HomeMy WebLinkAboutFile Documents.725 Cemetery Ln.0045-2019-BRES (30) REScheck Software Version 4.7.0
Compliance Certificate
r0\ .. L/�F4,11
Project 725 CemeteryLane (Lot 1A) :c,/—' R'�O'•.< ' It
1 /°5/29/20�-P �i
Energy Code: 2015 IECCEvihayie ii) % 30290
Location: Aspen, Colorado ��
p i
Construction Type: Single-family ,l) '�'� :t�J
Project Type: New Construction 06/02/2020 li
'I(O--es��'•••••••••.C)\�_%
Conditioned Floor Area: 4,358 ft2 (‘k�,, `�N
Glazing Area 21% R GALE
Climate Zone: 7 (9922 HDD) justinh
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
725 Cemetary Lane 725 Cemetery Duplexes LLC Ryan Doremus
Aspen, CO 81611 623 E. Hopkins Ave Thunderbowl Architects
Aspen, CO 81611 300 Spring Street
(970) 920-1280 Suite 201
Aspen, CO 81611
(970) 274-1421
ryan@thunderbowlarchitects.com
Compliance: Passes using UA trade-off
Compliance: 3.8%Better Than Code Maximum UA: 711 Your UA: 684
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly or R-Value R-Value U-Factor UA
Perimeter
Below Grade Wall: Solid Concrete or Masonry:Exterior Insulation 1,769 15.2 6.9 0.051 90
Above Grade Wall: Wood Frame, 16" o.c. 3,855 21.0 6.0 0.041 102
Window: Wood Frame:Double Pane with Low-E 935 0.320 299
Glass Door: Wood Frame:Double Pane with Low-E 290 0.320 93
Door: Solid 144 0.350 50
Below Grade Wall at Stair: Solid Concrete or Masonry:Exterior Insulation 266 9.6 6.9 0.061 16
Roof: Flat Ceiling or Scissor Truss 1,724 25.1 24.2 0.020 34
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.7.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Joshua Westerlind - Mechanical Engineer a a.. £L" 5/29/2020
Name-Title Signature Date
Project Notes:
Calcs by: Slator Aplin, slatora@raderengineering.com RECEIVED
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename:J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery PSPEllQf 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
REScheck Software VersionChecklist 4.7.0
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.1, 'Construction drawings and ❑Complies
103.2 documentation demonstrate ❑Does Not
[PR1]1 energy code compliance for the
g building envelope.Thermal ❑Not Observable
envelope represented on ❑Not Applicable
,construction documents.
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. ['Not Observable
d, Systems serving multiple ENot Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions. i
302.1, Heating and cooling equipment is Heating: Heating: EComplies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr Does Not
[PR2]z on loads calculated per ACCA Cooling: Cooling:
Manual J or other methods ❑Not Observable
Btu/hr Btu/hr
approved by the code official. ❑Not Applicable
Additional Comments/Assumptions:
RECEIVED
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 0 /29/20
Data filename:J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery P3P2I`Qf 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Section
# Foundation Inspection Complies? Comments/Assumptions
& Req.ID
303.2.1 A protective covering is installed to '❑Complies
[FO11]2 protect exposed exterior insulation ❑Does Not
and extends a minimum of 6 in. below
grade. ❑Not Observable
❑Not Applicable
403.9 :Snow-and ice-melting system controls'❑Complies
[FO12]2 installed. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
RECEIVED
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename:J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery P19(9f 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Framing / Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, ;Door U-factor. U- U- ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR1]1 ❑Not Observable
` ) ❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3,
402.5 ElNot Observable
[FR2]1 ElNot Applicable
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance ❑Does Not
0 with the NFRC test procedure or ❑Not Observable
taken from the default table.
1 ❑Not Applicable
402.1.1 Mass wall exterior insulation R- R- R- ❑Complies See the Envelope Assemblies
[FR10]1 value. If more than 1/z of the EDoes Not table for values.
0 insulation is on the wall interior, ['Not Observable
the interior insulation
requirement applies and ElNot Applicable
verification may need to occur
during Insulation Inspection.
303.2 Mass wall exterior insulation ❑Complies
[FR11]1 I installed per manufacturer's EDoes Not
;instructions.i ['Not Observable
I ❑Not Applicable
402.4.1.1 ;Air barrier and thermal barrier ❑Complies
[FR23]1 installed per manufacturer's ❑Does Not
instructions. ❑Not Observable
ElNot Applicable
402.4.3 j Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ElDoes Not
0, AAMA/WDMA/CSA 101/1.5.2/A440 ElNot Observable
or has infiltration rates per NFRC
400 that do not exceed code ElNot Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not
and labeled to indicate <_2.0 cfm
leakage at 75 Pa. ❑Not Observable
❑Not Applicable
403.3.1 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >= R-8 where duct is ❑Does Not
0, >= 3 inches in diameter and >= ['Not Observable
R-6 where < 3 inches. Supply and
return ducts in other portions of ❑Not Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for< 3 inches in diameter.
