HomeMy WebLinkAboutFile Documents.234 W Francis St.0118-2020-BRES (72) I
Permit Customize Page I Printable View I Help for this Page o Field Plan Set Must Be Printed In Color I
%.S, 0118-2020-BRES / /�
4 Show Feed CITY OF:ASPEN ;;'6;0
PERMIT NO.0118-2020-BRES r
Contacts[31 I Submissions It I Milestones(41 I Reviews[± I Inspections 101 I MEP Permit Inspections IO) I Fees IJ I Payments[1 I Bonds/Deoosits[11 I Conditions[0] I Properties[1] I
Open Activities[0] I Activity History[5s I Informational Notes tot I Complaints 101 I Notes&Attachments IJ I Affordable Housing Credits Igl I Work Items(Master Permit)tOt I Related Permits 1 t I OWNER 234 WEST FRANCIS LLC CITY OF
Permit History IJ I Violations[o] - , . ASPEN
ADDRESS 234 W FRANCIS ST
Permit Detail (Edit[[Clone I Permit Form Print Application Letter) View GIS Map Send Email Create Permit Feel Update BB project ID PARCEL ID These plans rr ltept at the
Number 0118-2020-BRES Record Type Building273512417003
building site or inspection
delays may occur.Construction
Address 234 W FRANCIS ST Owner 0 Emmy Garrigus[Change] RESIDENTIAL REFERENCES FROM 2015 IBC shall conform to these plans.All
City Development Engineers Comments
CV/CS=crawl space ventilation sec.1203.4. 18"x 24"access required
Original Number 20-2658 Status Permit Review 1.Encroachments:Any existing or planned encroachments into the public 1209.1 changes shall be approved by
right-of-way,including temporary construction trailers and dumpsters,must be EE=emergency escape required sec 1030 the building official.
e Reason for Cancel or Com I. applied for licensing at City Engineering(920-5080).Five days advance
TYP Building P eU= eenclosed Nola space under en shall be " permitted
a stair
Review Fail notice is required to obtain a temporary encroachment license. enclosure rating.No access from stair enclosure.%"gypsum permitted for
2.Right-of-way Permits:Approval of these plans by the City Building Dept.is stairs inside a single dwelling unit.1011.7.3.
Applicant DEREK SKALKO Aspen Internal? No for work on private property only.Design approvals for proposed work RV=roof and rafter ventilation required 1203.2
(including landscaping)in the public right-of-way(ROW)must be obtained A=Attic Access 20"x 30"1209.2 SEPARATE PERMITS ARE
Aet aunt 1 FRIDAY DESIGN Required Bond Amount from City Engineering Dept.(920-5080)and Parks Dept.(920-5120).A SA=smoke alarm(NFPA 72)required sec 907.2.11 REQUIRED FOR ELECTRICAL,
Project Total Available Bond Amount $45,000 permit for work in the public right-of-way must be obtained from the City CO=carbon monoxide detector req.per Aspen Municipal Code 8.15 PLUMBING,MECHANICAL,OR
Engineering Dept five days in advance of when the permit is needed. SG=safety glazing required sec 2406 FIRE SPRINKLER WORK
Land Use Planning Application LPA-20-049 Bluebeam Project Id 678-999-344 3.Mud,dirt and debris may not be tracked onto the adjacent public ROW, V=mechanical ventilation required sec 1203.1&IMC 403(bath fans and
and the adjacent ROW must be clean at the end of eachworkday.Construct whole house ventilation)
Permit Contractor KAEGEBEIN FINE HOMEBUILDING LLC HPC-ZON-EH-UTIL Review HPC Rev, mud rack if needed.Trucks hauling demolished matenalsmust becovered. GR=guards,42"min ht,4"max opening.Guards within dwelling unit 36"min
4.Utilities in ROW:No utility pedestals,meters,or electric transformers can ht sec 1015 FIRE
Valid Business License on Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Ulil be installed in the public right-of-way.Provide utility easements on private HR=handrails 34"-38"ht sec 1014
Account Rev, property.Ce Certificate
RD=Draft stopping e/fire50 blocking 718 SPRINKLERS
5.Certifcate of Occupancy(CO)Inspection:Engineering CO Inspection RD=Roof drainage 1503.4
Imported Parks-Prkng-San Review Parks Rev,Parks-LSE Rev,Parking Rev,San Rev, includes but is not limited to:(a)witnessing that all property comers STC=Sound transmission class not less than 50 at dwelling separations,sec
havemonuments,(b)drainage improvements were installed as approved,(c) 1207 REQUIRED
Required Submissions Conditional Inspections HPC Insp,Parks Insp, easements are documented,(d)no unapproved ROW encroachments exist, SI=Stairway Illumination 1205.4
and(e)the ROW has been restored.Call 429-2750 to arrange CO inspection. PD=protect against decay,sec 2304.12
Documents Resubmitted Conditional Final Insp HPC Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util 6.Snowmelt Driveways:(i)Snowmelt runoff from driveway cannot flow into REFERENCES FROM 2015 Imo
