Loading...
HomeMy WebLinkAboutFile Documents.234 W Francis St.0118-2020-BRES (76) -I Project Information I Legend 6 I General Notes I Mechanical Specifications I I ]- Building Jurisdiction: City of Aspen,CO _ 1.See Mechanical Project Specifications,which are included as part of this document.Where A.General Requirements 9.Ductwork: ...... w�rE"�rvOP1EPLgHOF SEA°",�°""Ecr" Building Codes: 2015 IRC : Pump conflicts between specification and plans exist,the plans take precedence.Notify Engineer of 1.Codes and Regulations:All work performed must comply with state and local codes,utility a.All ductwork shall be constructed according to the latest ASHRAE,SMACNA,and 2015 IECC any significant conflicts. company regulations,and the latest editions of:The International Codes(Building,Plumbing UMC standards. 2020-09-04 Permit Set 2.Equipment is to be installed as specified in the contract documents.All substitutions(or and Mechanical)and National Fire Codes of the National Fire Protection Association b.Sheet metal shall be constructed of coated galvanized steel of lock-forming grade ........c...,, - Gas Type: Natural Gas Three way mixing valve "equivalents")must be approved by the Engineer.All equivalent equipment will be (NFPA).Final interpretations will be made by the local inspection authority. conforming to ASTM Standards A-525 and A-527.Reinforcement shall be constructed of 1PRIDAV DEsias Electrical Service 120/240V 1 o considered.Provide equipment cutsheets(digitally)for Engineer review prior to ordering. 2.Contract Drawings:The Contract Drawings illustrate the general design and extent of galvanized steel. PG BOxTe26 �� 3.Mechanical Contractor shall coordinate all diffuser locations with Architect prior to performance required.All dimensions and locations shall be taken from the Architectural c.Ductwork shall be sealed with Mon-Eco Industries Eco Duct Seal 44-50 or equivalent ASTELPEN.CO16612 Design Conditions ' uem Motorized mixing valve installation. drawings. mastic. CONTACT:l 8 95 DEREK SKA Ko 4.All work performed shall comply with state and local codes,utility company regulations, Substitutions:Equipment is to be installed as specified in the contract documents. d.Flexible ductwork shall be constructed of a spring steel helix supporting a plastic core. .........Mr E and the codes listed under Project Information on this sheet.Final interpretations will be Substitutions(or"equivalents")must be approved bythe engineer. Flexible duct is onlypermitted for the last 5'connectingto diffusers unless noted E BLUEGREEN BLD Winter Outdoor Temperature: -15° g 1 Pq PP 9 3oos.SPRING sr SUITE 2oz Winter Indoor Setpoint: 70° Solenoid valve made by the local inspection authority. 3.Warranty:The Contractor shall be responsible for the successful operation of mechanical otherwise on the drawings.It shall be insulated with 1"fiberglass having a density of 1 ASPEN,CC a,6„ P TEL 840.e45.e675 Summer Outdoor Temperature: 82° 5.The Contractor shall provide the Owner with operating and maintenance instructions systems,equipment,and materials installed under this Contract for a period of one year IbJcu.ft.The insulation shall be sheathed in an copolymer vapor barrier jacket. CONTACT:SHERI SANZONE Summer Indoor Setpoint: 76° (minimum of two copies)for all mechanical systems and equipment.This information shall be from the date of final acceptance.Defective equipment or materials shall be repaired or (Uninsulated flexduct may be used where the adjacent ductwork is uninsulated or "RrPRL.E="..,°" Manual balancing valve(circuit setter) or anized in binders or books. re laced at no ex ense to the Owner. unlined. Elevation: 7800ft 9 P P ) 300S.SPRINGST.SUITE 202 6.The Contractor shall create a set of"as-built"drawings on site,noting significant 4.Cutting and Repairing:The contractor shall be responsible for all cutting,drilling,welding, e.All duct sizes on plans are interior clear dimensions. ASPEN.CO 61611 differences between the system as designed and as installed.Upon completion of the work, and repair required for his portion of the work.Coordinate with the Architect. 