Loading...
HomeMy WebLinkAboutFile Documents.234 W Francis St.0118-2020-BRES SELLDORF ARCHITECTS 860 BROADWAY NEW YORK NY 10003 PHONE 212.219.9571 / FAX 212.941.6362 / WWW.SELLDORF.COM / INFO@SELLDORF.COM TRANSMITTAL DATE: April 15, 2024 TO: 1 Friday ATTN: Derek Skalko VIA: Email REGARDING: 234 west Francis Street,Aspen, CO 81611 MESSAGE: Please see attached CoA Revised Permit Drawings [Structural, Mechanical] Revised Information: Mechanical • M001 A o control sequence added for Sauna exhaust fan • M002 o FCU1 values revised o Hydronic zone schedule revised o Snowmelt zone schedule revised • M003 o Schedules revised • M203 o Piping diagram revised • M101 o Duct routing and grille locations revised per field coordination o Radiant manifold locations and loops revised o Sauna ventilation added o Dryer vents rerouted o Thermostat locations and temperature sensors updated • M102 o Garage exhaust and dryer vents re-routed o Heat pump layout revised o Cabin Return air configuration revised o Kitchen Ventilation revised o Thermostat locations updated • M103 o Duct routing and grille locations revised per field coordination RECEIVED 04/25/2024 ASPEN BUILDING DEPARTMENT • M202 o Enlarged updates of changes captured on M101-103 • M202A o Enlarged updates of changes captured on M101-103 • M203 o Revised piping diagrams • M301 o Enlarged updates of changes captured on M101-103 • M302 o Enlarged updates of changes captured on M101-103 • M303 o Enlarged updates of changes captured on M101-103 • M304 o Enlarged updates of changes captured on M101-103 Structural: • S003 o Updated 3D representation of plan changes • S101 o Updated hot tub vault configuration • S102 o Updated garage slab o Revised steel configuration at GL C o Revised steel configuration at kitchen between GL G/F • S103 o Revised entry canopy steel o Revised steel location at GL F o Updated framing for recessed shower at garage 2'd fl • S103A o Added note for double LVL connection at mech platform o Pony wall added below upper level of mech platform • S104 o Mechanical enclosure added at flat roof • S201 o Detail 12 Vault Section updated • S302 o Detail 4 revised • S306 o Detail 1 replaced with 1/S309 o Detail 3 updated • S307—sheet added - new details from various RFIs • S308—sheet added - new details from various RFIs • S309—sheet added — new details from various RFIs • S310—sheet added — new details from various RFIs • S311 —details 1, 2, 3, 4, 5 updated for main stair structure • S312 —sheet added — new details for main stair, roof enclosure, and various RFIs • S313 —sheet added with details for exterior landscape slab RECEIVED 04/25/2024 ASPEN BUILDING DEPARTMENT