Loading...
HomeMy WebLinkAboutFile Documents.725 Cemetery Ln.0045-2019-BRES 0045-2019-BRES_BuildingComment2 0045-2019-BRES_BuildingComments_1.725 727 Cemetery Lane.2020.02.pdf(5) __._ ._.. _ a..__ V Subject: PlanCheck fia ;= -® Page: 1 Show electrical panel location on Author:justinh your floor plans not on the RCP, Color: • that is not relevant info for a File Name: 0045-2019-BRES_BuildingComments_1.725 727 ceiling plan. ._A.m� Cemetery Lane.2020.02.pdf Electrical panel locations are now being shown on the main level floor plan. See Sheet A-111 Subject: PlanCheck Building cannot approve your Page: 1 Still need permit until asbestos info and Author:justinh Color: • state demo license is submitted. File Name: 0045-2019-BRES_BuildingComments_1.725 727 You may submit all other E,®-----° = -= Cemetery Lane.2020.02.pdf responses without this, but �.. a understand we cannot approve ;- your permit until this has r Understood.State of Colorado Asbestos Abatement Permit has been added to occurred. ^ the submission.Other documents wit be uploaded as they are received. See Asbestos Abatement Permit.725&727 Cemetery Lane.2020.05 V Subject: PlanCheck 1 I "°°' Page: 2 Incorporate your additional •_m°, - -- Author justinh details into your plan set. WilialkColor: ■ 11011 ----.. File Name: 0045-2019-BRES_BuildingComments_1.725 727 Cemetery Lane.2020.02.pdf _ - �` 7 H The additional details have been added to the architectural plans. ., 4-:= - See Sheet A-502 Fors = Subject: PlanCheck Not addressed,window 108-B.1 rre : r ' Page:4 _.1`' "-- Fai . Author:justinh is less than 24"from door �;„ M ° - Color: ■ 109-B.1. Revise to show this as safety glazed - :71 ....m 1. �:- File Name: 0045-2019-BRES_BuildingComments_1.725 727 /lay Cemetery Lane.2020.02.pdf 41 21 EL=.=----- 1 Window 108-B.1 is now shown with safety glazing. See Sheet A-603 Subject: PlanCheck You are still showing different _ Page: 5 amounts of snowmelt. The -_,==]. Author:justinh „�a,_ ,,__ Color: • architectural set is not including `, = roof deck snowmelt. Previous �..m File Name: 0045-2019-BRES_BuildingComments_1.725 727 Cemetery Lane.2020.02.pdf comment still stands. Mechanical plans and architectural plans now both show the same snowmelt areas. �. .....— I See Sheet G-002 and MO.1 RECEIVED 05/07/2020 ASPEN BUILDING DEPARTMENT Architectural Plans.725 & 727 Cemetery Lane.2020.02.pdf(1) I Subject: PlanCheck Page: [34]A-603 WINDOW SCHEDULE The operable piece of glass is Author:justinh also required to be safety Color: • glazed, not just the fixed pane. II�i► File Name: Architectural Plans.725&727 Cemetery Lane.2020.02.pdf The operable piece of glass in window 105-B.1 is now shown with safety glazing. See Sheet A-603 RECEIVED 05/07/2020 ASPEN BUILDING DEPARTMENT