Loading...
HomeMy WebLinkAboutFile Documents.205 S Mill St.0009-2022-BCHO (4) w OS Permit Detail Edit Clone PermtForm Print Application Leller VerdType hndeO Create lan.]maFee UpdalaBBprgedl ci roFASPEN. A Field Plan Set Must Be Printed In Color l�►� Number 000&2022-BCHD Record Type Change Orbr CM1ang_e] Address 205 S MILL ST Owner 101 Er,Gnnite.ICbng-el Ong nal Number 22-0287 Scotus Permit Review PERMIT N0.0009-2022-BCHO �\ 4/ Type omrge order Reason for wncelacompl. MASTER PERMIT 0043-2021-BCOM Applicant wvlDRrBAN Aspen area? No SPECIAL INSPECTION REQUIRED: ;' /'I Aosood RYSAKARCHOECTURE A DEVELOPMENT PC Required Pond Amount OWNER MILL ST PLAZA ASSOC LLC Vli- ', , Protect Tow Available Bond Amarnt 4 ,10 -Structural steel welding:Field&Shop 1,I,�,n -High strength bolting Panning .ImebamPrm;mM 15]-0BS-loft ADDRESS 2D55MILL �lr�/ -Epoxy anchors CITY OF MU Master Binding Permit 9043-2021-BCOM NPC-ZON-EH-UrIL Review Hrg RevEH-Food Rea. - - ASPEN Permit Contractor GE VWDODS CONSTRUCTION INC NPO20N£R.arlL Review-2 CITY OF ASPEN Intumescent paint valid.".rims a Review 11bl Rea. PARCEL ID 273707338004 • B. Owner Responsibilities: -Spray applied resistive materials ace"" SPECIAL INSPECTION AND TESTING AGREEMENT I. The pr ject owner,an agent of the owner,or the design professional in responsible charge acting -Permanent micropiles ee Parka n Renew San Rev as the owner's agent,is responsible for employing special-inspection services.The special ' Import Conditional Inspections This form is required for projects needing special inspection and/or testing per Chapter l?of the International inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. Documents Required Resubmitted cConditional rims In. Building Code(IBC). [IBC Sec 1704.1]In case of an owner/contractor,the special inspector\agency shall be employed Special inspection is required per 201518C These plans must be cent at Approved eoaid-tat Plan Project Address:205 S.Mill St.,Unit 306 Permit Number.0009-2022-BCHO as specified by the building official. section 1704.Inspector to verify that copy of building site or inspection C. Design Professional in Responsible Charge Responsibilities: agreement for inspection program to be on delays mayoccur.Construct BEFORE A PERMIT CAN BE ISSUED:The owner,or the dprofessional inresponsible charge,actingas Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their y a Action Items design the job site prior to performing any the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing respective design profession as defined by the statutory requirements of the professional registration laws of the state or shall conform to these plans- - Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be jurisdiction in which the project is to be concocted;who is engaged by the owner to review and coordinate certain inspections.A copy of all Special Inspector •queue score required to review the Special-inspection requirements and procedseos. aspects of the project,as determined by the building official,for compatibility with the design of the building or field reports to be on the job site for changes shall be approved quiet-are. a Dates APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for 1. Prepare statement of special inspections.The registered design professional in responsible inspectors'review if requested.Failure to the which they provide special inspections.Special inspectors shall be approved by the building department prior to charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for comply may result in denial of inspection. r Bask Inhumation performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for submittal by the applicant.The statement of special inspections shall identify the following: Description Change order census Code -change Order pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, a. The materials,systems,components and work required to have special inspection or Fre Railed assembly revisions due to seta eamitan when performing the function of special inspector. testing by the building official or by the registered design professional responsible for SEPARATE PERMITS ARE diseceeerecl dump demolaon. each portion of the work. REQUIRED FOR ELECTRICAL, Revision awamn's Re:wmn plan Special inspection and testing shall meet the minimum requirements of the International Building Code Section Ddrg Soong"°dog 1704.Thar llowin ditions are alsoa I ble: b. The Type and extent of each special inspection. PLUMBING,MECHANICAL,OR �pmoht n Eq larw d conPP Ica c. The type and extent of each test. Use of Buildingcommercial A. Special Inspector Responsibilities: d. For each type of special inspection,identification as to whether it will be continuous FIRE SPRINKLER WORK uae Class common-dal Class or won Anerebon I. Signify presence at job