Loading...
HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (68).ARBKConstruction Management Plan For: King Louise Housing, 210 West Main Street, Aspen, CO 81611 Parcel ID Number: 273512440009 Permits Applied For: New Construction Multi Family Structure Property Managers Name: Theodore Guy – Phone: (970) 379-0967 Owners Representative’s Name: Theodore Guy – Phone: (970) 379-0967 Contractor’s Name: Keelty Construction, Inc. – Phone: (970) 927-6472 Architect’s Name: Kim Raymond Architects – Phone: (970) 925-2252 Description of Work: Remove the existing building. New construction wood superstructure with steel columns and wood siding. Green Roof. Public Notification: Contractor shall send notification to neighbors addressing project phasing, schedule, traffic and or pedestrian concerns and hauling/ staging operations. Notifications shall address all adjacent neighbors and all resident affected by possible traffic delays. The neighborhood notification shall take place periodically, through the duration of the project as required. Notification is required to all neighbors within 300 feet. First notification will be mailed no later than 10 days before start of work. Dates of Construction: Tentative Construction Start: July 17th, 2019 Tentative Construction Completion: May 26th, 2020 Hours of Construction: 7:30AM – 5:30PM Monday through Friday 9:00AM – 5:00PM Saturday No construction is permitted on Sundays, 4th of July day and/or weekend if it falls on a Friday or Monday, Memorial Day and Labor Day weekends, Thanksgiving Day, Christmas Day, New Year’s Day. Sequencing Schedule: Mobilization 1 Week Demolition 4 Weeks Shoring 2 Weeks Superstructure 20 Weeks Exterior/ Interior Finishes 16 Weeks Landscaping 2 Weeks Close Out and Punchlist 2 Weeks Total 46 Weeks Page 1 of 76 07/29/2019 Entity Company Contact Phone Property Owner King Louise LLC Theodore Guy (970) 379-0967 Architect Kim Raymond Architects Kim Raymond (970) 925-2252 Contractor Keelty Construction, Inc. Patrick Keelty (970) 927-6472 Site Supervisor Keelty Construction, Inc. David de L'Arbre (970) 618-0118 Project Manager Keelty Construction, Inc. Mike Charles (970) 618-0482 Traffic Control Officer TBD Erosion Control Rep Woody Creek Engineering Josh Rice (970) 309-7130 Entity Phone City of Aspen (970) 920-5090 Fire Department (970) 925-5532 Police Department (970) 925-5532 RFTA (970) 925-5532 City of Aspen Electric (970) 920-5148 Black Hills Energy (800) 694-8989 Comcast (800) 934-6489 City of Aspen Water (970) 920-5110 City of Aspen San (970) 925-3601 Aspen Valley Hospital (970) 925-1120 Valley View Hospital (970) 945-6535 Emergency Reminder 911 Contact List Page 2 of 76 07/29/2019 Construction Management Plan For: King Louise Housing, 210 West Main Street, Aspen, CO 81611 2.0 Project Location 2.1 & 2.2 Location: 210 W. Main Street, Aspen, CO 81611 Page 3 of 76 07/29/2019 Construction Management Plan For: King Louise Housing, 210 West Main Street, Aspen, CO 81611 2.3 Description: The project will consist of demoing the existing structure and building a new 7,500 square foot building in the lot. The largest impacts to the community are the following: · Demolition of the building. Contractor will remove the upper level by hand and then bring in equipment to remove the rest of the structure. Contractor will install temporary irrigation system for watering of the building as well as use hoses to spray the building down during demo. Sound mitigation fencing will be installed before demo begins. We will install sound fencing around the project. We anticipate this to take 10 working days. · Temporary Micropiling around the perimeter of the building. Contractor will install sound fencing around drilling equipment. Sound mitigation fencing will be installed before demo begins. We anticipate this to take 12 working days. · Trenching for the new services (electrical, sewer, water, gas, phone and cable). Contractor will submit for a ROW Permit to complete this work. We will start with the water service and electrical service since these will have the largest impacts. We begin during offseason after Labor Day. · Concrete Pours we are anticipating 5 concrete pours for the project. Contractor will group as many pours together as we can. · Crane erection. Contractor anticipates to have a crane onsite for 4 appearances for one day each. · Green Roof installation. Contractor will set up a conveyor belt to load soils up to the roof during this time. During these processes we will provide a public notice no later than 10 days prior to the work beginning. Contractor will inform the neighbors. See attached site plan Drawing C600 (Appendix C) for additional details. See attached schedule of work. 3.0 Project Documentation 3.1 Permits/ Other Documents: Applicable Permits · Demolition Permit · Building Permit · Electrical Permit · Fence Permit · Landscape/ Grading Permit · Mechanical Permit · Plumbing Permit · Fire Permit · Encroachment Permit · Roofing Permit · Right of Way Permit · Tent Permit · Tree Permit · Water Efficient Landscape Permit · Water Utility Connection Permit 3.2 Public Notification: Contractor shall send notification to neighbors addressing project phasing, schedule, traffic and/or pedestrian concerns and all residents affected by possible traffic delays. The Page 4 of 76 07/29/2019 Construction Management Plan For: King Louise Housing, 210 West Main Street, Aspen, CO 81611 neighborhood notification shall take place periodically, throughout the duration of the project as required. 3.3 Project Sign: See attached project sign that will be 18”x24”. Safety signs will be located at the entrance to the jobsite and facing Main Street. (Appendix B) 3.4 Contact Designation: See attached contract list. (Appendix A) 4.0 Project Implementation 4.1 Dates of Construction: Tentative Construction Start: July 17th, 2019 Tentative Construction Completion: May 26th, 2020 4.2 Hours of Construction: 7:30AM – 5:30PM Monday through Friday 9:00AM – 5:00PM Saturday No construction is permitted on Sundays, 4th of July day and/or weekend if it falls on a Friday or Monday, Memorial Day and Labor Day weekends, Thanksgiving Day, Christmas Day, New Year’s Day. 4.3 Sequencing Schedule: See attached Schedule (Appendix D). 4.4 Neighboring Properties: See attached Neighboring Properties and Mailing list within 300 feet (Appendix E). Contractor will be in direct communication with the neighbors to the East and West of the property and provide them personally with written updates of the project and any work to be happening in the next 2 weeks. Every utility provider will be requested to locate all existing utilities prior to commencement of construction. The contactor will be responsible for notifying the appropriate county authorities and affected utility users 48 hours in advance prior to interruption. The contractor will be responsible for posting visible and legible signage at the entrance to the lot and notifying neighbors by phone or in person. 5.0 Site and Right of Way Management 5.1 Right of Way Management Plan: Contractor will need to submit for a ROW permit when trenching and for connection of the new utilities. We will have an independent contractor provide ROW information. We plan on doing all utilities at the same time to minimize the impact on the ROW. 5.2 Emergency Vehicle Access and Ordinance 35: Contractor will allow at all hour access to the Jobsite for any emergency vehicles from Main Street. 5.3 Construction Parking Details: Minor Impact throughout the project. Contractor will enforce that all employees on the jobsite will carpool to the jobsite. Keelty Construction will have all labors carpool to the jobsite using a company truck with 5 sets for employees to fill. Page 5 of 76 07/29/2019 Construction Management Plan For: King Louise Housing, 210 West Main Street, Aspen, CO 81611 5.4 Staging Area: See attached site plan (Appendix C). Contractor will need to have a crane onsite for about 4 separate days using the alley way. The crane will be onsite for setting of structural items, loading of material to the third story and loading of material to the roof. 5.6 Site Plan: See attached site plan (Appendix C). 5.7 Waste Management: During demolition of the building we will sperate materials and have a separate dumpster located on the jobsite for recyclable material. Contractor will have all materials including concrete, wood and recyclable material separated. A bear proof trash can will be located onsite and will be emptied weekly by MRI. No hazardous waste , electronic waste, fluorescent bulbs or yard waste will be disposed of properly per the Colorado and Aspen landfill bans. 6.0 Traffic Control 6.1 General: During the trenching for utility services a certified traffic control supervisor will be onsite. We will only be trenching into Main Street to tap into the water service about 12’. We will get the water service beyond the sidewalk in one day. Contractor will excavate, install the water service, inspect, backfill and patch the street all in the same day. The Contractor will be responsible for ensuring compliance with the Traffic Control program provided. 6.2 Haul Routes: See hauling plan with location of jobsite (Appendix F). All traffic arriving at the site will start at Highway 82 and turn North on to 1st Street and down the alley way for materials to be dropped off. 6.3 Delivery Requirements: All deliveries will be completed in the morning from 7:30AM to 11:30AM and 1:30PM to 4:30PM Monday thought Friday. The site is large enough to handle more than one delivery at a time. Any deliveries in this area that will block the alley for more than 15 minutes will require a Temporary Encroachment Permit. 7.0 Pedestrian Protection 7.1 General: The only closure to the side walk will be during the connection of the water service. When submitting for the ROW Permit, we will provide a detailed Pedestrian Protection Plan. Contractor will have to close the sidewalk in this location. 8.0 Sediment and Erosion Control 8.1 Requirements: See attached sediment and erosion control plan (Appendix H). See attached Civil Plans for Stormwater Management Plan (SMP) for Best Management Practices. This will minimize erosion and sediment from the site. Page 6 of 76 07/29/2019 Construction Management Plan For: King Louise Housing, 210 West Main Street, Aspen, CO 81611 9.0 Fugitive Dust Control 9.1 General: See attached sediment and erosion control plan (Appendix H). Industry best practice will be used to keep dust to a minimal. The contractor will assume all responsibility for dust control and follow a plan to carry out efficient measure whenever necessary. 