Loading...
HomeMy WebLinkAboutFile Documents.725 Cemetery Ln.0045-2019-BRES (31) REScheck Software Version 4.7.0 Compliance Certificate Project 727 Cemetery Lane (Lot 1B) _rop,PDO LICF4/ t, Energy Code: 2015 IECC /. V�:o R�Oc<\% 1I#1 / • 5/29/20 / Location: Aspen, Colorado , / • 30 90 Construction Type: Single-family D I /DiIi , •• Project Type: New Construction �I��•• ��,� Conditioned Floor Area: 4,341 ft2 0 6/02/2 02 1ik ec,••••••••••• ���1. Glazing Area 21% (1�\\ONA\ ..� Climate Zone: 7 (9922 HDD) L aj,{AN(E Permit Date: justinh Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 727 Cemetary Lane 725 Cemetery Duplexes LLC Ryan Doremus Aspen, CO 81611 623 E. Hopkins Ave Thunderbowl Architects Aspen, CO 81611 300 Spring Street (970) 920-1280 Suite 201 Aspen, CO 81611 (970) 274-1421 ryan@thunderbowlarchitects.com Compliance: Passes using UA trade-off Compliance: 3.7%Better Than Code Maximum UA: 722 Your UA: 695 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Below Grade Wall: Solid Concrete or Masonry:Exterior Insulation 1,864 15.2 6.9 0.051 95 Above Grade Wall: Wood Frame, 16" o.c. 3,891 21.0 6.0 0.041 102 Window: Wood Frame:Double Pane with Low-E 948 0.320 303 Glass Door: Wood Frame:Double Pane with Low-E 304 0.320 97 Door: Solid 144 0.350 50 Below Grade Wall at Stair: Solid Concrete or Masonry:Exterior Insulation 226 9.6 6.9 0.061 14 Roof: Flat Ceiling or Scissor Truss 1,724 25.1 24.2 0.020 34 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.7.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Joshua Westerlind - Mechanical Engineer2,:dizia, G(J 5/29/2020 Name-Title Signature Date Project Notes: Calcs by: Slator Aplin, slatora@raderengineering.com RECEIVED Project Title: 727 Cemetery Lane (Lot 1B) Report911:(33 /?99A° Data filename:J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery EAV IS'f 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT REScheck Software VersionChecklist 4.7.0 Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, 'Construction drawings and ❑Complies 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the g building envelope.Thermal ❑Not Observable envelope represented on ❑Not Applicable ,construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ['Not Observable d, Systems serving multiple ENot Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. i 302.1, Heating and cooling equipment is Heating: Heating: EComplies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr Does Not [PR2]z on loads calculated per ACCA Cooling: Cooling: Manual J or other methods ❑Not Observable Btu/hr Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: RECEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) n' Project Title: 727 Cemetery Lane (Lot 1B) Report9n 11:(33 /ATZO° Data filename:J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery AVe(5'f 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section # Foundation Inspection Complies? Comments/Assumptions & Req.ID 303.2.1 ,A protective covering is installed to ❑Complies [FO11]2 protect exposed exterior insulation ❑Does Not and extends a minimum of 6 in. below [Not Observable grade. ❑Not Applicable 403.9 :Snow-and ice-melting system controls ❑Complies [FO12]2 installed. ❑Does Not d [Not Observable ENot Applicable Additional Comments/Assumptions: RECEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) // n(�'' Project Title: 727 Cemetery Lane (Lot 1B) Report911:(q// TZO° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery PAVOIqf 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section Plans Verified Field Verified # Framing / Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 [Not Observable ` ) ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.5 [Not Observable [FR2]1 ❑Not Applicable 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not 0 with the NFRC test procedure or ❑Not Observable taken from the default table. 1 ❑Not Applicable 402.1.1 Mass wall exterior insulation R- R- R- ❑Complies See the Envelope Assemblies [FR10]1 value. If more than 1/z of the EDoes Not table for values. 0 insulation is on the wall interior, ['Not Observable the interior insulation requirement applies and ❑Not Applicable verification may need to occur during Insulation Inspection. 303.2 Mass wall exterior insulation ❑Complies [FR11]1 I installed per manufacturer's EDoes Not ;instructions.i ['Not Observable I ❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not instructions. ['Not Observable ❑Not Applicable 402.4.3 j Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ElDoes Not 0, AAMA/WDMA/CSA 101/1.5.2/A440 ['Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate <_2.0 cfm leakage at 75 Pa. [Not Observable ❑Not Applicable 403.3.1 Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not 0, >= 3 inches in diameter and >= ['Not Observable R-6 where < 3 inches. Supply and return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.5 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. EDoes Not 4 [Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R R- - ❑Complies [FR17 above 105 °F or chilled fluids ❑Does Not below 55 °F are insulated to >_R ['Not Observable 3. ❑Not Applicable RECEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) // n(�'' Project Title: 727 Cemetery Lane (Lot 1B) Report911:(q// TZO° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery A15611f 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section Plans Verified Field Verified # Framing / Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 403.4.1 Protection of insulation on HVAC '❑Complies [FR24]1 piping. ❑Does Not d 1111 ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. ❑Does Not J ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]2 installed intakes onand