Loading...
HomeMy WebLinkAboutFile Documents.320 W Bleeker St.0019-2021-BRES (15) G 11i Galambos Architects Inc. City of Aspen Engineering Responses Permit# 0019-2021-BRES 320 W. Bleeker Aspen, CO 81611 July 28th, 2021 To Whom it May Concern, Please see the attached drawings for updates regarding comments received 6-15-2021. 1. Response to Engineering comment 80.Survey. See updated drawings Sheets EX-004, EX-101, EX-102, A-004, A-101, A-102 for added notes regarding temporary storm water drainage. RF Engineering has provided a drainage narrative explaining existing and proposed storm water drainage system for the addition. 2. Response to Engineering comment 90. Architectural Plans. See updated sheets EX-104, EX -101, EX-102, A-004, A-101, A-102, A-104, A-202 for added notes. The downspout at Grids J &4 will be used as the primary drain for the new roof addition. This will tie into the existing storm water system. RF Engineering has provided a drainage narrative that explains the proposed storm water drainage system for the addition. 3. Response to Engineering comment 90. Shoring Plans. See memo from RJ Engineering explaining the impacts on the existing micorpile walls and the proposed design. RECEIVED BUILDING 314-D,ASPEN AIRPOST BUSINESS CENTER ASPEN,CO 81611 T:970.429.1286 0 7/3 0/2 0 21 ASPEN BUILDING DEPARTMENT