Please see the attached drawings for updates regarding comments received 6-15-2021.
1. Response to Engineering comment 80.Survey.
See updated drawings Sheets EX-004, EX-101, EX-102, A-004, A-101, A-102 for added
notes regarding temporary storm water drainage. RF Engineering has provided a
drainage narrative explaining existing and proposed storm water drainage system for the
addition.
2. Response to Engineering comment 90. Architectural Plans.
See updated sheets EX-104, EX -101, EX-102, A-004, A-101, A-102, A-104, A-202 for
added notes. The downspout at Grids J &4 will be used as the primary drain for the new
roof addition. This will tie into the existing storm water system. RF Engineering has
provided a drainage narrative that explains the proposed storm water drainage system
for the addition.
3. Response to Engineering comment 90. Shoring Plans.
See memo from RJ Engineering explaining the impacts on the existing micorpile walls
and the proposed design.