CHANGE ORDER NARRATIVE
209 E BLEEKER STREET
This change order is for the addition of 233 sf of tile patio with snowmelt to the area between the
Historic cabin and the new addition (see sheet A1.3 REMP Plan, A2.3, M1.002, & C5). In order to set-off
the REMP fee, we are adding more solar panels to the roof (reference sheets A2.4 & REMP worksheet).
Thank you for your time,
Melanie Noonan
Z Group Architects
07/24/2020
1. There is a new
trench drain proposed
on sheet C5. What
does this trench drain
tie to? Has it been
sized to
accommodate the
tributary area?
2. Does the drainage
infrastructure have
capacity to provide
treatment of the
WQCV and detention
of the new impervious
area?
3. It appears that the
new impervious area
drains to a swale
heading north to the
gravel bed, verify this
is the proposed