Loading...
HomeMy WebLinkAboutFile Documents.234 W Francis St.0118-2020-BRES (40) CF 234 W Francis-Assembly U-value Calculations 9/15/2020 Roof 1 Roof framing: Flat Roof Framing spacing: 16 inches o.c. %framing: Eqn Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 Y N 0.17 0.17 Ballast-washed stones(BA-1) Washed Stone Ballast Y N 1.5 0.14 0.21 0.21 PVC Memebrane(WP-10) PVC Membrane 0.24 Y N 0.24 0.24 Cover Board(CB-1) Densdeck Roof Board-1/2" 0.56 Y N 0.56 0.56 Rigid Tappered roof insulation(INS-5) Insulation-Rockwool Toprock 4.30 Y Y 4.30 4.30 Sheathing Sheathing-Plywood 3/4" 1.08 Y N 1.08 1.08 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam N Y 8 6.50 51.98 Air Pocket Air Pocket Y N 4 0.16 0.64 0.64 Wood Board Ceiling Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 8.61 60.6ITOTALS Assembly values: 55.7 R-value 0.0180 U-factor Roof 2 Roof framing: Sloped Metal Roof Framing spacing: 16 inches o.c. %framing: 9.4% Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.171 Y N 0.17 0.17 Standing Seam Roofing(MTL-X3) Roofing-Steel Y N 0.0375 0.003 0.00 0.00 _ Air Vapor Barrier(WP-7) Weather Barrier 0.06 Y N 0.06 0.06 Continous Roof Insulation(INS-4) Insulation-Rockwool Toprock 4.30 Y Y 4.30 4.30 Sheathing Sheathing-Plywood 3/4" 1.08 Y N 1.08 1.08 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam N Y 8 6.50 51.98 Air Pocket Air Pocket Y N 4 0.16 0.64 0.64 Wood Board Ceiling Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 7.61 59.6ITOTALS Assembly values: 54.8 R-value 0.0183 U-factor Roof 3 Roof framing: Basement Planted Roof Framing spacing: inches o.c. %framing: Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 Y N 0.17 0.17 Sub-grade XPS(INS-9) Insulation-Extruded polystyrene Y N 6 5.00 30.00 30.00 Weather Barrier Weather Barrier 0.06 Y N 0.06 0.06 Slab Poured Concrete Y N 7 0.08 0.56 0.56 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam Y Y 2 6.50 13.00 13.00 Wood Board Ceiling Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 45.21 45.2ITOTALS Assembly values: 45.2 R-value 0.0221 U-factor Roof 4 Roof framing: Flat Roof at Historic Main House Framing spacing: 16 inches o.c. %framing: l4% Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 Y N 0.17 0.17 PVC Memebrane(WP-10) PVC Membrane 0.24 Y N 0.24 0.24 Cover Board(CB-1) Densdeck Roof Board-1/2" 0.56 Y N 0.56 0.56 Rigid Tappered roof insulation(INS-5) Insulation-Rockwool Toprock 4.30 Y Y 4.30 4.30 Sheathing Sheathing-Plywood 3/4" 1.08 Y N 1.08 1.08 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam Y Y 8 6.50 51.98 51.98 Wood Board Ceiling Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 59.71 59.7ITOTALS • Assembly values: 59.7 R-value !. 0.0167 U-factor ' 10/22/2020 ASPEN BUILDING DEPARTMENT CF 234 W Francis-Assembly U-value Calculations 9/15/2020 Roof 5 Roof framing: Sloped Cedar Roof Framing spacing: inches o.c. %framing: Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 Y N 0.17 0.17 Exterior Cedar Shingle Roof(WD-X3) Siding-Wood-3/4"lapped 1.18 Y N 1.18 1.18 Underlayment(WP-13) Weather Barrier 0.06 Y N 0.06 0.06 Cover Board(CB-1) Densdeck Roof Board-1/2" 0.56 Y N 0.56 0.56 Rigid Tappered roof insulation(INS-5) Insulation-Rockwool Toprock 4.30 Y Y 4.30 4.30 Sheathing Sheathing-Plywood 3/4" 1.08 Y N 1.08 1.08 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam Y Y 8 6.50 51.98 51.98 Wood Board Ceiling Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 60.71 60.71 Assembly values: 60.7 R-value 0.0165 U-factor WALLS Wall 1 Ext Wall at Addition Wall framing: wood Framing spacing: 16 