Loading...
HomeMy WebLinkAboutFile Documents.617 E Cooper Ave.0007-2023-BRES (2) 5366 Godding Hollow Pkwy EARTH ENERGY ENVIRONMENT (E3) Longmont, co 80504 Local: 303.902-5851 Industrial Hygiene and Environmental Engineering April 20, 2023 CAE & Abatement LLC. 19884 Elk Place Denver, CO 80249 Subject: Asbestos Air Clearance Report 617 E. Cooper Avenue, Aspen, CO (Units 207 and 208) To Whom It May Concern: The following is the project completion report for the work areas located at 617 E. Cooper Avenue, Aspen, CO (Units 207 and 208). The purpose of this report is to document this remediation project was completed, and indoor asbestos amplification was not occurring in the work area. The project remediation permit request was approved by CDPHE, the permit number had not been received from CDPHE at the time of the clearance. The remediation work areas (living area)were visually inspected in order to confirm the scope of work was properly followed and completed. The containments were also visually inspected to verify breaches and/or defects were not present. An Industrial Hygienist for Earth Energy Environment (E3) performed the remediation project completion inspection and testing procedures. Phase Contrast Microscopy (PCM) samples were collected in accordance with the National Institute for Occupational Safety and Health (NIOSH) method 7400 using cassettes (standard 3 piece, 25 mm dia., 0.8 urn MCE filter) purchased from Zefon International, Inc. Asbestos concentrations in the containment were calculated as airborne fibers per cubic centimeter of air (F/cc). Samples were read by an analysist working under Laboratory IHPAT Certification No. 221103 (Proficient). Visual Inspection, Air Clearance, and Sample Analyses Performed by: :4/;11,/.0,i Eli Willden CDPHE Certifications No. 20139 and Colorado Consulting Firm No. ACF-21719(303) 902-5851 RECEIVED ELI@E3C-USA.COM 04/27/2023 ASPEN BUILDING DEPARTMENT PCM Air Clearance Page 2 of 2 Visual inspection confirmed that no asbestos-containing debris was observed in the work areas. Table 1 provides a summary of the sample numbers, sample volumes, and calculated concentrations. The National Emission Standards for Hazardous Air Pollutants (NESHAP) clearance standard is 0.01 F/cc. TABLE 1: PCM CLEARANCE - AIR SAMPLING RESULTS. Date Unit/Area Sample# Sample Sample *Fibers/cc Description Volume Air Clearance CL-042023-1 Inside 1360 0.002 at: CL-042023-2 Containment 1365 0.002 CL-042023-3 1385 0.002 617 E. Cooper CL-042023-4 1390 0.002 April 20, 2023 Avenue, Aspen, CL-042023-5 1405 0.001 CO (Unit 207) (Living Area) BLK-1 Blanks - BRL BLK-2 - BRL Air Clearance CL-042023-1 Inside 1365 0.001 at: CL-042023-2 Containment 1370 0.001 CL-042023-3 1385 0.002 617 E. Cooper CL-042023-4 1395 0.002 April 20, 2023 Avenue, Aspen, CL-042023-5 1405 0.001 CO (Unit 208) (Living Area) BLK-1 Blanks - BRL BLK-2 - BRL *BRL denotes "Below Reporting Limits". The PCM Colorado Department of Public Health and Environment (CDPHE)clearance standard is 0.01 F/cc. The PCM clearance air sample results were all below the CDPHE regulation 8 clearance standard of 0.01 F/cc. Based on the information presented above, E3 concludes that the containment area has passed the air clearance testing as of April 20th at 7:00 pm. The containment may be removed, and the work area may be reoccupied after build back. Thank you for allowing E3 the opportunity to provide environmental services to you. If you have questions or require additional information, please contact me at (303) 902-5851. EARTH ENERGY ENVIRONMENT (E3) RECEIVED 04/27/2023 ASPEN BUILDING DEPARTMENT PCM Air Clearance Page 2 of 2 j.►41.�i Eli Willden CDPHE Certifications No. 20139 Colorado Consulting Firm No. ACF-21719 RECEIVED 04/27/2023 ASPEN BUILDING DEPARTMENT