Loading...
HomeMy WebLinkAboutFile Documents.617 E Cooper Ave.0008-2023-BRES (6) '' Project Address: 617 E COOPER AVE#208 ASPEN,CO 81611 Applicant Name: JESSICA CERISE,ANNE GRICE INTERIORS Owner Name: Owner Address: DPG INVESTMENT PROPERTIES LLF 120EHVMAN AVE ASPEN CO#1611 Reviewer: '�/i Date of Final Inspection: 1` `1 Applicant Email: JESSICA@ANNEGRICEINTERIORS.COM Owner Phone: 310-432-1234 1/i,/ Applicant Phone: (970)429-4148 Proposed Domestic Tap Size: LAST SPREADSHEET UPDATE:I 3/10/2020 I Date: 11/17/2022 Proposed Fire Suppression Tap Size: Type of Work Interior Remodel Existing ECUs(located on water bill): CITY OF ASPEN Building Permit No. Account Number(located on water bill): Proposed Fixture Count(include Definitions ECU Rate Total Proposed ECU Final Fixture Count Total Final ECU all existing fixtures) Bedrooms A room with a closet 0.10 0 0 0 1st Full Bathroom/Living Unit Includes tub/shower,toilet,lay 0.36 1 0.36 0 2nd Full Bathroom/Living Unit Includes tub/shower,toilet,lay 0.24 0 0 0 Toilets/Urinals Not included in 1st or 2nd bath 0.05 0 0 0 Lays Not included in 1st or 2nd bath 0.02 0 0 0 Tub only/Tub&shower/Shower Stall Not included in 1st or 2nd bath 0.05 0 0 0 Oversized Tub 0.02 0 0 0 Whirlpool Upgrade 0.05 0 0 0 Steam shower Upgrade 0.03 0 0 0 Kitchen Cook surface,refrigerator&sink 0.25 1 0.25 0 Dishwasher 0.10 1 0.1 0 Disposal 0.05 1 0.05 0 Additional Sink/Pot Filler 0.05 0 0 0 Bar/Hand Sink 0.05 0 0 0 Kitchen Efficiency/Kitchenette Does not include a cook surface 0.15 0 0 0 Stand Alone Ice Machine 0.05 0 0 0 Washer 0.10 0 0 0 Utility Sink 0.05 0 0 0 1st Hose Bib 0.20 0 0 0 2nd Hose Bib 0.10 0 0 0 Additional Hose Bib 0.05 0 0 0 Drip Landscaping(4 of emitters) 0.001/Drip Emitter 0.001 0 0 0 Sprinkler System Landscaping(sf) Spray system-0.01 ECU/100sf 0.01 0 0 0 Hot tub/jacuzzi(gal) per 100 gal-with jets 0.02 0 0 = 0 Pool(gal) per 1,000 gal-year round use 0.02 0 0 = 0 Water Softener 0.02 0 0 = 0 0 = 0 0 = 0 0 0 Line Size Minimum ECU Check Total Proposed ECU 0.00 Total Final ECU 0.00 Service Area Mr INSPECTOR NOTES: Service Area Fee Munis Account Record Governing ExistingECUs Substantial or Insubstantial ial Remodel Substantial Net ECUs for REVIEW UCP 0.00 RECEIVEC 01/19/2023 ASPEN BUILDING DEPARTMENT ASPEN WATER DEPARTMENT 427 RIO GRANDE PL ASPEN,CO 81611 Utility Connection Insubstantial Review Permit(UCP)Number:0009-2023-UTWC /C-23-054 Building Permit Number,if applicable: 0008-2023-BRES New ECU total:57.02 The property owner hereby acknowledges that this project has the potential to trigger a substantial utility review if additional water fixtures are added or modified resulting in a total ECU Count of 1.5 x existing ECU Count.A substantial review will have significant cost implications and cause delays in receiving a final inspection. In addition,a WELLS review will be initiated, requiring that a complete landscape plan and irrigation audit. UTILITY CONNECTION PERMIT AND WATER SERVICE AGREEMENT(form 20170617) THIS PERMIT EXPIRES ONE YEAR FROM DATE OF ISSUE IF UTILITY CONNECTION HAS NOT BEEN MADE. PROJECT OR BUILDING UCP PERMIT ISSUANCE DATE TAP DATE 617 E Cooper Ave#208(Bldg A) 4/17/2023 N/A OWNER OF SUBJECT PROPERTY MAILING ADDRESS ("Property Owner") 120 E HYMAN AVE'' DPG INVESTMENT PROPERTIES LLC ASPEN,CO 81611 PROPERTY ADDRESS LOT BLOCK SUBDIVISION 617 E COOPER AVE 208 ASPEN SQUARE ASPEN,CO 81611 ACCOUNT NUMBER PARCEL ID NUMBER #OF METERS SERVICE AREA 01-30052760-00 273718243103 1 1 Subject property located in City Boundaries?YES Irrigated Area Sq Ft: New Tap? NO Class of Service: Residential Size of fire line tap: 6.0 Abandon Existing Tap?NO Size of domestic line: 2.0 Abandon Existing Well? N/A COMPUTATION OF CHARGE Detail Total UTILITY INVESTMENT CHARGE Subject to Final Like for Like Replacement $0.00 PAYMENT IN LIEU OF WATER RIGHTS PER ECU WELL DEVELOPMENT CHARGES PER ECU PREVIOUS UTILITY INVESTMENT CHARGES PAID PREVIOUS UTILITY INVESTMENT CHARGES PAID PREVIOUS UTILITY INVESTMENT CHARGES PAID Total connection charge due: $0.00 UTILITY CONNECTION PERMIT MUST BE SIGNED/PAID WITH A SEPARATE CHECK IN THE AMOUNT INDICATED;ADDITIONAL PAYMENTS WILL BE DUE AND OVERPAYMENTS WILL BE REFUNDED FOLLOWING FINAL INSPECTION. At the time of review this interior remodel appears to be a like for like replacement.The work includes a reconfiguration of the existing studio floorplan including an updated