Final,Parking Final,Parks Final,Parks-LSE Final,San Final, street.A grate or swale must intercept runoff before street.(ii)Snowmelt DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM
installation in the public ROW requires an encroach-ment permit. AS=access and service space for maintenance req'd,sec 306
Approved Covid-19 Plan t/ 7.Drainage Issues:(i)Foundation drains cannot go to a dry well receiving MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 SMOKE ALARMS AND
other drainage flows.(ii)City must be notified of drainage plan changes.(iii) ET=exhausts terminate 3'from prop line and openings,10'from intakes, CARBON MONOXIDE
Plan approval assumes no ground water.If ground water is encountered,call 501.3.1
the Senior Dev.Engineer at 920-5080.Call for an open hole inspection prior IT=intake openings 10'from lot line&contaminant sources(vents,streets), DETECTORS REQUIRED
►Action Items to placement of the drywell. 401.4 THROUGHOUT DWELLING
8.No Loose Material Storage allowed in R.O.W. D=fasten and seal all ductwork per 603.9 UNIT PER CITY OF ASPEN
9.Neighbor Notification:For all excavation,the Contractor must comply with REFERENCES FROM 2015 IFGC MUNICIPAL CODE 8.15
►Queue Score neighbor notification requirements per Section 3307 of the 2003 International DV=direct vent req'd,sec 303.3
Building Code(IBC) CA=combustion air not taken from bedrooms,bathrooms or
storage sec 303.3 -
- OD=outdoor appliances must be listed for outdoor use,sec 303.6 It should be known that this review shall
►Dates _ REFERENCES FROM 2015 IECC not relieve the applicant of their
F=new or replacement fenestration shall not exceed 0.28 U-factor,NFRC
label required,Ordinance 40,2016 responsibility to comply with the
L=75%of lamps in permanently installed lights must be high efficacy,sec requirements of the City of Aspen
v Basic Information R404.1 Municipal Code.Pursuant to
I,/m,oq,,. SE=Continuous air barrier required;all exterior joints,cracks,and holes to Sec.26.104.050,any permit or approval
Description Proposed remodel and addition of a two storygarage Census Code 434-Additions,Alterations,and Conversions to caulked,gasketed,sealed,table R402.4.1.1
P 9 9To obtain sign off from the Engineering Department on the issued in error or otherwise not in
REFERENCES FROM 2014 NEC
construction with a full proposed basement to a SFR Residential Buildings Certificate m Occupancy(CO)the following requirementsmualbemet. EP=electric panel'happy space'30^x36"x7a",not in storage,sec 11 conformity with the requirements of this
historically designated Victorian and mining cabin located Minor Drainage Reviews Title,shall be void.Similarly,any permit
at 234 West Francis.Property located on an R-6 zoned •All Areas must be landscaped ornabui:ed per me approved plan or approval issued in reliance upon or
9000 square ft lot.Existing conditions:5,315 SF Habitable/ •Al drainage features must ainslxged per the approved plans innwdmgmules as a result of,a materially false
478 Garage increasing to a Proposed:8,031 SF Habitable •All temporary erosion control devices mug be removed statement or representation made in
Major Drainage Reviews.
/562 SF Garage total construction. •allymor{see aboerlrevirw criteria must bemet the process of obtaining the permit or
Use of Building Single Family Interior Remodel Only development approval shall,likewise,
be void.Any person having received a
Use Class Residential ', void or voidable permit or approval
ADDRESS:234 West Francis,Aspen CO 81611 PERMIT NUMBER:0118-2020-BRES y •sulmilanopemorsand Maintenance rwlAgreeme l signedby the Noe, shall not be relieved from having to
Class of Work Addition complywith all applicable terms and
Rigedwsynpovenlenb s indidilgsidcedk. ,bandgutlr,,andotlw
Permit Comments Parks comments:Parks to verify TPZ and air-spading prior to activity. COMMUNITY DEVELOPMENT DEPARTMENT 40 Po agate nesmueoems` not itions of this benstoppeditle arom fddlthe enforcing
shall
4�►' d d l h b b,
BUILDING PERMIT CONTACT SHEET "°°,rncumnnaevne°na°mded fin
al nfrnm° same.
HPC Comments: CITY OFISPEN
1.Provide walkway material for the one-story historic resource for Staff&Monitor review and approval.
2.Staff encourages the restoration of both historic chimneys on the two-story historic resource-Please review this detail with staff.Restoration policy will apply Name Derek skalko,Leval Project Representative phone a/u.c ttd uDJJ E-mall uere (U nnaay.eom I -.