11.0 Noise Suppression 11.1 General: See attached information from Behrens & Associates (Appendix G). The contractor will comply with all applicable noise control regulations as outlines in the Pitkin County Code. Include the City of Aspen noise abatement ordinance. All construction equipment operations will be schedule to operate no more than Monday through Friday 7:30AM to 5:30PM and Saturday 9:00AM to 5:00pm. Sound mitigation will be installed prior to the start of construction. Wound mitigation will be installed at 14’ tall on the East and West side of the property. The North side of the property will have a gate with sound mitigation blankets. The South side of the property will have a 14’ tall fence with sound mitigation blankets. The blankets will remain on the project until all exterior finishes are installed. Page 7 of 76 07/29/2019 Entity Company Contact Phone Property Owner King Louise LLC Theodore Guy (970) 379-0967 Architect Kim Raymond Architects Kim Raymond (970) 925-2252 Contractor Keelty Construction, Inc. Patrick Keelty (970) 927-6472 Site Supervisor Keelty Construction, Inc. David de L'Arbre (970) 618-0118 Project Manager Keelty Construction, Inc. Mike Charles (970) 618-0482 Traffic Control Officer TBD Erosion Control Rep Woody Creek Engineering Josh Rice (970) 309-7130 Entity Phone City of Aspen (970) 920-5090 Fire Department (970) 925-5532 Police Department (970) 925-5532 RFTA (970) 925-5532 City of Aspen Electric (970) 920-5148 Black Hills Energy (800) 694-8989 Comcast (800) 934-6489 City of Aspen Water (970) 920-5110 City of Aspen San (970) 925-3601 Aspen Valley Hospital (970) 925-1120 Valley View Hospital (970) 945-6535 Emergency Reminder 911 Contact List Appendix A Page 8 of 76 07/29/2019 Project Name: King Louise LLC Project Location: 210 W. Main Street, Aspen, CO Permit Number: TBD GC Name & Contact Number: Keelty Construction, Inc. (970) 927-6472 Emergency Name & Contact Number: Architect KRA (970) 925-2252 Appendix B Page 9 of 76 07/29/2019 REPLACE CURB & GUTTER EX T R E E T O R E M A I N 15.1" D I A M 30' D R I P REPLACE ASPHALT AT LOCATION OF CONCRETE PATCH. REPLACE ASPHALT A MINIMUM 2' OFF GUTTER. REPLACE ASPHALT OVER WATER SERVICE TRENCH. ADJA C E N T CURB C U T & SIDE W A L K T O REM A I N . ADJA C E N T S I D E W A L K TO R E M A I N . GREE N R O O F GREE N R O O F GREE N R O O F PARK I N G AREA S PERV I O U S PAVE R S MAIN S T . ROW = 1 0 0 ' NEW T R E E REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE. REMOVE CURB CUT & REVEGETATE PERVIOUS PATIO AREA=90 SF CIRCULATION PIPED INTO SUBSTRATE 420 SF / 90 SF=4.67:1 TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH GATE CONC. WASHOUT DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE CONCRETE TREATED BY PATIO PERVIOUS PAVERS CONCRETE TREATED BY GRASS BUFFER OR PAVERS NEW SIDEWALK NEW CURB AND GUTTER NEW ASPHALT EXISTING ASPHALT TO REMAIN PERVIOUS PAVERS GREEN ROOF EELECTRIC METER GGAS METER CCABLE PEDESTAL PPHONE PEDESTAL 2/6/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E 21 0 W M A I N S T . , A S P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N EROSION SEDIMENT CONTROL PLAN C800 1/11/20182/6/2018 Crane Swing Radious Crane Staging Area (Red) Parking Area (Blue) Trash (Green) Job Fence (Red) Sound Fence (Green) Material Staging (Yellow) Temp Toilets (Blue) Job Trailer (Orange)Recycling (Dark Green) Material Staging (Yellow) Sound Fence (Green) Job Fence (Red) Material Delivery (Red) Emergency Vehicle Location (Orange) Site PlanAppendix C Page 10 of 76 Any deliveries in this area that will block the alley for more than 15 minutes will require a Temporary Encroachment Permit. 07/29/2019 TRANS- FORME R REPLACE CURB & GUTTER EX T R E E T O R E M A I N 15.1" D I A M 30' D R I P WAT E R M A I N EX W A T E R SE R V I C E WATER MAIN & SERVICE NOT SURVEYED ABANDON EXISTING TAP PER COA WATER DEPT STANDARDS. NEW 2" TYPE K COPPER SERVICE MINIMUM DISTANCE 18" FROM EXISTING TAP REPLACE ASPHALT AT LOCATION OF CONCRETE PATCH. REPLACE ASPHALT A MINIMUM 2' OFF GUTTER. REPLACE ASPHALT OVER WATER SERVICE TRENCH. ADJA C E N T CUR B C U T & SIDE W A L K T O REM A I N . ADJA C E N T S I D E W A L K TO R E M A I N . G P C SEWER: ABANDON EXISTING SERVICE. INSTALL NEW SERVICE PER ASPEN SAN. DIST. STANDARDS. GAS: NEW SERVICE FROM ALLEY. PHONE & CABLE: PROVIDE NEW PEDESTALS ONSITE. ELECTRIC: ABANDON EXISTING DIRECT BURY. PULL NEW CABLE FROM EXISTING TRANSFORMER. GREE N R O O F GREE N R O O F GREE N R O O F PARK I N G AREA S PERV I O U S PAVE R S MAIN S T . ROW = 1 0 0 ' NEW T R E E REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE. REMOVE CURB CUT & REVEGETATE PERVIOUS PATIO AREA=90 SF CIRCULATION PIPED INTO SUBSTRATE 420 SF / 90 SF=4.67:1 E TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE CONCRETE TREATED BY PATIO PERVIOUS PAVERS CONCRETE TREATED BY GRASS BUFFER OR PAVERS NEW SIDEWALK NEW CURB AND GUTTER NEW ASPHALT EXISTING ASPHALT TO REMAIN PERVIOUS PAVERS GREEN ROOF EELECTRIC METER GGAS METER CCABLE PEDESTAL PPHONE PEDESTAL 2/6/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E 21 0 W M A I N S T . , A S P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N UTILITIES C600 1/11/20182/6/2018 Existing Tree to Remain with 30' Drip Diameter. New Water Service (Blue) New Electrical Service (Red) New Sewer Service (Green) New Gas Service (Yellow) New Phone & Cable Service (Orange) Site Plan - Utilities Tree Protection 6' Fence 13 ' - 6 1 1 / 1 6 " Appendix C Page 11 of 76 07/29/2019 TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH RE P L A C E S I D E W A L K . S O U T H E D G E A T E X I S T I N G P L A N T E D EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE. REMOVE CURB CUT & REVEGETATE REPLACE ASPHALT AT LOCATION OF CO N C R E T E P A T C H . R E P L A C E ASPHALT A MINIMUM 2' OFF GUTTER. REPLACE ASPHALT OVER WATER SERVICE TRENCH. CI R C U L A T I O N W A L K W A Y S AR E A : 4 2 0 S F MAIN S T . ROW = 1 0 0 ' Proposed Micropile Cap Location (Wall A) Proposed Micropile Cap Location (Wall B) Micropile Wall A Begin Wall Micropile Wall A Turn Line 1 Micropile Wall A Turn Line 2 Micropile Wall A Turn Line 3 Micropile Wall A End Wall Micropile Wall B Begin Wall Micropile Wall B End Wall 0+ 2 0 0+40 0+60 0+80 1+00 0+ 3 0 GR A D E - 5 0+70 GRADE - 5 0+20 GRAD E - 5 Temporary Micropile Walls Locations February 7, 2019 King Louise 210 West Main Street 19-001G-D1 Grade-2 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: N SCALE: 1" = 10' 10 0 5 10 Notes: 1. Base plan by Woody Creek Engineering dated 02-06-2019. 2. For utility installation, trench to back of micropile wall. Hand dig between micropiles and extend utilities through wall.266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 Area of Excavation (Yellow) Area of Temp Micropiles (Blue) Area of Temp Micropiles (Blue) Site Plan - Excavation & MicropilesAppendix C Page 12 of 76 07/29/2019 ID Task Mode Task Name Duration Start 1 Pre Construction 1 day Wed 7/3/19 2 Plans 1 day Wed 7/3/19 3 Budget Build 1 day Wed 7/3/19 4 Notice to Proceed 1 day Wed 7/3/19 5 6 Construction 259 days Thu 7/4/19 7 Asbestos Removal 10 days Thu 7/4/19 8 Start Date 0 days Wed 7/17/19 9 Mobilization 3 days Thu 7/18/19 10 Demo of Roof & Upper Level10 days Tue 7/23/19 11 Demo of Structure 5 days Tue 8/6/19 12 Structure 226 days Tue 8/13/19 13 Excavation 20 days Tue 8/13/19 14 Shoring 12 days Thu 8/15/19 15 Utilities 10 days Thu 8/15/19 16 Drywell 5 days Tue 9/3/19 17 Footings & Pads 10 days Tue 9/10/19 18 Foundation Walls 15 days Tue 9/24/19 19 Waterproofing & Insulation5 days Tue 10/15/19 20 Subdrainage 5 days Tue 10/15/19 21 Floor Framing ML 10 days Tue 10/15/19 22 Underground MEPs 5 days Tue 10/22/19 23 Structural Steel LL & ML5 days Tue 10/29/19 24 Backfill 10 days Tue 10/29/19 25 Slab Prep 8 days Tue 11/5/19 26 SOG 7 days Fri 11/15/19 27 Framing ML 10 days Tue 11/5/19 28 Floor Framing 2L 8 days Tue 11/12/19 29 Framing 2L 10 days Fri 11/22/19 30 Structural Steel 2L 5 days Fri 11/22/19 31 Floor Framing 3L 5 days Fri 11/29/19 32 Framing 3L 10 days Fri 12/6/19 33 Structural Steel 3L 5 days Fri 12/6/19 34 Roof Framing 8 days Fri 12/13/19 35 Exterior Sheathing 15 days Mon 12/16/19 36 Framing LL 7 days Mon 1/6/20 37 Roof Dry-In 5 days Wed 12/25/19 38 Roof Waterproofing 10 days Wed 1/1/20 39 Deck Waterproofing 10 days Wed 1/8/20 40 Windows 10 days Mon 1/6/20 41 Exterior Doors 8 days Wed 1/22/20 42 Gypcrete Floors 10 days Wed 1/22/20 43 Deck Slabs 5 days Wed 1/29/20 44 Green Roof 20 days Wed 5/27/20 45 46 MEPs 146 days Tue 10/22/19 47 Underground MEPs 5 days Tue 10/22/19 48 Rough-In Mechanical 20 days Wed 1/1/20 49 Rough-In Plumbing 25 days Wed 1/1/20 50 Rough-In Electrical 20 days Wed 1/8/20 51 Rough-In Fire Suppression10 days Wed 1/22/20 52 Rough-In Life Safety 10 days Wed 1/22/20 53 Rough-In Low Voltage 5 days Wed 1/29/20 54 Prewire 5 days Wed 1/29/20 55 Set Equipment 15 days Wed 2/5/20 56 Gas Meter 10 days Wed 2/5/20 57 Lighting 10 days Wed 2/5/20 58 Electrical Service 15 days Wed 2/19/20 59 Plumbing Fixtures 10 days Wed 4/15/20 60 Trim Out HVAC 10 days Wed 4/15/20 61 Trim Out Fire Suppression10 days Wed 4/15/20 62 Lighting Trim Out 10 days Wed 4/15/20 Pre Construction 7/3 Plans 7/3 Budget Build 7/3 Notice to Proceed Construction 7/4 Asbestos Removal 7/17 Start Date 7/18 Mobilization 7/23 Demo of Roof & Upper Level 8/6 Demo of Structure Structure 8/13 Excavation 8/15 Shoring 8/15 Utilities 9/3 Drywell 9/10 Footings & Pads 9/24 Foundation Walls 10/15 Waterproofing & Insulation 10/15 Subdrainage 10/15 Floor Framing ML 10/22 Underground MEPs 10/29 Structural Steel LL & ML 10/29 Backfill 11/5 Slab Prep 11/15 SOG 11/5 Framing ML 11/12 Floor Framing 2L 11/22 Framing 2L 11/22 Structural Steel 2L 11/29 Floor Framing 3L 12/6 Framing 3L 12/6 Structural Steel 3L 12/13 Roof Framing 12/16 Exterior Sheathing 1/6 Framing LL 12/25 Roof Dry-In 1/1 Roof Waterproofing 1/8 Deck Waterproofing 1/6 Windows 1/22 Exterior Doors 1/22 Gypcrete Floors 1/29 Deck Slabs 5/27 Green Roof MEPs 10/22 Underground MEPs 1/1 Rough-In Mechanical 1/1 Rough-In Plumbing 1/8 Rough-In Electrical 1/22 Rough-In Fire Suppression 1/22 Rough-In Life Safety 1/29 Rough-In Low Voltage 1/29 Prewire 2/5 Set Equipment 2/5 Gas Meter 2/5 Lighting 2/19 Electrical Service 4/15 Plumbing Fixtures 4/15 Trim Out HVAC 4/15 Trim Out Fire Suppression 4/15 Lighting Trim Out S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T Jun 2, '19 Jun 23, '19 Jul 14, '19 Aug 4, '19 Aug 25, '19 Sep 15, '19 Oct 6, '19 Oct 27, '19 Nov 17, '19 Dec 8, '19 Dec 29, '19 Jan 19, '20 Feb 9, '20 Mar 1, '20 Mar 22, '20 Apr 12, '20 May 3, '20 May 24, '20 Jun 14, '20 Jul 5, '20 Jul 26, '20 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Page 1 Project: King Louise Schedule Date: Wed 7/3/19 Appendix D Page 13 of 76 07/29/2019 ID Task Mode Task Name Duration Start 63 Trim Out Life Safety 5 days Wed 4/29/20 64 Thermostats 5 days Wed 4/29/20 65 Trim Out Switches & Outlets5 days Wed 4/29/20 66 Trim Out Low Voltage 5 days Wed 5/6/20 67 68 Exterior Finishes 219 days Thu 8/29/19 69 Curb & Gutters 5 days Tue 9/3/19 70 Asphalt Patch 3 days Thu 8/29/19 71 Stairwells 5 days Wed 1/1/20 72 Guardrails 5 days