HomeMy WebLinkAboutFile Documents.630 W Hopkins Ave.0052-2020-BRES (3) ► g 0�1► COMMUNITY `id 1DEVELOPMENT CITY OFASPEN Demolition Verification Policy Address: 630 W. Hoplins Ave. Permit Number: Parcel Number: 273512448520 Applicability: The City has a defined threshold' of when demolition occurs. This policy is being implemented to ensure all parties understand the ramifications of demolition on a structure as well as confirm that demolition has not been triggered. For all developments not proposing to trigger demolition that are proposing to demolish 35% or more of a structure, the City of Aspen requires four (4) additional steps during the building permit process to verify the demolition percentage. If a non-conformity is demolished then it cannot be reconstructed. Please see Chapter 26.312 - Nonconformities - regarding Ability to Restore Nonconforming Uses and Nonconforming Structures.3 Prior to Building Permit Issuance: Step 1: Before building permit issuance, the architect, and the builder are required to meet with the zoning enforcement officer (ZEO)4. The primary purpose of this meeting is to review the demolition plan and verify that the demolition proposed is viable from an engineering and building perspective. The secondary purpose is that all parties understand the process after the issuance of building permit and the ramifications of triggering "demolition" during the building process. After Building Permit Issuance: Step 2:Site inspection after veneer and drywall has been removed.The ZEO and a building official will meet with the architect and builder on site to evaluate the proposed demolition in the field'. In preparation for this meeting, the builder will clearly physically demarcate the proposed demolition. This step is to confirm that the demolition work will match what has been presented and approved in the building permit. Step 3: Site inspection after demolition with the ZEO and the architect'. It is the responsibility of the applicant to notify the ZEO when demolition is complete and to schedule the site inspection. This step is to confirm that the demolition work that did occur matches the demolition plans approved in the building permit. The City will make every effort to schedule the site inspection within 48 hours of the request. Section 26.104.100- Definitions—Demolition 2 Section 26.575.020.(H)- Measurement of Demolition 3 If the consequences of demolition are extreme this demolition verification policy may be applied when proposed demolition is less than 35%. °Whoever is needed as requested by the architect, owner,ZEO, or builder will also attend (as possible)RECEI Y ED Permit Number: Demolition Verification Policy- Pa4cO1/d!9/2020 Address: ASPEN BUILDING DEPARTMENT 4:j414,0 COMMUNITY $ ig/ DEVELOPMENT CITY ASPEN O F P N Step 4: Site inspection at rough framing with the ZEO and the architect'. It is the responsibility of the applicant to notify the ZEO when framing is complete and to schedule the site inspection.This step provides incremental verification that no demolition beyond what was approved as part of the building permit has occurred. The City will make every effort to schedule the site inspection within 48 hours of the request. I understand this policy and the ramifications of triggering demolition per Title 26— Land Use Regulations. 1. Owner Signature Date 9/30 j;.1,aao jcv itQQ(250.922A7\---- Owner Printed Name L.0 Iz-Pe k.,a C E -r OR Owner's Attorney Signature Date Owner's Attorney Printed Name 2. Contract° Sign ture Date -/‹./ 2.---?-'- _-----'-- Contractor Pri nted Name ( ,,, r1 t.4M tc-,r4+.---\ Permit Number: Demolition Verification Policy - Page 2 of 4 Address: ASPE , BUILDING DEPARTM A �► COMMUNITY NIA DEVELOPMENT I CITY OF ASPEN Demolition Verification Policy Checklist Step 1— Pre-Permit Meeting Date: 10/16/20 Proposed Demolition Percentage: Architect Signature: A Contractor Signature: ( L.,k_...7 Zoning Officer Signature: Step 2— Pre-Demolition Field Inspection-All Demolition Marked by Contractor Date: Updated Demolition Percentage: Architect Signature: Contractor Signature: ikk7 Zoning Officer Signature: RECEIVED Permit Number: Demolition Verification Policy- PageAot4 — 2020 Address: ASPEN BUILDING DEPARTMENT g ► COMMUNITY Milk,/ DEVELOPMENT I CITYOFASPEN Step 3— Post-Demolition Field Inspection Date: 10/16/20 Confirmed Demolition Percentage: Architect Signature: Contractor Signature: Zoning Officer Signature: Step 4— Rough Framing Field Inspection Date: Confirmed Demolition Percentage: Architect Signature: Contractor Signature: /� /' .....k:L. Zoning Officer Signature: RECEIVED Permit Number: Demolition Verification Policy- Pagel U 19/2 0 2 0 Address: ASPEN BUILDING DEPARTMENT