10.Balancing:Balancing shall be done by the mechanical contractor or a firm specializing in TEL e70.e26.2666 Drawing Index Strainer CONTACT:SARA000NS the Contractor shall furnish the Engineer and Owner with reproducible prints showing the"as- 5.Operating and Maintenance Manuals:The Contractor shall provide the Owner with the discipline of balancing air and water systems.Typed reports for all balanceable devices 3644E97,"E36 built"installation. operating and maintenance instructions for all mechanical systems and equipment shall be provided to the designing engineer.Variable speed pumps and fans shall be HIGH COUNTRY ENGINEERING M001 Mechanical General Notes and Legend Ball valve(full port) 7.This project will be commissioned per Section C408 of the IECC,including a detailed (minimum of two copies).This information shall be organized in binders or books. balanced to provide design flow to the highest pressure drop zone with 0%throttling via 1517 BLAKE AVENUE,,SUITE 101 M001A Control Sequences physical inspection of equipment and functional testing of all equipment and controls. 6.Temporary Heating:The permanent HVAC systems are not to be used as temporary reduction in peak design flow(motor adjustment).Pump/fan shall not be set to MAX during iei.sTo s�.z SPRINGS,co 6,60 Contractor shall work with commissioning agent to perform physical&functional testing and HVAC systems at any time without written consent by the engineer. balancing.Design flow to all zones simultaneously shall be confirmed during testing. CONTACT:ROGER NEAL M003 Mechanical Schedules correct any issues necessary to ensure that the system performs as intended. 7.Electrical Connection:All line-voltage wiring(120V and higher)will be done by the 11.Hydronic Fill Water Quality: °'"""'""""`°`"°'"`�" 1.1 Check valve 8.These plans do not show details for buildingwaterproofing or site drainage.Resource Electrical Contractor.All low-voltage(typically 24V and below)control wiringwill be done bya.Fill water used to dilute propylene glycol solution shall contain: - M003 Mechanical Schedules -RESOURCE ENGINEERING GROUP P 9 9 9 (YP Y P PY 9 Y 1 M101 Basement Mechanical Plan Engineering Group is not responsible for waterproofing(including but not limited to wall and the Mechanical Contractor. 1.Less than 50ppm Calcium CRESTED BUTTE,co SUITE M102 First Floor Mechanical Plan 14 Pressure-activated bypass valve roof detailing,foundation and under slab drainage)or site drainage. 8.Access Panels:The Mechanical Contractor shall furnish and install access panels where 2.Less than 50ppm Magnesium CON ACT'NUGUSTRASZIDODSON HARPER M103 Second Floor Mechanical Plan 9.HVAC systems shown in these drawings are designed for permanent occupancy and are required for access to equipment,in coordination with the General Contractor.Access 3.Less than 25ppm Chloride ....-r, ..°"E" not to be used for temporary heating,ventilation,cooling,humidification,or dehumidification panels shall be adequately sized,of a type approved by the Architect and shall be fire or 4.Less than 25ppm Sulfate UOBSERVATOIRE INTERNAnONAL M201 Mechanical Details 120WALKERSTREET.7E Anti-convection valve(or pipe bend) during construction. smoke-rated as required. b.If fill water is from a municipal connection,check with the county or city water NEW YORK.NEW YORK 10013 M202 Mechanical Sections 10.Variable speed pumps and fans to be adjusted during Testing Adjusting and Balancing 9.Controls:Temperature sensors used for measurement and control shall be of the department for chemical properties of local water,field test or hire a water qualityTEL 2,2.26.4463 M202A Mechanical Sections TAB to reduce maximum set point(pressure/speed)toprovide design flow to the most immersion type.Strapon sensors are notpermitted. P P CONTACT:cARLINA GERADI(TAB) P (P P ) 9 YP specialist to conduct a water analysis. AV CO./UAW M203 Piping Diagram -----)r- Supply piping or duct(single line) difficult(highest pressure)zone/device with fully open balancing valve/damper.Do not C.If fill water is from a well,field test or hire a water treatment specialist for a water 9 P 67 EDTTST balance equipment with pump/fan set to maximum speed.Total design flow with all zones B.Material Requirements anal sis wESTST a52T M301 Fan Coil Systems t BROOKLYN.T NEW YORK 11222 open(after balancing to be achieved/documented). 1.Equipment and Material Standards:Equipment and materials shall be new,UL-listed for d.If tap water does not meet the standards for quality(or there is any doubt of the waterTEL:917.396.0025 M302 Fan Coil Systems --x"-- Return piping or duct(single line) 11.Air handling systems with a combined supply of 2000 cfm or greater shall include a duct the intended use free from damage or defect and in compliance with the latest industry quality), CONTACT:MATT EMMI M303 Fan Coil Systems gic use growth demineralized water that has been fortified with suitable corrosion and/or EINELOPE°ON"°L-PM Ys smoke detector in the return air system that will disable the air handler upon activation per standards. biological inhibitors and pH buffer solution. D M304 Fan Coil Systems ° o Section 606 of the IMC.Building fire alarm integration shall be by Others. 