Wed 1/8/20 73 Hand Rails 5 days Wed 1/15/20 74 Sidewalks 10 days Wed 1/22/20 75 Housewrap 5 days Mon 1/6/20 76 Soffit & Fascia 15 days Mon 1/13/20 77 Exterior Trim 10 days Mon 1/20/20 78 Vertical Siding 30 days Mon 2/3/20 79 Horizontal Siding 30 days Mon 2/10/20 80 Flashing 10 days Mon 3/2/20 81 Exterior Railings 10 days Mon 3/23/20 82 Site Lighting 5 days Wed 4/29/20 83 Pavers 10 days Wed 4/29/20 84 Irrigation 10 days Wed 5/13/20 85 Green Roof 15 days Wed 5/27/20 86 Landscaping 20 days Wed 5/27/20 87 Exterior Painting 20 days Wed 5/27/20 88 Parking Space Stripping5 days Wed 6/24/20 89 90 Interior Finishes 105 days Wed 12/25/19 91 Radon 5 days Wed 12/25/19 92 Insulation 5 days Wed 1/1/20 93 Drywall 20 days Wed 1/8/20 94 Interior Doors 15 days Wed 1/22/20 95 Cabinetry 15 days Wed 1/29/20 96 Countertops 10 days Wed 2/12/20 97 Tile 15 days Wed 2/5/20 98 Trim 30 days Wed 2/5/20 99 Closet Doors 10 days Wed 3/11/20 100 Closet Rods & Shelves 5 days Wed 3/25/20 101 Paint & Stain 45 days Wed 2/12/20 102 Laminate Flooring 25 days Wed 3/18/20 103 Door Hardware 10 days Wed 4/15/20 104 Cabinetry Hardware 5 days Wed 4/22/20 105 Appliances 5 days Wed 4/22/20 106 Mirrors 5 days Wed 4/29/20 107 Carpet 10 days Wed 5/6/20 108 109 Inspections 166 days Mon 9/23/19 110 Inspection Footings 0 days Mon 9/23/19 111 Inspection Foundation0 days Mon 10/14/19 112 Inspection Rough-Ins 0 days Tue 2/4/20 113 Inspection Insulation 0 days Tue 1/7/20 114 Inspection Drywall 0 days Tue 2/4/20 115 Final Inspections 0 days Tue 5/12/20 116 117 Completion 25 days Wed 5/6/20 118 Touch Up & Caulking 5 days Wed 5/6/20 119 Demobilization 5 days Wed 5/13/20 120 Final Clean 10 days Wed 5/13/20 121 Finish Date 0 days Tue 5/26/20 122 Punchlist 10 days Wed 5/27/20 123 Closeout 5 days Wed 5/27/20 4/29 Trim Out Life Safety 4/29 Thermostats 4/29 Trim Out Switches & Outlets 5/6 Trim Out Low Voltage Exterior Finishes 9/3 Curb & Gutters 8/29 Asphalt Patch 1/1 Stairwells 1/8 Guardrails 1/15 Hand Rails 1/22 Sidewalks 1/6 Housewrap 1/13 Soffit & Fascia 1/20 Exterior Trim 2/3 Vertical Siding 2/10 Horizontal Siding 3/2 Flashing 3/23 Exterior Railings 4/29 Site Lighting 4/29 Pavers 5/13 Irrigation 5/27 Green Roof 5/27 Landscaping 5/27 Exterior Painting 6/24 Parking Space Stripping Interior Finishes 12/25 Radon 1/1 Insulation 1/8 Drywall 1/22 Interior Doors 1/29 Cabinetry 2/12 Countertops 2/5 Tile 2/5 Trim 3/11 Closet Doors 3/25 Closet Rods & Shelves 2/12 Paint & Stain 3/18 Laminate Flooring 4/15 Door Hardware 4/22 Cabinetry Hardware 4/22 Appliances 4/29 Mirrors 5/6 Carpet Inspections 9/23 Inspection Footings 10/14 Inspection Foundation 2/4 Inspection Rough-Ins 1/7 Inspection Insulation 2/4 Inspection Drywall 5/12 Final Inspections Completion 5/6 Touch Up & Caulking 5/13 Demobilization 5/13 Final Clean 5/26 Finish Date 5/27 Punchlist 5/27 Closeout S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T Jun 2, '19 Jun 23, '19 Jul 14, '19 Aug 4, '19 Aug 25, '19 Sep 15, '19 Oct 6, '19 Oct 27, '19 Nov 17, '19 Dec 8, '19 Dec 29, '19 Jan 19, '20 Feb 9, '20 Mar 1, '20 Mar 22, '20 Apr 12, '20 May 3, '20 May 24, '20 Jun 14, '20 Jul 5, '20 Jul 26, '20 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Page 2 Project: King Louise Schedule Date: Wed 7/3/19 Appendix D Page 14 of 76 07/29/2019 4,514 752.3 Legend 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet0752.3376.17 Notes Pitkin Maps & More THIS MAP IS FOR INFORMATIONAL PURPOSES. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content represented. Map Created on 11:44 AM 07/05/19 at http://www.pitkinmapsandmore.com State Highway Road Centerline 4K Primary Road Secondary Road Service Road Full Address Rivers and Creeks Continuous Intermittent River, Lake or Pond Town Boundary Federal Land Boundary BLM State of Colorado USFS Appendix E Page 15 of 76 07/29/2019 Pitkin County Mailing List of 300 Feet Radius Pitkin County GIS presents the information and data on this web site as a service to the public. Every effort has been made to ensure that the information and data contained in this electronic system is accurate, but the accuracy may change. Mineral estate ownership is not included in this mailing list. Pitkin County does not maintain a database of mineral estate owners. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. This document contains a Mailing List formatted to be printed on Avery 5160 Labels. If printing, DO NOT "fit to page" or "shrink oversized pages." This will manipulate the margins such that they no longer line up on the labels sheet. Print actual size. From Parcel: 273512440009 on 07/05/2019 Instructions: Disclaimer: http://www.pitkinmapsandmore.com Appendix E Page 16 of 76 07/29/2019 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST JACOBY FAMILY LP VERO BEACH, FL 32960 700 20TH ST RICKEL DAVID LANDSDALE, PA 19446 275 GOLDENROD DR GLICKMAN ADAM SAN JUAN PUERTO RICO 00907-3122, 644 FERNANDEZ JUNCOS AVE #301 DISTRICT VIEW PLAZA MIRAMAR HITE ANGELA R FAMILY TRUST WOODY CREEK, CO 81656 PO BOX 155 PESIKOFF DAVID HOUSTON, TX 77098 1811 NORTH BLVD GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GROVER FREDRICK W & PAULA J KEY LARGO, FL 330372917 6 NORTH DR WEST MAIN VENTURES ASPEN, CO 81612 PO BOX 11977 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE CHISHOLM HEATHER M ASPEN, CO 81611 205 W MAIN ST TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 233 WEST BLEEKER LLC ASPEN, CO 81611 400 E MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 211 WEST MAIN LLC ASPEN, CO 81611 323 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST BROWDE KRISTEN PRATA CHAPPAQUA, NY 10514 604 QUAKER RD GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST STEVENS BRUCE ASPEN, CO 81611 214 W BLEEKER ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST Appendix E Page 17 of 76 07/29/2019 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 TYROL APARTMENTS LLC ASPEN, CO 81611 200 W MAIN ST INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 220 WMAC LLC ASPEN, CO 81612 PO BOX 8346 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST SHEEHAN WILLIAM J & NANCY E FRANKFORT, IL 60423 10 GOLF VIEW LN GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GREENASPEN LLC KEY BISCAYNE, FL 33149 30 ISLAND DR GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GUNNING JANINE L ASPEN, CO 81612 PO BOX 11705 TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 ELKINS LESLIE KEITH TRUST HOUSTON, TX 77002 1001 FANNIN #700 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST KARP MICHAEL PHILADELPHIA, PA 19103 1630 LOCUST ST #200 WEST MAIN VENTURES ASPEN, CO 81612 PO BOX 11977 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE GUENTHER TODD NEW YORK , NY 10023 150 COLUMBUS AVE APT 16C CITY OF ASPEN ASPEN, CO 81611 130 S GALENA ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 Appendix E Page 18 of 76 07/29/2019 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST ASPEN MEDICAL CENTER CONDO ASSOC ASPEN, CO 81611 COMMON AREA W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST HOTEL ASPEN CONDO ASSOC ASPEN, CO 81611 COMMON AREA 110 W MAIN ST LADA COMMUNITY PROPERTY TRUST LAS VEGAS, NV 89109 2860 AUGUSTA DR BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE NIMMO GUENTHER KELLY ASPEN, CO 81611 121 W BLEEKER ST SNYDER GARY ELKINS PARK, PA 19027 8324 BROODSIDE RD KETTELKAMP TRUST PUEBLO, CO 81008 3408 MORRIS AVE TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 ASPEN HOMEOWNERS ASSOCIATION ASPEN, CO 81611 311 W MAIN ST SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 DIMITRIUS RALLI TRUST PASADENA, CA 91103 535 FREMONT DR INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST TWIN COASTS LTD BOCA RATON, FL 33432 433 PLAZA REAL #275 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GROSVENOR DENIS TAOS, NM 875716922 209 CAMINO DE LA MERCED # C 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 ASPEN MAIN OFFICE CONDO ASSOC ASPEN, CO 81611 220 W MAIN ST ASPEN CONDOS ASSOC ASPEN, CO 81611 COMMON AREA 311 W MAIN ST TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 Appendix E Page 19 of 76 07/29/2019 TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 CHOOKASZIAN DENNIS WILMETTE, IL 60091 1100 MICHIGAN AVE BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE HEINEMAN S MARLENE DALLAS, TX 753810323 PO BOX 810323 CRETE ASSOCIATES LP BRYN MAWR, PA 19010 1062 E LANCASTER AVE #30B GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST CRETE ASSOCIATES LP BRYN MAWR, PA 19010 1062 E LANCASTER AVE #30B SAND KATHERINE M ASPEN, CO 81612 PO BOX 51 212 WEST HOPKINS LLC ASPEN, CO 81611 212 W HOPKINS AVE TIMBERLINE BANK GRAND JUNCTION, CO 81505 633 24 RD STEVENSON KAREN H ASPEN, CO 81611 205 W MAIN ST TEMPKINS HARRY & VIVIAN MIAMI BEACH, FL 33139 605 LINCOLN RD #301 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST STEVENS LESLEY ASPEN, CO 81611 214 W BLEEKER ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 SEVEN SEAS INVESTMENT LLC WILMETTE, IL 60091 1120 MICHIGAN AVE MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 CRETE ASSOCIATES LP BRYN MAWR, PA 19010 1062 E LANCASTER AVE #30B 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 Appendix E Page 20 of 76 07/29/2019 HITE HENRY HARRIS REVOC TRUST WOODY CREEK, CO 81656 PO BOX 155 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 WEST HOPKINS LLC POTOMAC, MD 20859 PO BOX 61510 220 WMAC LLC ASPEN, CO 81612 PO BOX 8346 212 N SECOND ST LLC TAMPA, FL 33613 509 GUISANDO DE AVILA #201 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST MAYER KEVIN ASPEN, CO 81611 222 W HOPKINS AVE #2 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 BERGHOFF MICHAEL R TRUST INDIANAPOLIS, IN 46236 9112 WALNUT GROVE DR INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST HOLTZMAN L BART & PATRICIA G SAINT LOUIS, MO 63124 9741 LITZSINGER RD HAYMAX LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 RILEY AMY CLARK ASPEN, CO 81611 129 W BLEEKER ST TWIN COASTS LTD BOCA RATON, FL 33432 433 PLAZA REAL #275 ASPEN HOUSE LLC CHICAGO, IL 60601 225 N COLUMBUS DR #100 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST JDH INVESTMENT MGMT LLC DALLAS, TX 75205 12200 STEMMONS FWY MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST NORTHSTAR OFFICE BUILDING CONDO ASSOC ASPEN, CO 81611 COMMON AREA 122 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 Appendix E Page 21 of 76 07/29/2019 MARTIN SCOTT M ASPEN, CO 81611 PO BOX 51 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST TIMBERLINE BANK GRAND JUNCTION, CO 81505 633 24 RD 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 TIMBERLINE BANK GRAND JUNCTION, CO 81505 633 24 RD FCB LLC SNOWMASS VILLAGE, CO 816156622 PO BOX 6622 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 220 WEST MAIN PARTNERS LLC ASPEN, CO 81611 730 E COOPER AVE GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST BERGHOFF KRISTIN TRUST INDIANAPOLIS, IN 46236 9112 