inches o.c. %framing: Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 V N 0.17 1 0.17 Painted Wood Siding Siding-Wood-3/4"lapped 1.18 V N I 1.18 I 1.18 Air Gap Air Pocket N N 0.75 0.16 l 0.12 Exterior Frame Wood-Hem Fir N N 0.75 1.35 l 1.01 Vapor Barrier(WPA-4) Weather Barrier 0.06 Y N I 0.06 0.06 Sheathing Sheathing-Plywood 1/2" 0.79 Y N 0.79 0.79 Continuous Insulation(INS-3) Insulation-Mineral Wool Board Y Y 1 4.20 4.20 4.20 Wood Frame Wood Framing-2x6 7.43 N N 7.43 Cavity Batt Insulation(INS-2) Insulation-Mineral Wool N Y 5.5 3.82 20.99 Sheathing Sheathing-Plywood 1/2" 0.79 Y N 0.79 0.79 Doug Fir Siding Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 17.21 29.6ITOTALS Assembly values: 28.4 R-value 0.0352 U-factor Wall 2 Ext Wall at Addition w/Pocket Wall framing: wood Framing spacing: 16 inches o.c. %framing: Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 Y N I 0.17 0.17 Painted Wood Siding Siding-Wood-3/4"lapped 1.18 Y N 1.18 1.18 Air Gap Air Pocket Y N 0.75 0.16 0.12 0.12 Exterior Frame Wood-Hem Fir N N 0.75 1.35 1.01 Vapor Barrier(WPA-4) Weather Barrier 0.06 V N l 0.06 0.06 Sheathing Sheathing-Plywood 1/2" 0.79 Y N 0.79 0.79 Continuous Insulation(INS-3) Insulation-Mineral Wool Board Y Y 1 4.20 4.20 4.20 Wood Frame Wood Framing-2x6 7.43 N N 7.43 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam N Y 3.5 6.50 22.74 Gyp Board Gypsum Board-5/8" 0.57 Y N 0.57 0.57 Door Pocket Air Pocket Y N 5.25 0.16 0.84 0.84 Gyp Board Gypsum Board-5/8" 0.57 Y N 0.57 0.57 Interior Frame Wood-Hem Fir N N 2.5 1.35 3.38 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam N Y 2.5 6.50 16.24 Sheathing Sheathing-Plywood 1/2" 0.79 Y - N 0.79 0.79 Doug Fir Siding Doug Fir/Larch Y N 0.75 1.05 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 22.51 49.7ITOTALS Assembly values: 47.1 R-value 0.0212 U-factor RECEIVED 10/22/2020 ASPEN BUILDING DEPARTMENT CF 234 W Francis-Assembly U-value Calculations 9/15/2020 Wall 3 Ext Wall at Historic Wall framing: wood Framing spacing: inches o.c. %framing: Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Outdoor air film Outdoor Air Film 0.17 Y N 0.17 0.17 Painted Wood Siding Siding-Wood-3/4"lapped 1.18 Y N 1.18 1.18 Vapor Barrier(WPA-4) Weather Barrier 0.06 Y N 0.06 0.06 Sheathing Sheathing-Plywood 1/2" 0.79 Y N 0.79 0.79 Wood Frame Wood Framing-2x6 7.43 N N 7.43 Interior Closed Cell Insulation(INS-8) Insulation-Closed Cell Spray Foam N Y 5.5 6.50 35.74 Sheathing Sheathing-Plywood 1/2" 0.79 Y N 0.79 0.79 Doug Fir Siding Doug Fir/Larch Y N 1.05 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 11.01 39.3ITOTALS Assembly values: 36.7 R-value 0.0273 U-factor Wall 4 Ext Foundation Wall Wall framing: internal:wood Framing spacing: inches o.c. %framing: Required U value: 0.064 Framed Insulated Description Material R-Value Continuous Insulation Thickness(inches) R-value/inch R-values R-values Sub-grade XPS(INS-9) Insulation-Extruded polystyrene Y N 4 5.00 20.00 20.00 Air Vapor Barrier(WP-7) Weather Barrier 0.06 Y N 0.06 0.06 Concrete Wall Poured Concrete-150 lb/cf Y N 10 0.07 0.70 0.70 2"x4"wood frame furring Doug Fir/Larch N N 3.5 1.05 3.68 Cavity Batt Insulation(INS-2) Insulation-Closed Cell Spray Foam N Y 3.5 6.50 22.74 Sheathing(WD-10) Sheathing-Plywood 1/2" 0.79 Y N 0.79 0.79 Indoor air film Indoor Air Film 0.61 Y N 0.61 0.61 I 25.81 44.9ITOTALS Assembly values: 43.1 R-value 0.0232 U-factor *www.coloradoenergy.org http://www.coloradoenergy.org/procorner/stuff/r-values.htm **2017 ASHRAE Fundamentals,Chapter 26 RECEIVED 10/22/2020 ASPEN BUILDING DEPARTMENT