Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.315 E Hyman Ave.0026-2023-BREP (3)
GRAVITY HAUS LEBATEAU LIGHITNING SCHEDULE # Type of Fixture QTY Manufacturer NOTES WEB LINK L1 CEILING MOUNT 6 Lydia H340502-AGB REPLACE IN EXISTING LOCATION https://www.hvlgroup.com/Product/H340502-AGB httos://www.lumens.com/primo-wall-sconce-bv-cur rey-and-company-R222091.htm I?utm_sou rce=goo gle&utmmedium=PLA&utm term=&utm brand=C urrey-&-Company&utm_id=R222091&utm_camoai gn=189692751&gclid=CjwKCAjw3POhBhBQEiwA gTCuBnz_eCObpIPh3b4ayFeomLbi2X1 KK_I8RQA L2 WALL SCONCE INT 6 PRIMO WALL SCONCE REPLACE IN EXISTING LOCATION t_AUpAP2n2cR_AcBAQhoCIhgQAvD_BwE https://www.foundrylighting.com/collections/outdoo FOUNDRY CHAPMAN&MYERS r/products/generation-lighting-co1121htcp-chapma FREEPORT 1 LIGHT OUTDOOR n-myers-freeport-1-light-outdoor-light-in-heritage-c L3 WALL SCONCE EXT 4 LIGHT IN HERITAGE COPPER REPLACE IN EXISTING LOCATION opper httos://www.foundrvliqhtina.com/collections/best-s STUDIO VC SIENA SMALL FLUSH elling/products/visual-comfort-ss-4015hab-wg-stud MOUNT IN HAND-RUBBED ANTIQUE io-vc-traditional-ceiling-light-in-hand-rubbed-antiqu L4 CEILING MOUNT 7 BRASS WITH WHITE GLASS REPLACE IN EXISTING LOCATION e-brass L5 CEILING SPOT EXISTING TO REMAIN EXISTING https://www.homedepot.com/p/Stone-Liohting-4-5-1 n-1-Liq ht-Glossv-Black-Porcelain-Semi-Flush-Mou L6 D SOCKET LAMP 20 EXISTING LOCATION nt-CL982BLST64AM/310158457 L7 KITCHEN D SOCKET 2 EXISTING TO REMAIN L8 KITCHEN 4'STRIP 2 EXISTING TO REMAIN https://www.ledsupplv.com/led-strios/ac-power-505 0-led-strips?a cl i d=C iwKCAi w3 P O h B h B Q E i wAaTC u Bn02DgU 1 dJKnzbsD4voRxu0OF5s3utOGW KOin L9 LED STRIP 60' BAR AND SHELVING Ub7xyeYhnE5RglzFhoCItkQAvD_BwE https://www.superbrightleds.com/led-strips-and-ba rs/rig id-light-bars/waterproof-linear-led-light-bar-fixt u re-195-Im-ft+color-Warm-3000K+Iength_in-12in- L10 3'LED STRIP 2 BACK BAR COLUMN 1ft L11 COLUMN SCONCE EXT 3 EXISTING TO REMAIN EXISTING RECEIVED 05/24/2023 ASPEN BUILDING DEPARTMENT HUDSON earch VALLEYCI 8 LIGHTING GROUP SHOP ALL NEW CATEGORY BRANDS ROOM DESIGNERS INSPIRATION ABOUT MITZI Lydia H340502-AGB S178.00 In stock Specifications Width;Diameter: io.00" Height: 6.25" Backplate'Canopt Base: 8.25" Shade Material: Glass Shade Color: Opal Etched loopme- Number of Lamps: 2 Wattage: 40.00 Socket Type: E26 Medium Base Plug In: No UL Rating: UL Damp Downloads In-Room Try On Available Finishes ,L4ate4 Aged Brass Polished (AGB) Nickel (PN) RECEIVED 05/24/2023 ASPEN BUILDING DEPARTMENT Trade Advantage Program FREE SHIPPING On Most Orders 1111S.UMENS rFind your Design Q ,' (833) 405 0732 I Track My Order Trade Lighting Fans Furniture Decor Outdoor Design Rooms Shop By Brands The Edit Sale ® L Memorial Day Sale Save up to 50% Shop Now Home : Lighting : Wall Lights : Wall Sconces : Indoor Wall Sconces : Primo Wall Sconce by Currey& Company Customers Also Liked Similar Items ( , 7 �- Ailk iii 1r. Ilk CI ..___.. > I i ti +i ��., 31p1 f Ipr C2 Primo Wall Sconce Available to ship Xby Currey & Company in 2 to 3 weeks * * * * * 5.0 (2) a 0 $325.60 s FREE SHIPPING ev in 4 interest-free payments of S81.40 with Klarna. Learn More Trade Members: Apply or Sign In for Exclusive Access and Pricing -mop 11M Shop by Soonest Available < , I ! > Select Shade Color (2) : Black eu $325.60 1 Add to Cart + Free Shipping Available to ship in 2 to 3 weeks i Add To Project ITEM#: R222091 MFR ID: 5021 lof8 irr-ii -- `1 Questions about the Primo Wall Sconce?) _T 111 II! ... H Our 100% US-based ALA-certified product specialists can help you find the perfect product. i• r-� -� �„! (833) 405-0732 I Live Chat RECEIVED 05/24/2023 ASPEN 4a BUILDING DEPARTMENT .. LIGHTING BRANDS TRADE PRICING Fe) t..1r1.IDFK\ q MY ACCOUNT CART 10:i CHAPMAN >7 MYERS FREEPORT 1 LIGHT OUTDOOR LIGHT IN HERITAGE COPPER • BY GENERATION LIGHTING SKU C01121HICP S 477 . 24 ARE YOU A PRO?JOIN FOR TRADE PRICING. 