WALNUT GROVE DR GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST AJAX VIEW COMMERCIAL/NORTH STAR OFFICE ASPEN, CO 81611 132 W MAIN ST BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 CRETE ASSOCIATES LP BRYN MAWR, PA 19010 1062 E LANCASTER AVE #30B SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 WEST MAIN VENTURES ASPEN, CO 81612 PO BOX 11977 SHIELD JULIET E ASPEN, CO 81611 221 N STARWOOD DR 118 NORTH FIRST LLC ASPEN, CO 81611 623 E HOPKINS AVE 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 Page 22 of 76 07/29/2019 TYROLEAN LODGE LLC ASPEN, CO 81611 200 W MAIN ST INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GUNN ROBERT W FAMILY TRST MARBLEHEAD, MA 01945 409 OCEAN AVE GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST GUNNING RALPH ASPEN, CO 81612 PO BOX 11912 MARTIN SCOTT M ASPEN, CO 81611 PO BOX 51 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST DH ASE LLC WILMINGTON, DE 19808 2711 CENTERVILLE RD # 400 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST #2 WEST SIDE CONDO ASSOC ASPEN, CO 81611 234 W HOPKINS AVE 233 WEST BLEEKER LLC ASPEN, CO 81611 400 E MAIN ST #2 JACOBY FAMILY LP VERO BEACH, FL 32960 700 20TH ST CRETE ASSOCIATES LP BRYN MAWR, PA 19010 1062 E LANCASTER AVE #30B GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 JES 2002 GRANTOR TRUST ASPEN, CO 81611 221 N STARWOOD DR GARET CONDO ASSOC ASPEN, CO 81611 400 E MAIN ST #2 GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST SILVERSTEIN PHILIP & ROSALYN BRONX, NY 10463 25 KNOLLS CRESCENT APT 81 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST SAND KATHERINE M ASPEN, CO 81612 PO BOX 51 MELTON DAVID ASPEN, CO 81611 135 W MAIN ST Appendix E Page 23 of 76 07/29/2019 Appendix E - Central Resort Area and CommercialCore Area Map Project Location: Page 24 of 76 07/29/2019 E MAI N S T W MAI N S T E DUR A N T A V E E HOP K I N S A V E GI B S O N A V E E COO P E R A V E W HAL L A M S T W BLE E K E R S T N T H I R D S T S A S P E N S T W FRA N C I S S T N F I F T H S T W HO P K I N S A V E N M I L L S T NORTH S T N S I X T H S T W SM U G G L E R S T N F O U R T H S T S M O N A R C H S T P A R K A V E S M I L L S T R E D M T N R D N F I R S T S T S O R I G I N A L S T LA K E A V E N S E C O N D S T S G A R M I S C H S T LO N E P I N E R D O A K L N S H U N T E R S T S W E S T E N D S T E BLE E K E R S T N S P R I N G S T NEA L E A V E VINE ST S F I R S T S T S H A D Y L N MI D L A N D A V E E HYM A N A V E S G A L E N A S T GILLESPIE AVE W HY M A N A V E DEAN S T KIN G S T RI O G R A N D E P L N E I G H T H S T S S P R U C E S T M A P L E L N PAR K C I R N G A R M I S C H S T RA C E S T E HAL L A M S T WATE R S A V E N A S P E N S T S T H I R D S T N SPRUCE ST T E A L C T A J A X A V E N I C H O L A S L N W CO O P E R A V E JUAN S T WI L L I A M S W Y ASPEN MTN R D P U P P Y S M I T H S T QUEEN ST CL E V E L A N D S T L A C E T L N FOUN D E R S P L A C E C O T T O N W O O D L N S R I V E R S I D E A V E N S E V E N T H S T PEARL CT SOUTH AVE SUMM I T S T GILB E R T S T S F I F T H S T S S I X T H S T W NO R T H S T S F O U R T H S T S S P R I N G S T N R I V E R S I D E A V E S S P R I N G S T DEAN S T S G A L E N A S T N S E V E N T H S T P A R K C I R DEAN S T S M I L L S T AS P E N M T N R D Map prepared by Engineering and GIS Department City of Aspen, CO 81611 May 4,2007 0 600300 Feet Legend Designated Heavy Haul Route Roads Parcels City Boundary OFFICIAL HEAVY HAUL ROUTE MAP Project Location Appendix F Page 25 of 76 07/29/2019 Grading and Drainage Report Prepared for King Louise, LLC 210 West Main St., Aspen P.O. Box 575 Woody Creek, Colorado 81656 970-309-7130 Prepared By Josh Rice, P.E. February 6, 2019 Appendix G Page 26 of 76 07/29/2019 i I hereby affirm that this report and the accompanying plans for the drainage improvements of “Lots P&Q, Block 51, City of Aspen” was prepared by me for the owners thereof in accordance with the provisions of the City of Aspen Urban Runoff Management Plan and approved variances and exceptions listed herein. I understand that it is the policy of the City that the City of Aspen does not and will not assume liability for drainage facilities designed by others. Josh Rice, P.E. License No. 1/11/20182/6/2018 Page 27 of 76 07/29/2019 ii 1. INTRODUCTION ................................................................................................................................. 1 2. GENERAL SITE DESCRIPTION ....................................................................................................... 1 2.1 Existing Condition ..................................................................................................................................... 1 2.2 Proposed Condition ................................................................................................................................... 2 2.2.1 Determination of Major/Minor .................................................................................................................... 2 2.3 Drainage Basins ......................................................................................................................................... 2 2.3.1 Historical Basin EX:1 ..................................................................................................................................... 5 2.3.1 Proposed Basin PR:1A .................................................................................................................................. 5 2.3.1 Proposed Basin PR:1B .................................................................................................................................. 5 2.3.1 Proposed Basin PR:2A .................................................................................................................................. 5 2.3.1 Proposed Basin PR:2B .................................................................................................................................. 5 2.3.1 Proposed Basin PR:3 .................................................................................................................................... 5 2.3.1 Proposed Basin PR:4 .................................................................................................................................... 6 2.3.1 Proposed Basin PR:5 .................................................................................................................................... 6 2.3.1 Proposed Basin PR:6 .................................................................................................................................... 6 2.3.1 Proposed Basin PR:7 .................................................................................................................................... 6 2.3.1 Proposed Basin PR:8 .................................................................................................................................... 6 2.3.1 Proposed Basin PR:9 .................................................................................................................................... 6 2.3.1 Proposed Basin PR:10 .................................................................................................................................. 6 2.3.1 Proposed Basin PR:11 .................................................................................................................................. 7 2.3.1 Proposed Basin PR:12 .................................................................................................................................. 7 2.3.1 Proposed Basin PR:13 .................................................................................................................................. 7 2.3.1 Proposed Basin PR:14 .................................................................................................................................. 7 2.3.1 Proposed Basin PR:15 .................................................................................................................................. 7 2.3.1 Proposed Basin PR:16 .................................................................................................................................. 7 2.3.1 Proposed Basin PR:17 .................................................................................................................................. 8 3. STORMWATER BMPS AND ROUTING ......................................................................................... 8 3.1 General ..................................................................................................................................................... 9 3.1.1 Pipes ............................................................................................................................................................. 9 Porous Gravel .......................................................................................................................................................... 10 3.2 Operation and Maintenance ................................................................................................................... 10 APPENDIDX A--NRCS SOILS REPORT .............................................................................................. 1 APPENDIX B--FEMA FIRM MAP ......................................................................................................... 2 APPENDIX C--PLAN SET ....................................................................................................................... 3 APPENDIX D--HYDROLOGIC CALCULATIONS ............................................................................... 4 Page 28 of 76 07/29/2019 iii APPENDIX E--HYDRAULIC CALCULATIONS .................................................................................. 5 Page 29 of 76 07/29/2019 1. Introduction This report was prepared to meet the requirements of a City of Aspen Engineering Department Grading and Drainage Report for a Major Design. The report was prepared for a multi-family housing project at 210 West Main Street, Aspen, Colorado, 81611 (the “Site”). Facilities providing water quality capture volume and retention have been designed in this report and the associated plan. 2. General Site Description 2.1 Existing Condition The property was platted as “Lots P&Q, Block 51, City of Aspen.” Based on the topographical improve- ment survey, the lot area is approximately 6,000 square feet. The Site is located on the east side of Aspen (see Figure 1). The NRCS describes the hydrologic soil group as “Type B” (See Appendix A). The lot is currently occupied by a multi-family apartment. Figure 1. 210 West Main Street, Aspen Vicinity Map (Source: maps.google.com) Page 30 of 76 07/29/2019 2 The site is located away from all major drainage ways and is not located within the floodplain boundaries the Roaring Fork River. The Site is located within Zone X, as shown and described by FEMA (see FIRM Map, Appendix B.) 2.2 Proposed Condition The structure will be demolished and a tree-structure multifamily complex will be constructed. 