PLAN REVIEW REPORT
PROJECT
West End Residence
PROJECT LOCATION
320 N 7"' Street, Aspen, CO
DATE OF REVIEW
11/29/21
REVIEW BASED ON PLANS DATED
07/27/21
REVIEW CONTACT
Shaunna Mozingo
sdmozingo@shaunnamozingo.com
RECEIVED
05/23/2022
ASPEN
BUILDING DEPARTMENT
PROJECT INFORMATION
ARCHITECT: 1/1 Workshop LLC
STRUCTURAL ENGINEER: Evolve Structural Design
MECHANICAL ENGINEER: N/A
ELECTRICAL ENGINEER: N/A
CODES USED FOR REVIEW
2015 International Building Code
2015 International Mechanical Code
2015 International Plumbing Code
2015 International Energy Conservation Code
2020 National Electrical Code
BUILDING INFORMATION
Occupancy Classification: SFR
Notice
This cursory plan review is based on the codes noted herein and represents a list of corrections
necessary to comply with the requirements contained within them. This review is not a building
permit. The local jurisdiction is responsible for issuing the appropriate permits based on this
review. The approval of plans and specifications does not permit the violation of any section of
any federal, state or local regulations. All comments in this report are based on the information
provided on the drawings and supporting documentation provided for review. The Mozingo
Code Group, LLC does not accept any responsibility for any condition that was not known at the
time of this report. We reserve the right to amend this report if additional information is received.
This report does not purport to review, interpret, apply, or certify compliance with the
accessibility requirements set forth within the Americans with Disabilities Act (ADA). The
application, interpretation and enforcement of the ADA are vested with the Federal Department
of Justice. Applicants are encouraged to seek professional review to ensure compliance with
the ADA.
RECEIVED
2IPage
Mozingo Code Group, LLC 05/23/2022
ASPEN
BUILDING DEPARTMENT
REVIEW COMMENTS
The items noted below with a comment number (B-1, B-2 etc.) are items that need to be
corrected to show compliance with the applicable codes. Please provide a written response
indicating where the corrections are made on the plans. This will speed up the review process.
Additional comments may be forthcoming once revised plans and documents are received for
review.
BUILDING CODE COMMENTS
B-1 Refer to Sheet A130: Please provide a smoke alarm in the art studio in accordance with
I RC R314. Response:Smoke&CO detector added to RCP
Detail/Page:2/A-130
STRUCTURAL COMMENTS
The scope of this review is limited to the structural plans provided.
Structural Plan Comments:
S-1 Sheet S2.002: The section cut at C-3 is a foundation section. Please clarify if needed.
S-2 Sheet S6.002 Section 2: Please indicate the wall double top plate is to be strapped
where it will need to be cut for the installation of the new HSS.
S-3 Sheet S6.002 Section 2: Please provide a means, or clarify on the section how, the top
of HSS column to be braced in the plane of the wall.
S-1 Response:Section callout removed.
S-2&S-3 Response: Detail 2/S6.002 revised.
MECHANICAL CODE COMMENTS
M-1 No mechanical plans were submitted. Please specify how the art studio will be heated
and whether or not the garage will also be heated. If using existing mechanical system
for the existing residence, pl .ase provide calculations to show that the existing system
Response:The existing mechanical system will be replaced.The Art Studio will have
can handle the new addition new electric baseboard heaters.The garage will have in-floor radiant heat
(F1/A-500).New mechanical system to be designed by HVAC subcontractor.
M-2 Refer to Sheet A100: a new snowmelt system is being installed tor the driveway to the
new garage. Please provide specifications for this new system. including automatic
Response:New snowmelt system design by subcontractor. Required plans
controls. &specifications to be submitted to the City by subcontractor.
PLUMBING CODE COMMENTS
P-1 No plumbing plans submitted or reviewed.
ENERGY CODE COMMENTS
EN-1 Refer to Sheet A500: There are no mechanical plans submitted to identify whether the
garage will be conditioned or not. The detail for the floor between the garage and the art
studio lists "sound attenuation balls" only. If this is part of the thermal envelope, it will
RECEIVED
3IPage
Mozingo Code Group, LLC 05/23/2022
ASPEN
BUILDING DEPARTMENT
need to have R38 insulation in the assembly. Please specify whether the garage is
conditioned or not. If not, please specify the appropria e thermal envelope insulation for
Response:Garage is conditioned&the floor between the
the floor assembly between the studio and the garage. art studio&garage is not part of the thermal envelope.
Detail/Page: 1-A/300
ELECTRICAL CODE COMMENTS
E-1 No electrical drawings have been included with drawings. Per NEC Article 220.16
Additions to existing installations of a dwelling requires the existing service to be calculated per
NEC Article 220.14. Per Sec. 8.20.020 Amendments, sub sec. e—the provision of the most
current version of the National Electric Code shall apply to the installation of electrical systems,
including alterations... Response: Electrical system to be design-build by electrical subcontractor.
