HomeMy WebLinkAboutFile Documents.535 E Cooper Ave.0021-2022-BCOM (10) COMcheck Software Version COMcheckWeb
r A
Interior Lighting Compliance Certificate
Projectvill Information _ e ff e i
Energy Code: 2015 IECC 05/25/2022 149
Project Title: John Elliott
Project Type: Alteration FORCOIXGUNFLIANE
justinh _
Construction Site: Owner/Agent: Designer/Contractor:
529 East Cooper Ave John Elliott LLC Roscoe Hancock
Aspen, Colorado 81611 Taranaki Electric Inc
PO BOX 1748
ASPEN, Colorado 81612
9706189573
roscoe@sopris.net
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed
(ft2) Watts /ft2 Watts
1-Sales area (Retail:Sales Area) 848 1.59 1348
2-ADA Fitting rm (Retail:Dressing/Fitting Room) 56 0.71 40
3-Small Fitting rm (Retail:Dressing/Fitting Room) 18 0.71 13
4-Warehouse:Fine Material Storage 52 0.95 49
Total Allowed Watts = 1450
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Sales area (Retail: Sales Area. 848 sq.ft.)
LED: Ll: Para9c317: Other: 3 25 45 1125
LED: L2: Eurofase Santo 6 ": Other: 1 3 11 33
ADA Fitting rm (Retail: Dressing/Fitting Room, 56 sq.ft.)
LED: L2: Eurofase Santo 6": Other: 1 2 11 22
LED: L4: SSL20 linear mirror plug in: Other: 1 4 20 Exempt
Exemption:Furniture-mounted Supplemental Task Lighting
Small Fitting rm (Retail: Dressing/Fitting Room, 18 sq.ft.)
LED: L2: Eurofase Santo 6": Other: 1 1 11 11
LED: L4: SSL20 linear mirror plug in.: Other: 1 4 20 Exempt
Exemption:Furniture-mounted Supplemental Task Lighting
Warehouse: Fine Material Storage (52 sq.ft.)
LED: L3: LSA4330030k linear: Other: 1 2 26 52
Total Proposed Watts = 1243
Project Title: John Elliott Report da:"03 •2ED
Data filename: PaOe4/ Jf/25022
ASPEN
BUILDING DEPARTMENT
Interior Lighting PASSES
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Roscoe Hancock 7V 2. 3/27/2022
Name-Title Signature Date
Project Title: John Elliott Report date 03/27/22
Data filename: Pa6e / gf/250 2 2
ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2015 IECC
irlit
Requirements: 78.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or ❑Complies Requirement will be met.
[PR4]1 calculations provide all information ❑Does Not
with which compliance can be
determined for the interior lighting ENot Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 12 Medium Impact(Tier 2) 3 Low Impact(Tier 3) �=
Project Title: John Elliott Report ate:'03 27/22 �)
Data filename: Pace /28f/25022
l7 ASPEN
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.1 Lighting controls installed to uniformly EComplies Requirement will be met.
[EL15]1 reduce the lighting load by at least ❑Does Not
50%. ❑Not Observable
❑Not Applicable
C405.2.1 Occupancy sensors installed in EComplies Requirement will be met.
[EL18]1 required spaces. ❑Does Not
❑Not Observable
❑Not Applicable
C405.2.1, Independent lighting controls installed EComplies Requirement will be met.
C405.2.2. per approved lighting plans and all ❑Does Not
3 manual controls readily accessible and
[EL23]2 visible to occupants. ❑Not Observable
❑Not Applicable
C405.2.2. ;Automatic controls to shut off all EComplies Requirement will be met.
1 :building lighting installed in all ❑Does Not
[EL22]2 buildings.
❑Not Observable
❑Not Applicable
C405.2.3 :Daylight zones provided with EComplies
[EL16]2 :individual controls that control the ❑Does Not
lights independent of general area
lighting. ❑Not Observable
❑Not Applicable
C405.2.3, :Primary sidelighted areas are EComplies Exception: Requirement does not apply.
C405.2.3. :equipped with required lighting ❑Does Not
1, ,controls. ❑Not Observable
C405.2.3.
2 ❑Not Applicable
[EL20]1
C405.2.3, :Enclosed spaces with daylight area EComplies Exception: Requirement does not apply.
C405.2.3. :under skylights and rooftop monitors ❑Does Not
1, 'are equipped with required lighting
C405.2.3. controls. Not Observable
3 ❑Not Applicable
[EL21]1
C405.2.4 Separate lighting control devices for EComplies Requirement will be met.
[EL4]1 specific uses installed per approved ❑Does Not
lighting plans.
❑Not Observable
❑Not Applicable
C405.2.4 Additional interior lighting power EComplies
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and ❑Not Observable
separated from general lighting. ❑Not Applicable
C405.3 ,l Exit signs do not exceed 5 watts per ❑Complies Requirement will be met.
[EL6]1 :face. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) pref2 E�Project Title: John Elliott Repo a "03
Data filename: Pae /25f/25022
ASPEN
BUILDING DEPARTMENT
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, ;Furnished O&M instructions for EComplies Requirement will be met.
C408.2.5. :systems and equipment to the ❑Does Not
2 ;building owner or designated
[F117]3 :representative. ❑Not Observable
❑Not Applicable
C405.4.1 :Interior installed lamp and fixture EComplies See the Interior Lighting fixture schedule for values.
[F118]1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
;plans, demonstrating proposed watts ❑Not Observable
I are less than or equal to allowed ❑Not Applicable
:watts.
C408.2.5. 'Furnished as-built drawings for EComplies Requirement will be met.
1 electric power systems within 90 days ❑Does Not
[F116]3 of system acceptance.
❑Not Observable
❑Not Applicable
C408.3 :Lighting systems have been tested to ❑Complies
[F133]1 'ensure proper calibration, adjustment, ❑Does Not
programming, and operation.
ENot Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) kg tylk
PE DProject Title: John Elliott Repo a '03
Data filename: PaF-te4/Lgf/25022
l7 ASPEN