2.2.1 Determination of Major/Minor The Urban Runoff Management Plan (the “URMP”) has two controlling triggers when determining the permit requirements: interior demolition and exterior disturbed area. Based on these two triggers, Woody Creek Engineering (“WCE”) has determined that water quality capture volume (“WQCV”) and detention is required for the entire property. However, the site is located in the Aspen Mountain basin and therefore, only WQCV will be provided. The Site is located on a relatively flat area that slopes at 0.38% to the southeast. Drainage basins are delin- eated on Plan Sheet C200 (Appendix C, C200). The basins are described in the following sections. The drainage issues and WQCV treatment BMPs are also described. 2.3 Drainage Basins Both Historical and proposed basins are described below. Table 1, below, describes the impervious area, pervious area, total area, percent imperviousness, flow path length, basin slope, runoff coefficients for the minor (10-yr) and major (100-yr) storm events and runoff flowrates for the minor (10-yr) and major (100- yr) storm events. Although the Basins are delineated on Plan Sheet C200 (Appendix C, C200), they are also provided in Figure No. 2 and 3, below. Historical peak flows for the 5-year, 10-year and 100-year events were evaluated for the Site using a time of concentration based on the flow path length and slope. The proposed improvements to the site will not affect offsite drainage patterns. Table 1. Historical Basin Information Table 2. Proposed Basin Information BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 10YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) Tc (Computed) (min) Tc (Regional) (min)Tc (min)Intensity (5yr) (in/hr) Intensity (10yr) (in/hr) Intensity (100yr) (in/hr) PEAK FLOW 5YR (CFS) PEAK FLOW 10YR (CFS) PEAK FLOW 100YR (CFS) EX:1 6,000.00 0.00 0.138 0.000 0%0.06 0.15 0.35 104.40 0.0038 26.33 10.5800 10.5800 2.3597 2.8390 4.5350 0.020 0.059 0.219 Total 6,000 0 0.138 0.000 0%----0.020 0.059 0.219 BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 10YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) Tc (Computed) (min) Tc (Regional) (min)Tc (min)Intensity (5yr) (in/hr) Intensity (10yr) (in/hr) Intensity (100yr) (in/hr) PEAK FLOW 5YR (CFS) PEAK FLOW 10YR (CFS) PEAK FLOW 100YR (CFS) PR:1A 79.17 79.17 0.002 0.002 100%0.90 0.92 0.96 9.50 0.0200 0.91 10.0528 5.0000 3.2911 3.9596 6.3251 0.005 0.007 0.011 PR:1B 141.48 141.48 0.003 0.003 100%0.90 0.92 0.96 11.20 0.0200 0.98 10.0622 5.0000 3.2911 3.9596 6.3251 0.010 0.012 0.020 PR:2A 985.65 218.26 0.023 0.005 22%0.22 0.30 0.46 23.40 0.0100 7.66 10.1300 7.6552 2.7726 3.3357 5.3285 0.014 0.022 0.055 PR:2B 630.21 174.22 0.014 0.004 28%0.25 0.32 0.47 17.50 0.0100 6.43 10.0972 6.4317 2.9902 3.5975 5.7467 0.011 0.017 0.039 PR:3 2,065.31 321.28 0.047 0.007 16%0.20 0.27 0.44 32.80 0.0100 9.34 10.1822 9.3368 2.5195 3.0313 4.8422 0.024 0.039 0.101 PR:4 515.75 0.00 0.012 0.000 0%0.06 0.15 0.35 3.60 0.0200 2.83 10.0200 5.0000 3.2911 3.9596 6.3251 0.002 0.007 0.026 PR:5 175.50 175.50 0.004 0.004 100%0.90 0.92 0.96 14.50 0.0200 1.12 10.0806 5.0000 3.2911 3.9596 6.3251 0.012 0.015 0.024 PR:6 58.42 58.42 0.001 0.001 100%0.90 0.92 0.96 10.81 0.0200 0.97 10.0601 5.0000 3.2911 3.9596 6.3251 0.004 0.005 0.008 PR:7 30.66 30.66 0.001 0.001 100%0.90 0.92 0.96 8.10 0.0200 0.84 10.0450 5.0000 3.2911 3.9596 6.3251 0.002 0.003 0.004 PR:8 40.73 40.73 0.001 0.001 100%0.90 0.92 0.96 8.20 0.0200 0.84 10.0456 5.0000 3.2911 3.9596 6.3251 0.003 0.003 0.006 PR:9 39.05 39.05 0.001 0.001 100%0.90 0.92 0.96 4.10 0.0200 0.59 10.0228 5.0000 3.2911 3.9596 6.3251 0.003 0.003 0.005 PR:10 20.25 20.25 0.000 0.000 100%0.90 0.92 0.96 5.40 0.0200 0.68 10.0300 5.0000 3.2911 3.9596 6.3251 0.001 0.002 0.003 PR:11 23.63 23.63 0.001 0.001 100%0.90 0.92 0.96 4.90 0.0200 0.65 10.0272 5.0000 3.2911 3.9596 6.3251 0.002 0.002 0.003 PR:12 226.17 0.00 0.005 0.000 0%0.06 0.15 0.35 49.60 0.0100 13.22 10.2756 10.2756 2.3969 2.8838 4.6066 0.001 0.002 0.008 PR:13 136.79 0.00 0.003 0.000 0%0.06 0.15 0.35 18.20 0.0100 8.01 10.1011 8.0106 2.7150 3.2665 5.2180 0.001 0.002 0.006 PR:14 94.31 0.00 0.002 0.000 0%0.06 0.15 0.35 9.30 0.0100 5.73 10.0517 5.7263 3.1314 3.7675 6.0182 0.000 0.001 0.005 PR:15 170.18 0.00 0.004 0.000 0%0.06 0.15 0.35 33.20 0.0100 10.82 10.1844 10.1844 2.4083 2.8975 4.6285 0.001 0.002 0.006 PR:16 506.65 0.00 0.012 0.000 0%0.06 0.15 0.35 40.00 0.0100 11.88 10.2222 10.2222 2.4036 2.8918 4.6194 0.002 0.005 0.019 PR:17 59.64 59.64 0.001 0.001 100%0.90 0.92 0.96 0.50 0.0200 0.21 10.0028 5.0000 3.2911 3.9596 6.3251 0.004 0.005 0.008 Total 6,000 1,382 0.138 0.032 23%0.100 0.153 0.358 Page 31 of 76 07/29/2019 3 Figure 2. Historical Basins Page 32 of 76 07/29/2019 4 Figure 3. Proposed Basins Page 33 of 76 07/29/2019 5 2.3.1 Historical Basin EX:1 Historical Basin EX:1 encompasses the lot. The basin area is approximately 6000 sf. Runoff sheet flows for 104 ft at a 0.38% slope, resulting in a 100-yr flowrate of 0.011 cfs. 2.3.1 Proposed Basin PR:1A Proposed basin PR:1A is comprised of the first floor entrance roof. The roof discharges to Pipe C1. The basin area totals 79 sf and is 100% impervious. Based on a flow path of 9.5 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.011 cfs. PR:1A is collected and directed to a pervious paver system via Pipes C and A in order to provide WQCV. 2.3.1 Proposed Basin PR:1B Proposed basin PR:1B is comprised of the second and third floor stair and deck areas. The roof dis- charges to Pipe C2. The basin area totals 141 sf and is 100% impervious. Based on a flow path of 11.2 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.020 cfs. PR:1B is collected and directed to a pervious paver system via Pipes C and A in order to provide WQCV. 2.3.1 Proposed Basin PR:2A Proposed basin PR:2A is comprised of the southwest roof area. The basin area totals 986 sf and is 22% impervious. Based on a flow path of 23.4 feet at a slope of 1%, the time of concentration is 7.66 minutes. The resulting 100-year flowrate is 0.055 cfs. The roof discharges to the west and into basin PB:12. Because the roof is primarily a green roof struc- ture, the green roof area provides the WQCV although the roof is not entirely “green.” The Aspen Engi- neering Department has pre-approved this roof be exempt from providing at-grade WQCV for the imper- vious area. Please see PJ Murray or Hailey Guglielmo if you require an explanation of this determination. 2.3.1 Proposed Basin PR:2B Proposed basin PR:2B is comprised of the southeast roof area. The basin area totals 630 sf and is 28% impervious. Based on a flow path of 17.5 feet at a slope of 1%, the time of concentration is 6.43 minutes. The resulting 100-year flowrate is 0.039 cfs. The roof discharges to the east and into basin PB:15. Because the roof is primarily a green roof structure, the green roof area provides the WQCV although the roof is not entirely “green.” The Aspen Engineering Department has pre-approved this roof be exempt from providing at-grade WQCV for the impervious area. Please see PJ Murray or Hailey Guglielmo if you require an explanation of this determination. 2.3.1 Proposed Basin PR:3 Proposed basin PR:3 is comprised of the north roof area. The basin area totals 2065 sf and is 16% imper- vious. Based on a flow path of 32.8 feet at a slope of 1%, the time of concentration is 9.34 minutes. The resulting 100-year flowrate is 0.101 cfs. The roof discharges to the east and into basin PB:16. Because the roof is primarily a green roof structure, the green roof area provides the WQCV although the roof is not entirely “green.” The Aspen Engineering Department has pre-approved this roof be exempt from providing at-grade WQCV for the impervious area. Please see PJ Murray or Hailey Guglielmo if you require an explanation of this determination. Page 34 of 76 07/29/2019 6 2.3.1 Proposed Basin PR:4 Proposed basin PR:4 is comprised of the rear (north) parking area. The basin area totals 516 sf and is 0% impervious. Based on a flow path of 3.6 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.026 cfs. PR:4 is collected and discharges to a pervious paver system. The entire basin consists of pervious pavers. WQCV is provided by the pervious paver system. 2.3.1 Proposed Basin PR:5 Proposed basin PR:5 is comprised of the sidewalk found on the west of the north building. The basin area totals 176 sf and is 100% impervious. Based on a flow path of 14.5 feet at a slope of 2%, the time of con- centration is 5 minutes. The resulting 100-year flowrate is 0.024 cfs. PR:5 is collected and discharges to a pervious paver system via Pipe A in order to provide WQCV. 2.3.1 Proposed Basin PR:6 Proposed basin PR:6 is comprised of the sidewalk found on the south of the north building. The basin area totals 58 sf and is 100% impervious. Based on a flow path of 10.8 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.008 cfs. PR:6 is collected and discharges to a pervious paver system via Pipe B and A in order to provide WQCV. 2.3.1 Proposed Basin PR:7 Proposed basin PR:7 is comprised of the bike parking area located at the northeast of the north building. The basin area totals 31 sf and is 100% impervious. Based on a flow path of 8.1 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.004 cfs. PR:7 is collected and discharges to a pervious paver system found in PR:4 (parking area pervious pavers) in order to provide WQCV. 2.3.1 Proposed Basin PR:8 Proposed basin PR:8 is comprised of the sidewalk found in between the southwest and southeast build- ings. The basin area totals 41 sf and is 100% impervious. Based on a flow path of 8.2 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.006 cfs. PR:8 is collected and discharges to a pervious paver system via Pipe C and A in order to provide WQCV. 2.3.1 Proposed Basin PR:9 Proposed basin PR:9 is comprised of the sidewalk found at the entrance to the southwest building. The basin area totals 39 sf and is 100% impervious. Based on a flow path of 4.1 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.005 cfs. PR:9 is collected and discharges to PR:12. PR:12 is a vegetated area that meets the definition of a grass buffer. WQCV is provided by the grass buffer. 2.3.1 Proposed Basin PR:10 Proposed basin PR:10 is comprised of the sidewalk found at the entrance to the courtyard located between the southwest and southeast buildings. The basin area totals 20 sf and is 100% impervious. Based on a flow path of 5.4 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.003 cfs. Page 35 of 76 07/29/2019 7 PR:10 is collected and discharges to PR:13. PR:13 is a vegetated area that meets the definition of a grass buffer. WQCV is provided by the grass buffer. 