2.Duct insulation,wrap:Duct wrap insulation shall be flexible fiberglass insulation,1 pcf, 12.Closed Hydronic System Water Quality: D APPLIED ENCLOSURE CONSULTING LLC `in--�r�l Hydronic zone manifold Y Y Y 11757 WEST KEN CARYL AVENUE.SUITE r308 with factory-applied,reinforced,aluminum foil vapor barrier.Insulation shall have a K-factor a.Prior to filling,ensure the system is properly flushed,drained,and rinsed thoroughly. LTTLETON.,COLORADO 80127 Abbreviations of 0.28 at 75°min.Ducts in unconditioned spaces to be insulated per IECC. b.Solution pH shall be maintained between 8.3 and 9.0 TEL:3033..:6Eve6ETr VERScwwN System Description p Pipingheatingcooling supply e.Solution conductivityshall be maintained between 700-3200 S/cm y 3.Pipe Insulation for Pi In Above Grade:All and and return, �T Thermostat/temperature sensor p "CCU9°05 CCO"'r domestic hot water,and domestic hot water recirculation piping shall be insulated per IECC d.Solution hardness shall be maintained between 100-300ppm EREMOS ACOUSTICS AFF Above Finished Floor PP SEWBROA.50100UITE 202 An air source heat pump plant coupled with radiant in-floor tubing and zone level fan coils or with R-3 min.insulation,whichever is greater. B Boiler e.Solution shall be free of biological growth and organic material NEW YORK Nv,m4 provides heating and cooling to the spaces.A boiler plant provides heating for domestic hot 4.Acoustic Duct Liner:Acoustic liner shall be 1-1/2 lb density,constructed of glass fiber TEL:.6650.2235 BD Balancing Damper Humidistat f.NO phosphate based inhibitors shall be used in the system CONTACT:RYAN GRAVE(GLORBECKER) H water,snowmelt and supplemental space heating. liner.The air stream surface shall be black-coated mat.Liner shall have a"K"value of BDD Backdraft Damper g.NO automatic make-up water systems that are connected to building domestic water "P...s"Lr,"r 0.28/inch at 75°F mean.Duct liner shall be 1/2°thick or as shown on the plans.Provide 1" BOD Bottom of Duct systems.Pressure may be maintained via glycol auto feeder(s)with pressure control C1301 W.O POOL DESIGNS u BOU Bottom of Unit Master controller for ventilator"x" Laundry room has tempered make-up air and dedicated cooling. thick liner in return air ducts at mechanical rooms,per acoustical report recommendations. capabilities.These shall contain the same propylene glycol solution as currentlyinstalled 11301 w.43R8 DR..suITE4 M:V- 5.Hydronic Radiant Tubing:Tubingfor in-floor and underfloor radiant heatingshall be cross- p P PY 9 Y GOLDEN.COLORADO 80403 BP Burst Protection Y in the closed loop hydronic system. CO:720.6 3... CELtE BT Buffer Tank(hydronic)or Bathtub The primary mechanical and laundry room have OA economizer cooling. linked polyethylene(PEX)conforming to ASTM F877 and ASTM F876,with an oxygenANDY(y ) 13.Hydronic Water Quality Maintenance and Field Inspection: CC CoolingCoil V� Sub-controller for ventilator"x" barrier meeting DIN 4726. '_"""" a.Glycol concentration,pH,and turbidity levels of the solution shall be checked at least - V- The wine cellar has redundant air cooled chillers that reject heat to the mechanical room. 6.Valves: - CFM Cubic Feet Per Minute(Air) once a year. CH Chiller (� a.Gate valves 2"and smaller shall be cast bronze,rising stem,Teflon packing,solid T Steam humidification ifprovided via fan coils to deliver humidified air to occupied spaces. verify Initial that theheline analysiss completed be performed serve two to four ereweeps of initial future to \�\ CLG CeilingY Pressure gauge,permanently mounted, P P disc,200 PSI WOG.Gate valves shall be used only for hose bibs,equipment drains,and \ fill was properly and serve as a reference point for future test CO Clean Out appropriate pressure range fill connections. results CXN Connection (T� Ventilation is provided by energy recovery ventilators that serve to exhaust bathrooms b.Shutoff valves shall be full-port ball valves with chrome plated brass ball,Teflon seats T Temperature gauge,permanently mounted, spaces and provide fresh air to living spaces.These are connected to the respective fan coil and seals,vinyl-covered steel handle,200 PSI WOG. \ \ CT