3.Schedule framing inspection with HP staff to assess if historic framing remains.This inspection will determine appropriate insulation material for exterior walls Kaegebein Fine Hameballtling-General Contractor/PM y/u.a/yDSD/ DnanLklnome0uu0ing.com
of the historic structures. "ante nanwells, "°"` E-mailEnergy Approved
Use A roved
Name vs4 west Francis Lu„t,lu:mr eteve tlls,manager Phone s l/./44.U/UD can phone y l/.//4.1.1/UD
® RREMP El CREMP
;2jl]g 40 5th Avenue thy New York sore NY 21,10011 0118-2020-BRES
ll C/O:Amber Steele,Assistant: amber@bairullc.com PERMIT ft, DATE: 2/11/22
`addae�a
same(local)DerekSkelko,tFridayDesign phoney/U.3U`J.UO`JJ Cell Phone SNOWMELT: 1D15
Addle".PO BOX 7928 Dry,Aspen sataCO np81612 POOL:
SPA: 56
Addrreesaderek@1friday.com REMP SHEET: ZN 002 / M102
Name(Local Representative)Derek Skalko,1 Friday Design phone y/U.3US.UOUO ce„,nay/U.3US.UDSJ MINIMUM BOILER AFUE: 95
ram PO BOX 7928 city Aspen State CO Zip 81611 OFFSET: 5.16 kw PV
Oddrem,derek@lfriday.com DAM
REVIEWED BY:
seine Selldont Architects phoney IL.L Iy.UJ/I CeIlPhoney I/.0/0.I0IJ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY RMS.
rag,860 Broadway,2nd Floor New York NY 10003 All ancwmeitsystems shall meet the following:
thyState ZIP -Any portions in the Right of Way must be on a separate zone.A ROW
p-mailddree,John Spencer,Studio Director john@selldorf.com permit and Permanent Encroachment License are required.
-R10 insulation shall be instated under the area to be snow melted or R5
insulafion shall be installed under and at the slab edges.(Ordinance 11
Name HCE-High Country Engineering: phon.U f U.t40.0010 Cell phone y/U.O4J.DO(O Series2011)
-Automatic controls installed for system shut off when pavement
neeie:1517 Blake Avenue,Unit 101-LL Cry Glenwood Springs sate CO zlP 81601 temperature is above 50°F and no precipitation is falling.(2009 iecC
Sec.403.8&503.2.4.5)
e-AILMike Grzesiak,PE: mikeg@hceng.com -Automatic or manual controls installed for system shut off when outdoor
y t-eInmsppeecatieb yis tabstinveg 4h0Fo s(2ta0c9lIlEy CatC l%dcin.4e0s3 m.8 a&5sy0s3te2m.4.d5e)
sign
Name REG-Resource Engineering Group „one y/U-J4J.IL ID CeIlPhone /U.LUU.JySD
pressure,but not less than 100psi,for 15minutes.(2009 IMC Sec.
mailing 426 Belleview Avenue,Suite 201 Crested Butte CO 81224 1208.1)
Address City sate ZIP
a.sccilss Dodson Harper: dodson@reginc.com
Name KFH-Kaegebein Fine Homebuilding LLC-GC phoney/U.J1 U.J/`J/ cell Phoney/U.S/tt.DSD/
Magag 225 Main Street,Suite 301&302 Carbondale CO 81623 t
I ��L a
Aaaresa ury sine nP sophiev
Adpanss Nathan Kaegebein:natekaegebein@kfhomebuilding.com/Brian Wells: brian@kfhomebuilding.com 01/28/2022 J INSPECTIONS:The General Contractor must schedule inspections online. ZO N I N G
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
ivrrirer ears9-28-2020 �C `,
❑ Check if you area tested owner builder(single-family homes only).You must take a test and complete the ownegEiCEB.ED
(CITY USE ONLY)Owner builder approved by: Date: Affidavit af}I77/AA
(CITY OF ASPENAnea,t,esx 130 S.GALENA ST I ASPEN,CO 81611J
ASP N
5UILUINti UtPARTMENT
�, Field Plan Set Must Be Printed In Color �1►�
4., ;►, '�ii '►
CITY OF ASPEN B. Owner Responsibilities:
I. The project owner,the design professional in responsible charge,or an agent of the owner is
responsible for employing special-inspection services.The special inspector/agency shall not be in CITY OF
SPECIAL INSPECTION AND TESTING AGREEMENT the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In case of an ASPEN
This form is required for is ncedin,spec inspection and/or testingowner/contractor,the special inspector\agency shall be employed as specified by the building
q projec 6 p p per Chapter 17 of the International official.
Building Code(IBC).Protect Address: 234 W Fr C. Design Professional in Responsible Charge Responsibilities:
St. permit Number: 0118-2020-BRES Design Professional inResponsible Charge definition:An individual who is registered or licensed to practice their These lans'rl a tat the
respective design profession as defined by the statutory requirements of the professional registration laws of the state or p p
BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as jurisdiction in which the project is to be constructed;who is engaged by the owner to review and coordinate certain building site or inspection
the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing aspects of the project,as determined by the building official,for compatibility with the design of the building or
Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be structure. delays may occur.Construction
required to review the special-inspection requirements and procedures. 1. Prepare statement of special inspections.The registered design professional in responsible shall conform to these plans.All
charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for submittal by the applicant.The statement of special inspections shall identify the following: changes shall be approved by
which they provide special inspections.Special inspectors shall be approved by the building department prior to a. The materials,systems,components and work required to have special inspection or the building official.
performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for testing by the building official or by the registered design professional responsible for
pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, each portion of the work.
when performing the function of special inspector. b. The type and extent of each special inspection.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section c. The type and extent of each test. SEPARATE PERMITS ARE
1704.The following conditions are also applicable: d. For each type of special inspection,identification as to whether it will be continuous
special inspection or periodic special inspection. REQUIRED FOR ELECTRICAL,
A. Special Inspector Responsibilities: D. Contractor Responsibilities: PLUMBING,MECHANICAL,OR
1. Signify presence at job site.Special inspectors should notify contractor personnel of their 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or FIRE SPRINKLER WORK
presence and responsibilities at the job site.If required by the building official,they shall sign in agency regarding individual inspections for items listed on the attached schedule and as noted on
on the appropriate form posted with the building permit. the building department approved plans.Adequate notice shall be provided so the special inspector
2. Observe assigned work.The special inspector shall observe assigned work for conformance with has time to become familiar with the project.
8 P P 8 2. Provide access to approved plans.The contractor is responsible for providing the special FIRE
the building department approved(stamped)design drawings,specifications,and applicable inspector access to approved plans.
workmanship provisions of the International Building Code.Architect\engineer-reviewed shop 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining,
drawings may be used only as an aid to inspection. at the job site,all special inspection records completed by the special inspector. SPRINKLERS
For continuous special-inspection,the special inspector shall be on site at all times observing the E. Inspection of Fabricators:
work requiring special inspection.Periodic inspections,if any,must have prior approval based on 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing REQUIRED
a separate written plan reviewed and approved by the building department and the engineer or members and assemblies is being performed on the premises of a fabricator's shop,IBC Section
architect of record. 1704.2 shall require special inspection of the fabricated items.
3. Report nonconforming items.The special inspector shall bring nonconforming items to the 2. Fabrication and implementation procedures.The special inspector shall verity that the
immediate attention of the contractor and note all such items in the daily report.If any item is not fabricator maintains detailed fabrication and quality control procedures that provide a basis for
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall inspection control of the workmanship and the fabricator's ability to conform to approved
immediately notify the building department by telephone or in person,notify the engineer or construction documents and reference standards.The special inspector shall review the procedures SMOKE ALARMS AND
architect,and post a discrepancy notice. for completeness and adequacy relative to code requirements for fabricator's scope of work. CARBON MONOXIDE
4. Provide timely reports.The special inspector shall complete written inspection reports for each F. Approved Fabricator Responsibilities:
inspection visit and provide the reports on a timely basis determined by the building official.The 1. Fabrication exempt inspetions.Special inspections me not required where work is done on the DETECTORS REQUIRED
special inspector or inspection agency shall furnish these reports directly to the building official, premise of a fabricator registered and approved to perform such work without special inspection. THROUGHOUT DWELLING
engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should If work is done on site that requires special inspection,special inspection will be required. UNIT PER CITY OF ASPEN
be organized on a daily format and may be submitted weekly at the option of the building official. 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written MUNICIPAL CODE 8.15
These reports should include: procedural and quality control manuals and periodic auditing of fabrication practices by an
a. Description of daily inspections and tests made with applicable locations, approved special inspection agency.
b. Listing of nonconforming items, 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit
c. Report on how nonconforming items were resolved or unresolved as applicable, certificate of compliance to the building official stating that the work was performed in accordance
d. Itemized changes authorized by the architect,engineer,and building official if with the approved construction documents.
not included in nonconforming items
5. Provide Final Inspection Report.The special inspector shall submit a written final report
documenting required special inspections and correction of any discrepancies noted in the
inspections prior to the final building inspection.
RECEIVED RECEIVED
01/28/2022 01/28/2022
too South Galena Street Aspen.CO 8,6m97S I P:970.910.5000 I F.970.920.51971 c i t yofa spa n.com ASPEN ISO South Galena Street Aspen. Brdn t925I P.070.920.5000I F,070.920.5197I cityof.rea,.com ASPEN �
i„
BUILDING DEPARTMENT il,
BUILDING DEPARTMENT
02/09/2022
FOR COM C(1fiFg1JANCE
denism
r REG
C. Building Department Responsibilities:
I. Approve special-inspection program.The building department shall approve all special
inspectors and special-inspection requirements.
2. Enforce special Inspection.Work roquinng special inspection and the budding inspoctor shall
monitor the performance of special inspectors.HisMer approval,in addition to that of the special
inspector,most be obtained prior to placement of wnrs alm ete,covering of Penal steel,orother Korbinian Kainz
similar860 Broadway,2nd floor
3. Review inspection reports.The building official should nines special-inspection pnsgrss and New York,NY 10003
final reports. T 212.219.9571
4. Perform Baal Inspection.The building official should perform the final inspection and approval korbinian@selldorf.com November 30,2021
for a project[IBC Sec.109 3.11 after the final special-inspection report has been reviewed and
approved. Regarding:234 W.Francis Special Inspections
Korbinian:
�tAdtms: 234 W Francis St. Permit number: 0118-2020-BRES
Pry This letter is regarding the special inspection requirements at 234 W Francis Avenue,Aspen,CO.