2.3.1 Proposed Basin PR:11 Proposed basin PR:11 is comprised of the sidewalk found at the entrance to the southeast building. The basin area totals 24 sf and is 100% impervious. Based on a flow path of 4.9 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.003 cfs. PR:10 is collected and discharges to PR:14. PR:14 is a vegetated area that meets the definition of a grass buffer. WQCV is provided by the grass buffer. 2.3.1 Proposed Basin PR:12 Proposed basin PR:12 is comprised of the lawn found at the western edge of the the southwest building. The basin area totals 226 sf and is 0% impervious. Based on a flow path of 49.6 feet at a slope of 1%, the time of concentration is 10.28 minutes. The resulting 100-year flowrate is 0.008 cfs. PR:12 does not require WQCV and discharges to the ROW. 2.3.1 Proposed Basin PR:13 Proposed basin PR:13 is comprised of the lawn found at the in between the entrance to the southwest building and the entrance to the central courtyard. The basin area totals 137 sf and is 0% impervious. Based on a flow path of 18.2 feet at a slope of 1%, the time of concentration is 8.01 minutes. The result- ing 100-year flowrate is 0.006 cfs. PR:13 does not require WQCV and discharges to the ROW. 2.3.1 Proposed Basin PR:14 Proposed basin PR:14 is comprised of the lawn found at the in between the entrance to the southeast building and the entrance to the central courtyard. The basin area totals 94 sf and is 0% impervious. Based on a flow path of 9.3 feet at a slope of 1%, the time of concentration is 5.73 minutes. The resulting 100-year flowrate is 0.005 cfs. PR:14 does not require WQCV and discharges to the ROW. 2.3.1 Proposed Basin PR:15 Proposed basin PR:15 is comprised of the lawn found at the eastern edge of the southeast building. The basin area totals 170 sf and is 0% impervious. Based on a flow path of 33.2 feet at a slope of 1%, the time of concentration is 10.18 minutes. The resulting 100-year flowrate is 0.006 cfs. PR:15 does not require WQCV and discharges to the ROW. 2.3.1 Proposed Basin PR:16 Proposed basin PR:16 is comprised of the lawn found between the north and southeast buildings. The ba- sin area totals 507 sf and is 0% impervious. This basin also includes a pervious paver area which treats many of the impervious areas. Based on a flow path of 40 feet at a slope of 1%, the time of concentration is 10.22 minutes. The resulting 100-year flowrate is 0.019 cfs. PR:16 does not require WQCV and discharges to the ROW. Page 36 of 76 07/29/2019 8 2.3.1 Proposed Basin PR:17 Proposed basin PR:17 is comprised of the 1-ft sidewalk encroachment found at the southern property boundary. The basin area totals 60 sf and is 100% impervious. Based on a flow path of 0.5 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.008 cfs. PR:17 does not require WQCV because it is a public improvement requirement due to the location of the trees in the ROW. The sidewalk discharges to the ROW. 3. Stormwater BMPs and Routing Low impact design has been utilized where possible to provide WQCV. 9 Principles 1. Consider stormwater quality needs early in the design process. The architect and owner considered stormwater requirements early in the process. 2. Use the entire site when planning for stormwater quality treatment. Where possible, overland conveyance was utilized to increase the time stromwater is in contact with natural systems. 3. Avoid unnecessary impervious areas. Impervious areas were reduced where acceptable to the owner and the design team and include such BMPs and the green roof, pervious pavers and grass buffers. 4. Reduce runoff rates and volumes to more closely match natural conditions. To the extent possible, impervious areas have been limited and onsite storage provided to reduce discharge rates to as class to historical conditions as possible. Because the site is located in the Aspen Mountain Basin, it is not required to reduce the discharge to historical flowrates. 5. Integrate stormwater quality management and flood control. Through the use of onsite BMPs, stormwater quality management and flood control are integrated in the project. 6. Develop stormwater quality facilities that enhance the site, the community and the environment. The site, community and the environment are enhanced by reducing the amount of sediment and other river pollutants conveyed to the stream system. Hopefully, the use of these stormwater BMPs on this property and throughout the community will improve the water quality of the Roar- ing Fork River and its tributaries. 7. Use a treatment train approach. Where feasible, impervious areas are disconnected from the storm sewer with grass buffers, green roofs and pervious pavers. 8. Design sustainable facilities that can be safely maintained. The stormwater BMPs located onsite can be easily and safely maintained and are readily accessi- ble. 9. Design and maintain facilities with public safely in mind. Elevation drops to stormwater BMPs are minimal and designed with public safely in mind. Page 37 of 76 07/29/2019 9 3.1 General Low impact design has been utilized where possible to provide WQCV. Inlets • Inlet 1 and Inlet 2 o These inlets collect runoff from basin PR:5 which discharges 0.024 cfs or 10.77 gpm. Each of the inlets provide 11.78 gpm or a total of 23.56 gpm. With a factor of safety of 2 applied, the two inlets provide a capacity of 11.78 gpm. The two inlets have the capacity to adequately covey the tributary runoff. • Inlet 3 and Inlet 4 o Inlets 3 and 4 collect runoff from basin PR:1B which discharges 0.020 cfs or 8.98 gpm. Each inlet has a capacity of 11.78 gpm. With a factor of safety of 2 applied, the inlet pro- vides a capacity of 11.78 gpm. The two inlets have the capacity to adequately covey the tributary runoff. • Inlet 5 and Inlet 6 o Inlets 5 and 6 collect runoff from basin PR:6 which discharges 0.008 cfs or 3.59 gpm. Each inlet has a capacity of 11.78 gpm. With a factor of safety of 2 applied, the inlet pro- vides a capacity of 11.78 gpm. The two inlets have the capacity to adequately covey the tributary runoff. • Inlet 7 o Inlet 7 is located under a roof, but is provided to collect nuisance drainage. • Inlet 8 o Inlet 8 collects runoff from basin PR:8 which discharges 0.006 cfs or 2.69 gpm. The inlet has a capacity of 11.78 gpm which when reduced by a factor of safety of 2 becomes 5.89 gpm. The inlet has adequate capacity to convey the tributary runoff. 3.1.1 Pipes Pipes A, B and C are all 4” PVC pipes laid at a slope of 2% with a capacity of 0.261 cfs when flowing at 80%. As shown in in Table 3, the total tributary flowrate to the pipe network is 0.069 cfs. The pipe net- work has adequate capacity to convey the tributary runoff. Basin 100- Year Flowrate (cfs) PR:1A 0.011 PR:1B 0.020 PR:5 0.024 PR:6 0.008 PR:8 0.006 Total 0.069 Table 3. Pipe A, B and C tributary areas Page 38 of 76 07/29/2019 10 Porous Gravel A porous gravel strip totaling 408 sf of area will provide retention volume for the 910 sf of road area de- scribed by Proposed Basin OS-1. Overall the porous gravel will provide 238 cf of storage in the void spaces (7in X 1in / 12 ft X 408 sf X 0.25). The 910 sf area develops 58 cf of runoff during the 10-year event (0.77 in X 1 in / 12 ft X 910 sf). The porous gravel has adequate capacity to retain the 10-year event. 3.2 Operation and Maintenance The following maintenance recommendations for pervious paver systems can be found in Table 8.9 of the URMP. Page 39 of 76 07/29/2019 Appendidx A--NRCS Soils Report Page 40 of 76 07/29/2019 United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties Natural Resources Conservation Service February 6, 2019Page 41 of 76 07/29/2019 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2Page 42 of 76 07/29/2019 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3Page 43 of 76 07/29/2019 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................11 Map Unit Descriptions.........................................................................................11 Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties...................................................................................................13 107—Uracca, moist-Mergel complex, 1 to 6 percent slopes, extremely s..13 References............................................................................................................15 4Page 44 of 76 07/29/2019 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5Page 45 of 76 07/29/2019 scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6Page 46 of 76 07/29/2019 identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7Page 47 of 76 07/29/2019 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8Page 48 of 76 07/29/2019 9 Custom Soil Resource Report Soil Map 43 3 9 6 4 4 43 3 9 6 5 0 43 3 9 6 5 6 43 3 9 6 6 2 43 3 9 6 6 8 43 3 9 6 7 4 43 3 9 6 8 0 43 3 9 6 8 6 43 3 9 6 9 2 43 3 9 6 4 4 43 3 9 6 5 0 43 3 9 6 5 6 43 3 9 6 6 2 43 3 9 6 6 8 43 3 9 6 7 4 43 3 9 6 8 0 43 3 9 6 8 6 43 3 9 6 9 2 342434 342440 342446 342452 342458 342464 342428 342434 342440 342446 342452 342458 342464 39° 11' 31'' N 10 6 ° 4 9 ' 2 8 ' ' W 39° 11' 31'' N 10 6 ° 4 9 ' 2 6 ' ' W 39° 11' 30'' N 10 6 ° 4 9 ' 2 8 ' ' W 39° 11' 30'' N 10 6 ° 4 9 ' 2 6 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 10 20 40 60 Feet 0 3 7 14 21 Meters Map Scale: 1:239 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. Page 49 of 76 07/29/2019 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties Survey Area Data: Version 9, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Data not available. The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10Page 50 of 76 07/29/2019 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 107 Uracca, moist-Mergel complex, 1 to 6 percent slopes, extremely s 0.2 100.0% Totals for Area of Interest 0.2 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, Custom Soil Resource Report 11Page 51 of 76 07/29/2019 onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12Page 52 of 76 07/29/2019 Aspen-Gypsum Area, Colorado, Parts of Eagle, Garfield, and Pitkin Counties 107—Uracca, moist-Mergel complex, 1 to 6 percent slopes, extremely s Map Unit Setting National map unit symbol: jq4g Elevation: 6,800 to 8,400 feet Mean annual precipitation: 16 to 19 inches Mean annual air temperature: 40 to 43 degrees F Frost-free period: 75 to 95 days Farmland classification: Not prime farmland Map Unit Composition Uracca, moist, and similar soils: 50 percent Mergel and similar soils: 40 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Uracca, Moist Setting Landform: Alluvial fans, structural benches, valley sides Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium derived from igneous and metamorphic rock Typical profile H1 - 0 to 8 inches: cobbly sandy loam H2 - 8 to 15 inches: very cobbly sandy clay loam H3 - 15 to 60 inches: extremely cobbly loamy sand Properties and qualities Slope: 1 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.20 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Very low (about 2.6 inches) Interpretive groups Land capability classification (irrigated): 6s Land capability classification (nonirrigated): 6s Hydrologic Soil Group: B Ecological site: Stony Loam (R048AY237CO) Other vegetative classification: Stony Loam (null_82) Hydric soil rating: No Custom Soil Resource Report 13Page 53 of 76 07/29/2019 Description of Mergel Setting Landform: Alluvial fans, structural benches, valley sides Down-slope shape: Linear Across-slope shape: Linear Parent material: Glacial outwash Typical profile H1 - 0 to 8 inches: cobbly loam H2 - 8 to 20 inches: very cobbly sandy loam H3 - 20 to 60 inches: extremely stony sandy loam Properties and qualities Slope: 1 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 6.