HomeMy WebLinkAboutFile Documents.530 E Main St.0009-2024-BCOM (5) AOk
CITY OF ASPEN
Construction Mitigation Plan for Medium Projects
Full Construction Management Plan (CMP) requirements can be found in the Construction Management
Plan Requirements Manual available He e. The following document can be utilized for interior remodels
and/or soil disturbance greater than 1,000 SF and less than 2,000 SF. The "Construction Mitigation Plan
for Minor Projects" document can be utilized for interior remodels and/or soil disturbance less than 1,000
sf. For large projects or at the discretion of the CMP reviewer a full CMP written by the project contractor
is required.
The purpose of this form is for medium projects to provide the required information for construction
management and to acknowledge the applicant is aware of all CMP requirements and will abide by all
requirements.
1.0 General
V The project contractor has completed the City of Aspen online CMP certification class. The online
training course is available at cmpaspen.com. A copy of the CMP certificate is provided with this
submission.
2.0 Project Location
Project Address: 530 E. Main St. Suite 302 Aspen CO. 81601
Project Disturbance Area: 500
Project Description_ Interior office remodel adding a double door to existing wall, relocation of
Project Description: electrical and AN equipment Finishes to match existing schedules.
Contact Information:
Name: Pitkin County--Jodie Grady
Phone: Cell-970.618.3717
Email: Jodie.Grady@pitkincounty.com
3.0 Project Documentation
List all Permits Related to this Project (MEP, tree removal
permit, UTWC, encroachments, etc.):
Electrical.
RECEIVED
February 200 /15/2024
ASPEN
BUILDING DEPARTMENT
`�;'k Appendix A-PTojed Sign
%41110 PROJECT NAME
PROJECT ADDRESS
CITY OF ASPEN PERMIT NUMBER
' G.G.NAME✓)CONTACT NUMBERS)
Indicate Project Public Notification:
EMERGENCY NAME d CONTACT NU MBERIS)
See Attachment.
V Project Sign Will Be Posted at Site— Required information is
provided to the right.
Project DescrIpM1al
Project Partner
Project Partner
4.0 Project Implementation Project
mart"`'
UstIng Agent Agency
WebsiterContact
Dates of Project Construction: 9/23/24-10/14/24 (
Hours of Construction: Construction hours shall be limited to 7:30am —5:30pm Monday through
Friday and 9:00am —5:00pm on Saturday. No construction is permitted on Sundays or holidays as
identified by the CMP Manual.
Will construction fencing be provided? Yes Ti Not required for the project scope
The fence shall be six feet (6') in height and constructed out of chain-link fence with mesh
windscreens (visual barriers).
If fencing is required show the location of the construction fencing on the site plan.
Are there trees within the work area? nYes nNo
If trees are within the work area provide a site plan showing exact tree protection fence
location and accurate tree driplines
5.0 Site and Right of Way Management
A Site plan is attached which shows all construction staging areas. ❑✓
Construction trailer,job materials storage, waste management and recycling container
locations, and portable restrooms shall be clearly designated on the project site plan. Loose job
material storage is not allowed in ROW under any circumstance. Show any use of the ROW or
show there is adequate space onsite.
Will the project use any portion of the Public Right of Way for construction
purposes?The project shall submit a temporary encroachment permit for Yes V No
use of the ROW.
Will the Project maintain continuous emergency vehicle access, on and V Yes No
around site, including but not limited to police, fire, and ambulance services?
Does the project require leasing public parking spaces for construction
purposes?
ri Yes nNo
RECEIVED
February200 5/2024
ASPEN
BUILDING DEPARTMENT
/14
CITY OF ASPEN
All parking must be leased through the COA Parking Department as a
separate process.
Does the project propose earth retention?
If the project proposes earth retention a plan shall be submitted Yes 1/ No
that depicts the extent of excavation and details any method of
stabilization employed. The plan shall also depict any non-
surcharge areas associated with the stabilization plan.
The City of Aspen requires recycling of materials, both conventional and
CI
construction related. Does the project have a recycling plan in place on site? Yes El No
See section 5.7 of the CMP Manual for full recycling details.
