HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (69).ARBKUP
T Gyp
100'-0"
T Ply
99'-10 1/2"
T Gyp
100'-0"
T Ply
99'-10 1/2"
T Gyp
100'-0"
T Ply
99'-10 1/2"
MAIL BOX
18"D X 30 1/2"W
X62"H BRONZE
SI
D
E
W
A
L
K
Living
Unit 102
Dining
Kitchen
Porch
UNIT 103
Dining
Hall
Bedroom 2Bedroom 1
Bath
Bath
Laundry
Living
Kitchen
Porch
Bedroom 2Bedroom 1
Unit 101
Living
Dining
Kitchen
Unit Storage
Unit Storage
Trash
UP
SETBACK LINE
PROPERTY LINE
North Wing
East Wing
West WingParking Space #6
Handicapped
Parking Space #5
Parking Space #3
Parking Space #4
Parking Space #2
Parking Space #1
Bike Rack
Patio
Patio
Patio
Open Above
P.O. Box
North Wing
East Wing
West WingParking Space #6
Handicapped
Parking Space #5
Parking Space #3
Parking Space #4
Parking Space #2
Parking Space #1
Bike Rack
Patio
Patio
Patio
Open Above
P.O. Box
Property Line
Parking / Pervious Pavement
Edge of Green Roof Above
Proposed Hardscape
Proposed Small Shrub
Proposed Lawn
Proposed Lawn in Right of Way
Existing Sidewalk
Proposed Street Tree Per Parks Department
Property Line
Proposed Lilac Shrubs
Proposed Walkay
Proposed Evergreen Shrub
Sod
Sod
Sod
Sod
Sod
Sod
Sod
Proposed Perennials & Groundcovers
Proposed Lilac Shrubs
Proposed Narrowleaf Cottonwood Tree
Proposed Lawn
Proposed Evergreen Shrub
Existing Street Tree
To Remain
1. All Discrepancies Should Be Reported To The Landscape Architect.
2. Locate All Utilities Before Digging.
3. All Areas Shown Are Approximate Only. Verification Of Areas To Be Revegetated Shall Occur On Site Between
The Contractor and Landscape Contractor.
4. Grades Are To Be Checked And Approved By The Contractor Before Installation Of Plant Material.
5. Location Of Plant Material Is To Be Approved By The Contracor Before Installation.
6. Quality Of Plant Material Is To Be Approved By The Contractor Before Installation.
7. All Planted Areas To Be Covered With Mini Pine Bark Nuggets Only (No Debris Mixed In). Mulch To Be A
Minimum Depth Of 4". Mulch To Be Applied To Soil Surface Only, Not Against Stems Or Tree Trunk Base.
8. Planting Beds Are To Contain "Pre-mixed" Planting Mixture To A Minimum Depth Of 12"
9. All Planting Beds Are To Be Contained By 4" Metal Edging.
10. Irrigate All Disturbed Areas With An Automatic Irrigation System.
11. Layout All Planting Beds And Edge Prior To Plant Installation.
12. All Plerennials Are To Be Layed Out With Uniform Spacing. Layout To Be Approved By Contractor Prior To
Installation.
13. Contractor To Provide & Install Drainage And Irrigation/ Lighting Sleeves As Needed For All Planting Areas.
Planting Notes
1) Amendment shall be tilled to a minimum depth of six inches (6”).
2) Site shall be graded to within two-tenths of a foot (2/10th’) of the grading plan.
3) Site shall be free of rocks and debris over one inch (1”) diameter in size. Rocks and debris 0.5 inch (0.5”)
to one inch (1”) shall not exceed 5 percent (5%) by volume and gravel 0.6 inch (0.6”) to 1.25 inches (1.25”)
shall not exceed 5 percent (5%) by volume.
Particles such as concrete, brick, glass, metal, wood or plastic greater than one inch (1”) shall not be allowed.
The total volume of these materials smaller than one inch (1”) shall not exceed 5 percent (5%).
4) Site shall be free of dirt clods over three-quarter inch (3/4”) diameter in size. Dryland seed areas may
contain dirt clods up to two inch (2”) diameter in size.
5) Stockpiling - Stripping and stockpiling of indigenous soil (topsoil) shall be required during construction
(except as waived by the City of Aspen). The replacement of this soil, plus additional soil amendments,
are critical to successful plant material establishment, ongoing health, and efficient use of water
through the life of the project.
6) The soil shall have no herbicides, heavy metals, biological toxins or hydrocarbons that impact plant growth
or exceed the EPA’s standards for soil contaminant.
7) All applicable soil criteria and standards shall be noted on the landscape design plan. Written verification
of approved soil amendment type and volume is required.