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Low (about 3.3 inches) Interpretive groups Land capability classification (irrigated): 4s Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Ecological site: Stony Loam (R048AY237CO) Other vegetative classification: Stony Loam (null_82) Hydric soil rating: No Minor Components Other soils Percent of map unit: 10 percent Hydric soil rating: No Custom Soil Resource Report 14Page 54 of 76 07/29/2019 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 15Page 55 of 76 07/29/2019 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 16Page 56 of 76 07/29/2019 2 Appendix B--FEMA FIRM Map Page 57 of 76 07/29/2019 Page 58 of 76 07/29/2019 3 Appendix C--Plan Set Page 59 of 76 07/29/2019 1/30/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E , L L C 21 0 W M A I N S T . , AS P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N DETAILS C501 1/11/20182/6/2018 Page 60 of 76 07/29/2019 1/30/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E , L L C 21 0 W M A I N S T . , AS P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N WATER DEPT DETAILS C502 1/11/20182/6/2018 Page 61 of 76 07/29/2019 Silt Fence (SF)SC-1 November 2010 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 SF-3 Concrete Washout Area (CWA)MM-1 November 2010 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 CWA-3 SC-1 Silt Fence (SF) SF-4 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 November 2010 MM-1 Concrete Washout Area (CWA) CWA-4 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 November 2010 1/30/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E , L L C 21 0 W M A I N S T . , AS P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N EROSION SED. CONTROL DETAILS 1 C503 1/11/20182/6/2018 Page 62 of 76 07/29/2019 Vehicle Tracking Control (VTC)SM-4 November 2010 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 VTC-3 Vehicle Tracking Control (VTC)SM-4 November 2010 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 VTC-5 SM-4 Vehicle Tracking Control (VTC) VTC-4 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 November 2010 SM-4 Vehicle Tracking Control (VTC) VTC-6 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 November 2010 1/30/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E , L L C 21 0 W M A I N S T . , AS P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N C504 EROSION SED. CONTROL DETAILS 2 1/11/20182/6/2018 Page 63 of 76 07/29/2019 TRANS- FORME R REPLACE CURB & GUTTER EX T R E E T O R E M A I N 15.1" D I A M 30' D R I P WAT E R M A I N EX W A T E R SE R V I C E WATER MAIN & SERVICE NOT SURVEYED ABANDON EXISTING TAP PER COA WATER DEPT STANDARDS. NEW 2" TYPE K COPPER SERVICE MINIMUM DISTANCE 18" FROM EXISTING TAP REPLACE ASPHALT AT LOCATION OF CONCRETE PATCH. REPLACE ASPHALT A MINIMUM 2' OFF GUTTER. REPLACE ASPHALT OVER WATER SERVICE TRENCH. ADJA C E N T CUR B C U T & SIDE W A L K T O REM A I N . ADJA C E N T S I D E W A L K TO R E M A I N . G P C SEWER: ABANDON EXISTING SERVICE. INSTALL NEW SERVICE PER ASPEN SAN. DIST. STANDARDS. GAS: NEW SERVICE FROM ALLEY. PHONE & CABLE: PROVIDE NEW PEDESTALS ONSITE. ELECTRIC: ABANDON EXISTING DIRECT BURY. PULL NEW CABLE FROM EXISTING TRANSFORMER. GREE N R O O F GREE N R O O F GREE N R O O F PARK I N G AREA S PERV I O U S PAVE R S MAIN S T . ROW = 1 0 0 ' NEW T R E E REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE. REMOVE CURB CUT & REVEGETATE PERVIOUS PATIO AREA=90 SF CIRCULATION PIPED INTO SUBSTRATE 420 SF / 90 SF=4.67:1 E TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE CONCRETE TREATED BY PATIO PERVIOUS PAVERS CONCRETE TREATED BY GRASS BUFFER OR PAVERS NEW SIDEWALK NEW CURB AND GUTTER NEW ASPHALT EXISTING ASPHALT TO REMAIN PERVIOUS PAVERS GREEN ROOF EELECTRIC METER GGAS METER CCABLE PEDESTAL PPHONE PEDESTAL 2/6/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E 21 0 W M A I N S T . , A S P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N UTILITIES C600 1/11/20182/6/2018 Page 64 of 76 07/29/2019 REPLACE CURB & GUTTER EX T R E E T O R E M A I N 15.1" D I A M 30' D R I P REPLACE ASPHALT AT LOCATION OF CONCRETE PATCH. REPLACE ASPHALT A MINIMUM 2' OFF GUTTER. REPLACE ASPHALT OVER WATER SERVICE TRENCH. ADJA C E N T CURB C U T & SIDE W A L K T O REM A I N . ADJA C E N T S I D E W A L K TO R E M A I N . GREE N R O O F GREE N R O O F GREE N R O O F PARK I N G AREA S PERV I O U S PAVE R S MAIN S T . ROW = 1 0 0 ' NEW T R E E REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE. REMOVE CURB CUT & REVEGETATE PERVIOUS PATIO AREA=90 SF CIRCULATION PIPED INTO SUBSTRATE 420 SF / 90 SF=4.67:1 TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE FOUNDATION DRYWELL 4-FT DIAMETER CONCRETE TREATED BY PATIO PERVIOUS PAVERS CONCRETE TREATED BY GRASS BUFFER OR PAVERS NEW SIDEWALK NEW CURB AND GUTTER NEW ASPHALT EXISTING ASPHALT TO REMAIN PERVIOUS PAVERS GREEN ROOF EELECTRIC METER GGAS METER CCABLE PEDESTAL PPHONE PEDESTAL 2/6/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E 21 0 W M A I N S T . , A S P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N FOUNDATION DRAINAGE PLAN C700 1/11/20182/6/2018 Page 65 of 76 07/29/2019 REPLACE CURB & GUTTER EX T R E E T O R E M A I N 15.1" D I A M 30' D R I P REPLACE ASPHALT AT LOCATION OF CONCRETE PATCH. REPLACE ASPHALT A MINIMUM 2' OFF GUTTER. REPLACE ASPHALT OVER WATER SERVICE TRENCH. ADJA C E N T CURB C U T & SIDE W A L K T O REM A I N . ADJA C E N T S I D E W A L K TO R E M A I N . GREE N R O O F GREE N R O O F GREE N R O O F PARK I N G AREA S PERV I O U S PAVE R S MAIN S T . ROW = 1 0 0 ' NEW T R E E REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE. REMOVE CURB CUT & REVEGETATE PERVIOUS PATIO AREA=90 SF CIRCULATION PIPED INTO SUBSTRATE 420 SF / 90 SF=4.67:1 TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH GATE CONC. WASHOUT DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE DISCHARGE ROOF DRAIN TO GRADE CONCRETE TREATED BY PATIO PERVIOUS PAVERS CONCRETE TREATED BY GRASS BUFFER OR PAVERS NEW SIDEWALK NEW CURB AND GUTTER NEW ASPHALT EXISTING ASPHALT TO REMAIN PERVIOUS PAVERS GREEN ROOF EELECTRIC METER GGAS METER CCABLE PEDESTAL PPHONE PEDESTAL 2/6/2019 DATE OF PUBLICATION C0.0 COVER SHEET KI N G L O U I S E 21 0 W M A I N S T . , A S P E N , C O 2/6/2019 BUILDING PERMIT WOODY CREEK ENGINEERING, LLC P.O. BOX 575 WOODY CREEK, COLORADO 81656 (P): 970-429-8297 WOODYCREEKENGINEERING.COM 0 5 10 20 40 Scale: 1" = 10' N N EROSION SEDIMENT CONTROL PLAN C800 1/11/20182/6/2018 Page 66 of 76 07/29/2019 4 Appendix D--Hydrologic Calculations Page 67 of 76 07/29/2019 BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 10YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) Tc (Computed) (min) Tc (Regional) (min)Tc (min)Intensity (5yr) (in/hr) Intensity (10yr) (in/hr) Intensity (100yr) (in/hr) PEAK FLOW 5YR (CFS) PEAK FLOW 10YR (CFS) PEAK FLOW 100YR (CFS) EX:1 6,000.00 0.00 0.138 0.000 0% 0.06 0.15 0.35 104.40 0.0038 26.33 10.5800 10.5800 2.3597 2.8390 4.5350 0.020 0.059 0.219 Total 6,000 0 0.138 0.000 0%- - - -0.020 0.059 0.219 Page 68 of 76 07/29/2019 BASIN NO.TOTAL BASIN AREA (SF) IMPERVIOUS AREA (SF) TOTAL BASIN AREA (ACRES) IMPERVIOUS AREA (ACRES) % IMPERVIOUS RUNOFF COEF. 5YR RUNOFF COEF. 10YR RUNOFF COEF. 100YR FLOW PATH LENGTH (FT) FLOW PATH SLOPE (FT/FT) Tc (Computed) (min) Tc (Regional) (min)Tc (min)Intensity (5yr) (in/hr) Intensity (10yr) (in/hr) Intensity (100yr) (in/hr) PEAK FLOW 5YR (CFS) PEAK FLOW 10YR (CFS) PEAK FLOW 100YR (CFS) PR:1A 79.17 79.17 0.002 0.002 100% 0.90 0.92 0.96 9.50 0.0200 0.91 10.0528 5.0000 3.2911 3.9596 6.3251 0.005 0.007 0.011 PR:1B 141.48 141.48 0.003 0.003 100% 0.90 0.92 0.96 11.20 0.0200 0.98 10.0622 5.0000 3.2911 3.9596 6.3251 0.010 0.012 0.020 PR:2A 985.65 218.26 0.023 0.005 22% 0.22 0.30 0.46 23.40 0.0100 7.66 10.1300 7.6552 2.7726 3.3357 5.3285 0.014 0.022 0.055 PR:2B 630.21 174.22 0.014 0.004 28% 0.25 0.32 0.47 17.50 0.0100 6.43 10.0972 6.4317 2.9902 3.5975 5.7467 0.011 0.017 0.039 PR:3 2,065.31 321.28 0.047 0.007 16% 0.20 0.27 0.44 32.80 0.0100 9.34 10.1822 9.3368 2.5195 3.0313 4.8422 0.024 0.039 0.101 PR:4 515.75 0.00 0.012 0.000 0% 0.06 0.15 0.35 3.60 0.0200 2.83 10.0200 5.0000 3.2911 3.9596 6.3251 0.002 0.007 0.026 PR:5 175.50 175.50 0.004 0.004 100% 0.90 0.92 0.96 14.50 0.0200 1.12 10.0806 5.0000 3.2911 3.9596 6.3251 0.012 0.015 0.024 PR:6 58.42 58.42 0.001 0.001 100% 0.90 0.92 0.96 10.81 0.0200 0.97 10.0601 5.0000 3.2911 3.9596 6.3251 0.004 0.005 0.008 PR:7 30.66 30.66 0.001 0.001 100% 0.90 0.92 0.96 8.10 0.0200 0.84 10.0450 5.0000 3.2911 3.9596 6.3251 0.002 0.003 0.004 PR:8 40.73 40.73 0.001 0.001 100% 0.90 0.92 0.96 8.20 0.0200 0.84 10.0456 5.0000 3.2911 3.9596 6.3251 0.003 0.003 0.006 PR:9 39.05 39.05 0.001 0.001 100% 0.90 0.92 0.96 4.10 0.0200 0.59 10.0228 5.0000 3.2911 3.9596 6.3251 0.003 0.003 0.005 PR:10 20.25 20.25 0.000 0.000 100% 0.90 0.92 0.96 5.40 0.0200 0.68 10.0300 5.0000 3.2911 3.9596 6.3251 0.001 0.002 0.003 PR:11 23.63 23.63 0.001 0.001 100% 0.90 0.92 0.96 4.90 0.0200 0.65 10.0272 5.0000 3.2911 3.9596 6.3251 0.002 0.002 0.003 PR:12 226.17 0.00 0.005 0.000 0% 0.06 0.15 0.35 49.60 0.0100 13.22 10.2756 10.2756 2.3969 2.8838 4.6066 0.001 0.002 0.008 PR:13 136.79 0.00 0.003 0.000 0% 0.06 0.15 0.35 18.20 0.0100 8.01 10.1011 8.0106 2.7150 3.2665 5.2180 0.001 0.002 0.006 PR:14 94.31 0.00 0.002 0.000 0% 0.06 0.15 0.35 9.30 0.0100 5.73 10.0517 5.7263 3.1314 3.7675 6.0182 0.000 0.001 0.005 PR:15 170.18 0.00 0.004 0.000 0% 0.06 0.15 0.35 33.20 0.0100 10.82 10.1844 10.1844 2.4083 2.8975 4.6285 0.001 0.002 0.006 PR:16 506.65 0.00 0.012 0.000 0% 0.06 0.15 0.35 40.00 0.0100 11.88 10.2222 10.2222 2.4036 2.8918 4.6194 0.002 0.005 0.019 PR:17 59.64 59.64 0.001 0.001 100% 0.90 0.92 0.96 0.50 0.0200 0.21 10.0028 5.0000 3.2911 3.9596 6.3251 0.004 0.005 0.008 Page 69 of 76 07/29/2019 5 Appendix E--Hydraulic Calculations Page 70 of 76 07/29/2019 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Feb 5 2019 4 in PVC @ 1% Circular Diameter (ft) = 0.33 Invert Elev (ft) = 100.00 Slope (%) = 1.00 N-Value = 0.009 