HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (80).ARBKMarkup Summary aaronr 1-23-2018 0010.2018.ARBK 834 W Hallam (stormwater rnd1)
Subject: Certificate of Occupancy Requirements
Page: 1
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:26:25 AM
Creation Date: 1/23/2018 10:26:06 AM
File Name: PERMIT SET.834Hallam.2017.11.pdf
Attendee: Unchecked
aaronr (8)
Subject: Cloud+
Page: 9
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:21:54 AM
Creation Date: 1/23/2018 10:20:26 AM
File Name: Consturction Management Plan.834
Hallam.2017.11.pdf
Attendee: Unchecked
Do not place significant
obstruction in the flowline of the
ditch. Other BMPs are available
that would be preferred.
Subject: Cloud+
Page: 14
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:14:35 AM
Creation Date: 1/23/2018 10:13:28 AM
File Name: Consturction Management Plan.834
Hallam.2017.11.pdf
Attendee: Unchecked
If stockpiling is to occur please
provide Stormwater BMP details
and description.
Subject: Cloud+
Page: 14
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:15:34 AM
Creation Date: 1/23/2018 10:14:56 AM
File Name: Consturction Management Plan.834
Hallam.2017.11.pdf
Attendee: Unchecked
Please Provide statement
related to securing the toilet in
some manner.
Subject: Cloud+
Page: 14
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:16:08 AM
Creation Date: 1/23/2018 10:15:42 AM
File Name: Consturction Management Plan.834
Hallam.2017.11.pdf
Attendee: Unchecked
Please depict tracking pad and
add detail to Civil Sheets
EXIS
UTILI
AREA TO BE GRAD
PROPOSED RETAI
WALKWAY ABOVE
STRAW BAIL OR
SOCK
PROTECTION
FOR EXISTING
DITCH
Do not place
significant obstruction
in the flowline of the
ditch. Other BMPs
are available that
would be preferred.
3'-0"
PARKING 6
Const Trailer
Staging and
Material Storage
Parking
If stockpiling is to
occur please provide
Stormwater BMP
details and
description.
Toilet
Please Provide
statement related to
securing the toilet in
some manner.
5'-0"
KEEP EXISTING SLOPE CONDITION T
PROPOSED 5" ROLL CURB
EXISTINGUTILITIES
AREA TO BE GRADED FOR PARKING
PROPOSED RETAINING WALL
Rent Parking
Spaces as
Needed, Typ.
Gate
Please depict
tracking pad and add
detail to Civil Sheets
Noted, Civil to suggest?
No stockpiling, we do not have the space
Added to CMP site plan
Note added to CMP, Civil to add to their plans
04/13/2018
Subject: Cloud+
Page: 14
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:18:28 AM
Creation Date: 1/23/2018 10:17:19 AM
File Name: Consturction Management Plan.834
Hallam.2017.11.pdf
Attendee: Unchecked
Provide ditch protection as
depicted in Civil Plan Set. No
disturbance is permitted, contact
the City of Aspen Engineering
and Water Departments if any
ditch modification is needed.
Subject: Cloud+
Page: 14
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:19:22 AM
Creation Date: 1/23/2018 10:18:43 AM
File Name: Consturction Management Plan.834
Hallam.2017.11.pdf
Attendee: Unchecked
Depict location of concrete
washout.
Subject: Cloud+
Page: 42
Checkmark: Unchecked
Author: aaronr
Date: 1/23/2018 10:24:18 AM
Creation Date: 1/23/2018 10:22:24 AM
File Name: PERMIT SET.834Hallam.2017.11.pdf
Attendee: Unchecked
Include Tracking pad and
Concrete washout details and
location. The CMP also depicts
Silt Fence abutting the site
fence, please provide a detail or
visual depiction of the assembly.
7'-0"
5'-0"
PROPERTY LINE
SETBACK LINE
SETBACK LINE
PROPERTY LINE
DE
PROPOSED CULVERT INLET TOCLEAR WALKWAY
5'-0" DITCH EASEMENT
BUILDING OUTLINE AT GRADE
WALKWAY ABOVE DITCH CULVERT
Rent Parking
Spaces as
Needed, Typ.
Current Share Bike
Station
Provide ditch
protection as
depicted in Civil Plan
Set. No disturbance
is permitted, contact
the City of Aspen
Engineering and
Water Departments if
any ditch modification
is needed.
ON TO STREET
PARKING 1 PARKING 3 PARKING 4 PARKING 5 PARKING 6
PROPERTY LINE
PARKING 2
Co
Toilet
Dumpster
Staging a
Material
Parking
Depict location of
concrete washout.
WV
WV
E
D D
POINT B
FLOW
SEDIMENT REMOVAL SHALL BE PERFORMEDCONTINUOUSLY FOR PROPER FUNCTION.Ø
ENTRENCH 3"
ØFLO
W
TO E
A
C
H
O
T
H
E
R
APP
R
O
X
.
9
0
°
lc3dtr016
SECTION A-A
EROSION LOG
FEATURE THAT NEEDS
PROTECTION
Include Tracking pad
and Concrete
washout details and
location. The CMP
also depicts Silt
Fence abutting the
site fence, please
provide a detail or
visual depiction of the
assembly.
Noted
Added to CMP site plan
Civil?
04/13/2018