The following special inspections must be performed in accordance with IRC Section 1705:
OWLEDGMENTS
to ly with the conditions of this agreement
Special Inspections Program
Induseial I million 9/22/21 napectre56@yusna.mse Project Name:234 W Francis
Special Signature Printed Name Date Email Building Jurisdiction:City of Aspen,CO
Agency*
Job#:2968
Steve Ells Steve Ells 9/8/2020 amber@bahWlt.com
signanae feinted Name Doe Emil All inspections shall comply with the requirements of City of Aspen,IRC 2015,and the project
Resource Engineering 1 Dodson Harper,PE Dodson Harper,PE gdodaonharperfgmail.com
Group � � specifications.If in any case a conflict arises between governing documents the most stringent
Design Purr anon m Signature Printed Name Dam Erna requirements shall apply.
Responsible
Charge... Reinforced Concrete:
mime...Fine NontYY atr.au Brian Wells L "..'."""'..`"'" 1.Reference Specification 3300 for testing of placed concrete and verification of mix design
Comrecwr Signature Primed Name DLO Email
and rebar mill certifications.
Dennis Clemons' -- 2.Placement of rebarprior to pouringconcrete shall be inspectedper cityregulations.
Myers&Comnanv �"�� P !
Approved Signature Printed Name Date Email
Fabricator".. �. _./ Structural Steel:
Alpine Steel LLC #h~y ' Carlos Lopez 9/22/21 alpinestee115@gmaiLcom 1.Periodic Inspections of:
Inspected :411fa" Printed Name D.5e Eel a)Material verification of high strength bolts
Fabricator**. b)Bolted bearing connections
City of Aspen Building ..-9' Denis Murray 2/4/22 denis.murray@aspen.gov c)Single pass fillet welds<=5/16"
Dupabrwat: Signature Printed Name Dam Emil d)Inspection of fabricator and fabrication facilities
'Enkindle Owner or the Mien Prot:snarl m Relponnble Cher ems figs
"Tie osim Bnfnuanai in Pommel.chase on.renewed to son ndrry0eaa.Mdsa.r9.4d:1.n Cthee. Sincerely,
•••Fadw Sabra.m the Alnrea fabnhayead Fsbnuv must Aga nail wed b pvh :maCd.snap orna Agrees,retrsa.m neta =401:10 lic4;',
I A
oO Aamrr.a^amre aeon require(ra field an5:. ,t onnna.'Fo',
Dodson Harper,PE ' ,
;',e 45610 0!
G:7'�
RECEIVED Fs,„„, 6= RECEIVED
ASPEN
Consulting Engineers•Mechanical•Structural•Energy 01/28/2022
BUILDING DEPARTMENT Crested Butte&Golden Colorado•m@nc.com ASPEN
BUILDING DEPARTMENT
rr wrr,MNuumxNNy nm„,"", e,1,2030 Field Plan Set Must Be Printed In Color ,`►►;k;°
„m, e ° ° inn. �ae,axx =, �dd1g/
Fgarned Insulated
cuktagg 0.17 °e,nnoMateriel
PVC aneNW,;' .nx,= ° Generated by REScheck-Web Software CITY OF
Rigid iapperetl roof „�°p661Cover Board 1.-11 Board b - 1 Compliance Certificate ASPEN
nn„lx 1r,yr�m 1
Woal
6,101a.
IndooAlr Pocket Ay,A„,gat A 0.16 0.60 0.64 inter:m.0os.Cell insulagog 1,15-61 Instgation.Closed Cell Spray F Oarg 6 6.50 51.98 51..
r °.Axrdm s 6q n6;6°.61r°rA, Indoor mawrarrnn .°1 os.1 These plans'rtept at the
�151uti[10 Project 234 West Francis[Historic]
building site or inspection
U;
Energy Code: 2015 IECC delays may occur.Construction
° I wArr� Location: Aspen,Colorado shall conform to these plans.All
wail Construction Type: Single-family
„°`mini �'""'°` xr1im� ` Project Type: Alteration changes shall be approved by
Orientation: Bldg.faces 225 deg,from North the building official.
