Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0061-2020-BCHO (10) Z-Group Architects 411 East Main Street, Suite 205 Aspen, Colorado 81611 Telephone 970-925-1832 FAX 970-925-1371 Date: July 23, 2020 Project Name: 209 E Bleeker Street Permit No.: 0320-2017-ARBK Project Contact: Melanie Noonan CHANGE ORDER NARRATIVE 209 E BLEEKER STREET This change order is for the addition of 233 sf of tile patio with snowmelt to the area between the Historic cabin and the new addition (see sheet A1.3 REMP Plan, A2.3, M1.002, & C5). In order to set-off the REMP fee, we are adding more solar panels to the roof (reference sheets A2.4 & REMP worksheet). Thank you for your time, Melanie Noonan Z Group Architects 07/24/2020 1. There is a new trench drain proposed on sheet C5. What does this trench drain tie to? Has it been sized to accommodate the tributary area? 2. Does the drainage infrastructure have capacity to provide treatment of the WQCV and detention of the new impervious area? 3. It appears that the new impervious area drains to a swale heading north to the gravel bed, verify this is the proposed drainage path.