Loading...
HomeMy WebLinkAboutFile Documents.234 W Francis St.0118-2020-BRES (65) Engineering 1 _0118-2020-BRES_234 W Francis 40.Drainage Report.20201022.pdf(8) ting drainage pattern is to the north,northeast and drainagAuthor: pjm n the property are minimal at I.S-nercentannroximately. File Name: 40.Drainage Report.20201022.pdf Confirm soil _ rt' geotech. Confirm soil type with geotech. The revised geotech report specifies the soil - Is`s`of construction°fanappr°x`mat•ly 3,472 square foots`ng'' depth as gravel and sand. Thi •_. - T I the existing residence,remodel of the existing guest house,f p andscaping and stormwater convey. ce and management faci MRCS descriptio -- r•- -•rained with mo:- _ = T igh to high permeability. p locates thi ite in the Type"B"soils area. Ilt, - •• S y es within m.,.in u.it .-1=v,cai -Mergel com Soil Conserva..•1 i`ce.eScrt.es a so,as well-drained a . -ea.ility,and very low water storage capacity.The .u. a.,m.°ae ea,a.=rn" Author: pjm ° File Name: 40.Drainage Report.20201022.pdf The analysis of hi • cond. '•• ould be . m �,a , n °^rho - ° Paragraph has been revised to describe a historic, predevlopment, and empty lot, undeveloped condition. per the URMP checklist for "°^•== "°` "- " " major projects. Revise this ,.. . .,.;... n,..�R e,•e..,a,.. paragraph. Author: pjm Per Checkli ajor projects File Name: 40.Drainage Report.20201022.pdf STORM SEWER CALCULATIONS MP, calculate the storm Downstream capacity has been calculate st sewer capacity for the next two Per St(EX-P1), and the end of F (EX-P2)and downstream drainage structures neereconsir (max velocity of 20ft/sec, for Prolate In to rmsewnt°ca it added to the a s. 50%full and max capacity minimum velocity 5 ft/sec at half Edw �aamdrainage flow as been highlighted on the report grid for full conduit flow). vefoclry�(max full °45 each pipe. Naec at half. Author: pjm What infrastructure does this File Name: 40.Drainage Report.20201022.pdf co urtd to? Use a consistent What infrastructure"' Callouts have been added to label the storm se naming scheme for the Channel Report doeesm o eapont ° e°t rounds. The "West Roof Storm S rves roof infrastructure. naming scheme fo nverenowa Yve r,.unmonrorau mcwiv Na infrastructure. ,,,EAST STORM 100-YR, the pipes on the Plan downspouts on the e of the residence. The y `erEhI N areshownat4"antl Hi.hI "Eastewer" The pipes on the plan are shown 6"on the east sitle of serves the driveway trench Diameter(ft) -- the property. Dept! °r rain, mech. area, patio, eastern downspouts, and at andon the east side of Invert Elev(ft) =788384 Valor the property. Slope(%) we. downspouts on the north side of the cabin. N-Value =0.012 Crit C Top V n„ Author: pjm COMM Oat tlle File Name: 40.Drainage Report.20201022.pdf Conf' at the storm pipes ere sized so that the design a,.IN During the 100-yr event, the east storm is depth does not exceed 80%of ""Po approximately 56% full. the diameter of the pipe. Is that a parameter in the program used " _______ for this calculation? „... _ RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT Author: pjm File Name: 40.Drainage Report.20201022.pdf asin is considered in TRENCH STORM? Hydrology Report The trench storm is serving the co avement which goes from the a garage. This area is TRENCH STORM 100-YR', Vc basinls included i R-1. TRENCH STORM? HytlrograpM1 type =RaOonal eak tliscM1 5lorm frequency(yrs) =100 Time inie Drainage area(ee) =0.010 Rainfall Inian(inlM1r) = Tc by User IDF Curve =ASPS Rec Ilmbfa Author: pjm File Name: 40.Drainage Report.20201022.pdf Drywells used o QCV need ount fora factor of Drywell modeling has been updated to account for safety of 1.5 per the URMP. volume factor of safety of 1.5. The re ui V Confirm the drywell has 2is 83.8cf, the detention volu or drywell adequate capacity. —FE°cr,n a sizing is 125.7cf. Author: pjm File Name: 40.Drainage Report.20201022.pdf Acco a g to the site plan,this area has a walkway and a mech. An inlet has been added in the mech a • apture yard.Are these impervious s " drainage from this area, wa . .r as been graded to areas? How are they treated for tlaiteta�ti s water quality?These areas are kN awilisigor4 a i flow to trench dr. •. q y not discussed in the basin i description in the drainage report. v"n�on�lll i dI 40.Soils Report.20201022.pdf(5) Author: pjm File Name: 40.Soils Report.20201022.pdf Incorrect address, revise to be Incorrect address, W Francis St. revise to be W Address was updated. Francis St. PURE • results of a West Bleeker Street,-.pen,Color, •.