Project is an interior remodel of an 450 square foot single floor condominium unit.
TABLE of CONTENTS
Introduction and Table of Contents 1
Vicinity 2
Project Introduction, Dates of Construction, Hours of Construction 3
Contact Designation 4
Sequence of Construction, Adjoining Properties, Project Fencing,
Public Health& Welfare,Natural Environment, Parking Management,
Emergency Vehicles & Ordinance 35, Staging Areas, Traffic Control 5
Pedestrian Protection, Sediment& Erosion Control, Fugitive Dust Control,
Emissions,Noise Suppression 6
Site Plan
Official Heavy Haul Route Map
Construction Noise Suppression Plan Form
RECEIVED
01/10/2023
ASPEN
BUILDING DEPARTMENT
VICINITY MAP
Address
617 E Cooper Ave Unit #208
_ -
. . ,.,
. ....
,_
A
//// � � � /4 - '. .
i - -
4 + ..�'.Y t' •� - mow /t'�
I
t
Nip
Sr
No Mil 1
E Cooper Ave
u 17 /III//
J
4 ism �"� it
•Poppycockks
.. 1 0
= c
2 Or - MVP .. w. wi- .- 'Q '
,.....jp, .. �y ' " 3 co
1
--� •
+ -�-
4.111.
t is
4-, • I .. SS - re , : 9: ., r
4....;
. •
i • I - - '- i. - 4 i' I
1 eCl
4 �, `
•o• l CM
t•r.44 /./
�!
RECEIVED
01/10/2023
ASPEN
BUILDING DEPARTMENT
PROJECT INTRODUCTION
• Project disturbance is limited to the interior of the condominium unit which is 450 square
feet.
• The project is located on the second floor of the Aspen Square Condominiums. The building
consists of four stories of residential units. The proposed development is limited to the
interior of unit#208 The building and unit are currently connected to public utilities
including water and sewer and the project is not expected to have any effect on these utilities.
Permits Applied For:
Demolition Permit #
Building Permit #
• Project Notification will be performed by the general contractor as required.
• A project sign will be posted on the window of the unit so that it is visible from the
parking/driveway in front of the unit.
DATES OF CONSTRUCTION
• The proposed project dates are April 4th—June 10th 2023.
HOURS OF CONTRUCTION
• Construction hours during the season (June 1st thru Labor Day and November 15th thru
March 31 st)will be limited to 7:30am—5:30pm Monday through Friday and 9am—5pm on
Saturday.
• No work will be performed during the Food&Wine Festival in June (Friday thru Saturday).
• Construction hours during off-season(April 1st thru May 31 st and Day after Labor Day thru
November 15th) will be 7:30am- 5:30pm Monday through Friday and from 9am—5pm on
Saturdays. No construction work will be performed on Sundays.
• All activity that generates noise in excess of 80 decibels requires a noise suppression plan
and is restricted to operating between the hours of 9am and 5pm Monday through Friday.
RECEIVED
01/10/2023
ASPEN
BUILDING DEPARTMENT
CONTACT DESIGNATION
Owner—DPG Investment Properties LLC 120 E Hyman Ave. Aspen CO
General Contractor Office—Janckila Construction(970) 927-6714
General Contractor Site Supervisor—Ryan Janckila 970-309-8056
Traffic Control Officer—Not Applicable
Erosion Control Representative—Not Applicable
City of Aspen Community Development Department— (970) 920-5090
City of Aspen Fire Department—(970) 925-5532
City of Aspen Police Department—(970) 920-5400
Emergency Fire &Police—911
Aspen Valley Hospital—(970) 925-1120
Roaring Fork Transit Authority (RFTA)—(970) 925-8484
Aspen School District—(970) 925-3760
Holy Cross Energy Electrical—(970) 945-5491
Xcel Energy Natural Gas —(800) 895-2999
Century Link Telephone—(800) 603-6000
Comcast Xfinity Cable—(800) 266.2278
RECEIVED
01/10/2023
ASPEN
BUILDING DEPARTMENT
ADJOINING PROPERTIES
• Not applicable -there is no exterior excavation work required.
PROJECT FENCING
• Not applicable - all of the work is primarily confined to the interior of the unit.
PUBLIC HEALTH AND WELFARE
• The general contractor, shall uphold utmost respect to public health and welfare.
NATURAL ENVIRONMENT
• Not applicable—it is an interior remodel project with no threat to trees or other natural
elements.
PARKING MANAGEMENT
• All parking to be contained to Aspen Square parking lot.
EMERGENCY VEHICLE ACCESS AND ORDINANCE 35
• See attached Site Plan for emergency vehicle access, parking and staging areas.
STAGING AREAS
• Materials storage will be inside the unit to be remodeled.
• A construction trailer will be used to load and haul away construction debris. If a dumpster is
required temporarily it may be located in the designated parking space.
• A construction office trailer will not be necessary, the inside of the unit will accommodate a
desk.
TRAFFIC CONTROL
• The need for traffic control is not anticipated at this time.
• No heavy hauls are anticipated for this project. Haul route will be from Cooper Street, to
Highway 82.
• The heaviest construction related vehicle anticipated at this time will be a dual cab pick-up
truck with trailer or, if necessary, a trash truck to haul a 10 yd max.dumpster.
• Deliveries to the job site are expected to consist of light loads with drywall being the
heaviest. One delivery truck at a time will be scheduled.
PEDESTRIAN PROTECTION
• Not Applicable
SEDIMENT AND EROSION CONTROL
• Not applicable—project is an interior remodel.
FUGITIVE DUST CONTROL
RECEIVED
01/10/2023
ASPEN
BUILDING DEPARTMENT
• Not applicable—project is an interior remodel and all surfaces traveled by vehicles are
paved.
EMISSIONS
• All vehicles and equipment used on site will be properly maintained such that the engines
will function within manufacture's standards or parameters.
• Emissions from diesel engines operated within the City of Aspen shall be of a shade or
density no darker than 40% opacity, except for starting motion no longer than 10 seconds or
for stationary operation not exceeding 10 seconds.
NOISE SUPRESSION
• Not Applicable. Interior Remodel.
,‘1. _ - _ 1,,,,„ or 7 .-,. --, •
e, Auberc CI-
lection - -. Z -
-_--- E Main,St- E:Main,st
"_ �_{ = ,y j.: I
is
111.1
a� r � N e
E Hopkin Ave r '_ ."-~ ..`. A E
i
ii rit.'�_ it a c) tit
I" MIEHymari Ave -
� • E
El
____ ,...-- _ " 1_ ,
ir ,
- AspenArroom
t Museunn - .
-‘. ,I *szlituritc
_ -,..,-
- _.___._ .
......
...,
, .
. .
„. . . . -
. s .
, .. ., ,
. ,_
. 7-- -
, _ _
,.._3,-4-..,.."
r.a, Ary!'k City M,Irket • Ills
Aspen 00�€ -
�... _ vim. allImiri--- - Ih. in(
E Durant Ave E Dur
_ :-------n -• ' - -
Haul Route
RECEIVED
01/10/2023
ASPEN
BUILDING DEPARTMENT