Materral
Cumber egg. Oubloar Air Film 017 0.17 0.17 Climate Zone: 7 (9922 HDD)
In6lxxr-xn1 00325 0.om
wr-n Permit Date:
r!mulligan ax6<I r oe Siding - /4 m°°ea 118 119
m e,4"'°` nod 1m Permit Number:
din","i>,A„nx5-xl =dad5r,yrwm - 071 165 SEPARATE PERMITS ARE
Ali-Pocket lgr Pocket
,x n24 105 mum@ - °� Construction Site: Owner/Agent: Designer/Contractor: REQUIRED FOR ELECTRICAL,
Woad Beard Gelling °,Axrdm n61 n61 n61 ,.,° ,,,°79
234 West Francis Steve Ells John Spencer PLUMBING,MECHANICAL,OR
Aspen,CO 81511 Selldorf Architects
aq sashOrAs 1i0onl,x%zl ,,g""^°z'�'"°°' o n•s%s "i. 860Broadway FIRE SPRINKLER WORK
-6 °°a>a
ov °r„/urm 0rz nos New York,NY 10003
eell me„nnim me°°ru,rnm 0„ .61 0.61- 9571
I 0.:Sr�a°, 1 1721 isslrnr amber@bairulic.com SMOKE ALARMS AND
CARBON MONOXIDE
� 1„ =5=1°-r°` Compliance:Average fenestration U-factor exceeds maximum DETECTORS REQUIRED
Maximum UA:474 Your VA:594
THROUGHOUT DWELLING
'"°'"'°""'°°"" UNIT PER CITY OF ASPEN
,yslmssl rme a „e m6 6 s.w urn„,„v. ° -n Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck.Each slab-on-grade MUNICIPAL CODE 8.15
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements.
interior Closed Cell Insulation 1iN581Cell Sony roan 6.Nalue Conn"o"„, insole on mmwne„Imiles,xy,m,/loch
.75
�neowmrlum ' dim°,.„nn„ 0.61 ° 05 061 "Sit °a Ind,„, - °av4•m„=a 1.16
l 521 s21r°'r= °y5 1.15 °no Envelope Assemblies FIRE
I °m Flu-•° no„pxs61 °"ea eo„e °w 1 az° As •z° Assembly Gross Area Cavity Cont. Prop. Req. Prop. Req.
Cell insulation,x , n PerimeterR-Value R-Value U-Factor U-Factor UA UA SPRINKLERS
intew°"or Closed mu .aa 14-Flat Roof at Historic Main House:Flat Ceiling or 71 52.0 5.0 0.022 0.026 2 2
iimmammim1x01N, ,K 00 aoa�b� bSA. 057 Scissor Truss REQUIRED
xn„„me. - iiumiriam
u Interior Magni ruun,m.xe„Nxse zs 6s0 338 15-Sloped Cedar Roof:Cathedral Ceiling(no attic) 2,217 58.0 7.0 0.016 0.026 35 58
xn°°" av 0
7
9 ots Ins 0.70 070 Exterior Wet at Historic[South]:Wood Frame,16"
0.61 0.61 0'1 o.c. 816 42.0 9.0 0.027 0.045 17 29
1 22.51 .s 21r0r Orientation:Front
,ea��aa.°"pxssl ED101:Glass Door(over 50%glazing) 24 0.500 0.320 12 8
toe Orientation:Front
man ousel ,usw,vrean o2s 1os 1 0.12105,,,°, 208:Wood FrameWood.ard Ceiling 9 0.950 0.320 8 3
Moor an nim indoor.MI 061 061 0u Orientation:Front
1 sa.z1 °Jen rlrcroo 209:Wood Frame 24 0.950 0.320 23 8
Orientation:Front
3Ort Orientation:
Frame:Fro3 0.950 0.320 3 1
lu 0014, CEIVED RECEIVED 01:Woodrpnt D2/D9/2D22
109:Wood Frame 10/22/2020 10/22/2020 Orientation:Front 30 0.950 0.320 29 10 ` 1eesism MCC
112:Wood Frame denism
ASPEN Orientation:Front 40 0.950 0.320 38 13
BUILDINGDEPARTMENT ASPEN 113:Wood Frame
BUILDINGDEPARTMENT Orientation:Front 4
0 RECEIVED0 0.320 38 13
Project Title:234 West Francis[Historic] Report date: 02/08/22
Data filename: 02/09/2022 Page l ofil
er 9/1s/ww
ASPEN
m BUILDING DEPARTMENT
ssrrami g, -'h'.-c- Gross Area Cavity Cont. Prop. Req. Prop. Req.
Assembly Pen m eter R-Value R-Value U-Factor U-Factor UA UA
Material
w uo oo, m.°i,oo mxxo.elmm=q ny,m=Non
Exterior Wall at Historic[West]:Wood Frame,16"
"IwvMl lapped 827 42.0 9.0 0.027 0.045 19 32
sheathing Nyave 1/2- 0.76 Orientation:Left side
Wood Frame Ww1Framing-2g6 anm=onno„p„sel ,m zo ss Ls0 zns ED307:Solid Door(under 50%glazing) 18 0.500 0.320 9 6
rg.e1"v 0.tz 0, 0.79 Orientation:Left side
mxr"nM nos 106:Wood Frame 16 0.950 0.320 15 5
Indoor Inn ns1 ns1 061 Orientation:Left side
I 1.01 e9.31r0rA,: 107:Wood Frame Project Notes:
Orientation:Left side 4 0.950 0.320 4 1 Numerals appearing in front of roof and foundation wall assemblies correspond to architectural envelope details.