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 0.26 Q (cfs) = 0.261 Area (sqft) = 0.07 Velocity (ft/s) = 3.56 Wetted Perim (ft) = 0.73 Crit Depth, Yc (ft) = 0.29 Top Width (ft) = 0.26 EGL (ft) = 0.46 0 1 Elev (ft)Section 99.75 100.00 100.25 100.50 100.75 101.00 Reach (ft) Page 71 of 76 07/29/2019     May 14, 2019 Theodore K Guy Associates PC 225 N Mill St #111 Aspen, CO 81611 Attention: Theodore "Ted" Guy (970) 379-0967 Subject: Temporary Sound Control Proposal (Rev1) Reference: King Louise Aspen, CO Dear Mr. Guy, As a follow-up to our conversation concerning temporary sound control, we have prepared the following REVISED rental cost proposal including rental rate for product based on a minimum rental period. General product information is included below as Attachment ”1”. Proposed Product: E812 STC-25 Portable Panels – 14 Panels (details to follow) More information on our complete line of products and services can be found on our websites at www.environmental-noise-control.com and www.drillingnoisecontrol.com. Please do not hesitate to contact us with any additional questions or concerns. Very truly yours, Tom Carter Rocky Mountain Senior Account Manager Email: tcarter@baenc.com Cell: (970) 314-3915 Office: (970) 805-0213 PROPOSAL ACCEPTANCE If approved, please complete this section and return via email to tcarter@baenc.com. Approved by: __________________________ PO or AFE #: __________________________ Date: __________________________ Appendix H Page 72 of 76 07/29/2019   Theodore K Guy Associates PC May 14, 2019 Page 2      Acoustical Materials Description E812 STC-25 Portable Panels E812 panels portable sound mitigation, which are designed to be utilized in applications where it is impractical or uneconomical to erect a standard temporary sound wall. BAENC E812 Portable Acoustic Panel System provides the sound mitigation benefits of our ENC STC-25 Acoustic Blankets with the versatility and portability of a lightweight free-standing steel support frame. Each panel is 8' x 12' (width x height) and in standard construction includes frame, blanket, support legs and angle braces. Freestanding portable panels are not designed for high wind conditions and may require additional support to meet wind loading requirements. Rental Cost Proposal E812 STC-25 Portable Panels Rental of E812 STC-25 Portable Panels – Qty. 14 Panels @ $9.00 /Panel /Day: $126.00 /Day Proposal Notes: 1. Payment terms NET 30 days unless otherwise specified. 2. Prices do not include applicable sales taxes or permit fees. 3. To process order please supply AFE# or Purchase Order# with proposal signoff. 4. Quotation is valid for 30 days. 5. Customer agrees that subscription service charges necessary for timely payment of invoices may be subject to a change order and will be billed back to the customer. 6. BAENC reserves the right to invoice for any changes in a project’s scope of work. 7. Line items will be billed to customer as completed. 8. BAENC reserves the right to charge for any damaged or stolen material while on the client’s site. 9. Customer agrees that there will be no retainage on any BAENC invoice for any reason. 10. Permit(s), if required, to be obtained by others. 11. Rental Rates based on 60-day minimum rental commitment. 12. BAENC will not be liable for any damaged property of Theodore K Guy Associates PC, caused by the installation, use, removal or handling of our sound mitigation system. 13. Repair or replacement of material damaged by the customer during installation, moved from location-to-location, removal or return to BAENC will be billed back to the customer at our standard product repair or replacement rates. 14. Quotation does not include site specific Engineering calculation submittal. 15. Freestanding BAENC acoustical panels are not wind rated. Site specific wind loading engineering calculations are recommended when installing acoustical panels. 16. Freestanding Acoustic Panels are not designed for installation in high wind conditions without additional structural support. Always Follow installation instructions. Page 73 of 76 07/29/2019   Theodore K Guy Associates PC May 14, 2019 Page 3      Attachment “1” Page 74 of 76 07/29/2019   Theodore K Guy Associates PC May 14, 2019 Page 4      Attachment “1” (continued) Page 75 of 76 07/29/2019     Terms and Conditions for Rental Services The Lessor hereby rents to the Customer sound control systems, including but not limited to, sound walls, blankets, enclosures, equipment, sound measurement and monitoring instrumentation systems, and accessories described in the proposal, which are subject to the provisions of this Agreement. “Customer” refers to the company renting from Lessor, Behrens and Associates, Inc., dba Environmental Noise Control (“BAENC”) and any other person or organization to which charges are billed: his employer, partner, or representative all of whom shall be jointly and severally liable hereunder. The above referenced equipment is the property of Lessor, except as otherwise provided herein, and shall be returned or released by the Customer in the same condition as received, excluding ordinary wear and tear, on the day specified or sooner upon Lessor's demand. The equipment shall be a used solely in Customer's business and be kept only at its place of business or job site and shall not be moved without prior written consent of Lessor. The Customer shall call the Lessor when it is ready to return the equipment. The customer shall be responsible for securing equipment from loss, theft, and/or damage until picked up by the Lessor. With respect to equipment or any other rentals, all loss, or damage thereto, from any cause whatsoever while in the Customer’s care, custody and control, whether or not due to the fault of the Customer, including but not limited to fire, flood, winds with speeds above the International Building Code standards, theft, comprehensive losses and Acts of God, shall be the sole responsibility of the customer and shall be charged back to the customer and paid to Lessor promptly upon receipt. Quoted prices are based on the location being ready on the specified day; that the customer has on-site security to protect equipment and material and the customer’s site management has been briefed on the noise mitigation installation process. Rent is based on a minimum of 30 days. This quote presumes the installer will be able to augur pier holes in penetrable soil, with no underground or overhead obstructions. If rock drilling, Hydro-Excavation, or any other special installation techniques are required there will be additional charges of the direct cost plus 30%. If the customer requires our crew to work overtime the overtime cost will be charged back to the customer at cost plus 30%. Delays, worker waiting time or changes to the original structure quoted, not within the installer’s purview, will be billed back to the customer, i.e. wall additions or changes requiring additional auguring, transportation costs and labor costs. A minimum of seven (7) calendar days is required prior to mobilizing on site. Requests to mobilize outside of the required time period, may result in additional costs. Lessor will in no event have liabilities for damages as a result of supplying equipment or its use of the same or furnishing of any service hereunder. Customer shall furnish underground utility locations or pay for underground utility locations provided by Lessor. Lessor is not responsible for any loss or damage caused by installation of equipment after underground utility locations have been identified and work is completed within a reasonable time thereafter whether caused in whole or in part by the negligence or fault of BAENC. In the event of a loss, theft, or damage to equipment, Customer agrees to notify Lessor immediately by telephone and thereafter to promptly report in writing to Lessor and the public authorities (where required by law or by Lessor) all information relating thereto. Customer shall cause its agents and employees to give the Lessor and public authorities full access of information and assistance in the investigation and prosecution of any matter resulting from said loss, theft, or damage. The Customer will indemnify, save harmless and defend BAENC, its employees and contractors, all liability and expense for loss, damage, death or injury to person or property in any manner arising from, or is incident to, the use of this equipment regardless of whether caused in whole or in part by the negligence or fault of BAENC. Customer will maintain a commercial or comprehensive general liability insurance including but not limited to premises operations, products/completed operations, contractual liability and independent contractors and personal injury. Such policy shall name Lessor as additional insured with respect to premises operations and completed operations and be primary and non-contributing with any insurance maintained by Lessor. Any failure of performance by Lessor which is due to a cause beyond Lessor’s control, including, but not limited to, acts of civil or military authority, Acts of God, labor difficulties, and failure of transportation, shall not be deemed a default by Lessor. Should Customer fail to pay any invoice to Lessor or in accordance with the terms of the Lessor’s invoice, customer shall pay to Lessor, interest on such delinquent payment until paid at the lesser of 10% or the maximum rate allowable by the laws of the jurisdiction in which Lessor’s branch office renting the equipment, is located. In addition to the rental payments called for in the proposal to furnish equipment, the Customer shall pay all taxes or impositions of any nature or kind imposed upon this transaction, (excluding only state and federal income taxes of BAENC) including but not limited to sales or use taxes, real property taxes or assessments, personal property taxes or assessments, and fixture or inventory taxes, regardless of how denominated or computed, regardless of the party upon whom the taxes are imposed, and irrespective of the timing or frequency of such assessments. Customer shall pay such amounts prior to delinquency upon receipt of a notice from the taxing authority or within ten (10) days of receipt of a notice from BAENC. The Customer shall also pay any interest or penalties assessed or imposed with respect to any tax or assessment which is not timely satisfied unless the cause of the default or delinquency giving rise to the interest or penalty is the failure of BAENC to provide timely notice to Customer. Customer agrees that subscription service charges necessary for timely payment of invoices may be subject to a change order and billed back to the customer, to the extent permitted by applicable law, Customer hereby waives any and all rights and remedies granted to customer by article 2A of the Uniform Commercial Code. Page 76 of 76 07/29/2019