allexhausts. outdoor air ❑Does Not ❑Not Observable ,❑Not Applicable Additional Comments/Assumptions: RECEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) // n(�'' Project Title: 727 Cemetery Lane (Lot 1B) Report911:(q// TZO° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery AV0.11f 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ;All installed insulation is labeled '❑Complies [IN13]2 or the installed R-values 1L1Does Not provided. • [Not Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass [Not Observable [IN3]1 exterior,the exterior insulation 4 requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 :Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not ❑Not Observable j ❑Not Applicable Additional Comments/Assumptions: RECEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) // n(�'' Project Title: 727 Cemetery Lane (Lot 1B) Report911:(q// TZO° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery AkSPL.ilf 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID_ 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel [Not Observable 402.2.6 [FI1]1 ENot Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ft2. [Not Observable ENot Applicable 402.2.3 !Vented attics with air permeable EComplies [F122]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that ;extends over insulation. [Not Observable , ENot Applicable 402.2.4 Attic access hatch and door R- R- EComplies [F13]1 insulation >_R-value of the ❑Does Not adjacent assembly. [Not Observable ENot Applicable 402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = EComplies [F117]1 ach in Climate Zones 1-2, and ❑Does Not ,<=3 ach in Climate Zones 3-8. ENot Observable , ENot Applicable 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 EComplies [F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ['Not Observable tests,verification may need to ENot Applicable occur during Framing Inspection. 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 EComplies [F127]1 determine air leakage with ft2 ft2 Does Not either: Rough-in test:Total leakage measured with a ['Not Observable pressure differential of 0.1 inch ENot Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated EComplies [F124]1 by manufacturer at<=2%of ❑Does Not design air flow. [Not Observable ENot Applicable 403.1.1 :Programmable thermostats EComplies [F19]2 installed for control of primary ❑Does Not heating and cooling systems and :initially set by manufacturer to ['Not Observable :code specifications. ❑Not Applicable i 403.1.2 Heat pump thermostat installed ❑Complies [F110]2 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.5. Circulating service hot water ❑Complies [F111]z systems have automatic or EDoes Not accessible manual controls. ['Not Observable ENot Applicable Er,:pEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) / n' Project Title: 727 Cemetery Lane (Lot 1B) Report911:°?�/ATZD° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery A I Jqf 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system '❑Complies [F125]2 fans not part of tested and listed0 ❑Does Not HVAC equipment meet efficacy and air flow limits. [Not Observable ❑Not Applicable 403.2 ;Hot water boilers supplying heat ❑Complies [F126]2 through one-or two-pipe heatingail ❑Does Not systems have outdoor setback control to lower boiler water [Not Observable temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies [F128]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply [Not Observable pipe. Gravity and thermos- ENot Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the 'occupancy. Controls 41 automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 'Electric heat trace systems ❑Complies [F129]2 comply with IEEE 515.1 or UL El Does Not 515. Controls automatically adjust the energy input to the ['Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the :piping. 403.5.2 Water distribution systems that 1 ❑Complies [F130]2 have recirculation pumps that EDoes Not pump water from a heated water supply pipe back to the heated ['Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold :water piping to 104°F. 403.5.4 Drain water heat recovery units ❑Complies [F131]z tested in accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat [Not Observable recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies [F16]1 fixtures or 75%of permanent EDoes Not fixtures have high efficacy lamps. Does not apply to low-voltage ['Not Observable lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F123]3 no continuous pilot light. EDoes Not J 111 [Not Observable❑ — Not Applicable _ D ,.., . 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) // n(�'' Project Title: 727 Cemetery Lane (Lot 1B) Report911:(q// TZO° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery AkSP4 f 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 ;Compliance certificate posted. '❑Complies [F17F ❑Does Not 1_ 111L1Not Observable ❑Not Applicable 303.3 'Manufacturer manuals for ❑Complies [F118P mechanical and water heating ❑Does Not systems have been provided. [Not Observable ❑Not Applicable Additional Comments/Assumptions: RECEIVED 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) // n(�'' Project Title: 727 Cemetery Lane (Lot 1B) Report911:(q// TZO° Data filename: J:\Jobs\2019 -Jobs\19002.00 - 725 Cemetery PPAkS1581f 9 Lane\Mechanical\Calculations\REScheck\19002 - 727 Cemetery Lane (Lot 1B).rck BUILDING DEPARTMENT Li( 2015 IECC Energy Efficiency Certificate Insulation Ratin. R-Value Above-Grade Wall 27.00 Below-Grade Wall 0.00 Floor 0.00 Ceiling / Roof 49.30 Ductwork (unconditioned spaces): Glass& Door Rating U-Factor SHGC Window 0.32 Door 0.35 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments RECEIVED 06/02/2020 ASPEN BUILDING DEPARTMENT