6.0 Traffic Control
Does the project require a traffic control plan? ❑ Yes ❑✓ No
If so, attach the traffic control plan to this application.
Does the project require any special circumstances for deliveries? Yes ❑ No
Traffic control required for deliveries must be fully coordinated with the City of Aspen
Engineering Department. Roads will not be closed under any circumstances, unless granted
permission from the City of Aspen Engineering Department.
7.0 Pedestrian Protection
Does the Project maintain pedestrian walkways including all ADA requirements? ❑✓ Yes ❑ No
If temporary ramps are needed please show the location on the CMP site plan.
8.0 Sediment and Erosion Control
P1Attach a site plan to this application which identifies all Best Management Practices which will
prevent any erosion and sediment transport offsite.
Is the project located in the Smuggler Mountain Superfund Site? fl Yes ✓ No
If so, attach the Superfund Site soil Removal Permit.
9.0 FUGITIVE DUST CONTROL
A Fugitive Dust Control Plan is in place. ❑Yes ✓❑Not Applicable
10.0 EMISSIONS
RECEIVED
February 202 /315/2024
ASPEN
BUILDING DEPARTMENT
/14
iii110
CITY OF ASPEN
All vehicles and equipment used on site will be properly maintained such that the engines will
function within manufacture's standards or parameters. ❑✓ Yes ❑ No
11.0 NOISE SUPPRESSION
A noise suppression plan is in place. n Yes with minimum 14' noise fencing ✓ Not Applicable
The minimum requirements for a non-modeled plan are a 14-foot tall fence of noise dampening
material completely surrounding the construction site.
❑ Provide a Noise Suppression Plan. Provide a drawing showing the location of the sound fence.
Include the property line, where the earth retention will be, the extent of excavation, any trees that
are to be left throughout the construction, and location of gate. Also include a detail of how the fence
will be supported and the noise dampening material used.
Projects are limited to 70 decibels (dB) at the property line during the summer on season. Projects
located on the Mall will be limited to 70 decibels (dB)at the property line during the winter on
season. All other times projects will be limited to 80 decibels (80dB) at the property line.
12.0 ENFORCEMENT
A City Construction Mitigation Officer will complete random site visits to determine if the project is
following approved Plan and City requirements.
SIGNATURE
I acknowledge that all information provided is accurate. The Project will comply with all COA
Construction Management Plan Requirements as Outlined in the CMP Manual. Contractor
acknowledges that failure to abide by this affidavit will result in red tags on the project and loss of
participation in the program
OVain K '
Signature: Levi Higgs eoI-so^ c-war*�► le^' �
OSY M2l D3 DB 1 1157-07'DD
Printed Name: Jodie Grady " ""'"'�
Jodie Grady CM m-A�4d�w-L.*/ 9.^eI °�°
C**VG*r'*.**** ***o.Mr COT c-IA
Darhr SGN91 IS 1111.11 4690
Date: 03/115/2024
RECEIVE ►
February 200 /15/2024
ASPEN
BUILDING DEPARTMENT
to
III i � I• illi
I •
A B D I �...,, _
�,.� Chamberlin
r ► %/� DISTANCE TO CHOICE 437 Ma n Street
/ � OF EXITS IS 59'-9'< Grand Junction,CO 81501
NORTH STAIR SUB TOTAL / 100 FT AND 88'-9'< 970.2426804
52P x.3'IP=15.6' I Se
� ��� 100'-0' chamberlinarchitects.com
REQUIRED � /3,900 SF B)
46' PROVIDED , I'= i OCCUPANT LOAD 7 0 !$jr
�
�- ITS A A.
,HERIFF,1'OLICE N
ON GRADE EXIT Ii
u ��� �/ ����/ ���, INTERCONNECTION otyO
DISCHARGE 111..a.t:.r' 0// roil/ APPROVED BY AHJ& GONstc�
!um= AP"/ / ZAI�" / A NOT REQ D EGRESS oc-
- �E. - - 1 FOR EITHER BLDG. N
CONVERGENCE OF I•h17��//. r�������.