Projects with inadequate soil amendment and preparation will not be approved.
8) Removing sod and amending soil under protected trees requires hand grubbing no deeper than 4". Any
additional soil above existing grade limited to a maximum 3".
9)All irrigation work performed under protected treesrequires hand grubbing no deeper than 4".
Soil Preparation
Soil Amendments
Water Budget Analysis
“I have complied with the criteria of the Water Efficient Landscaping
Standards and applied them for the efficient use of water in the
landscape design plan”.
Greg Mozian, RLA
Water Usagage Legend
HZ 'C' - VeryHigh/Sod - Drip - Zones 2,5,7
HZ 'A' - Low/Flower Beds - Drip - Zones 1,4,6
Hydrozones
1) Topsoil of irrigated grasses (including turf), shrubs, perennials, and annuals shall be a sandy loam
to a depth of at least 6 inches (6”) containing at least 5 percent (5%) organic matter by volume.
2) Tree soil must be a sandy loam and 36" deep for areas where trees are planted.The total soil depth shale have
at least 1%-3% organic matter by volume. If in turf, topsoil should be 6" and have 5% organic matter by volume.
In good existing soils, dig and turn the soils to three times the dimension of the root ball. Hard or compacted subsoil
or lower soil layers should be broken up to create adaquate drainage and avoid trapping water creating saturated
and anaerobic conditions in the upper soil layer. In newly developed planting sites, soil depth shall be 20' diamter
around the trees to a depth of 36".
3) Soil amendment organic matter shall consist of either Class I and Class II compost.
Sod
Native Grass Mix Seed
VH
L
Plant List
Common Name Scientific Name Size
Deciduous Shrubs
Evergreen Shrubs
Assorted Groundcovers and Perennials
Groundcovers
Medium Shrub
ie. Mugo Pine
Potentilla fruticosa'Kathryn'
Pinus mugo
Kathryn Dykes Potentilla 5 Gal.
30" Spread
1 Gal.
3-5 ft.Purple Reblooming Lilac
HZ
L
L
L
Blue Siberian Iris Iris siberica 'Caesar's Brother'
Sweet Woodruff Galium odoratum
Woolly Thyme Thymus praecox 'Pseudolanuginosus'
Blue Spike Speedwell Veronica spicata 'Tall Blue'
Dwarf Fall Aster Aster novi-belgii
Black-Eyed Susan Rudbeckia fulgida 'Goldsturm'
Dwarf Gold 'Daylily'Hemerocallis 'Stella De Oro'
1 Gal.
1 Gal.
1 Gal.
1 Gal.
1 Gal.
1 Gal.
L
L
L
L
L
L
Syringa x Bloomerang
L
1 Gal.
FA
BSS
I
BES
DL
SW
WT
Maroon Hollyhock Alcea rosea 1 Gal.LMH
Sod
1 Gal.
Creeping Speedwell Veronica repens 1 Gal.LCS
Right of Way - Spray - Zone 3
Narrowleaf Cottonwood Populus trichocarpa 3" CalL
Quaking Aspen Populus trimuloids 3" CalL
SW
SW
SW
SW
SW
SW
SW
SW
SW
SD
BES
BES
BES BES BES
BES
BES
BES
BES
WT
WT
WT
WT
WTWT
BSS
BSS
BSS
BSS
BSS
BSS
BSS
DL
DL DLDL
DL DL
DL
DL
SW
SW
SW
BES
DL
SW
BES
SW
WT
SW
WT
SW
SW
BSS
BES
SW
BSS
BES
BSS
SW
DL
BES
SW
BESBESBESBES
GRE
G
MOZ
I
A
N
A
N
D
ASS
O
C
I
A
T
E
S
,
INC
.
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
•
En
v
i
r
o
n
m
e
n
t
a
l
P
l
a
n
n
i
n
g
11
7
S
o
u
t
h
S
p
r
i
n
g
S
t
r
e
e
t
,
S
u
i
t
e
2
B
•
A
s
p
e
n
,
C
o
l
o
r
a
d
o
8
1
6
1
1
Ph
:
(
9
7
0
)
9
2
5
-
8
9
6
3
•
Fa
x
:
(
9
7
0
)
9
2
5
-
1
2
1
7
•
E
m
a
i
l
:
be
n
@
g
r
e
g
m
o
z
i
a
n
.c
o
m
Sheet:
North
Date:
Scale:
Drawn By:
Revised:
Schematic Design
Design Development
Construction Documents
King Louise
WELS Plan
BM
3/16" = 1'-0"
1/25/2018
L.4.02
05/25/2018
01/31/2019
03/02/2019
04/10/2019
09/02/2019