• ,. .• .-op recommei in neawti ^ -toil fn Author: pjm File Name: 40.Soils Report.20201022.pdf Per the URMP Section 8.5.4.2 Drywells, a perc rate less than Drywell section has been updated to reflect infiltration Sin/hour is not acce le for rate of 30in/hr. drywells. RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT Author: pjm Infiltra ' is 2 min/in here draining and should be suitable for surface water t�fRt�! edinBorinQl orb File Name: 40.Soils Report.20201022.pdf Table 2 says perc rate is 2 Infiltration rate was updated. min/in.Are these terms being used as synonyms in this report? Infiltration rate is 2 min/in here but Table 2 says perc rate is 2 min/in.Are these terms being used as synonyms in this - report? swardOAP-08 chill ng lM bodnys were logged by s rcpeemNliw of Kumar A Author: pjm aura. File Name: 40.Soils Report.20201022.pdf Per the soils report requiremen ofae, oibwereuger,w;"I''•;�.nx;m�g°spoon outlined in th ppendix nw, odors.. Th„��um,m.; ;2m,n,e,nnon,att„ ;; Report was updated accordingly. raulic conductivity needs w �derwIX m �°AZ:°""I"d to be included as well as the n Ne Lop of Exploratory Boring,figure x.The samples were .Appendix",hydraulic ° needs testing method. theltte°sti g method.as MINIMA.CONDITIONS n by relatively w n x y sandy gravel .oe n wi.probable boulders down to ng,�nm nn mNebodng;naua�nerunlmniermn :o the subsoils at various depths with blows from a 140 pour Author: pjm Identify the NRCS soil type. lit is similar to then - •--°--• ebbed by AS File Name: 40.Soils Report.20201022.pdf Identify the NRCS soil a resistance values type. ive density a hsat which the samples re taken and the penetration resin Soil type was included in report. .og of Exploratory Boring,Figure 2.The samples were rent heproj-e - SUBSURFACE CONDITION tfthe su eft s shown r about 2 feet of topsoil,consist of about 3 feet of natural,sti 90.Architectural Plans.20201022.pdf(2) _ It Author: pjm __ I I File Name: 90.Architectural Plans.20201022.pdf Survey mu ormed or o$f within the last 12 == g Survey has been verified within last 12 mont months. Revise. Author: pjm Surveyor cent' ' to shall match File Name: 90.Architectural Plans.20201022.pdf w own in the COA SURVEYOR'S CERTIFICATION Surveyors certificate has been revised to Engineering Standards and call �m a � a•�••--•m•-• include error of closure less than 1:1 out an error of closure of less than 1 1 00 less�Rk�oRE oROE_ than RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT 90.Civil.20201022.pdf(21) _,,,rffi.. II; ;. _ma Author: pjm Water service line and drywell File Name: 90.Civil.20201022.pdf r r . :l •-,- -ss than 10'horizontal % /, 00 Horiztonal separation between drywell .•• - me separation.What measures are A'1 has been modified to 1 e' •••'-. proposed to prevent the water q service line from freezing due to introduction of freezing air from Cony ° 4 ", the drywell? . __� I_LLL Author: pjm NV iMrFile Name: 90.Civil.20201022.pdf Call out material of proposed frAl . -r service line with the size. Type K copper has been added to the c. .. O •4"W 89.63'�� 4 t WWI , SHUTOFF uYE ilk„ O111 „I vs Author: pjm Call out vertical separation from File Name: 90.CiviI.20201022.pdf the storm main I' 18-inch vertical separation, and 10' horizontal ho • separation from the WEST FRANCIS '''`°'n°M' - separation callouts have been added. Inverts we proposed manhole. _r_ _ T dipped at the manholes at 2nd St a o establish the existin v , and Francis St was Was the storm main testholed to .