HomeMy WebLinkAboutFile Documents.234 W Francis St.0028-2024-BCHO (2) Kaegebein Fine Homebuilding, LLCAppr/ Project:234 W FRANCIS 225 Main St.Ste.301 &302 234 W FRANCIS ST Carbondale,Colorado 81623 ASPEN,Colorado 81611 KA E G E B E I N P:+19705105797 FINE HOMEBUILDING RFI #154: Garage-Bed 4 Plumbing, Duct, & Manifold Status Closed on 08/07/23 To Corey Crist(Selldorf) From John Fenton(Kaegebein Fine Homebuilding,LLC) Date Initiated Jul 20,2023 Due Date Jul 28,2023 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings P103,A-412, M102 Received From Ed Geiss(Kaegebein Fine Homebuilding,LLC) Copies To Keith Forney(Storm King Mechanical),Josh Anthes (T&E Marshall),Josh Archuleta(Storm King Mechanical),Scott Bacher(T&E Marshall),Corey Grist(Selldorf),John Fenton(Kaegebein Fine Homebuilding,LLC), Ed Geiss(Kaegebein Fine Homebuilding,LLC), Dodson Harper(Structural) (REG),Jonathan Holton(Plumbing)(REG),Lori Maas(VVA Project&Cost Managers), Hannah Maloy(Structural)(REG),Catherine Mchale(VVA Project&Cost Managers),Arliss Merrell(Plumbing) (REG),John Mulcahy(VVA Project&Cost Managers),Susan Parapetti(Selldorf),Andrew Schalk(Selldorf) RECEIVED 05/10/2024 Kaegebein Fine Homebuilding,LLC Page 1 of 2 Printed On:May 3,2024 11:29 AM MDT ASPEN BUILDING DEPARTMENT RFI#154-Garage-Bed 4 Plumbing,Duct,&Manifold Project:234 W FRANCIS Activity Question Question from John Fenton Kaegebein Fine Homebuilding,LLC on Thursday,Jul 20, 2023 at 12:25 PM MDT All, In looking at the routing for the plumbing,dryer duct and manifold we have come up with some questions: 1. Manifold location—We have two manifolds to be located in the SE corner of the garage(1-8 loop, 1-3 loop). If we were to try to stack these above each other in the wall,we'd need a 7'/4"wall for all of the lines of the upper manifold to pass behind the lower. We'd like to move these manifolds under the stairs and have the access be the full width of the space between the trim and wall. Please see page 5 of attachment. 2. Bed 4 plumbing—The LVLs which frame the dropped floor for the bathroom cannot be drilled(per Boise Cascade specs)for the 3"waste line that will need to run to the chase at the south wall. We believe a chase in the ceiling may need to be framed for this. See pages 9, 10 and 11. 3. Dryer duct—There is a steel beam below the wall where the dryer vents are shown coming up from the LL. Would it be acceptable to bring these into the garage behind the cabinet void in the NE corner? If they are to be routed below the stairs as shown,we would need to notch the stairway header for them to pass into the joist bay. We then have blocks that were added to support the small warmboard filler sections that we'd need to pass through to follow the routing per M102.See pages 1,6,7,8. 4. Garage exhaust—holes in joists will need to be further west than what's shown on plan. Please confirm that this shift is acceptable. Page 1, 12. 5. Trash enclosure exhaust—please provide spec for this fan. Is this intended to tie into Garage exhaust ducting? If it is easier to review these questions over a Zoom call please let us know and we can schedule a meeting to review this RFI along with RFI#147 Boiler Flue&Duct Routing. Attachments RFI 154 Garage-Bed 4 plumbing,duct and manifold.pdf Official Response Response from Hannah Maloy(Structural)REG on Wednesday,Jul 26, 2023 at 01:40 PM MDT It is acceptable to replace the 9-1/2"LVLs below the shower with 9-1/2"BCIs @ 16"OC. It is also acceptable to leave the LVLs in place and add BCIs @ 16"OC between the LVLs. Official Response Response from Corey Crist Selldorf on Wednesday,Jul 26, 2023 at 07:57 AM MDT Please see attached responses following 06/24 review call with REG. Item#2 still under review by REG structural Attachments 1912_RFI-154_OUT.pdf RECEIVED 05/10/2024 Kaegebein Fine Homebuilding,LLC Page 2 of 2 Printed On:May 3,2024 11:29 AM MDT ASPEN BUILDING DEPARTMENT