kitchen and bathroom.A final inspection will be required to establish a fixture count for the residence,if additional fixtures are discovered during the inspection the owner will be responsible to pay the associated fees. No more than 1 service line(s)is(are)allowed under this Permit.Each must be controlled separately as its own curb valve.Application must be made to the Water Department for additional service lines. Water Rights Conveyed to the City: -aced Ae/e1e-oGn-a,n, 04/18/2023 4/17/2023 Signature of Owner of Subject Property Date City seen Date State of Texas; County of BEXAR \�\\\plbNOG/u� 18th April 23 avid Paul Glickman ,1:1 Geovann1Hughmartln Hosang Subscribed and sworn to before me this day of ,20_,by (Owner) ,-; �\ff ID NUMBER f:P\ 133465846 �~ 664".1 11/29/2025 /,/9�ell�lllll\\�±�� U Novels O]9,I015 5 /�/�� My commission expires: Notary Public Notarized online using audio-video communication Notary Public, State of Texas �� ��� ADDITIONAL TERMS AND CONDITIONS ARE IN THE ATTACHMENT TO THIS UTILITY CONNECTION AGREEMENT. THIS I AGREEMENT HAS IMPORTANT LEGAL CONSEQUENCES AND PROPERTY OWNER IS ADVISED TO CONSULT LEGAL COUNSEL B / 19SI 2 N 2 3 ASPEN BUILDING DEPARTMENT ATTACHMENT TO UTILITY CONNECTION AGREMENT: ADDITIONAL TERMS AND CONDITIONS OF CITY OF ASPEN WATER SERVICE 1. Connection to City Water System. City water service will be connected to the Subject Property in accordance with all requirements and procedures of the Aspen Municipal Code and Aspen Water Department,including but not limited to all applicable standards and specifications for materials and meters,and all required Water Department inspections. 2. Payment for Water Service. Water use charges will be billed on a monthly basis from date of tap unless the Property Owner has received the Water Department's written permission to have the curb valve closed. Should the curb valve be found open without Water Department permission,water charges will be billed back to the date of tap. If the Subject Property is not occupied and construction is being undertaken on the Subject Property,the account for the Subject Property will be billed at a construction rate for nine months from the date the tap is made. At the end of such nine-month period,the higher flat rate will be assessed until a water meter has been installed and passes inspection and the Certificate of Occupancy is issued. Upon issuance of the Certificate of Occupancy,the account will then be billed at the City's water service rates applicable to the Subject Property,as such rates may be changed from time to time. 3. Utility Investment Charge:Utility Investment Charge(Tap Fees)based on water using fixtures will be calculated initially based on the attached worksheet and are subject to revision upon survey of the fixtures in the completed structure.Within 60 days of final survey, Property Owner shall pay any increase in Utility Investment Fees required by the survey,or the City shall refund any overpayment made prior to the final survey.ADDITONAL WATER-USING FACILITIES INSTALLED FOLLOWING THE FINAL SURVEY SHALL BE REPORTED TO THE WATER DEPARTMENT AND ARE SUBJECT TO ADDITIONAL UTLITY INVESTMENT CHARGES AS DETERMINED BY THE WATER DEPARTMENT. 4. Landscaping. If the fixtures authorized for this permit include one or more hose bibs,up to 3,000 square feet of irrigated lawns and gardens are permitted. Additional irrigation will be allowed only if additional ECUs are allocated in the attached worksheet to the Subject Property for irrigation. The total amount of irrigated lawns and gardens authorized by this Utility Connection Permit will be determined by the final ECU survey. Irrigation in excess of the amount allowed by this Utility Connection Permit will require Water Department approval,amendment of this permit and additional connection charges. If outdoor irrigation is permitted by this Utility Connection Permit,and if the Subject Property is subject to the City of Aspen Water Efficient Landscaping Standards(or the pilot project for such standards)["Aspen Landscaping Standards"],all landscaping will be designed,installed and maintained in accordance with,and subject to the requirements of the Aspen Landscaping Standards. 