HomeMy WebLinkAboutFile Documents.320 W Bleeker St.0019-2021-BRES (14) Engineering1_0019-2021 -bres_320 W Bleeker St
80.Survey.20200628.pdf(1)
Subject: Cloud+
(, — Page: 1 To complete this work it appears
l � Page Index: 1 that the existing storm
;,g • Author: infrastructure will be impacted by
kililut or. pjm
!�"� Date: 2/24/2021 5:26:51 PM the excavation and the addition.
';`Ir/ File Name: 80.Survey.20200628.pdf How will this infrastructure for
• drainage purposes be
�
"w- 1 maintained through the project?
." 1.
� Will this infrastructure be
,- "' replaced?
90.Architectural plans REVISED.20200728.pdf(1)
Subject: Cloud+
_ Page:A 004 SITE PLAN How does the proposed addition
Page Index: 18 drain? Per the URMP,this
-. o project qualifies as a minor
4 9;fi
==;:
1 engineering review. The
Date: 2/24/2021 5:28:44 PM
7_ ' .. File Name: 90.Architectural plans REVISED.20200728.pdf hardscape is required to drain to
cli.�-r-_- - 1.`L I green space or a BMP. Provide
s, L i a drainage narrative that meets
the URMP requirements and
0- • °- f= 2.
show drainage patterns on a site
plan. How does this new roof
line tie into the existing storm
infrastructure? Is there capacity
in the existing infrastructure to
accomodate this addition?
90.Shoring Plans.20200628.pdf(1)
...- N r T T 7 - 2" Subject: Cloud+ Is this design relying on the
Page: 3
-f., I -I I integrity of the existing micropile
'` Page Index: 3
'J�IIII11111111111�N X�I�����q�r,;,‘.;----1 Author: pjm system?The design life of these
;°� III IlliI _L J_ I_ ,.., Date: 2/24/2021 5:30:42 PM is 12 weeks, does that impact
r ' the reliability of the old system?
i I i I File Name: 90.Shoring Plans.20200628.pdf
9is�
j -
3.
RECEIVED
07/30/2021
ASPEN
BUILDING DEPARTMENT