Loading...
HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0207-2018-ARBK (3)Existing Gross Floor Area UNIT 5UNIT5 UNIT 2 UNIT2 EX'G WATER HETER UNDER STAIRS PHOTO 1 PHOTO 2 PHOTO 3 PHOTO 4 PHOTO 1PHOTO 2PHOTO 3PHOTO 4 PHOTO 5 PHOTO 5 DEMOLISHED WALLS SEE STRUCTURAL NOTE 3/A201 REMOVE EXISTING CABINETS AND APPLIANCES REPLACE ELECTRIC RANGE WITH GAS NO MODIFICATIONS TO EXISTING FIREBOX SEE A/503 FOR NEW KITCHEN LAYOUT REMOVE EXG GAS LOG SET SEE A/504 FOR FIREPLACE WORK Scale Plot Time matadesign@mac.com 970. 274. 6011. Project Address: 1001 E Cooper Ave Aspen, CO P R O J E C T T E A M: Architect: Martin Mata, Architect Mata Design Company 970-274-6011 matadesign@mac.com Mdesignmata company Owner: PLATINUM IRREV TRUST SAN DIEGO, CA Legal Description: Unit 1, The Villager Townhouse Condominiums General Contractor: David Lambert Construction David Lambert P.O. Box 1727 Basalt, CO 81621 970-309-0805 david@davidlambertaspen.com Structural Engineer: - 12" = 1'-0" 18/07/30 5:46:13 PM C: \ U s e r s \ M D C - B O X X - 1 \ D r o p b o x \ 8 - K a h n \ R E V I T S c h e m e s \ 1 8 0 7 2 7 K a h n C h an g e O r d e r 1 . r v t A102 Existing Conditions Floor Plans 273718233504 Villager Unit 1 KAHN 30 July, 2018 City Of Aspen Ch. Order 1 Parcel ID # 08/02/2018 09 / 2 1 / 2 0 1 8 bon n i e m 09/24/2018 EXG ELECT PANEL V C1 F1 D4 S SVC1 V C1 B1 B1 V C1 F1 V C1 D4 S VC1 S V C1 W/D GAS DRYER A B 1 2 SD Bedroom 2 New Bath 3 Office Hall Exg Bath 2 Stair Foyer Entry Bedroom 3 Shower RELOCATE TV B1 B1 B1 EXG TO REMAIN EXG TO REMAIN S RELOCATED SWITCHES PRESENT SWITCH LOCATION SD SD SD S 3" / 12" 3" / 12" V C1 D4 F1 V C1 EXISITNG SKYLIGHT B1 B1 B2 B2 B2B2 recessed can fixture wall mounted fixture surface mounted fixture track/ cable lighting step/recessed wall light fluorescent fixture undercounter lighting exhaust fan combined smoke detector carbon monoxide detector bring existing detectors up to coa code SD wall outlet- additional locations may be required by code general wall switch location- specific gang switch layout to be field located S S S S B1 D4 V C1 SD F1 DURING DEMOLITION VERIFY THAT NEW RECESSED CANS FIT WITHIN EXISTING CEILING/ ROOF CAVITY.PER COA CODE FINAL FIXTURES AND LAMPS TBD DURING DEMOLIITON 100% HIGH EFFICACY LAMPS IN RECESED CANS FLAT FLAT FLAT EXG EXG B2 sloped ceiling recessed can fixture vapor proof recessed can fixture A B 1 2 NEW FLAT CEILING EXISTING SKYLIGHT B2 B2 EXG CEILING FIXTURE TO REMAIN EX I S T I N G SK Y L I G H T S EXG SWITCHES B1 B1 STEAM SHOWER GA S OV MW 18" DW 30" REF REPLACE ALL FIXTURES REPLACE EXG CANS WITH LED FIXTURE NEW E X G I N S U L A T I O N E X G TYP 1HR HOUSING RECESSED FIXTURE EXG ROOF ASSEMBLY EXG 5/8" TYPE X GWB @ CEILING SITE-BUILT: 5/8" TYPE X ENCLOSURE @ NEW FIXTURES Scale Pl o t Ti m e matadesign@mac.com 970. 274. 6011. Project Address: 1001 E Cooper Ave Aspen, CO P R O J E C T T E A M: Architect: Martin Mata, Architect Mata Design Company 970-274-6011 matadesign@mac.com Mdesignmata company Owner: PLATINUM IRREV TRUST SAN DIEGO, CA Legal Description: Unit 1, The Villager Townhouse Condominiums General Contractor: David Lambert Construction David Lambert P.O. Box 1727 Basalt, CO 81621 970-309-0805 david@davidlambertaspen.com Structural Engineer: - As indicated 18 / 0 7/ 3 0 5 : 4 6: 1 6 P M C: \ U s e r s \ M D C - B O X X - 1 \ D r o p b o x \ 8 - K a h n \ R E V I T S c h e m e s \ 1 8 0 7 2 7 K a h n C h an g e O r d e r 1 . r v t A202 Power & Lighting Plans 273718233504 Villager Unit 1 KAHN 30 July, 2018 City Of Aspen Ch. Order 1 Parcel ID # 1/4" = 1'-0"1 Level 1 Proposed Power & Lighting 1/4" = 1'-0"2 Level 2 Proposed Power & Lighting EZBARRIER.COM 1 1/2" = 1'-0"3 Sloped Can -Flat Similar 08/02/2018 MA 2015 IBC Residential Code References MA Make up air required if hood exhausts greater than 