5. No Independent Water Systems. Aspen shall be the sole provider of all treated and untreated water service to the Subject Property for all purposes,including irrigation.Without Aspen's prior written permission,there shall be no use on the Subject Property of raw or treated water from wells,ditches or other sources. The owner of the Subject Property will not develop,allow,or utilize an independent treated or untreated water system,or any wells within or serving the Subject Property. 6. Abandonment of Existing Wells and Use of Wells. Prior to issuance of a Certificate of Occupancy,the Property Owner shall have all wells located on the Subject Property properly plugged,sealed and abandoned as required by the rules and regulations(including any amendments or revisions thereof)of the Colorado State Engineer for abandonment of wells. If any well serves the Subject Property but is not owned by Property Owner,or is not located on the Subject Property,or serves properties in addition to the Subject Project, Property Owner shall permanently disconnect well service to the Subject Property from such well. A certificate of well abandonment or evidence of permanent disconnection,as the case may be,shall be provided to Aspen prior to issuance of the Certificate of Occupancy. Property Owner will record the Certificate of Abandonment and provide a copy of the recorded Certificate to Aspen within 90 days of abandonment. 7. Well Permits and Water Rights Associated with Wells. Well permits and any decrees for exempt wells associated with any wells located on the Subject Property shall be cancelled. Water rights decreed to wells on or serving the Subject Property,other than decrees for exempt wells located on the Subject Property,shall be assigned or conveyed to Aspen,or relinquished by the Property Owner,at Aspen's discretion. The Property Owner shall relinquish any water rights to wells shared with others,which serve the Subject Property. Such transfers,or relinquishments shall be completed before a Certificate of Occupancy is issued. 8. Water Rights or Payment in Lieu of Water Rights;Annexation. If the Subject Property is considered an extraterritorial connection as defined in Section 25.12.020(b)of the Aspen Municipal Code,or any amendment or revision thereof,the Property Owner must,as a condition of receiving Aspen water service(a)either convey water rights acceptable to Aspen or make a payment in lieu thereof as provided in the Aspen Municipal Code,and(b)agree to annex the Subject Property to the City of Aspen when requested by Aspen to do so.Property Owner acknowledges and agrees that the Subject Property will be annexed to the City of Aspen at such time as Aspen requests annexation and Property Owner will pay all costs associated with such annexation. 9. Well System Development Fee. A well system development fee will be assessed if applicable and must be paid upon issuance of this Utility Connection Permit. 10. Abandonment of Existing Taps,Lines and Meters. All existing Aspen water taps to the Subject Property that are to be abandoned must be physically severed from the City water system,and all service lines and meters to be abandoned must be disconnected in accordance with Water Department procedures. Property Owner shall contact the Aspen Water Department to schedule Water Department inspection of all taps,service lines,and meter installations,as well as all abandoned wells on the Subject Property,prior to receiving City water service under this Utility Connection Permit. 11. Subject to Laws,City Charter and Code. The water service provided pursuant to this Utility Connection Permit is subject to,and the Property Owner,Subject Property,and all occupants thereof,are bound by,all applicable state and federal laws,and all applicable provisions of the Charter of the City of Aspen,the Aspen Municipal Code,and all applicable rules,regulations,policies and ordinances of the City of Aspen now in effect or as may hereafter be adopted. 12. Recording. Aspen will record this Utility Connection Permit and it will be a covenant running with the Subject Property,enforceable against Property Owner and subsequent owners of the Subject Property. 13. Authorization. By signing this Agreement,Property Owner represents to Aspen he/she/it is the owner of the Subject Property and that all procedures necessary to validly contract and execute this Utility Connection Permit have been performed,and that the nrEIVED signing for Property Owner is duly authorized to do so. 05/19/2023 ASPEN BUILDING DEPARTMENT