS 4''S D 4''S D 6''SD 6''SD 2''W 2''W 2''W W 2''W 2''W 2''W 2''W 2''W ET C ET C ETC ETC T.O . S L A B 89' - 0 " H 8 D X X X X X C/O DS SH O R I N SHORING DS ELECTRIC &TELECOMMUNICATIONSERVICES INV:7911.5' SOLID 6"Ø SCH. 40 PVC @ 1.0% MIN. WITH HEAT TAPE SERVICE AT 1% MIN. 38.3 L F F UNDERGROUND THE ROOF GUTTER DOWNSPOUT COLLECTION PIPE AT THE NORTHEAST CORNER OF THE BUILDING INV:7911.6' UTILITY METER BANK 7 9 1 5 10' of separation should be maintained between water lines and drywells to avoid freezing issues. UE UT UT UT UT UT UT UE UE UE UE UE W W W 4''W 4''W 4''W 4''W N REPRESENT THE COA HALLAM STREET INSTALL A 8"x4" TEEW/ TB, A 4"Ø GATEVALVE AND A PRIVATE104 LF 4"Ø DIP WATERSERVICE LATERAL PERCITY OF ASPEN WATERDEPT. STANDARDDETAILS 79 791 2 7911 7909 7910 This water configuration essentially entends the main line and creates a dead end, which is not permitted in the City system. This configuration cannot be approved. The project will be permitted three standard taps off the existing main line. 6''SS 6''SS 6''SS 6''SS ''SD 6''SD 2''W 2''W 2''W 2''W 2''W 2''W ''W 2''W 2''W 2''W ET C ET C ET C ETC ETC ETC T.O . S L A B 89' - 0 " H 8 S SS SS X X X X X X DS 'W 4''W 4''W DRAIN SH O R I N G SHORIN G DS ELECTRIC &TELECOMMUNICATION SERVICES MANHOLE RIM: 7915.91' IO: 7911.66' INV:7911.5' INV:7912.0' SOLID 6"Ø SCH. 40 PVC @ 1.0% MIN. WITH HEAT TAPE CORE THE MANHOLE AND INSTALL A NEW 6"Ø C900DR-18 PVC SEWERSERVICE AT 1% MIN. 38.3 L F UNDERGROUND THE ROOF GUTTER DOWNSPOUT COLLECTION PIPE AT THE NORTHEAST CORNER OF THE BUILDING BEND & TB 7 9 1 5 W S O W S OW SO The previous iterations showed one 2" tap was sufficient for the entire property. This iteration shows three 2" taps. Provide fire flow calcs which verify three taps are needed. UT UT UT UE UE UE > 4''W 4''W 4''W Alley B 21.07' 4' LATE THE WATER CE FROM 4' EACH OF THE CULVERT 791 379 What's the separation distance of the water service and culvert? The dimension is specified on the WQCV Drywell with Skimmer Pipe detail on Sheet C.7 The Drywells have been relocated further east and the water services rerouted on the west side which affords 10' of separation. The single trunk service has been replaced with 3 services. See Sheet C.7. (3) 2" service lines are required to meet fire protection requirements for the (3) buildings. The culvert pipe invert and the top of the water service pipe elevations have been included on Sheet C.7. FP Response: Fire Flow Calcs are included as a form titled Fire Suppression Letter. 05/22/2018 OK Still close to foundation drywell. OK Ok Ok Page: C.7 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf COA Water Department standard is 10' separation between water and sanitary lines. This needs to be further vetted. Page: C.8 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf What's the basin that was used to determine the 100 year flow in Hallam St? I see the Hydraflow - HallamSt Channel Report, but don't see the delineated basin this was based off of. Page: C.8 Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf This portion of new 8th St improvements is not within the scope of the COA Hallam St project. Loris did the design for the COA project. They are currently putting together an estimate for the design work to extend the typical section further south on 8th St. Once this estimate is finished Gould would need to put together a construction estimate. It is not the intent of the City to do this work. The Poppies project can opt to contract with Loris and Gould if they wish to do this work to improve the alley entrance. Alternatively we could possibly put in place an agreement that the project will finance this portion of work and pay back the City. This needs to be discussed in person. Engineering cannot sign off on the permit until a clear resolution is in place. A resolution means demonstrating ADA compliant slopes are achieved along the sidewalk crossing and the alley slope is 12% or approved variance. Page: GRADE-2 Temporary Ground Nail and
Micropile Wall
