Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (153).ARBKPROJECT ADDRESS: Parcel ID #: Permit Number: CONTACT INFORMATION : Owner: Name:City:Mission Hills Address:State:KS Email:Zip Code:66208 Phone: Cell Phone: Owner's Representative : Name:City:Aspen Address:State:CO Email:Zip Code:81611 Phone: Cell Phone: ` A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool, spa, and solar/GSHP information: Do you have snowmelt or a spa that has been exempted by the buiding official? Hydro Snowmelt Electric Snowmelt Pool Spa Existing 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft To be Removed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New 1148.00 sqft 51.00 sqft New (exempt)40.00 sqft Total on site 1148.00 sqft 0.00 sqft 0.00 sqft 91.00 sqft Total Snowmelt on site Boiler Efficiency 95.0%100%75.0%95.0% Mitigation Fee -$ 9,448.42$ Total Fee for Mitigation:50,534.74$ B.ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV Worksheet Photovoltaic System 38,050.35$ Use Thermal Worksheet Hot Water Panels -$ Use GSHP Cert Ground Source Heat Pump 13,188.00$ Other Approved System -$ Total Mitigation Credits:51,238.35$ Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 7.36 or How many square feet of SHW (solar hot water) would I need?224.95 R-REMP Fee:-$ Amount Previously Paid on This Permit:-$ TOTAL R-REMP FEE :-$ Refund (includes minus $750):-$ C. PREPARED BY:Date: Print Name: Signature: Phone & EMail: REVIEWED:Date: afromm@smg.com (816) 304-8001 970-925-1832 melanie@zgrouparchitects.com 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM City of Aspen Version 11.1 Updated March 28 2017 209 E. Bleeker Street 2737 073 20 002 0320-2017-ARBK seth@zgrouparchitects.com Cathedral Cutthroat LLC 5601 High drive Z Group Architects (Seth Hmielowski) 1148.00 sqft 411 E. Main Street, #205 (970) 925-1832 A1.3 $41,086.32 Melanie Noonan - Z Group Architects Yes (enter sqft below on the exempt row)No 11/15/2018 NT 11/16/18 Parcel ID #: Collector Aspect, Degress from True South Collector Tilt, Degrees From Horizontal Solar Orientation Adjustment Factor DC side capacity (kW) Inverter capacity (kW) kW for credit kW Mitigation Credit Collector Group 1 70 45 86.60%7.4 6.4 6.4 5.54 kW Collector Group 2 0 0 87.00%0 0 0 0.00 kW Collector Group 3 0 0 87.00%0 0 0 0.00 kW Collector Group 4 87.00%0 0.00 kW Collector Group 5 87.00%0 0.00 kW Collector Group 6 87.00%0 0.00 kW Collector Group 7 87.00%0 0.00 kW Collector Group 8 87.00%0 0.00 kW Collector Group 9 87.00%0 0.00 kW Collector Group 10 87.00%0 0.00 kW Collector Group 11 87.00%0 0.00 kW Collector Group 12 87.00%0 0.00 kW Collector Group 13 87.00%0 0.00 kW Collector Group 14 87.00%0 0.00 kW Collector Group 15 87.00%0 0.00 kW Collector Group 16 87.00%0 0.00 kW Collector Group 17 87.00%0 0.00 kW Collector Group 18 87.00%0 0.00 kW Collector Group 19 87.00%0 0.00 kW Collector Group 20 87.00%0 0.00 kW Total:5.54 kW $ Mitigation Credit:38,050.35$ Instructions: 1) 2) 3)DC side capacity is the total labled panel output kW in a group. 4)Inverter capacity is the recommended input power in kW of your inverter(s). 5) 6) 7) 8) PREPARED BY:Date:8/25/2017 Print Name: Signature: Phone & EMail: REVIEWED:Date: PV WORKSHEET City of Aspen Version 11.1 Updated March 28 2017 Permit Number: 0320-2017-ARBK2737 073 20 002 Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically calculated. PROJECT ADDRESS: The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP fee. Determine how many collector groups you have. Groups are used to differentiate between collectors (panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you might have just one group. 209 E. Bleeker Street Greg Peterson 970-963-1420 greg@sunsensesolar.com The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit You will be given credit for the lesser of the labeled panel output or the inverter. The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit. 11/15/2018 NT 11/16/18 Project Address: Parcel ID #: I.Please list the following information BTUs per hour of installed GSHP: $ Mitigation Credit: Designer Certification: Installer Accreditation: Division of Water Resources Permit: II.GSHP System Design Specifications Number of Loops: Depth of Loops:ft. Total Loop Length:ft. Total System Capacity @ 32 oF EWT:tons ARI 330 or ISO 13256-1System Performance:COP III.Attach the following information with application. A. GSHP unit performance sheets certified by ARI 330 or ISO 13256-1. B. Designer Certification Sheets C. Installer Certification Sheets D. Division of Water Resource Permit IV.PREPARED BY:Date: Print Name: Signature: Phone & EMail: REVIEWED:Date: Coefficient of Performance of the system must be at least 3 as per American Research Institute Standard performance method (ARI 330) or ISO 13256-1 for closed loop earth- coupled heat pump systems (for hydronic systems use an output temperature of 115 degrees F) or equivalent procedure. 4/11/2018 Provided by contractor 3.1 6 7.85 350 4200 303-424-1622 tproffer@gomajornow.com NOTE: A GSHP is an energy-efficient option that significantly reduces energy use and minimizes REMP payments. The REMP payment associated with a GSHP is used to offset the coal powered electricity over 20 years. This option is calculated on REMP summary sheet. Terry Proffer Permit Number: 2737 073 20 002 12131-994 94200 btu/hr AEE CGD Number:16 GROUND SOURCE HEAT PUMP SOURCE CERTIFICATION City of Aspen Version 11.1 Updated March 28 2017 Agency 209 E. Bleeker Street IGSHPA Number: please provide all the required information as part of your application. 0320-2017-ARBK All Ground Source Heat Pump systems must be certified prior to installation; 13,188.00$ 11/15/2018 NT 11/16/18