Additional comments, submitted 11/18/2021
REVISED RESPONSE 01/07/2021
1.The FOR for the structural design needs to provide a Special Inspection program and you need to get a
special inspector on board for the field fabrication.
UPDATED SPECIAL INSPECTION AND TESTING AGREEMENT AND STRUCTURAL SPECIAL INSPECTION
LETTER WAS ADDED
2.The wall of the cottage on the property line and the eve are required to be one hour. Is this siding going to be
new in the area?
TER CONVERSATION WITH BUILDING DEPARTMENT AND HPC, 1 HOUR FIRE RATED ASSEMBLY WILL
BE PROVIDED AT THE EAST SIDE OF THE COTTAGE WHICH WILL REQUIRE A FULL REPLACMENT OF
THE EXTERIOR WOOD SIDING AND ROOF OVERHANG ALONG THE PROPERTY LINE. ALL HISTORIC
ELEMENTS WILL BE REPLACED IN KIND IN COORDINATION WITH HPC. REFER TO UPDATED SHEETS
DM-202 AND A-311.
s/3.Why the 2 hour doors?
INTERIOR DOORS WERE REDUCED TO 1 HOUR RATING PER CODE REQUIREMENT. REFER TO SHEET
A-610.
4.The window and door schedule have incorrect U-values. 0.28 is the maximum, plan shows .32.
WINDOW/ DOOR SCHEDULE WAS UPDATED TO REFLECT 0.28 U-VALUE FOR NEW UNITS
THROUGHOUT. EXISTING WINDOWS AT HISTORIC BUILDINGS ARE EXCEMPT AND REMAI AT 0.32.
REFER TO SHEET A-611. AN UPDATED RESCHECK WAS PROVIDED.
5.Where are the wall type tagged to the assemblies?
EXTERIOR WALL TYPES WERE TAGGED ON PROPOSED FLOOR PLANS A-100, A-101, A-102 AND
PROPOSED BUILDING SECTIONS A-300 THROUGH A-305; WALL TYPE LABELS WERE ADDED TO
SHEET A-530.
In the schedule label the emergency escape windows.
EMERGENCY WINDOWS WERE LABELLED IN WINDOW/ DOOR SCHEDULE. REFER TO SHEET A-611.
7.Provide an APSP-15 worksheet for the spa and a ASTM 01346 F safety cover.
APSP-15 WORKSHEET AND ASTM F1346-91 COMPLIANCE LETTER WERE PROVIDED.
8.Provide a complete RREMP worksheet. Revise the inverters maximum continuous output and there are no
values in the snowmelt and spa.
UPDATED REMP WORKSHEET WITH SNOWMELT, SPA AND UPDATED PV INVERTER INFORMATION
WAS PROVIDED.
V9.The sheet ZN-200 does not match M002. Please revise.
SHEETS ZN-002, M002 AND M101 WERE REVISED WITH MATCHING SNOWMELT AREAS.
10.Provide details for a listed Class A roof assembly.
ROOF ASSEMBLIES WERE UPDATED TO MEET CLASS A REQUIREMENTS THROUGHOUT.
REFER TO A-530 AND A-531. CUTSHEET OF THE CLASS A ASSEMBLY MATERIAL WERE PROVIDED ON
SHEET A-532 THROUGH A-536.
1.Where is the relocation [plan for the historic resources ? ED
HISTORIC RESOURCES TO REMAIN IN PLACE. SHEET DM-100 WAS UPDATED TO INDIC
4
FOOTINGS TO REMAIN, REFER TO SHEET A-311 FOR UNDERPINNING DETAIL AT CABLE.
AN ENGINEERING SUPPORT PLAN FOR THE HISTORIC STRUCTURES WAS ADDED. 01/28/2022