108:Wood Frame
Orientation:Left side 30 0.950 0.320 29 10 Wall assembles are grouped by orientation and do not have corresponding numerals given the worst case
Assem°".,.�""°' assemblies were used through out.
216:Wood Frame 12 0.950 0.320 12 4
Orientation:Left side
smii,ni `ne°w,ea0ai"e. 218:Woad Frame 5 0.950 0.320 4 2
oo6° Orientation:Left side
0noec al ic,r eu.,.. m"n„°„, I0000 en mm00000 P„ • Sa 217:Wood Frame 25 0.950 0.320 24 8
A,vu-tl - - °,06- - Orientation:Left side
_ o'o:v _ _ 0.z0 Exterior Wall at Historic[North]:Wood Frame,16"
2,1,000 frame�,'�nsxl - ens° °em - - s.s 6s0 6.6e ,c 532 42.0 9.0 0.027 0.045 12 20
CavingBang y,„e yz-"v oOrientation:Back
- 061- - n6t 0s1 114:Wood Frame 6 0.950 0.320 5 2
I zssl 44.e1r°r,s Orientation:Back
115:Wood Frame 40 0.950 0.320 38 13
1A °,, Orientation:Back
213:Wood Frame 20 0.950 0.320 19 6
Orientation:Back
mimiamammi�ne.,n,y,wro,eaoez'r,6v.°ry°��rz,/nmri.y,m=e.nm, 214:Wood Frame 10 0.950 0.320 10 3
Orientation:Back
zo r00006r°"e,mem,i,. 0„re 215:Wood Frame 10 0.950 0.320 10 3
Orientation:Back
302:Wood Frame 7 0.950 0.320 6 2
Orientation:Back
Exterior Wall at Historic[East]:Wood Frame,16"o.c. 795 42.0 9.0 0.027 0.045 19 32
Orientation:Right side
ED102:Solid Door(under 50%glazing) 24 0.500 0.320 12 8
Orientation:Right side
110:Woad Frame 15 0.950 0.320 14 5
Orientation:Right side
111:Wood Frame 15 0.950 0.320 14 5
Orientation:Right side
210:Wood Frame 11 0.950 0.320 11 4
Orientation:Right side
211:Wood Frame 11 0.950 0.320 11 4
Orientation:Right side
212:Wood Frame 11 0.950 0.320 11 4
Orientation:Right side
Basement Floor:Slab-On-Grade(Heated) 265 18.0 0.642 0.655 0 0
Insulation depth:4.0'
06-Exterior Foundation Wall:Sold Concrete or
Masonry
Orientation:Unspecified 3.000 'J�\� ,a�)027 0.050 81 150 RECEIVED
Wall height:grade: CE!t E V
Depth below grade:12.0'
Insulation depth:11.0' 02/09/2022
02/09/2022 ASPEN
RECEIVED
ASPEN BUILDING DEPARTMENT
10/22/2020 BUILDING DEPARTMENT
Project Title:234 West Francis[Historic] Report date: 02/08/22 Project Title:234 West Francis[Historic] Report date: 02/08/22
ASPEN Data filename: Page 2 of11 Data filename: Page 3 of11
BUILDING DEPARTMENT
Field Plan Set Must Be Printed In Color �1►�
I
Generated by REScheck-Web Software ;`'; �
��1
Assembly Compliance Certificate Gross Area Cavity Cont. Prop. Req. Prop. Req.
Perim /1 ,
oreter R-Value R-Value U-Factor U-Factor UA UA
60105:Solid Door(under 50%glazing) 24 0.280 0.320 7 8 CITY OF
Orientation:Front
Project 234 West Francis[Addition] Exterior Wall at Addition[West]:Wood Frame,16" ASPEN
628 19.0 10.0 0.036 0.045 19 24
Orientation:Left side
Energy Code: 2015 IECC ED106:Glass Door(over 50%glazing)
Location: Aspen,Colorado Orientation:Left side 67 0.280 0.320 19 21
Construction Type: Single-family 105:Wood Frame fl
11 0.280 0.320 3 4 These plans ept at the
Project Type: Addition Orientation:Left side
Orientation: Bldg.faces 225 deg.from North 202:Wood Frame building site or inspection
Orientation:Left side 12 0.280 0.320 3 4
Climate Zone: 7 (9922 HDD) delays may occur.Construction
Permit Date: 203:Wood Frame 12 0.280 0.320 3 4
Permit Number: Orientation:Left side shall conform to these plans.All
Exterior Wall at Addition[North]:Wood Frame,16" changes shall be approved by
Construction Site: Owner/Agent: Designer/Contractor:ner/Contractor: 644 19.0 10.0 0.036 0.045 17 22
9 9 Orientation:Back the building official.