10P(BASEMENT) I WOMEN "l
52P(MAIN) I I MULTI-PURPOSE ROOM �f 25 _
QI ''' SF 4A-34 ' t - m "1 .
=62P x.2'1P iJ ; ',OCCUPANT LOAD 37`' —IF I'T'r; ` I I■II
= 12.4'REQUIRED t1 I ,' "I1 '11, ,, 1 gm I IIILLLI I
32'CLEAR PROVIDED I _ ' ".'■ j� 4 t�1Et1
_(36' DOOR) ,i __-I '� 1 1 65 I[.I.I..11V ';18 ' BOCC EETING\vi
1 ��,, I 11 1
'1.923 F(A^3).\ 4i_ _
•0. !IPA T LOAD 132
°— - r \\\\\ \E\:IW\\\''.
�, I / I
BOUNDARY OF 10 II- 1-6--791-----r--- 7/'.
.- �'-_---- � w� / '
l r �
NEW WORK MEDIA I i JV fAl
54 SF(B) • 1OCCUPANT LOAD 1 `
CONVERGENCE OF m - /CLERK di RECORDER
I PITKIN COUNTY
65P(2ND) /3,660 SF(B)%/ BOCC MEETING
140P(MAIN) a UPANT LOAD 37 IJ ROOM REMODEL
=205Px.27P
i =41'-Cr REQUIRED %��
66'CLEAR PROVIDED A
8 539 E.MAIN ST.SUITE 302
1 ASPEN,COLORADO
, Th
•
•
r i n i w r r I m r I PLAAN FLOOR KEY
ees ose o ose a eoso
NG VseuED FOP: 0kTE
control f this project . Interior conversion
A
reriioclel on .
PROJECT STATUS:0
DATE:
2/19/2024 SHEETH,. =
1 MAIN FLOOR KEY PLAN
A011 — PROTECT NO: O 1 I
ID ,s aP3r-ra'1.fdiam) 2404 H
R LE VED
03/15/2024
ASPEN
BUILDING DEPARTMENT
3/8/2023
Ok
5.0 Site and Right of way Management plan 1106._
NORTh
PEAL{
Property line and affected work areas
Property Line tr �w! ^ � �.. .t;' • All Demo materials
iliow
- -... ;_ . afr.,1/1 will be sorted and
removed from the
14. I I /I60.....,\. .1k..
Ir.*'''- r interior of the Job site.
i •, • •* 11 (No waste will be
el
.4 .1
v y t located outside)
ma . . vt0k .. 1, ,
` f 4'� 144 • New materials will be
t
4 delivered as needed
o ` and staged inside.
Location of ik , ' 4 ii .
Interior work , • - 4. .,. ' ', . • •All County offices
t� �� r, - { bathrooms will
r x �416 remain operational
114
f - • + - for the entirety of the
• ;�'�Mr. :•1 project.
../.....,.
r,` i
IM *may. .r 4 �!� ; • Crew Parking will
a , -: utilized the Parking
r ` 14111 1 4 • 4 garage.
1 w
_ _ i� M • • No exterior work
`M '` - }� # reflected in the Project
y •
� •�-.l r - I Scope.
- + * ,,• II - • ADA compliant Access
' - i - t "s to the Facility will be
E Main St. is r ; ' 'r I maintained24/7.
' !
,. , .IIIPr*' All if .
' - ti
RE ,. EIVED
3 03/15/2024
ASPEN
BUILDING DEPARTMENT
1
Pitkin County Administration Office
530 E Main St. Aspen Co . 81601
Permit #
GC-North Peak Construction- 970 .626.8767
Emergency Contact PM-Jodie Grady 970 .626.87671
a-.. .sl i= s vaAlsilimmailm
Coming Soon- New Double Doors
-Owner-
Pitkin County
-Design Team-
Chamberlin Architects
RECEIVED
pitkincounty.com 03/15/2024
north peakconstruction.com ASPEN
BUILDING DEPARTMEN-