E2 Cover Sheet—Applicable Building Codes — Per Sec. 8.24.010 Correct to 2020 NEC as
currently adopted in the city of Aspen. Response:DetaiPage:corrected A-COVERto"2020"
E3 Sheet A-100E — Existing Electrical Service Disconnect to be relocated. Per NEC Article
230.85 a new Emergency Disconnect is required for the dwelling.
Response:New location indicated,to be verified with electrical subcontractor. Detail/Page:1/A-110,3/A-201
E4 Sheet A-110E - Existing Electrical Service Disconnect to be relocated. Per NEC Article
230.85 a new Emergency Disconnect is required for the dwelling.
Response: New location indicated,to be verified with electrical subcontractor. Detail/Page:1/A-110,3/A-201
E5 Sheet A-100 - Proposed Roof Mounted solar panels. No solar information has been
provided for review. Response:Solar Specification provided. Final specification to be confirmed&
submitted to the City by the solar subcontractor. Detail/Page:A-100
E6 Sheet A-120 - Proposed Roof Mounted solar panels. No solar information has been
provided for review. Response:Solar Specification provided. Final specification to be confirmed&
submitted to the City by the solar subcontractor.Detail/Page:A-100
E7 Sheet A-130— Motorized Shades. Need specifications of product for power
requirements. All new lighting and power installations require GFCI protection per NEC Article
210.8 and AFCI protection per NEC Article 210.12 as applicable.
Response: Note added for compliance. Electrical subcontractor to confirm power requirements. Detail/Page:A-130
E8 General Note: Per NEC Article 406.4 (D) - Any power receptacles added or replaced will
require GFCI and AFCI protection as well as be Tamper Resistant and Weather Resistant as
applicable. All resets for required protection is to be located in a readily accessible location per
NEC Articles 210.8 and 210.12. Response:Note added for compliance. Detail/Page:A-130
RECEIVED
4IPage
Mozingo Code Group, LLC 05/23/2022
ASPEN
BUILDING DEPARTMENT
Building_1_320 N 7th st_0111 -2021 -BRES
90.Architectural Plans.20210727.pdf(25)
----
.._ 21051ECC'_.... Page: 1-COVER-COVER SHEET
2015C Checkmark: Unchecked Change to 2020
2015 IM1MC
20151FGC
2015IIFC Author:jimp
20151EBC
C„ar9e,o2620 1,Ng File Name: 90.Architectural Plans.20210727.pdf
MUNICIPAL CODE: CITY OF ASPEN 4
TITLE 26 LAND UI
:ICT: R-6 MEDIUM DEN Response:Changed to"2020"
AREA: 6,000 SF(REFER Detail/Page:Cover Sheet
:: -- Page:A-100E-SITE PLAN-EXISTING
Checkmark: Unchecked Any portion of this roof that is within 5'of
Author:jimp the rear property line, and is being
I — altered,will need to be brought into
g File Name: 90.Architectural Plans.20210727.pdf
compliance with the Fire Resistant
I . —fi °,r Construction rules of R302.
-- I at
A,,,_ Response: Detail added to show compliance.
""" Detail/Page: 1/A-120,3/A-510
i Page:A-110E-MAIN LEVEL PLAN -EXISTING/DEMO
Checkmark: Unchecked„ ,a What is the plan with this shed? If it is
Author:jimp being altered, it will need to be brought
i File Name: 90.Architectural Plans.20210727.pdf back from the property line and brought
`� into compliance with the Fire Resistant
I44_
— mmq,en 1,0
°aN ao Construction rules of R302.
Response: Not altering shed,leaving existing shed as-is.
--Ia Detail/Page:n/a
Page:A-111 -UPPER LEVEL PLAN -PROPOSED Please show details on the handrail(s),
eV Checkmark: Unchecked and how they meet R311.7.8
Author:jimp
pw - [
File Name: 90.Architectural Plans.20210727.pdf
I ""' Response: Detail added
- Detail/Page: 1/A-511
1 — °°° l d .w Page:A-130-REFELCTED CEILING PLANS-PROPOSED The new art studio will require a smoke
_ -) Checkmark: Unchecked
`~• a_�_ - and a Co detector
Author:jimp
--°° File Name: 90.Architectural Plans.20210727.pdf
Response:Smoke&CO detector added to RCP
Detail/Page:2/A-130
Page:A-201 -EXTERIOR ELEVATIONS-PROPOSED
i Checkmark: Unchecked Any portion of this roof that is within 5'of
Author:jimp the other dwelling units projections, and
mm� n�R,� File Name: 90.Architectural Plans.20210727.pdf
is being altered,will need to be brought
� � �� " into compliance with the Fire Resistant
Construction rules of R302.
AE "E="= Response: Detail added to show compliance.
Detail/Page: 1/A-120,3/A-510
i._LL Page:A-201 -EXTERIOR ELEVATIONS-PROPOSED
1 Checkmark: Unchecked Please show that you meet black hills
� ��It
, Author:jimp energy guidelines of 3'from the gas
s:1,. meeter to any window openings.