Location Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf Soil Nails are not permitted within 5' of the centerline of the ditch. As laid out in the ditch easement language, there shall be no above grade nor subgrade alterations within a distance of 5' from the centerline of the ditch. 6''SS 6''S S 6''S S 6''SSD 8''S D 8''S D SD 4''S D 4''S D 6''SD 6''SD 8''SD 2''W 2''W 2 2''W 2''W 2''W 2''W 2''W 2''W 2''W ET C ET C ETC ETC T.O . S L A B 89' - 0 " T.O . S L A B 89 ' - 0 " T.O . S L A B 89' - 0 " AC AC AC H 8 X X X X X C/O DS DS S DS DS SHORIN G C/O DS INV:7911.5' INV:7913.0' INV:7912.9' INV:7912.6' SOLID 6"Ø SCH. 40 PV 1.0% MIN. WITH HEAT 11 UNDERGROUND THE R DOWNSPOUT COLLEC NORTHEAST CORNER INV:7911.6'29 . 5 L F .0 LF INV:7911.4' INV:7911.6' UTILITY METER BANK 79 1 6 COA Water Department standard is 10' separation between water and sanitary lines. This needs to be further vetted. 7918 X1. 9 % % .7% PROPERTY LINE THIS PLAN REPRESENT THECOMPLETED COA HALLAM STREETPROJECT IMPROVEMENTS 79 1 8 7916.70' #627 7917.61' 7917.44'#630 7917.52' #631 7917.58'#632 7917.67' What's the basin that was used to determine the 100 year flow in Hallam St? I see the Hydraflow - HallamSt Channel Report, but don't see the delineated basin this was based off of. 915 791 0 7910 7896 79 1 0 79 0 5 7905 7900 7912 UE UE UE UE UTUE W W W W W W W 4''W 4''W 4''W 4''W Point Table Point # 302 353 600 601 602 603 604 605 606 607 610 611 612 613 614 615 616 618 619 620 621 622 623 624 Raw Description YPC #14111 YPC #14111 FG-Walk (Match) FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk (Match) FG-Walk (Match) FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk FG-Walk Elevation 7913.99' 7917.55' 7918.93' 7918.84' 7918.07' 7917.86' 7917.89' 7918.10' 7918.85' 7918.94' 7918.86' 7918.77' 7918.28' 7918.20' 7917.27' 7917.20' 7916.60' 7916.07' 7915.99' 7916.06' 7917.26' 7917.34' 7918.27' 7918.34' Northing 1096.38 999.81 982.72 987.37 995.18 1000.22 1000.98 995.95 988.14 983.48 980.11 984.62 991.38 995.25 1008.05 1011.91 1021.40 1032.44 1031.14 1030.24 1011.02 1007.15 994.35 990.49 Easting 1025.95 1000.19 1018.82 1020.05 1025.74 1027.08 1024.18 1022.84 1017.15 1015.91 1029.51 1030.71 1032.50 1033.53 1036.92 1037.94 1040.46 1038.12 1043.04 1046.42 1041.33 1040.30 1036.91 1035.89 THIS PLAN REPRESENT THE COMPLETED COA HALLAM STREET PROJECT IMPROVEMENTS 7 79 79 NO R T H N. 7 t h S t r e e t Critical Point (Low Point) Existing/HPC Historic Basin This portion of new 8th St improvements is not within the scope of the COA Hallam St project. Loris did the design for the COA project. They are currently putting together an estimate for the design work to extend the typical section further south on 8th St. Once this estimate is finished Gould would need to put together a construction estimate. It is not the intent of the City to do this work. The Poppies project can opt to contract with Loris and Gould if they wish to do this work to improve the alley entrance. Alternatively we could possibly put in place an agreement that the project will finance this portion of work and pay back the City. This needs to be discussed in person. Engineering cannot sign off on the permit until a clear resolution is in place. A resolution means demonstrating ADA compliant slopes are achieved along the sidewalk crossing and the alley slope is 12% or approved variance. Soil Nails are not permitted within 5' of the centerline of the ditch. As laid out in the ditch easement language, there shall be no above grade nor subgrade alterations within a distance of 5' from the centerline of the ditch. Per review comments provided by the Water Dept., the sewer service has been encased in 12" Sch. 40 PVC. The offsite basin has been indicated on the Existing Drainage Basin map on Sheet C.8. FP Response: We are working to have a coordination meeting with Loris and Gould but have our civil engineer and contractor design and execute the extension. FP Response: The shoring plan has been revised, and the site plan now shows that 5' offset from the centerline of the ditch that may not be crossed. 05/22/2018 OK OK NOT COMPLETED Page: L-100 OVERALL•50MATERIALS PLAN Author: haileyg File Name: Shoring and Civil Pages from Complete Permit Set Clarification 1.834 Hallam.2018.03.pdf How will the ditch be protected during construction? Temporarily piping the ditch is not permitted. There's been discussion of utilizing a liner and hand laying the liner in the ditch. Provide either in this planset or in the CMP the plans for the ditch during construction. There shall be no disturbance to the ditch, not minimized disturbance. How will the ditch be protected during construction? Temporarily piping the ditch is not permitted. There's been discussion of utilizing a liner and hand laying the liner in the ditch. Provide either in this planset or in the CMP the plans for the ditch during construction. There shall be no disturbance to the ditch, not minimized disturbance. FP Response: The plan for the ditch during construction will be to hand line it with plastic. We have listed this on sheet A-001. 05/22/2018