HomeMy WebLinkAboutFile Documents.507 E Main St.0053-2024-BRES (6) APPLICATION ACCEPTED DATE: 2024-05-28 PERMIT NUMBER: 0053-2024-BRES Field Plan Set Must Be Printed In Color 0
4040p;0
40
COMMUNITY DEVELOPMENT DEPARTMENT 01 /� CITY OF
A g% ASPEN
BUILDING PERMIT COVERSHEET 41
CITY OF ASPEN
These plans mu's e�ept at the
building site or inspection
PROPERTY INFORMATION delays may occur.Construction
shall conform to these plans.All
changes shall be approved by
ADDRESS: 507 W MAIN ST C201 UNIT: Aliging official.
PARCEL ID: 273512449025 LEGAL DESCRIPTION: CHRISTIANA ASPEN CONDO
OWNER: WELLES PETER S&SONDRA T General Electrical Requirements 100%of lamps in
PERMIT CONTRACTOR: Berry Design Works Any areas affected by the renovation must be brought permanently installed light SEPARATE PERMITS ARE
up to the current electrical code including: fixtures must be high efficacy REQUIRED FOR ELECTRICAL,
tamperproof receptacles(NEC 406.12), ECC R404.1 PLUMBING,
SPRINKLERNWORK R
ground-fault circuit interrupter protection(NEC 210.8),
arc-fault protection(NEC 210.12), SMOKE ALARMS AND
DESCRIPTION OF WORK UPGRADE BEDROOM/BATHROOM IN KIND. receptacle spacing(NEC 210.52)etc. CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
1.REMOVE DOOR/HEADER FOR CURRENT BEDROOM ENTRY MUNICIPAL CODE 8.15
FIRE 1 IT should be known that this review shall
2.REMOVE EXISTING CLOSET(PRESUMED NON LOAD BEARING WALL..see structural letter) not relieve the applicant of their
responsibility to comply with the
SPRINKLERS requirements of the City of Aspen
Municipal Code.Pursuant to
Sec.26.104.050,any permit or approval
3.SEAL CURRENT BATHROOM DOOR AND ADD NEW DOOR/DOORWAY IN BATHROOM issued in error or otherwise not in
REQUIRED conformity with the requirements of this
Title,shall be void.Similarly,any permit
or approval issued in reliance upon or
as a result of,a materially false
4.ADD ONE SINK IN BATHROOM statement or representation made in
the process of obtaining the permit or
development approval shall,likewise,
be void.Any person having received a
void or voidable permit or approval
5.ADD DOOR/DOORWAY TO BEDROOM shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
5.REPLACE CARPET WITH HARDWOOD FLOOR EV L�
STRUCTURAL VEgIEVIBIS I 1040 MAIN STREET•CARBONDALE,C00061623•(9701 510-07 7 3 vw�v.evolvestruct.cam
04/16/24 I))
USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED? Yes May 1,2024
FORCOOECOMPLANCE
Chris Berry SMont
PO Box 10544
Aspen,Colorado 81611
CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13 R (415)999-1456
c berry@mac.com
RE: 507 W Main
BUILDINGREQUIRED SPECIAL
TYPE(IRC) soy West Main Street
Aspen,Colorado 81611
INSPECTIONS ESD Project#:24.035C
Chris,
CONSTRUCTION TYPE VA ENERGY CODE COMPLIANCE Prescriptive Table
As requested,we have reviewed the potential structural impact of the proposed remodel at the location noted
above.Our review is based upon April 23,2024 email showing existing architectural drawings with proposed
modifications highlighted.The current proposed scope of work includes removal of an interior wall and an
OCCUPANCY GROUP(IBC) R-2 WORK CHANGES BUILDING No interior door and its header.
FOOTPRINT?
Once demolition can begin,the wall and ceiling finishes in these areas,shall be at least partially removed in
order to verify the potential effects to the existing structure.We shall be contacted to visually observe the
conditions and will then work to define the structural impact of the proposed.This shall be done prior to
CODE EDITIONS 2021 IEBC TOTAL SPA SQ.FT. proceeding with the removal or modification of any framing members,while also allowing sufficient time for the
scope of structural engineering to be defined and completed.Please note,no interior partition walls nor ceiling
framing shall be removed or modified prior to our observation.Furthermore,if any drywall or other finishes are
showing signs of movement or moisture,such as cracking,bubbling,discoloration or spalling,we should be
notified to observe conditions prior to the removal of any finishes.
OTHER CODE EDITIONS 2021 IBC,2021 IMC,2021 IPC TOTAL SNOWMELT SQ.FT.
The proposed structural modifications may require an analysis of both the gravity and lateral systems,tracing
gravity and lateral load paths through the building,possibly affecting and requiring structural work in areas of
the building outside of the proposed architectural scope.
HISTORIC PROPERTY? Yes TOTAL POOL SQ.FT. Please note,that verifications and subsequent recommendations may have a significant impact on the project
direction and schedule.Should you have any further questions regarding this matter,please feel free to contact
our office.We look forward to working with you through the completion of your remodel.
Sincerely,
FIRE SPRINKLER EXISTING? Yes Evolve Structural Design LLC Reviewed By: 00,00 L/c;h,,
55448 riri
i
'1 ►L RECEIVED
Jonathan Steurer,P.E. Dustin Wheatly,P.E.
Project Engineer Principal-Senior P.M. 05/02/2024 05/28/2024
ASPEN
BUILDING DEPARTMENT