400 CFM, 2015 IMC 505.2 MA See Notes on Master Permit Set 09 / 2 1 / 2 0 1 8 bon n i e m 09/24/2018 GA S OV MW 18" DW 30" REF A5034 7 5 6 A5038 SK Y L I G H T A B O V E BE A M A B O V E 10 ' - 6 1 / 2 " V E R I F Y E X I S T I N G 7' - 0 1/2" VERIFY EXISTING 1"2' - 6"1"1' - 6"2' - 3"1' - 0 1/4"2' - 0"1' - 0 1/4"1" 2' - 6 1 / 2 " 2' - 2 " 3' - 0 " 30" REF FREEZER 18" D/W 24" SINK 24" COOKTOP VENT STANDARD KICK STONE BACK GAS OVEN MICRO 7' - 8 1 / 2 " 3' - 0 " 1"2' - 0"1"1' - 9"3' - 3"3' - 4 1/2" WINE STANDARD KICK EXISTING SKYLIGHT EXISTING WALL PANEL PANEL PANEL CABINET END 3/4" KICK PANEL EXISTING WALL 3/4" KICK EXISTING BEAM Scale Pl o t Ti m e matadesign@mac.com 970. 274. 6011. Project Address: 1001 E Cooper Ave Aspen, CO P R O J E C T T E A M: Architect: Martin Mata, Architect Mata Design Company 970-274-6011 matadesign@mac.com Mdesignmata company Owner: PLATINUM IRREV TRUST SAN DIEGO, CA Legal Description: Unit 1, The Villager Townhouse Condominiums General Contractor: David Lambert Construction David Lambert P.O. Box 1727 Basalt, CO 81621 970-309-0805 david@davidlambertaspen.com Structural Engineer: - 1/2" = 1'-0" 18 / 0 7/ 3 0 5 : 4 6: 2 0 P M C: \ U s e r s \ M D C - B O X X - 1 \ D r o p b o x \ 8 - K a h n \ R E V I T S c h e m e s \ 1 8 0 7 2 7 K a h n C h an g e O r d e r 1 . r v t A503 Kitchen Replacement 273718233504 Villager Unit 1 KAHN 30 July, 2018 City Of Aspen Ch. Order 1 Parcel ID # 1/2" = 1'-0"1 Proposed Kitchen Floor Plan2Kitchen View A3Kitchen View B 1/2" = 1'-0"4 Kitchen -East 1/2" = 1'-0"5 Kitchen -West 1/2" = 1'-0"6 Kitchen -North 1/2" = 1'-0"7 Kitchen -South 1/2" = 1'-0"8 Kitchen -Island NEW SHEET 08/02/2018 09 / 2 1 / 2 0 1 8 bon n i e m 09/24/2018 A504 2 NORTH F. WALL ABOVE HEARTH EXISTING FIXED GLASS PANEL EXISTING FIREBOX EXISTING MASONRY WALL 7' - 3 1/4" EXISTING HINGED GLASS SIDE PANEL BUILD-OUT TO MATCH AREA OVER FIREBOX SEE 6/A201 1' - 0 " 1 0 1 / 2 " EXISTING GWB WALL NEW STONE NEW STONE NEW STEEL PLATE TRIM NEW LINEAR GAS BURNER & DECORATIVE GRAVEL NEW BUILT-OUT GWB PAINT 2 REDUCE EXISTING SOFFIT 2 1 / 2 " H E A R T H 1/ 2 " R E V E A L 1' - 2 " GWB PAINT 3 MOVE EXG GAS VALVE NEW STONE HEARTH EXISTING FIXED GLASS PANEL 2' - 3 1 / 2 " 1' - 5 " EXISTING GWB PAINT 1 EXISTING GWB PAINT 1 FLUSH TRIM @ FIREPLACE W/ 1/2" REVEAL 3/4" STEEL PLATE TRIM PROUD 1X4 TRIM THROUGHOUT UPPER LEVEL NEW STONE NEW STONE 8' - 2 3/4" ALTERNATE: PLASTER FINISH 9' - 9 1 / 2 " Scale Pl o t Ti m e matadesign@mac.com 970. 274. 6011. Project Address: 1001 E Cooper Ave Aspen, CO P R O J E C T T E A M: Architect: Martin Mata, Architect Mata Design Company 970-274-6011 matadesign@mac.com Mdesignmata company Owner: PLATINUM IRREV TRUST SAN DIEGO, CA Legal Description: Unit 1, The Villager Townhouse Condominiums General Contractor: David Lambert Construction David Lambert P.O. Box 1727 Basalt, CO 81621 970-309-0805 david@davidlambertaspen.com Structural Engineer: - 1/2" = 1'-0" 18 / 0 7/ 3 0 5 : 4 6: 2 3 P M C: \ U s e r s \ M D C - B O X X - 1 \ D r o p b o x \ 8 - K a h n \ R E V I T S c h e m e s \ 1 8 0 7 2 7 K a h n C h an g e O r d e r 1 . r v t A504 Fireplace Re-Facing 273718233504 Villager Unit 1 KAHN 30 July, 2018 City Of Aspen Ch. Order 1 Parcel ID # 1/2" = 1'-0"1 Plan -Fireplace @ Living Room 1/2" = 1'-0"2 Fireplace Elevation 4 Fireplace View B 5 Fireplace View AEXISTING FIREPLACE REMOVE ALL EXISTING MARBLE TILE 1. DIMENSIONS SHOWN ARE FOR PRICING ONLY. 2. SUBSTRATE IS LIKELY ORIGINAL FACE-BRICK NEW 7FT RECESSED LINEAR LED FIXTURE NEW BUILT-OUT GWB EXISTING FIREBOX NEW STONE HEARTH REDUCED LENGTH OF SOFFIT BOTH SIDES NEW STEEL PLATE TRIM NEW STONE EXISTING PROJECTION NEW SHEET 08/02/2018 Install per manufacturer's instructions. Installation instructions required on site at time of inspection. 09 / 2 1 / 2 0 1 8 bon n i e m 09/24/2018