site.Special inspectors should notify contractor personnel of their special inspection or periodic special inspection. and responsibilities at the job site.If required the buildingofficial,theyshall sign D. Contractor Responsibilities: perms coin... presence Corsi jo quire by o s a gn in 1. Notify the special inspector.The contractor is responsible for nofifying the special inspector or SMOKE ALARMS AND on the appropriate form posted with the building permit. agency regarding individual inspections for items listed on the attached schedule and as noted on CARBON MONOXIDE r Joe Location 2, Observe assigned work.The special inspector shall observe assigned work for conformance with the building department approved plans.Adequate notice shall be provided so the special inspector DETECTORS REQUIRED Address ants MILL sr ASPEN 2ra107535a0e can a the building department approved(stamped)design drawings,specifications,and applicable has time to become familiar with the project. THROUGHOUT DWELLING Site Address Oisplry onj Legal Description oasesa.CITY AND Taataslre oFASPEN Boot workmanship provisions of the International Building Code.Architect\engineer-reviewed shop 2. Provide access to approved plans.The contractor is responsible for providing the special UNIT PER CITY OF ASPEN Lon DAND:-tat:Thru I drawings maybe used only as an aid to inspection. inspector access to approved plans. Historic PropeM, No Eden Addr.s 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, MUNICIPAL CODE 8.15 For continuous special-inspection,the special inspector shall be on site at all times observing the at the job site,MI special inspection records completed by the special inspector. Historic Diroan Vim work requiring special inspection.Periodic inspections,if any,must have prior approval based on E. Inspection of Fabricators: a separate written plan reviewed and approved by the building department and the engineer or 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing a 11PC-Planning-Zoning Delais architect of record. embers and assemblies is being formed on the of fabricator's shop,IBC Section It should be known that this review shall 3. Report nonconforming items.The special inspector shall brio nonconforming items to the m g per premises° P not relieve the applicant of their r Building Project Details Po g i p p g noncom g i 1704.2 shall require special inspection of the fabricated items. pp mediate attention of the contractor and note all such items in the daily report lfany item is not 2. Fabrication and implementation procedures.The special inspector shall verify that the responsibility to comply with the vdtrasm-.30.00 Lot size sat n 5 I55 resolved in a timely manner or is about to be incorporated in the work,the special inspector shall fabricator maintains detailed fabrication and quality control procedures that provide a basis for requirements of the City of Aspen Reason nor valuation Charge mil Disturbance Sq Ft o immediately notify the building department by telephone or in person,notify the engineer or inspection control of the workmanship and the fabricator's ability to conform to approved Municipal Code.Pursuant to Unit as Ft 4.007 AI...Area sq Ft o ahitect,and pasta discrepancy notice. construction documents and reference standards.The special inspector shall review the dares p peeia p Croce Building Footprint s4 Ft Existing Hard...Footprint k o 4. Provide timely reports.The special inspector shall complete written inspection reports for each for completeness and adequacy relative to code requirements for fabricator's scope of work. SeC.26.1 O4.OSO,any permit or approval n inspection visit and provide the reports on a timely basis determined by the building official.The F. Approved Fabricator Responsibilities: issued in error or otherwise not in sq 47 Existing w Ss rd.oam of Lot Dye special inspector or inspection agency shall rrnish these reports directly to the building official, I. Fabrication exempt inspections.Special inspections are not required where work is done on the conformity with the requirements of this Building Fire .I1ere Area sq Ft Con Mn sq Ft Total 4.057 engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should premise of a fabricator registered and approved to perform such work without special inspection. Title,shall be void.Similarly,any permit °wiry Review Sq.FL 105 May Review sq Ft Total o be organized on a daily format and may be submitted weekly at the option of the building official. If work is done on site that requires special inspection,special inspection will be required. s onmaar bassalblred laow These reports should include: 2. Approval of fabricator.A l shall be baseduon review of the fabricator's written or approval issued in reliance upon or New Sq.Ft a a. Description of daily inspections