403.3.5 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. EDoes Not
4 ElNot Observable
❑Not Applicable
403.4 HVAC piping conveying fluids R R-
-
ElComplies
[FR17 above 105 °F or chilled fluids ❑Does Not
below 55 °F are insulated to >_R ['Not Observable
❑Not Applicable
RECEIVED
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery VOPENif 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Framing / Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
403.4.1 Protection of insulation on HVAC '❑Complies
[FR24]1 piping. ❑Does Not
d 1111 ❑Not Observable
❑Not Applicable
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
J ❑Not Observable
❑Not Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR19]2 installed
intakes onand allexhausts.
outdoor air ❑Does Not
❑Not Observable
,❑Not Applicable
Additional Comments/Assumptions:
RECEIVED
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery PSIFILNif 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
303.1 ;All installed insulation is labeled '❑Complies
[IN13]2 or the installed R-values ❑Does Not
provided. •
lot
Observable
❑Not Applicable
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass ❑ Mass [Not Observable
[IN3]1 exterior,the exterior insulation
4 requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 :Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
❑Not Observable
j ❑Not Applicable
Additional Comments/Assumptions:
RECEIVED
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery 17-6f3S`$f 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID_
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, ❑ Steel ❑ Steel [Not Observable
402.2.6
[FI1]1 ENot Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. ❑Does Not
[F12]1 Blown insulation marked every
300 ft2. [Not Observable
ENot Applicable
402.2.3 !Vented attics with air permeable EComplies
[F122]2 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
;extends over insulation. [Not Observable
j ENot Applicable
402.2.4 Attic access hatch and door R- R- EComplies
[F13]1 insulation >_R-value of the ❑Does Not
adjacent assembly.
[Not Observable
ENot Applicable
402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = EComplies
[F117]1 ach in Climate Zones 1-2, and ❑Does Not
I<=3 ach in Climate Zones 3-8.
ENot Observable
j ENot Applicable
403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 EComplies
[F14]1 cfm/100 ft2 across the system or ft2 ftz ❑Does Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in ['Not Observable
tests,verification may need to ENot Applicable
occur during Framing Inspection.
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 EComplies
[F127]1 determine air leakage with ft2 ft2 Does Not
either: Rough-in test:Total
leakage measured with a ['Not Observable
pressure differential of 0.1 inch ENot Applicable
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
handler enclosure.
403.3.2.1 Air handler leakage designated EComplies
[F124]1 by manufacturer at<=2%of ❑Does Not
design air flow.
❑Not Observable
ENot Applicable
403.1.1 :Programmable thermostats EComplies
[F19]2 installed for control of primary ❑Does Not
j heating and cooling systems and
:initially set by manufacturer to ['Not Observable
:code specifications. ❑Not Applicable
i
403.1.2 Heat pump thermostat installed ❑Complies
[F110]2 on heat pumps. ❑Does Not
ENot Observable
❑Not Applicable
403.5. Circulating service hot water ❑Complies
[F111]z systems have automatic or EDoes Not
accessible manual controls.
['Not Observable
qEINOt Applicable RECEIVE®
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery Page2i9f 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDIN DEPARTMENT
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
403.6.1 ;All mechanical ventilation system ' •Complies
[F125]z fans not part of tested and listed •Does Not
HVAC equipment meet efficacy
and air flow limits. •Not Observable
403.2 ;Hot water boilers supplying heat ❑Complies
[F126]z through one-or two-pipe heating ❑Does Not
ailsystems have outdoor setback
control to lower boiler water ❑Not Observable
temperature based on outdoor ❑Not Applicable
j temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F128]2 have a circulation pump.The ❑Does Not
system return pipe is a dedicated
return pipe or a cold water supply [Not Observable
pipe. Gravity and thermos- ENot Applicable
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
41'occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 'Electric heat trace systems ❑Complies
[F129]z comply with IEEE 515.1 or UL El Does Not
515. Controls automatically
adjust the energy input to the ['Not Observable
heat tracing to maintain the ❑Not Applicable
desired water temperature in the
:piping.
403.5.2 Water distribution systems that 1 ❑Complies
[F130]z have recirculation pumps that EDoes Not
pump water from a heated water
supply pipe back to the heated ['Not Observable
water source through a cold ❑Not Applicable
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
:water piping to 104°F.
403.5.4 Drain water heat recovery units ❑Complies
[F131]z tested in accordance with CSA ❑Does Not
B55.1. Potable water-side
pressure loss of drain water heat [Not Observable
recovery units < 3 psi for ❑Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
404.1 75%of lamps in permanent ❑Complies
[F16]1 fixtures or 75%of permanent EDoes Not
fixtures have high efficacy lamps.
Does not apply to low-voltage ['Not Observable
lighting. ❑Not Applicable
404.1.1 Fuel gas lighting systems have ❑Complies
[F123]3 no continuous pilot light. EDoes Not
J 111 [Not Observable
❑Not Applicable nil/
so r
,., .
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery 17-6f38$f 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
401.3 ;Compliance certificate posted. '❑Complies
[F17F ❑Does Not
1_ 1L1Not Observable
❑Not Applicable
303.3 'Manufacturer manuals for ❑Complies
[F118P mechanical and water heating ❑Does Not
systems have been provided.
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
RECEIVED
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
06/02/2020
Project Title: 725 Cemetery Lane (Lot 1A) Report date: 05/29/20
Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery 17-6f38$f 9
Lane\Mechanical\Calculations\REScheck\19002 - 725 Cemetery Lane (Lot 1A).rck BUILDING DEPARTMENT
Li( 2015 IECC Energy
Efficiency Certificate
Insulation Ratin. R-Value
Above-Grade Wall 27.00
Below-Grade Wall 0.00
Floor 0.00
Ceiling / Roof 49.30
Ductwork (unconditioned spaces):
Glass& Door Rating U-Factor SHGC
Window 0.32
Door 0.35
Heating&Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
RECEIVED
06/02/2020
ASPEN
BUILDING DEPARTMENT