_i l o
= _ _®r,N File Name: 90.Architectural Plans.20210727.pdf
,,
Response:Meters dimensioned on°° elevation
,°.°.°°°°°,° E"'' Detail/Page:3/A-201 RECEIVED
05/23/2022
ASPEN
BUILDING DEPARTMENT
..�. Page:A-201 -EXTERIOR ELEVATIONS-PROPOSED
.o,ra:� Checkmark: Unchecked
I � 1 �
� Author:jimp
..°-�1 File Name: 90.Architectural Plans.20210727.pdf
Page:A-201 -EXTERIOR ELEVATIONS-PROPOSED
Checkmark: Unchecked 3' 11"
Author:jimp
14-3'-11"- 1 File Name: 90.Architectural Plans.20210727.pdf
ED DIST BET DWELLING
RE:A-100
Page:A-201 -EXTERIOR ELEVATIONS-PROPOSED
Checkmark: Unchecked Please provide a detail showing that the
® Author:jimp vertical bars in the railing meet the
� , _ omeaaa�il opening limitations of IRC R312.1.3
=lghiZe051 a File Name: 90.Architectural Plans.20210727.pdf
o CRSI1 Xxlions of
=y�IRC R312.1.3
MMI
Response:The proposed railing has horizontal bars only,with openings that comply with IRC R312.1.3
Detail/Page:8/A-510
---"" Page:A-201 -EXTERIOR ELEVATIONS-PROPOSED
Checkmark: Unchecked
Author:jimp
— li.--~E, File Name: 90.Architectural Plans.20210727.pdf
Li
Page:A-300-BUILDING SECTIONS
0 �° ° Checkmark: Unchecked Indicate how you will accomplish the air
F
Author:jimp
sealing requirements of 2015 IECC table
- File Name: 90.Architectural Plans.20210727.pdf R402.4.1.1 using notes and details.
- _
N= Indicate the continuity of the air barrier
L a i.- 1 Response:Air barrier indicated in assemblies&details, and where it is located throughout the
. 1 "°— additional details added for clarity. building. Note locations that require
Detail/Page: caulking, sealing,taping, etc. Note which
F3,F3E,R1,R2,RE/A-500 components are included in the air barrier
W2,W3,W3"/A-501
3,5,6,7,9,10,11,12/A-510 such as spray foam, gypsum, housewrap,
2/A-511 and/or exterior insulation. You may have
1/A-600 all of the above but you need to pick one
continuous barrier and stick to it. It needs
to follow the thermal barrier. The better
detail you provide,the easier it will be for
the contractor and inspector to be
successful.This is a new 2015 code
requirement in lieu of a blower door test.
Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IBC 2406
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
RECEIVED
05/23/2022
ASPEN
BUILDING DEPARTMENT
Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IRC R308.4
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
^ ' ^ Detail/Page:Window Schedule A-600
Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IBC 2406
\40 Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
i Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IBC 2406
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IRC R308.4
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IRC R308.4
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
Lvvn Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IRC R308.4
Author:jimp
SG/ File Name: 90.Architectural Plans.20210727.pdf
/ Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked Safety glazing required, 2015 IRC R308.4
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
RECEIVED
05/23/2022
ASPEN
BUILDING DEPARTMENT
�.F Page:A-600-WINDOW&DOOR SCHEDULE
Checkmark: Unchecked
Author:jimp
2015 IRC Code References File Name: 90.Architectural Plans.20210727.pdf
O SO&y glazing required,2015 IRC R308 4
Response:Safety glazing indicated where required.
Detail/Page:Window Schedule A-600
I - Page: SURVEY
Checkmark: Unchecked 2.942 ft
il Author:jimp
S File Name: 90.Architectural Plans.20210727.pdf
E SF
i D
I
i ii Page: SURVEY 3.017 ft
Checkmark: Unchecked
3.0 Author:jimp
File Name: 90.Architectural Plans.20210727.pdf
I-- 5
toil:
Page: SURVEY
Checkmark: Unchecked
Author:jimp
File Name: 90.Architectural Plans.20210727.pdf2.968 ft
IN
�v ��
��,,,°� Page: SURVEY
,wl-_ ;fl If any portion of this wall is within 3'of the
l,_ Checkmark: Unchecked rear property line, and is being altered, it
I E "'I Author:jimp
File Name: 90.Architectural Plans.20210727.pdf will need to be brought into compliance
I° with the Fire Resistant Construction rules
Po ° of R302.
Response:W3*Wall assembly shows compliance with R302.
- ,� Detail/Page:W3*/A-501,wall locations indicated on 1/A-110&1/A-111
90.Structural Plans.20210727.pdf(1)
_= Page: 1
® Checkmark: Unchecked We will require a filled out Special
_ Author:jimp Inspection form for the steel structural
1 File Name: 90.Structural Plans.20210727.pdf members. Please have it signed and
___ _ - a dated by the Special Inspection Agency,
__ a_ the Owner,the Design Professional in
- -M` - Response:A steel fabricator has not been selected at this charge, Contractor, and either Approved
p 9 Pp
-----------= time.A completed Special Inspection form will be or Inspected Fabricator.
submitted to the City when a fabricator has been selected,
prior to fabrication.