and tests made with applicable locations, ocedue control map procedural and quality manuals and periodic auditing of fabrication practices by an as a result of,a materially false b. Listing of nonconforming items, approved special inspection agency. statement or representation made in a scope or wont Dewas c. Report on how nonconforming items were resolved or unresolved as applicable, 3. Completion oI fabrication.Upon completion of fabrication,the approved fabricator shall submit d. Itemized changes authorized by the architect,engineer,and building official if certificate of compliance to the building official stating that the work was performed in accordance the process of obtaining the permit or not included in nonconforming items with the approved construction documents, development approval shall,likewise, 5. Provide Final Inspection Report.The special inspector shall submit a written final report be void.Any person having received a •Building Description documenting required special inspections and correction of any discrepancies noted in the void or voidable permit or approval Code Editions ants IEBC Required special Inspections Para,Fr.Rgiernta inspections prior to the final building inspection. Oder Code Editions Energy code Compliance shall not be relieved from having to Building Type(IBC) Total smowmea sq Ft comply with all applicable terms and comseuaon Type vA Tool an.sgFt conditions of this Title and the City shall Fire Sprinkler Existing? No Tow Pod sq Ft not be estopped from fully enforcing Fare spmnher Required? No Amount or OnsiteG RemwaUle __ _ ___._ same. enera5on? i5. '-f=1G:n 1l:w. port CORIt,rIg75 p,9J0.920.SDOC F9J0.920.SI971'.Itv f.i.,v"n.com Free Sprinkler Type CO Dezcnprion Poe Alarms Installed? None Basement •woad Fireplaces 1MFlav • a Gas Lou Fireplaces 2nd Flax a Gas Appliances and Floor Open Teat Feld For Carmine AddEorW PAS OCIATES � j3r-TVIlt_tkVLU STRUCTURAL ENGINEERS G. Building Department Responsibilities: boon C. Building Department Responsibilities: 1. Approve special-inspection program.The building department shall approve all special Memorandum 1. Approve special-inspection program.The building department shall approve all special inspectors and special-inspection requirements. 03/17/2022 To . Dave Rybak/Rybak Architecture&Development inspectors and special-inspection requirements. 2. Enforce special inspection.Work requiring special inspection and the building inspector shall ZONING From Craig Biere,PE 2. Enforce special inspection.Work requiring special inspection and the building inspector shall _ monitor the performance of special inspectors.His/Her approval,in addition to that of the special monitor the performance of special inspectors.His/Her approval,in addition to that of the special inspector,must be obtained prior to placement of concrete,covering of structural steel,or other Date January 12,2022 inspector,must be obtained prior to placement of concrete,covering of structural steel,or other similar materials. Re Los Montanas similar materials. 3. Review inspection reports.The building official should review special-inspection progress and 3. Review inspection reports.The building official should review special-inspection progress and final reports. It should be known that this review shall We have been asked to review the existing roof framing for the additional weight of 2 Make-up Air Units as final reports. 4. Perform final inspection.The building official should perform the final inspection and approval relievetheapplicant of their located on sheet A-101 prepared by Rybak Architecture&Development.Both Make-up Air Units have an 4. Perform final inspection.The building official should perform the final inspection and approval for a project[IBC Sec.109.3.1 j after the final special-inspection report has been reviewed and not approximate footprint of 96"x 65'and a maximum weight of 2,659 pounds. for a project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and approved. responsibility to comply with the approved. requirements of the City of Aspen At MAU 1,a new 3.2x12 floor beam must be added spanning north and south below the east and west Municipal Code.Pursuant to sides of the unit.The south end of the beams must bear on the misting exterior wall and the north ends Sec.26.104.050,any permit or approval must be connected to the existing GL beam with HU212-3 hangers.The existing 5 1/8"x 161/2"GL 205 S.Mill St-,Unit 306 0009-2022-BCHO issued in error or otherwise not in beam at the north end of the new beam has been reviewed for the additional load of the unit and it still 205 S.Mill St.,Unit 306 0009-2022-BCHO Project Address: Permit Number: conformity with the requirements of this seeds the code requirements for both stress and deflection.The new load results in less