Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.630 W Hopkins Ave.0020-2022-BCHO (2)
WELS 1 630 W Hopkins 5(2) Page:5 Author:rickma Any disturbance within driplines of existing trees will require review by the City Forester,as per WELS Section 4.3.2 L&M.#10 container C.lucidus will require substantial disturbance to install. Date:4/28/2022 8:52:23 AM File Name:90.20220314 LIFT-630WHA-LANDSCAPE ARCH AND IRR-ADDL INFO 01 (1).pdf LIFT: The contractor will review with the City Forester at the time of install. If needed the shrubs will be relocated or omitted from P:athe project. Page:5 r Author rickma Living fences are prohibited by the City Municipal Code.J.virginiana'Taylor"can reach height of 15-20 feet and 4-5 feet in width at Date:4/28/2022 9:49:14 AM maturity.The trees are presently spaced at 3 feet O.C.which may compromise long-term plant health and viability.Revise plans . File Name:90.20220314 LIFT-630WHA-LANDSCAPE ARCH appropriately. Liv;o9fenwserepmh;EtleEhY, AND IRR-ADDL INFO 01 (1).pdf ty Municipal Code J LIFT:There were no changes here from building permit ..virginiana ^raNar aa raau neigm m is-zo r� "_feet a,";amda;3�;e response number one. Junipers were previously approved and wni�,mav�mp,pmiae Revsepan's a'ppmp"a "a'" will be maintained by the owner within the 6' height. This variety stays between 2-3'wide. 6(1) Author:rickma , Page:6 The Special Feature areas are not clearly identified as such on the plans.Please label them on the appropriate plans. inn Date:4/28/2022 9:39:24 AM FYI:Areas outside of the subject property cannot be utilized as Special Feature Areas. ®�d� File Name:90.20220314 LIFT-630WHA-LANDSCAPE ARCH AND IRR-ADDL INFO 01 (1).pdf LIFT: Complete. E■mB=Ir:IR — ©� O�IDC RECEIVED 06/30/2022 ASPEN BUILDING DEPARTMENT 9(1) m — 9 AUthor:rickma Replace this note with the language of WELS Section 4.3.2 L&M. - _ Auth Date:4/28/2022 9:19:49 AM File Name:90.20220314 LIFT-630WHA-LANDSCAPE ARCH LIFT: Complete. ` I AND IRR-ADDL INFO 01 (1).pdf RECEIVED 06/30/2022 ASPEN BUILDING DEPARTMENT