RFI #154: Garage-Bed 4 Plumbing, Duct, & Manifold
Status Closed on 08/07/23
To Corey Crist(Selldorf) From John Fenton(Kaegebein Fine Homebuilding,LLC)
Date Initiated Jul 20,2023 Due Date Jul 28,2023
Location Project Stage
Cost Impact Schedule Impact
Spec Section Cost Code
Drawing Number Reference
Linked Drawings P103,A-412, M102
Received From Ed Geiss(Kaegebein Fine Homebuilding,LLC)
Copies To Keith Forney(Storm King Mechanical),Josh Anthes
(T&E Marshall),Josh Archuleta(Storm King
Mechanical),Scott Bacher(T&E Marshall),Corey
Grist(Selldorf),John Fenton(Kaegebein Fine
Homebuilding,LLC), Ed Geiss(Kaegebein Fine
Homebuilding,LLC), Dodson Harper(Structural)
(REG),Jonathan Holton(Plumbing)(REG),Lori
Maas(VVA Project&Cost Managers), Hannah
Maloy(Structural)(REG),Catherine Mchale(VVA
Project&Cost Managers),Arliss Merrell(Plumbing)
(REG),John Mulcahy(VVA Project&Cost
Managers),Susan Parapetti(Selldorf),Andrew
Schalk(Selldorf)
RECEIVED
05/10/2024
Kaegebein Fine Homebuilding,LLC Page 1 of 2 Printed On:May 3,2024 11:29 AM MDT
ASPEN
BUILDING DEPARTMENT
RFI#154-Garage-Bed 4 Plumbing,Duct,&Manifold Project:234 W FRANCIS
Activity
Question Question from John Fenton Kaegebein Fine Homebuilding,LLC on Thursday,Jul 20, 2023 at 12:25 PM MDT
All,
In looking at the routing for the plumbing,dryer duct and manifold we have come up with some questions:
1. Manifold location—We have two manifolds to be located in the SE corner of the garage(1-8 loop, 1-3 loop). If we were
to try to stack these above each other in the wall,we'd need a 7'/4"wall for all of the lines of the upper manifold to pass
behind the lower. We'd like to move these manifolds under the stairs and have the access be the full width of the
space between the trim and wall. Please see page 5 of attachment.
2. Bed 4 plumbing—The LVLs which frame the dropped floor for the bathroom cannot be drilled(per Boise Cascade
specs)for the 3"waste line that will need to run to the chase at the south wall. We believe a chase in the ceiling may
need to be framed for this. See pages 9, 10 and 11.
3. Dryer duct—There is a steel beam below the wall where the dryer vents are shown coming up from the LL. Would it be
acceptable to bring these into the garage behind the cabinet void in the NE corner? If they are to be routed below the
stairs as shown,we would need to notch the stairway header for them to pass into the joist bay. We then have blocks
that were added to support the small warmboard filler sections that we'd need to pass through to follow the routing per
M102.See pages 1,6,7,8.
4. Garage exhaust—holes in joists will need to be further west than what's shown on plan. Please confirm that this shift is
acceptable. Page 1, 12.
5. Trash enclosure exhaust—please provide spec for this fan. Is this intended to tie into Garage exhaust ducting?
If it is easier to review these questions over a Zoom call please let us know and we can schedule a meeting to review this RFI
along with RFI#147 Boiler Flue&Duct Routing.
Attachments
RFI 154 Garage-Bed 4 plumbing,duct and manifold.pdf
Official Response Response from Hannah Maloy(Structural)REG on Wednesday,Jul 26, 2023 at 01:40 PM MDT
It is acceptable to replace the 9-1/2"LVLs below the shower with 9-1/2"BCIs @ 16"OC. It is also acceptable to leave the
LVLs in place and add BCIs @ 16"OC between the LVLs.
Official Response Response from Corey Crist Selldorf on Wednesday,Jul 26, 2023 at 07:57 AM MDT
Please see attached responses following 06/24 review call with REG.
Item#2 still under review by REG structural
Attachments
1912_RFI-154_OUT.pdf