than a 5% Project Address: Period Number` Title,shall be void.Similarly,any permit quiremen ACKNOWLEDGMENTS change from the existing column loads at each end of the GL beam,and have not been reviewed per IEBC ACKNOWLEDGMENTS or approval issued in reliance upon or section 807.4,exception 1. I have reed and agree to comply with the conditiom of this agreement. as a result of,a materially false I have read and agree to comply with the conditions of this agreement. statement or representation made in At MAU-2,a new 3.2x12 floor beam must be added spanning east and west below the north and south \/�� fJ l"gA� p_ e f a2 1' the process of obtaining the permit or sides of the unit The west end of the new beams must bear on the existing exterior wall and the east ends �1"1�'i.��w�[p+5d.1 �¢se.� v✓J„/ll-Yi- t �li. 1QC 3l3 L t�WW�,1Q a 4t5ee..pfmA_CdM Special Inspection Signature Printed Name Date Email development approval shall,likewise, must be connected to the GL with HU21D3 hangers.The existing 5 1/8"x 161"GL beam at the east end Special Inspedtion V Signature V e Printed Name Date Email f Agency*** �AA pp be void.Any person having received a Agency*** @-� tA. 4f-Z4'•Py elAM1-L�2SPtiA-L�fr`/,Ua1. of the new beam has been reviewed for the additional load of the unit and it still exceeds the code Las MwimasAepen.uc. L void or voidable permit or approval rs for both stress and deflection.The new load results in less than a 5%chap from the a Aspen,LLc- Owner* S Prim Date Email 9 requirements change on"a shall not be relieved from having to existing column loads at each end of the GL beam,and have not been reviewed per IEBC section 807.4, Owner* Signature Printed Name Date Email // comply with all applicable terms and exception 1. P6rg-0714W u'Yrji f E/s t.a�L slum Ry.„,, 1"3,.aL i2Avse? s M=af .4141 conditions of this Title and the City shall Design Professional in Signature Printed Name Date Email Where the new 3-2x12 beams bear on an existing tenor wall,the caner of the new beam must bear Design Professional in Signature Printed Name Date Email Responsible Charge** not be estopped from fully enforcing g Responsible Charge** same. within I"of the center of an existing cold formed metal stud.The builder has verified the existing studs to be 1 5/8"x 5 1/2"x 16 gauge metal surds with a 1 1/4"x 5 1/2"x 18 gauge metal track on cop of the surds. - Contractor r Signature Printed Name a* Date Email There is an existing single 2x6 plate on top of the metal track which the roof joists are fastened to.The contractor signature Printed Name Dace Email Wood G F s Co nsbumon �,(L•� %"-� 34..j2 fr,,,g,04.4,-ca.eq single metal send is acceptable to support the load of the new 3.2x12 and the single wood plate and metal G F woods Conslroction Approved Signature Printed Name Date Email ALL OUTDOOR LIGHTING track are sufficient to transfer the load to the top of the metal stud. Approved Signature Printed Name Date Email Fabricator**• MUST COMPLY WITH Fabricator*** Thank you for the opportunity to assist you with this project.Please contact us if you have any questions. THE CITY OF ASPEN LIGHTING CODE Inspected Signature Printed Name Date Email SECTION 26.575.150 Reviewed b, ""`\`gly4t Inspected Signature Printed Name Date Email Fabricator*** Y _.�RpDO Lic Ili Fabricator*** �O............... . .. ,rl// City of Aspen Building JH Justin Hahn 4/1/22 justin.hahn@aspen.gov c ojr�.A(8°R/c-grv0 If City of Aspen Building JH Justin Hahn 4/1/22 lustin.hahn@aspen.gov Department Signature Printed Name Date Email S Department: Signature Printed Name Date Email 32972 'See a list of who may sign as the owner al page 2. SEE NOTES#1 PLANS i t •Seee De of who may signas the owner on argei ••The Deli Professional in Revue ible Char.is not negccrd to if the dudes as describedn item C above ""The Design Pmf ional in Resporuible Charge is not required cosign if they perform the duties as described in item Cabove. •••Either the Approved Fabtirssor or Inspected Fabricator musts.IIrfall nwtk u performed in din slop of an Approved Fahrioror.the SpacUl //a'�-.,, 1:;) •••Either the Approved Fabricator or Inspected Fabricator must sign.(fall work is performed in the shop of an Approved Fabricator,the Special Inspxsio.Aguwy sigraaue is Pare...el(no Paid woekl. Jack Albright,PE /rlllgi,`IONAL � Inspection Agency signature is not required(no field work). Principal Stamp u roe valid for building department we unless romanna�liddi�pam rde �irmg�m.. 21044 MI RECEIVED A 04/O 01/2022 -- ---- - _.-_ --_- --. - the SALMI Galata Etre*Aepeu copo gr51P,p-43.no5 lFM-W.24S PI.Eltyghzpen.cam 1:970.927.4363 11:970.927.3039 117392 A Highway 82 I Calllnlale,1111623 I ailIight-associates.cam a„,-,Si,..: -.C- ttli'b7GOD.V,Vti I I:9JQ920.519J I ctyrla.p- F'ORCOOte0MY1AMIGf • • • justinh •,u.DING DEPARTMENT