HomeMy WebLinkAboutFile Documents.725 Cemetery Ln.0045-2019-BRES 0045-2019-BRES_BuildingComment2
0045-2019-BRES_BuildingComments_1.725 727 Cemetery Lane.2020.02.pdf(5)
__._ ._.. _ a..__ V Subject: PlanCheck
fia ;= -® Page: 1 Show electrical panel location on
Author:justinh your floor plans not on the RCP,
Color: • that is not relevant info for a
File Name: 0045-2019-BRES_BuildingComments_1.725 727 ceiling plan.
._A.m� Cemetery Lane.2020.02.pdf
Electrical panel locations are now being shown on the main level floor plan.
See Sheet A-111
Subject: PlanCheck Building cannot approve your
Page: 1 Still need permit until asbestos info and
Author:justinh
Color: • state demo license is submitted.
File Name: 0045-2019-BRES_BuildingComments_1.725 727 You may submit all other
E,®-----° = -= Cemetery Lane.2020.02.pdf
responses without this, but
�.. a understand we cannot approve
;- your permit until this has
r Understood.State of Colorado Asbestos Abatement Permit has been added to occurred.
^ the submission.Other documents wit be uploaded as they are received.
See Asbestos Abatement Permit.725&727 Cemetery Lane.2020.05
V Subject: PlanCheck
1 I "°°' Page: 2 Incorporate your additional
•_m°, - -- Author justinh details into your plan set.
WilialkColor: ■
11011 ----.. File Name: 0045-2019-BRES_BuildingComments_1.725 727
Cemetery Lane.2020.02.pdf
_ - �` 7
H The additional details have been added to the architectural plans.
.,
4-:= -
See Sheet A-502
Fors = Subject: PlanCheck Not addressed,window 108-B.1
rre : r ' Page:4
_.1`' "-- Fai . Author:justinh is less than 24"from door
�;„ M ° - Color: ■ 109-B.1. Revise to show this as
safety glazed
- :71 ....m 1. �:- File Name: 0045-2019-BRES_BuildingComments_1.725 727
/lay Cemetery Lane.2020.02.pdf
41
21 EL=.=----- 1 Window 108-B.1 is now shown with safety glazing.
See Sheet A-603
Subject: PlanCheck
You are still showing different
_ Page: 5 amounts of snowmelt. The
-_,==]. Author:justinh
„�a,_ ,,__ Color: • architectural set is not including
`, = roof deck snowmelt. Previous
�..m File Name: 0045-2019-BRES_BuildingComments_1.725 727
Cemetery Lane.2020.02.pdf comment still stands.
Mechanical plans and architectural plans now both show the same snowmelt areas.
�. .....— I See Sheet G-002 and MO.1
RECEIVED
05/07/2020
ASPEN
BUILDING DEPARTMENT
Architectural Plans.725 & 727 Cemetery Lane.2020.02.pdf(1)
I Subject: PlanCheck
Page: [34]A-603 WINDOW SCHEDULE The operable piece of glass is
Author:justinh also required to be safety
Color: • glazed, not just the fixed pane.
II�i► File Name: Architectural Plans.725&727 Cemetery
Lane.2020.02.pdf
The operable piece of glass in window 105-B.1 is now shown with safety glazing.
See Sheet A-603
RECEIVED
05/07/2020
ASPEN
BUILDING DEPARTMENT