1 �- 183 IN STOCK EXPECTED SHIP DATE MAY 27. 2023 DD TO CAR Buy with 1 Pay More payment options ADD TO LIST h SPEC SHEET Have a question? SHIPPING Et RETURNS — ADDITIONAL INFORMATION cUL Listing cETL Wet General Return Policy Mounting Procedure Set Screw(s) • Exchange or Return it for 30 days! Foundry Lighting prioritizes our customer experience above all else_ We want to make sure the products you purchase from us meet all of your expectations. All BULB & ELECTRICAL — uninstalled non-closeout and non-custom products may be returned within 30 days of receipt_ Read our return policy for more details. Bulb 41 1 Medium T10 60w Return Shipping & Restocking Fees Bulbs Included No Connection Hardwired • Our manufacturers charge restocking fees for returns. Although we still have to pay them, we will Total Bulbs 1 waive your restocking fee. However. the return shipping fees for undamaged or non- defective Wire/Cord Color Black/White This website uses cookies to target ads, and Wlre/Cord Length 8 ensure you get the best experience on our website. Learn more DESIGN INFORMATION — GOT IT! RECEIVED Category Outdoor Light 05/24/2023 r after date of purchase. ASPEN Class Outdoor BUILDING DEPARTMENT itng•llchnnifir fni inrinrlinhtinn rnmlnanaclnrnriiirtclSnar-ghaatliniri=dR1171R22c LIGHTING BRANDS TRADE PRICING F(ZJ.J 1 t D AY Q MY ACCOUNT CART (0) STUDIO VC SIENA SMALL FLUSH MOUNT IN HAND • RUBBED ANTIQUE BRASS WITH WHITE GLASS BY VISUAL COMFORT SIGNATURE COLLECTION SKU. SS 4015HAB - WG $ 479 - - ARE YOU A PRO? JOIN FOR TRADE PRICING. . — 1 + mit' AV I 198 iN STOCK EXPECTED Skid' DATE MAY 27. 2023 Il -,so ADD TO CART Buy with t' Pay More payment options ADD TO LIST a SPEC SHEET To demonstrate various viewpoints, identical items aro exhibited in a variety of Have a question? shapes, sites. and colors. the featured item is shown in the first picture lip iiil ov. b iiii 2 1-._ -� DESIGN INFORMATION i '.--gt—I1 DIMENSIONS & WEIGHT ± Ithi4 •'"-"" BULB & ELECTRICAL INFORMATION — Socket 2 - E26 Keyless RELATED ITEMS Wattage 2 - GOA19 Bulb Shape A Certi Note DRY This website uses cookies to target ads, and — _ Celli Type ETL ensure you get the best experience on our _ __...of website. Learn more Jbox 40 STUDIO VC SIENA STUDIO VC SIENA STUDIO VC SIENA RECEIVED ' CIPIMIL GOT IT1 SMALL FLUSH MOUNT SMALL FLUSH MOUNT SMALL FLUSH MOUNT SHADE INFORMATION + IN BRONZE WITH WHITE IN CHROME WITH IN POLISHED NICKEL 05/24/2023 GLASS WHITE GLASS WITH WHITE GLASS ASPEN ADDITIONAL INFORMATION + BUILDING DEPARTMENT Leviton 660 Wat Medium Base One-Piece Single Circuit Keyless Ceiling Mount Glazed Porcelain Incandescent Lampholder, White ***II (11) " Questions & Answers (23) 4k - (IF .11 Hover Image to Zoom RECEIVED 05/24/2023 g> Share 45 'nnt BUILDING DEPARTMENT (i) CoLEDSUPPIY LEDs Drivers Optics Heatsinks Power Supplies Dimmers Accessories Bulbs & Fixtures Strips Kits Closeout Q I tome > Strips Plug & Play LED Strip Lights AC Plug- in LED Strip Lights tS FREE SHIPPING °`�° $�-8-.69 * * * * * Select Color Select Length Sale Price: $16.99 You Save: $1 .70 See our reviews 8386 PCS IN-STOCK L� PART #: LS-AC50-XX-XXX QTY r 1 ADD TO CART -- ___- `F�� VOLUME DISCOUNTS SHIPPING INFORMATION* ORDER BY 3PM EST FOR SAME DAY SHIPPING •••••sW PCS % OFF First Class FREE '+ --%, 10 - 49 5% Fedex 2-Day $11 .99 • PlugPlay g N Light - Sft. Cord • Upto 150 Feet of Continuous Light! 