Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.617 E Cooper Ave.0008-2023-BRES
DocuSign Envelope ID:674FB766-BE53-492A-87D2-08F532751 FD9 E COOPER AVE #208 ADDRESS: 617 PERMIT NUMBER: 1 COMMUNITY DEVELOPMENT DEPARTMENT JUILDING PERMIT CONTACT SHEET CITY OF ASPEN FOR PLAN REVIEW QUESTIONS ' Name Jessica Cerise Phone E-mail �� FOR INSPECTION QUESTIONS Name Pete Waaraniemi Phone E-mail ••• OWNER N I — , y V Name Phone Cell Phone Mailing 120 E HYMAN AVE CO Adr 81611 Addresss City Aspen State ZIP E-mail Address david@ultra.me OWNER'S AUTHORIZED AGENT Name Phone Cell Phone Mailing Address City State ZIP E-mail Address APPLICATION BEST CONTACT Jessica Cerise,Anne Grice Interiors - 1_4 '—' ' i Name Phone Cell Phone Mailing 408 AABC Suite 201 Aspen CO 81611 Address City State ZIP E-mail Address jessica@annegrice.com ARCHITECT OR DESIGNER OF RECORD Name Jessica Cerise,Anne GricelInteriors Phone Cell Phone Mailing 408 AABC Ste 201 Aspen CO 81611 Address City State ZIP ,ail jessica©annegr ce.com .,ddress CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Andrew Calvetti Phone Cell Phone Mailing PO Box 4231 Aspen CO 81611 Address City State ZIP E-mail Address alcengrg@aol.com GENERAL CONTRACTOR Name Pete Waaraniemi Phone Cell Phone • Mailing 40 Sunset Dr Ste 3 Basalt CO 81621 Address City State ZIP E-mail Address pete@janckilaconstruction.corn I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any oth r state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comment that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Additionally,I understand that I a responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance with the approocu � neve lgMgner plan se .I understand that the City does not review sub-permits for compliance with the master plan set contractor Pat, (Pazi 'A.LidVA4t 12/1/2022 natures Date r■�� aaSBtFc,ubn6uo8., 9■■ ,J Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit. (CITY USE ONLY)Owner builder approved by: Date: Affidavit on file 1.LCITY OF ASPENOctober2020 130 S. GALENA ST I ASPEN, CO°4169.k1°23 BUILDING DEPARTMEN DocuSign Envelope ID:674FB766-BE53-492A-87D2-08F532751FD9 617E COOPER AVE#208 ADDRESS: PERMIT NUMBER: _COMMUNITY DEVELOPMENT DEPARTMENT L.-IOMEOWNER ASSOCIATION COMPLIANCE FORM All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS 617 E COOPER AVE UNIT#208 PARCEL ID# 273718243103 I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. 0 This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature 1.-`-' Date a ! - , Owner Printed Name Q mit6, 44 . GAt 4.4+....n OR Owner's Attorney Signature Date Owner's Attorney Printed Name RECEIWED lj CITY OF ASPENianuary2018 130 S. GALENA ST I ASPEN, CO`$16/.Aj°23 DocuSign Envelope ID:674FB766-BE53-492A-87D2-08F532751FD9 617 E COOPER AVE #208 ADDRESS: PERMIT NUMBER: LCOMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFIDAVIT ,,441,30 : . an AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC)with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, s ch as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and abor. 109.3 Building permit v:luations.The applicant for a permit shall provide an estimated permit value at time of application. Permit v jluations shall include total value of work, including materials and labor, for which the permit is being issued, s', ch as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official,the valuation is underestimated on the application,the permit shall be denied, unless the appli'', ant can show detailed estimates to meet the approval of the building official. Final ,building permit valuatio shall be set by the building official. City policy indicates tha permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and,gas,fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting an HVAC controls are included in the total as are expenses directly related to construction such as equipment rent I and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectu al and engineering design fees, landscaping and planting, tap fees, development mitigation fees,trash re oval, and cleaning are not included. I certify that the permit aluation entered on the permit application for this property complies with the above valuation requirements. ..u.raders d that t is document is a public document. Owner Signature: Date: l2 kt. .04s1.1.. Owner Printed Name p®uhe. . Cs 1i�1r...,.an or, Authorized Agent Signat' re: Date: Authorized Agent Printe. Name: RECEIVED ( CITY OF ASPEN anuary2019 130 S. GALENA ST I ASPEN, CO` 1/611.j°23 BUILDING DEPARTMENT DocuSign Envelope ID:674FB766-BE53-492A-87D2-08F532751FD9 ADDRESS: 617 E COOPER AVE#208 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLISTNddieSr l 1 CITY OF ASPEN• ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncon rolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose p ople to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting fro disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbesto?