Loading...
HomeMy WebLinkAboutFile Documents.535 E Cooper Ave.0021-2022-BCOM (10) COMcheck Software Version COMcheckWeb r A Interior Lighting Compliance Certificate Projectvill Information _ e ff e i Energy Code: 2015 IECC 05/25/2022 149 Project Title: John Elliott Project Type: Alteration FORCOIXGUNFLIANE justinh _ Construction Site: Owner/Agent: Designer/Contractor: 529 East Cooper Ave John Elliott LLC Roscoe Hancock Aspen, Colorado 81611 Taranaki Electric Inc PO BOX 1748 ASPEN, Colorado 81612 9706189573 roscoe@sopris.net Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts /ft2 Watts 1-Sales area (Retail:Sales Area) 848 1.59 1348 2-ADA Fitting rm (Retail:Dressing/Fitting Room) 56 0.71 40 3-Small Fitting rm (Retail:Dressing/Fitting Room) 18 0.71 13 4-Warehouse:Fine Material Storage 52 0.95 49 Total Allowed Watts = 1450 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Sales area (Retail: Sales Area. 848 sq.ft.) LED: Ll: Para9c317: Other: 3 25 45 1125 LED: L2: Eurofase Santo 6 ": Other: 1 3 11 33 ADA Fitting rm (Retail: Dressing/Fitting Room, 56 sq.ft.) LED: L2: Eurofase Santo 6": Other: 1 2 11 22 LED: L4: SSL20 linear mirror plug in: Other: 1 4 20 Exempt Exemption:Furniture-mounted Supplemental Task Lighting Small Fitting rm (Retail: Dressing/Fitting Room, 18 sq.ft.) LED: L2: Eurofase Santo 6": Other: 1 1 11 11 LED: L4: SSL20 linear mirror plug in.: Other: 1 4 20 Exempt Exemption:Furniture-mounted Supplemental Task Lighting Warehouse: Fine Material Storage (52 sq.ft.) LED: L3: LSA4330030k linear: Other: 1 2 26 52 Total Proposed Watts = 1243 Project Title: John Elliott Report da:"03 •2ED Data filename: PaOe4/ Jf/25022 ASPEN BUILDING DEPARTMENT Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Roscoe Hancock 7V 2. 3/27/2022 Name-Title Signature Date Project Title: John Elliott Report date 03/27/22 Data filename: Pa6e / gf/250 2 2 ASPEN BUILDING DEPARTMENT COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2015 IECC irlit Requirements: 78.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting ENot Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 Medium Impact(Tier 2) 3 Low Impact(Tier 3) �= Project Title: John Elliott Report ate:'03 27/22 �) Data filename: Pace /28f/25022 l7 ASPEN BUILDING DEPARTMENT Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.1 Lighting controls installed to uniformly EComplies Requirement will be met. [EL15]1 reduce the lighting load by at least ❑Does Not 50%. ❑Not Observable ❑Not Applicable C405.2.1 Occupancy sensors installed in EComplies Requirement will be met. [EL18]1 required spaces. ❑Does Not ❑Not Observable ❑Not Applicable C405.2.1, Independent lighting controls installed EComplies Requirement will be met. C405.2.2. per approved lighting plans and all ❑Does Not 3 manual controls readily accessible and [EL23]2 visible to occupants. ❑Not Observable ❑Not Applicable C405.2.2. ;Automatic controls to shut off all EComplies Requirement will be met. 1 :building lighting installed in all ❑Does Not [EL22]2 buildings. ❑Not Observable ❑Not Applicable C405.2.3 :Daylight zones provided with EComplies [EL16]2 :individual controls that control the ❑Does Not lights independent of general area lighting. ❑Not Observable ❑Not Applicable C405.2.3, :Primary sidelighted areas are EComplies Exception: Requirement does not apply. C405.2.3. :equipped with required lighting ❑Does Not 1, ,controls. ❑Not Observable C405.2.3. 2 ❑Not Applicable [EL20]1 C405.2.3, :Enclosed spaces with daylight area EComplies Exception: Requirement does not apply. C405.2.3. :under skylights and rooftop monitors ❑Does Not 1, 'are equipped with required lighting C405.2.3. controls. Not Observable 3 ❑Not Applicable [EL21]1 C405.2.4 Separate lighting control devices for EComplies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable C405.2.4 Additional interior lighting power EComplies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ❑Not Observable separated from general lighting. ❑Not Applicable C405.3 ,l Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL6]1 :face. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) pref2 E�Project Title: John Elliott Repo a "03 Data filename: Pae /25f/25022 ASPEN BUILDING DEPARTMENT Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, ;Furnished O&M instructions for EComplies Requirement will be met. C408.2.5. :systems and equipment to the ❑Does Not 2 ;building owner or designated [F117]3 :representative. ❑Not Observable ❑Not Applicable C405.4.1 :Interior installed lamp and fixture EComplies See the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ;plans, demonstrating proposed watts ❑Not Observable I are less than or equal to allowed ❑Not Applicable :watts. C408.2.5. 'Furnished as-built drawings for EComplies Requirement will be met. 1 electric power systems within 90 days ❑Does Not [F116]3 of system acceptance. ❑Not Observable ❑Not Applicable C408.3 :Lighting systems have been tested to ❑Complies [F133]1 'ensure proper calibration, adjustment, ❑Does Not programming, and operation. ENot Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) kg tylk PE DProject Title: John Elliott Repo a '03 Data filename: PaF-te4/Lgf/25022 l7 ASPEN BUILDING DEPARTMENT