50 - 99 7.5% FedEx Ground $10.99 g I I ' __ • Connectable - link strips together 100 - 249 15% UPS Ground $11 .99 LLE ' P' 1 } 1 ,�. A„ YA,,. {a N,_ 14 :G: 250 - 499 20% FedEx Express CALC `ED•"" SHARE: 0 © 0 Product Details INPUT POWER: AC 110 Line Voltage (No Driver Required - in-line DC rectifier on power cord) LUMENS: 180 Lumens per Foot (Super Bright) MAX RUN: Continuous Length Up to 150-Feet CUSTOM LENGTHS: cuttable every 1 /2-Meter COLORS: Cool-White, Warm-White, Red, Green & Blue MOUNTING: Clips, Clear Plastic Track, Aluminum Channel or Tape WATERPROOF: Flexible Rubber Housing, Clear PVC Lens & UV Inhibitor WATTAGE: 2.3-Watts per foot RECEIVED INCLUDED: 5 ft. AC CORD & Mounting Clips (1 /3ft) ACCESSORIES: Jumpers (spaces between light) & Track 05/24/2023 ASPEN BUILDING DEPARTMENT ADDRESS: 315 E HYMAN STREET PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET ITYOFasPEN FOR PLAN REVIEW QUESTIONS Name GRADY HUFF Phone , E-mail FOR INSPECTION QUESTIONS Name GRADY HUFF Phone I I I ii E-mail OWNER Name • • • , Phone Cell Phone Mailing Address City State ZIP 4624 CENTRAL PARK AVE STE 101 DENVER CO 80238 E-mail Address ALICIA@GRAVITYHAUS.COM OWNER'S AUTHORIZED AGENT Name GRADY HUFF Phone Cell Phone • I I • Mailing Address City State ZIP 4624 CENTRAL PARK AVE STE 101 DENVER CO 80238 E-mail Address GRADY@GRAVITYHAUS.COM APPLICATION BEST CONTACT Name GRADY HUFF Phone I Cell Phone Mailing Address 4624 CENTRAL PARK AVE STE 101 City DENVER State CO ZIP 80238 E-mail Address GRADY@GRAVITYHAUS.COM ARCHITECT OR DESIGNER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address GENERAL CONTRACTOR Name Phone Cell Phone Mailing Address City State ZIP E-mail Address I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Additionally,I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance with the approved Master plan set.I understand that the City does not review sub-permits for compliance with the master plan set Contractor 05-23-2023 I� Signature Date t�� ❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file 20 ( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO/81611i BUILDING DEPARTMENT 1 ADDRESS: 315 E HYMAN STREET PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM CITY OF ASPEN • All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS 315 E HYMAN STREET UNIT#301 PARCEL ID# 273718217801 I, the property owner, certify as follows: (pick one) O This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature Date 05-23-2023 Owner Printed Name GRADY HUFF OR Owner's Attorney Signature Date Owner's Attorney Printed Name ( CITY OF ASPEN November 2022 427 RIO GRANDE PL I ASPEN, CO �81611 \_i BUILDING DEPARTMENT 315 E HYMAN STREET ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ,,''►►. VALUATION AFFIDAVIT CITY OF ASPEN • AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Date:05-23-2023 Owner Printed Name: GRADY HUFF or, Authorized Agent Signature: Date: Authorized Agent Printed Name: RECEIVE 05/ 20 ( CITY OF ASPEN 427 RIO GRANDE PL I ASPEN, CO November 2022 81611J _ l BUILDING DEPARTMENT ADDRESS: 315 E HYMAN STREET PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ;�11�,0 ASBESTOS VERIFICATION AND CHECKLIST CITY OFASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑Yes❑ No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? El Yes ■❑ No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner GRAVITY HAUS LLC Phone #303 901 0038 Applicant (print name) G RADY HUFF Phone#30390 1 0038 Applicant Signature Date 05-23-2023 Please contact the Building Department at buildingsupport@aspen.gov at any time if you have quegti n`s out — asbestos, interpreting your test results, or other matters. 05/24/2042 CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO 81611i ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT 11�,� ZONING COMPLIANCE VERIFICATION POLICY CITY OFASPEN • Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed meaw m' t. Additional roof plans showing location of measurements may be necessary. 05/24/20 CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO 81611J 1 PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY CITY OFASPEN • 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: N/A NO GC I (contractor name) understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: 5/23/23 Date: RECE1V 05/24/20 ( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO 81611 t l BUILDING DEPARTMENT