-containing materials is commonly misunderstood.In fact,in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-call d'Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing,i' portation,processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE', FFECT.Therefore,ALL demolition,remodel or renovation projects must determine if disturbed material above the trigger levels cont:ins asbestos. • ASBESTOS CHECKLIST [)Yes❑No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallo drum of any material besides concrete, wood, bricks, or steel -examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes❑No Commercial:Will you b- removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallol drum of any material besides concrete, wood, bricks, or steel -examples are drywall, "linoleum, carpet, carpel adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to ny of the above,you will need an asbestos test before you can receive a building and/ or demolition permit. Is u will also need to provide plans indicating areas to be demolished and determine if a CO state demolition licz nse is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating tha i all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/inde' .html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certifica Son.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This orm may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolitio permit app must be submitted with the initial building permit application. When the CDPHE approves the apI, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner 2 ev` 4, 1 4tvlc4t,an Phone#970-429-4148 Applicant (print name) @SSICa Cerise Phone#970-429-4148 Je.,slca Cerise Digitally signed by Jessica Cerise —Applicant Signature Date:2oz2.,,so�a:2,:os-oroo Date c5EI\IED ?lease call the City of As'.en Environmental Health Department at 920-5039 at any time if you have a :w. about asbestos, interpre 'ng your test results, or other matters. I CITY OF ASPEN!August 2017 130 S. GALENA ST I ASPEN, CO 611 °23 DocuSign Envelope ID:674FB766-BE53-492A-87D2-08F532751FD9 ADDRESS: PERMIT NUMBER: ICOMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY .;. Applicability:All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the —structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verifilcation during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report:A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set.The City's Zoning Officer canlassist in determining which elements of the structure should be measured and if natural or finished grade should)be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, --or other veneer treatments orornamentation), and the location and dimension of each observed megAra LiAdditional roof plans showing location of measurements may be necessary. ECEIVED CITY OF ASPEN IAugust 2017 130 S. GALENA ST I ASPEN, CO`$1-1/6Y4 °23 DocuSign Envelope ID:674FB766-Bi 53-492A-87D2-08F532751FD9 A 1 PERMIT NUMBER: ADDRESS: [COMMUNITY IDEVELOPMENT DEPARTMENT ZONING COM " LIANCE VERIFICATION POLICY t I CITY OFASPEN. 4-Plans and elevations lust include height or setback exemption items unique to the building, such as stair/ elevator overruns, utilit /mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall includ- a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must corr-late with the building locations, elevations, and grading/drainage representations in the approved building p:rmit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptanceof Report:The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensil.ns shown on the zoning sheets of the approved building permit plan set and meets l the zoning limitations fo the property or shall determine which elements of the project are not in compliance. The Zoning Officer may r-quest additional information to verify zoning compliance, which may include but is not limited to additional sur'ey work or a site visit. 111 drawings of the surv-y report must correlate with representations in the approved building permit set for acceptance. Modificatio s to field conditions or amendments to the building permit may be required. A determination of non-i ompliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are'encouraged to verify zoning compliance as early as reasonably practical in the construction process to inimize disruption to the construction schedule. Acknowledgment: Pete waaraniemi I (contractor name) understand this policy. I agree that this project will comply with the zoning Imitations affecting this parcel and the representations made on the zoning sheets of the approved building pzi rmit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with - I' )j, lie zoning limitations. Contractor Signature: pI` `. N0 tionta`tAi AASQR0GMfIRSA SR 12/1/2022 Date: i RECEIVED I CITY OF ASPEN!August2017 130 S. GALENA ST I ASPEN, CCALY61k1°23