Loading...
HomeMy WebLinkAboutFile Documents.320 W Bleeker St.0019-2021-BRES (14) Engineering1_0019-2021 -bres_320 W Bleeker St 80.Survey.20200628.pdf(1) Subject: Cloud+ (, — Page: 1 To complete this work it appears l � Page Index: 1 that the existing storm ;,g • Author: infrastructure will be impacted by kililut or. pjm !�"� Date: 2/24/2021 5:26:51 PM the excavation and the addition. ';`Ir/ File Name: 80.Survey.20200628.pdf How will this infrastructure for • drainage purposes be � "w- 1 maintained through the project? ." 1. � Will this infrastructure be ,- "' replaced? 90.Architectural plans REVISED.20200728.pdf(1) Subject: Cloud+ _ Page:A 004 SITE PLAN How does the proposed addition Page Index: 18 drain? Per the URMP,this -. o project qualifies as a minor 4 9;fi ==;: 1 engineering review. The Date: 2/24/2021 5:28:44 PM 7_ ' .. File Name: 90.Architectural plans REVISED.20200728.pdf hardscape is required to drain to cli.�-r-_- - 1.`L I green space or a BMP. Provide s, L i a drainage narrative that meets the URMP requirements and 0- • °- f= 2. show drainage patterns on a site plan. How does this new roof line tie into the existing storm infrastructure? Is there capacity in the existing infrastructure to accomodate this addition? 90.Shoring Plans.20200628.pdf(1) ...- N r T T 7 - 2" Subject: Cloud+ Is this design relying on the Page: 3 -f., I -I I integrity of the existing micropile '` Page Index: 3 'J�IIII11111111111�N X�I�����q�r,;,‘.;----1 Author: pjm system?The design life of these ;°� III IlliI _L J_ I_ ,.., Date: 2/24/2021 5:30:42 PM is 12 weeks, does that impact r ' the reliability of the old system? i I i I File Name: 90.Shoring Plans.20200628.pdf 9is� j - 3. RECEIVED 07/30/2021 ASPEN BUILDING DEPARTMENT