=: surveyed a the existing surface. confirm depth? Author: pjm Excavation stab'• ' pans File Name: 90.Civil.20201022.pdf w rovided as part of this Excavation stabilization plans were not submittal.What is the provided as part of this submittal.What is the stabilization plan for the GC provided a CMP with excavatio stabilization plan for the installation of the basement and the plan, includingengine i ization plans. installation of the basement and drywell?Provide plans that comply with g the checklist in the Engineering the drywell? Provide plans that Standards. comply with the checklist in the Engineering Standards. ,.!7w - r .-ro. ,/A~,,� ! , p Author: pjm 2"type K copper is able to N "'�1O"`�-` i PROPOSE rati..•�. ���" File Name: 90.Civil.20201022.pdf accommodate"sweeping"bends li LTAWater service line has been modified to show rather than 90degre- •--. . '" sweeping bends rather than 90 degree bends. Revis- • -- . s ow this. RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT ° o o,,, Author: pjm - U G O O File Name: 90.Civil.20201022.pdf This line type appears to be 1OL 130 used as storm pipes on the Legend has been modified to remove the hatching. following page. Clarif . Y Y This line type appears to be used as storm pipes on the following 1 page.Clarify. — —SS— PROHE N IL EL_' �_ Author: pjm ___ ;� Include the • •- - ypes in the ■ File Name: 90.Civil.20201022.pdf de ®A .�„ _-- . or proposed conditions __ ___ Legend has been modified to include the light , - to clarifyhow to read this plan. T J ..4. _s% .!:— - drain line type. ` I� g. a:s1� '.�I=, — h. 'Po'E:N:..: 1, I =IIZL 4 r _ Author: pjm :ems .� I� I Note that the private ate Pak. File Name: 90.Civil.20201022.pdf Noteinfra th e ROW will _ A - it • "—,� `� Understood. A permanent encroachment will be ulre a revocable permanent r �� submitted prior toCO. encroachment prior o CO. ffirte; ,'71.I ' I I Author: pjm This trench drain ••es not ThifiTbdrain I File Name: 90.Civil.20201022.pdf does capture I ca it - . •' from the driveway fOOe"fr°^"he Gradinghas been revised for drivewayto drain to ddveway before i, .store it leaves the site, revise ea"es`hefii`e,revise R_ ___ trench drain. Trench drain grate capaci _. ave the design. Provide capacity capacitysl9ca Provide - calcs for the a 'fe°°hdra' been added in the appendi _. calcs for the trench drain. «3,25o N ° = ''''''i afia 9 ,1 ,^' t o__ Author: pjm -,vv. 1 �N File Name: 90.Civil.20201022.pdf Is this the grass sw- - I mentioned in •, •rainage I ,° This is the grass swale discussed in the report. report? ' •vide capacity calcs 1,` •m F °°° Capacity calcs have been added to the report f• e swale and a cross iT"' appendices, a cross section has been added to the �,,,; �I °° • pp section. Is ar,«•tan,4i9 7I.,II�7•I�����rV ,4. details. �r+�• Faocoseo ABIN �H i eo MAIN FF:7885.60 a; RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT 1U eau Author: pjm NN' �000`;FA�Fs File Name: 90.Civil.20201022.pdf Provide capacity calcs for all slot ,_- _ drains pro•o -. : e.. STORM roNRooF°°WNSP°°TED A slot drain capacity analysis has been added to the � SaEOETRC03�Ot5FORF P�LAry. yRAIN LEADER � rtivi��r PROPOSED slot drain detail on sheet C401. . .I/II/I AI Prowdecapacity! d for all slot g I on a s proposed wAS - - The • . in ront of the cabin entry has been °°° F removed. / ��/ FINISHED T�FL {. El Author: pjm p Ir • E; Per presubmittal s, this C ar w off File Name: 90.Civi1.20201022.pdf pro' nically required to . �N 4/ Riprap with geotextile fabric is proposed to be install C&G, however Council - "-------: - installed at the end of the existin n gutter. has requested the no new C&G ��_ be installed. How is street --- ,-- No modifications sed to the existing drai erns from the street which would drainage managed? How is the "" negatively impact the downstream property. downstream property impacted by this. Author: pjm How is the discharge rate of the !