Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.205 S Mill St.0043-2021-BCOM (20)
Permit Field Plan Set Must Be Printed In Color �► \ 0043-2021-BCOM Customize Page I Printable View I Help for this Page 0 '` � A -4- Show Feed / '�I Contacts[zl I Submissions[5L] I Milestones[z] I Reviews I l- I Inspections[It I MEP Permit Inspections[ol I Fees[5+] I Payments In I Bonds/Deposits[ol I CITY OF ASPEN Conditions[0] I Properties[t] I Open Activities NI I Activity History[5E I Informational Notes[d] I Complaints[d] I Notes&Attachments[J I Affordable Housing Credits[d] I CITY OF Work items(Master Permit]tot I Related Permits[b] I Permit History l5«] I Violations lot PERMIT NO.0043-2021-BCOM ASPEN Edit Clone Permit Form Print Application Letter View GIS Map Send Email Create Permit Fee Permit DetailER These plans LAS MONTANAS rrept at the Update BB project ID building site or inspection Number 0043-2021-BcoM Record type Building[Change] ADDRESS 205 S MILL#3 delays may occur.Construction Address 205 S MILL ST 3 Owner ©Emmy Gamgus[Change] PARCEL ID shall conform to these plans.All Original Number 21-2871 Status Final Review changes shall be approved by type Building Reason for Cancel or Compl. the building official. Review Fail Applicant DAVID RYBAK Aspen Internal? No Account RYBAK ARCHITECTURE&DEVELOPMENT PC Required Bond Amount SEPARATE PERMITS ARE REQUIRED FORRELECTRICAL, Project Total Available Bond Amount PLUMBING,MECHANICAL,OR FIRE SPRINKLER WORK Land Use Planning Bluebeam Project id 157-496-149 Application Permit Contractor G F WOODS CONSTRUCTION INC HPC-ZON-EH-UTL Review HPC Rev,EH-Food Rev, SMOKE ALARMS AND CARBON MONOXIDE Valid Business License on Eng Review Eng-CMP Rev,Eng-Dev Rev,Util Rev, DETECTORS REQUIRED Account THROUGHOUT DWELLING Imported Parks-Prkng-San Review San Rev; UNIT PER CITY OF ASPEN Required Submissions Conditional Inspections HPC Insp, MUNICIPAL CODE 8.15 Documents Resubmitted Conditional Final Insp HPC Final,EH-Food Final,Eng-Dev Final,Eng-Wtr Final,Util Final,San Final; Approved Covid-19 Plan Lj\PYMMIU ►Action Items 11K2127/Sa1 I, ►Queue Score ZONING ►Dates .Basic Information Description Tenant Improvement-Interior Finishes,partition Census Code 437 R-Remodel only—Alterations and FIRE wall remodel,accessible restrooms,kitchen Conversions-Nonresidential and Non- equipment revisions;hvac equipment revisions housekeeping Use of Building Mixed-Use Interior Remodel Only / P RI RS Use Class Commercial RE R Class of Work Alteration .Job Location Address 205 S MILL ST 3.ASPEN:273707338004 Lot D Site Address Dis lay on Map Legal Description Subdivision:CITY AND TOWNSITE OF ASPEN Block:81 Lot:D AND:-Lot Thru I - NOT REQUIRED Historic Property? No Eden Address THIS PERMIT 0 ALBRIGHT Historic District? Yes BUILDING NOTEQUIPED WITH .HPC-Planning-Zoning Details STRUCTURAL ENGINEERS_ SPRINKLERS September 13,2021 Zone District CC HPC Certificate of No Appropriateness? Is There an ADU? No Work Involves a Land Us No City of Aspen-Building Department Approval? 130 S Galena Deed Restricted? No Located in a PD? No Aspen,CO 81611 Category of Zoning Fee Commercial Adds/Changes Floor Area? No Zoning Work Level Minor Zoning Fee Occupancy or Use Change? No Re: Las Montanas Renovation HOA/Covenant Property Not Subject to HOA or Covenant Work Affects Exterior of No 205 S Mill St Building? Aspen,CO #of Dwellings 0 To Whom It May Concern: ►Building Project Details This letter is to inform you that Albright&Associates,Inc.has been retained by Las Montanas Aspen,LLC to provide structural engineering design services for the renovation of the above ►Scope of Work Details referenced property.We anticipate being involved through the demolition,design,and construction phases of the project. .Building Description I have reviewed the design of the proposed remodel dated September 03,2021 for their feasibility Code Editions 2015 IEBC Required Special Inspections and impact on the existing structure.The project scope is understood to be an interior renovation Other Code Editions Energy Code Compliance COMCheck UA Alternative with updated mechanical systems. Based on the scope of work proposed,the existing structure Building Type(IRC) Existing Snowmelt Energy 0 appears to be amenable to the proposed design.Albright&Associates will be involved in the Use review of the structure once the demolition is underway and we can observe the existing Construction type VA New Snowmelt Energy Use 0 conditions more specifically and make the appropriate recommendations. Occupancy Group(IBC) A-2 Existing Spa Energy Use 0 An agent of Las Montanas Aspen,LLC is to provide documentation of our findings and Occupancy Load 150 New Spa Energy Use 0 recommendations to the building department for review prior to construction. If you have any Fire Sprinkler Existing? No Existing Pool Energy Use 0 questions regarding this project,please contact me for additional information. Fire Sprinkler Required? No New Pool Energy Use 0 Sincerely, Fire Sprinkler Type Open Text Field For / .;O.........,/,i'I• Comments �v.v.^LHg4 Fp v Fire Alarms Installed? NFPA 72 `"'q.13-Zh{r;'' Jack LAlbri), 321.172 Principal C '} T- �Q 21044 L1 "�„40fiAi f'' RECEIVED I:970.927.4363 I I:970.927.3039 117352 HlttWa➢62,Unit 0 I Caraenaale,CO 81623 I alarlght-asstciates.ctm