234 West Francis Steve Ells John Spencer ED104:Solid Door(under 50%glazing) 160 0.400 0.320 64 51
Aspen,CO 81511 Selldorf Architects Orientation:Back
New York,Broadw NYYy 10003
New Exterior Wall at Addition(East]:Wood Frame,16"
2122199571 a . 581 19.0 10.0 0.036 0.045 16 22 SEPARATE PERMITS ARE
amber@bairullc.com Orientation:Right side
101:Wood Frame REQUIRED FOR ELECTRICAL,
Orientation:Right side 36 o.zso o.3zo 10 11 PLUMBING,MECHANICAL,OR
201:Wood Frame 11 0.280 0.320 3 4 FIRE SPRINKLER WORK
Compliance:Passes using UA trade-off Orientation:Right side
Compliance:25.8%Better Than Code Maximum UA: on Your UA:a64 103:Wood Frame 22 0.280 0.320 6 7
me%Better or worse Than code Inge,reflects now close to compliance the noun Ia based on code trade-off rules. Orientation:Right side
It Does NOT provide anemmate mane :e or pan reiae.eroa mimmum<oae home. 104:Wood Frame 22 0.280 0.320 6 7
Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck.Each slab-on-grade Orientation:Right side
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Exterior Wall at Addition(Light Wells]:Solid Concrete SMOKE ALARMS AND
or Masonry 325 0.0 16.0 0.053 0.057 13 14
Orientation:Unspecified CARBON MONOXIDE
Envelope Assemblies 001:xtec Frame 16 0.280 0.320 5 5 DETECTORS REQUIRED
Orientation:Unspecified
THROUGHOUT DWELLING
Gross Area 0Ori Wood Frame 16 0.280 0.320 5 5 UNIT PER CITY OF ASPEN
Assembly or cavity -ValeCont. Prop. Req. Prop. Req. Orientation:Unspecified MUNICIPAL CODE 8.15
Perimeter R-Value R-Value U-Factor U-Factor UA UA 003:Wood Frame
Orientation:Unspecified 7 0.280 0.320 2 2
11-Basement Roof:Flat Ceiling or Scissor Truss 631 36.0 28.0 0.017 0.026 11 16 004:Wood Frame
10-Basement Planted Roof:Flat Ceiling or Scissor 515 36.0 28.0 0.017 0.026 9 13
Truss Orientation:Unspecified 14 0.280 0.320 4 4
005:Wood Frame
08-Flat Roof:Flat Ceiling or Scissor Truss 783 49.0 18.0 0.018 0.026 14 20 Orientation:Unspecified
16 0.280 0.320 5 5
09-Sloped Metal Roof:Cathedral Ceiling 953 49.0 7.0 0.019 0.026 17 23 Basement Floor:Slab-On-Grade(Heated) 350 18.0 0.642 0.655 0 0
Insulation depth:4.0'
206:Wood Frame 15 0.550 0.550 8 8 06-Exterior Foundation Wall:Solid Concrete or
204:Wood Frame 15 0.550 0.550 8 8 Masonry 5,000 15.0 18.0 0.027 0.050 135 250 FIRE
Orientation:Unspecified
207:Wood Frame 15 0.550 0.550 8 8 Wall height:12.0.
th below grade:
205:Wood Frame 7 0.550 0.550 4 4 IInnsulation depth:11.0.
0
Exterior Wall at Addition Pocket:Wood Frame,16" 07-Exterior Foundation Wall w/Closed Cell:Solid SPRINKLERS
° 405 39.0 19.0 0.021 0.045 7 14 Concrete or Masonry
Orientation:Unspecified Orientation:Unspecified 100 22.0 18.0 0.024 0.050 2 5 REQUIRED
102:Glass Door(over 50%glazing) Wall height:12.0'
Orientation:Unspecified 95 0.280 0.320 27 30 Depth below grade:12.0.
Exterior Wall at Addition[South]:Wood Frame,16" Insulation depth:11.0'
°
75 19.0 10.0 0.036 0.045 2 2 Orientation:Front RECEIVED
RECEIVED
Project Title:234 West Francis[Addition] Report date: 02/08/22
Data filename: 02/09/2022 Page l ofll Project Title:234 West Francis[Addition] 02/09/2022 Report date: 02/08/22
Data filename: Page 2 ofllASPEN ASPEN
BUILDINGDEP RTMENT BUILDINGDEARTMENTr.„,,,k,f,_,, ,,_„09/2022
FORCOLtalarUANCE
denism
Compliance Statement:The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has b designed to meet the 2015 IECC requirements in
REScheck Version:REScheck-Web and to comply with the mandatory require s listed in REScheck Inspection Checklist.
-
Naamle gThaen Fenerty-Prnjent Engineer Signature D02/08/2022
ate
Project Notes:
Numerals appearing in front of roof and foundation wall assemblies correspond to architectural envelope details.
Wall assemblies are grouped by orientation and do not have corresponding numerals given the worst case
assemblies were used through out.
RECEIVED
02/09/2022
ASPEN
BUILDING DEPARTMENT
Project Title:234 West Francis[Addition] Report date: 02/08/22
Data filename: Page 3 ofll