_ 1 - SU E RRE BELOW FINISHED INSTALL 20 MIL GRADE,TW. i File Name: 90.CiviL20201022.pdf _ S'D */ -I A(C drywell impacted by this DPE L ER -, a IANp f�,ND a° Discharge rate of the drywell is not to be impacted by impermeable li - ? - impermeable liner. Liner is to be placed between ,.. °R WELL i foundation and drywell, with native soils ...- - o d _ How is the discharge _ gravel ring. 1 ik_ rate of the drywell impacted by this / impermeable liner? \ Author: pjm ;.. , DISCHARGE o AN File Name: 90.Civil.20201022.pdf Provide detail of the sump pump. � * Sump pump has been removed. Overflow will ..11� aPERa BE EN SUMP SUMPPO F°°rv°A FCONNECT ill I °sE=aRM°ACE discharge out of catch basin CB-1. °ER M. 7SED IN I 1 I IS FOR CONTINUATION V401,1.� -1 I Author: pjm iN coNNECT To— I File Name: 90.Civil.20201022.pdf What does CB-1 mean? r.° '°I"�' CB-1 is a catch basin. The gravel pocket only serves It appears th ipe I.1 � 1 light well drainage and is below CB-1, and is not gang to this gravel pocket � w^rw�w. ma connected to CB-1. This is a limited area of does not have WQ treatment for -- 1 F.E7u,Lr wP,e - drainage from rainfall that enter wells. the impervious area routed her. o=���a4 g How is WQ provided? RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT �- ' .ots = -a=, —r Author: pjm File Name: 90.Civil.20201022.pdf Provide some nar - .r the �i' stac.-. :'.- design. „,-4g i� — The pipes are to be stacked vertically at sta 0+39.93 rather than %•�' � ®�v side-by-side. The lower pipe cannot be represented II • . ,ew ' �r.►wwiiaaiwii�s 'r 4�� It looks like the two pipes turn �%� as its below the upper,therefore only on- •': s own in plan / /, — I view starting at the stackin. • '• . Sta 0+39.93 is the correct into one pipe on the plan view. stacking loca..• • . .n and profile view. The basement The double stack pipes in the . in location as represented was incorrect and has been plan view doesn't match the adjusted to sta 0+40.43. A U-shaped channel will be formed into double stacked pipes on the ' the top of the basement slab to fit the stacked pipes and has been profile. coordinated with structural. Author: pjm r File Name: 90.Civil.20201022. df In the maintenance plan 1 L p submitted for Certificate of >E Maintenance procedures for the riser will be Occupanc ' c, include _ _� _au developed and submitted for CO. • maintenance —_ procedures for the"candy cane" so that runoff doesn't bypass 1 .M ; straight to the overflow to the o,E - — storm main if it clogs quickly. Author: pjm I File Name: 90.Civil.20201022.pdf Call out that the lid should be Call out lid thatch ea°easiso placed so that the access is out oha"h°a"°=°'_°f Callout for lid to beplaced outside of wheelpath has • - aw"aa'°a'" eel path of moving � moving vosicles as °`a'° been added. vehicles as best as possible. -x,_ C I Author: pjm File Name: 90.Civil.20201022.pdf Provide profile for storm lines on west side of the house. Profile for storm line has been added to sheet C302. Provide profile for (— storm lines on west side of the house. --------------- r Author: pjm 1 \ File Name: 90.Civil.20201022.pdf These pipes are not included in li the profiles shown on C301, A inn ji Profile for storm line has been added to sheet C302. ensure all pipes have a profile view in the plans. • l �� olr3 I I imm.QS i 1 Fill' ® --=T tC •.i� 10.E -- 1+Q 6, RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT Author: pjm File Name: 90.Civil.20201022.pdf Call out the drywell depth. Call out the drywell Dr well depth has been added. Depth is also shown Provide calcs for drain depth.Provide calcs y p p time for th per Chapter for drain down time for the drywell per on storm structure table sheet C300. a URMP. Chapter 8 of the URMP. At the bottom of the drywell siz adsheet is the required percolatio calculation per URMP ., cha a required percolation area for a 24hr raindown is 83.1-sf. The percolation area provided is 257.E-sf. RECEIVED 05/20/2021 ASPEN BUILDING DEPARTMENT