HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0089.2018 (46).ACBKEngineering1_0089.2018.ACBK_230 E Hopkins
Page: [6] C5 Overall Grading Plan
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Street light shall be relocated to
the west of the wing. Include
COA light pole base detail in the
civil sheets.
230 E. Hopkins_Drawings_Civil_2019-04-18.pdf (13)
Page: [7] C5.1 Detailed Grading Plan
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Call out tie in points to ensure
alley grading conveys drainage
to Monarch St.
Page: [7] C5.1 Detailed Grading Plan
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
High point between ramps need
to be 3" minimum.
Page: [8] C5.2 Drainage Plan (Proposed)
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
It seems that this is called out as
a drywell in the drainage report,
please revise so the drainage
report, detail sheet and this
sheet refer to this infrastructure
consistently as a pump vault or
drain basin.
Page: [8] C5.2 Drainage Plan (Proposed)
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Since WQCV treatment is
provided in the green roofs,
provide a detail.
DYH
WV
Street light shall be
relocated to the west
of the wing. Include
COA light pole base
detail in the civil
sheets.
in
s
A
v
e
n
u
e
,
A
s
p
e
n
\
P
l
a
n
s
\
C
5
.
1
D
e
t
a
i
l
e
d
G
r
a
d
i
n
g
P
l
a
n
.
d
w
g
Call out tie in points
to ensure alley
grading conveys
drainage to Monarch
St.
Y
Is
a
High point between
ramps need to be 3"
minimum.
It seems that this is
called out as a drywell
in the drainage report,
please revise so the
drainage report, detail
sheet and this sheet
refer to this
infrastructure
consistently as a
pump vault or drain
basin.
Since WQCV
treatment is provided
in the green roofs,
provide a detail.
Page: [8] C5.2 Drainage Plan (Proposed)
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Call out pipe slope and diameter
to connect planter to pump vault.
Page: [10] C6.1 Overall Utility Plan
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
4" service lines are reviewed like
a main line, provide the
following:
- A profile of the water line, show
required restraints and the
connection to the building
- Fire flow calcs that show a 2"
line fails to provide adequate
pressures.
Page: [16] C9.1 Details
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
This drywell does not meet COA
URMP standards for a 2
chamber drywell which provides
WQCV treatment. Is this drywell
meant to treat for water quality
or is all treatment in the planter
along Monarch?
Drywell minimum depth per the
URMP is 10', revise drywell
design to comply wit URMP.
Page: [16] C9.1 Details
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Clarify that the break shown on
the detail represents vertical and
horizontal break in the scale and
that the 3.5' vertical dimension is
a minimum requirement for bury
depth on the pipe.
B
Call out pipe slope
and diameter to
connect planter to
pump vault.
DYH
WV
4" service lines are
reviewed like a main
line, provide the
following:
- A profile of the
water line, show
required restraints
and the connection to
the building
- Fire flow calcs that
show a 2" line fails to
provide adequate
pressures.
File
P
a
t
h
:
D
:
\
D
r
o
p
b
o
x
\
P
r
o
j
e
c
t
F
i
l
e
s
\
1
8
.
0
0
6
-
2
3
0
-
2
3
4
E
a
s
t
H
o
p
k
i
n
s
A
v
e
n
u
e
,
A
s
p
e
n
\
P
l
a
n
s
\
C
9
D
e
t
a
i
l
s
.
d
w
g
Plot D
a
t
e
/
T
i
m
e
:
A
p
r
i
l
1
5
,
2
0
1
9
-
1
1
:
1
6
a
m
This drywell does not
meet COA URMPstandards for a 2
chamber drywellwhich provides
WQCV treatment. Isthis drywell meant to
treat for water qualityor is all treatment in
the planter alongMonarch?
Drywell minimum
depth per the URMPis 10', revise drywelldesign to comply witURMP.
Clarify that the break
shown on the detail
represents vertical
and horizontal break
in the scale and that
the 3.5' vertical
dimension is a
minimum
requirement for bury
depth on the pipe.
Page: [16] C9.1 Details
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Comment for Drainage Report:
1. Please note a thorough
maintenance plan will be
required at time of CO for the
property. It will need to include a
description of how drainage
works on the property, how to
maintenance the infrastructure
and how to know when the
system is not working properly.
This document will be for the
owner/HOA/property manager
so it shall be easy to understand.
2. The hydraulic calcs in
appendix B still call out soil type
B, were the calculations updated
when the geotech found the soils
to be type A?
Page: [16] C9.1 Details
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
Per sheet C5.2 it looks like there
are three inverts to the pump
vault, show all three pipes.
Page: [17] C9.2 Details
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
The landscape media in the
planters must meet URMP
standards for bio-retention
gardens to provide treatment for
the WQCV. Include a note.
Page: [17] C9.2 Details
Author: pjm
File Name: 230 E. Hopkins_Drawings_Civil_2019-04-18.pdf
How will the 8" gravel buffer be
maintained in the winter? The
gravel will be impacted during
snow removal. Pervious pavers
may be a more permanent
solution.
Comment for Drainage Report:
1. Please note a thorough maintenance plan will be required at time of CO
for the property. It will need to include a description of how drainage works
on the property, how to maintenance the infrastructure and how to know
when the system is not working properly. This document will be for the
owner/HOA/property manager so it shall be easy to understand.
2. The hydraulic calcs in appendix B still call out soil type B, were the
calculations updated when the geotech found the soils to be type A?
Per sheet C5.2 it
looks like there are
three inverts to the
pump vault, show all
three pipes.
The landscape media
in the planters must
meet URMP
standards for
bio-retention gardens
to provide treatment
for the WQCV.
Include a note.
How will the 8" gravel
buffer be maintained
in the winter? The
gravel will be
impacted during
snow removal.
Pervious pavers may
be a more permanent
solution.