Combination Waste and Ventvalves CT Cooling Tower appropriate temperature range systems. c.Butterfly valves 2"and smaller shall be cast bronze,stainless steel disc,surrounding CW Cold Water p T fluorelastomer seal,350 PSI WOG. DBT Dry Bulb Temperature Y Pressurefremperature measurement port Make-up air for the kitchen hood system is provided by FCU-1. d.Check valves shall be horizontal,swing-cast bronze,bronze disc,200 PSI WOG. tt DHW Domestic Hot Water e.Pressure-reducing valves shall be diaphragm-operated,cast-iron or brass-body valve, Controls shall be a custom DDC building automation system(BAS). DIA Diameter with low-inlet pressure check valve,inlet strainer removable without system shutdown, DN Down Balancing damper and noncorrosive valve seat and stem. DW Dishwater f.Relief valves shall be all-bronze A.S.M.E.rated valves with external test levers,with ;-^.....".n,RE C DWG Drawing Backdraft damper Ventilation Calculation: discharge piped outside or to floor drain where possible. C EA Exhaust Air g.Valves shall be domestically manufactured by Milwaukee,Powell,Nibco,Watts,or EAT Entering Air Temperature Qr=[(0.01'8,390 sgft)+(7.5'(5 bedrooms+1))]'0.75 equivalent. =Pp00 trCFhl EC Electrical Contractor ® cfm Diffuser callout(return,supply,exhaust) Qr=(83.9+45)'0.75 h.Solenoid valves shall be slow-acting. ;,o.,�ousr'•�sFoh EL Elevation XxX Qr=96.7 CFM IC"� A4•'•• yt ERV Energy Recovery Ventilator �a C.Installation Requirements A ' 38880�•' ESP External Static Pressure Detail callout and sheet reference number 1.General requirements:All equipment is to be installed per manufacturer's F Furnace �itl4ii recommendations.If drawings and manufacturer's recommendations are in conflict,contact 0, '• �,, FCU Fan Coil Unit the engineer. �1'Y,- ••'��`:=. FD Floor Drain Detail callout(same sheet) 2.Clearance requirements:All equipment is to be installed so that manufacturer's \\ONAt.EN-_ FLR Floor recommended clearances for access and maintenance are met.If clearances cannot be met FP Freeze Point because of site conditions or other equipment,Contractor shall notify engineer immediately. 06-W-2022 GA Gauge Zone callout 3.Startup Procedures:Follow manufacturer's recommended procedures in starting up all - GC General Contractor equipment.Damage caused by improper start-up shall be repaired at no expense to the - GPM Gallons Per Minute owner. 234 W.Francis St. GRD Grade x Supply air 4.Piping Installation: GSHP Ground Source Heat Pump a.Install I inplumb and straight,parallel with walls andpartitions.Concealpiping234 W.Francis St. H Humidity p p g 9 Aspen,CO HE Hose Bib Return air/ within structure whenever practical.Provide drain valves at all low points,vents at all HX Heat Exchanger highepoints,ton to allowe completem drainage and oem purging.A ommcdation for(and GREG HP Heat Pump execution of)proper system purging is the responsibility of the Contractor. HRV Heat Recovery Ventilator Outside air b.Material and methods shall be per ASME,ASTM,ASA,AWS,and National Plumbing HVAC Heating,Ventilation and Air Conditioning Code Handbook. R,"c H Hot Wg Return c.Provide unions or flanges in piping connections to each valve,device,or item ofGROUP O oN E E r HWS Hot Water Supply -"-'* Wall supply diffuser equipment.Install each union or flange to permit the removal of parts and equipment for reginc.com•970.349.1216 inspection or cleaning,without disconnecting any piping,except unions or flanges. IM Ice Maker consulting Engineers B INWG Inches Water Guage d.Where penetrations are required through structural members such as joists or beams, B Mechanical•Structural•Energy L Lavatory .4„„-...,.. Wall return diffuser drilling shall be in accordance with the manufacturer's recommendations.Questionable MAX Maximum drilling requirements shall be reviewed by the structural engineer via the General efficiency I sustainability I simplicity MBH Thousand Btu Per Hour I ♦♦I Contractor. MC Mechanical Contractor ( < 5.Hangers and Supports:Support piping and equipment from the structure to prevent " �°"° MECH Mechanical 7) j) Floor return diffuser sagging,pocketing,swaying,and vibrations,and arrange to provide for expansion and MIN Minimum contraction.Brackets,clamps,and hangers shall be steel or copper of a type acceptable to 2022-06-10 COA BUILDING PERMIT NIC Not in Contract I I the Engineer.Contact between dissimilar metals shall be insulated with a non-metallic NTS Not to Scale ( ( mater s noestiaeed n it ( ( Floor supply diffuser permittialed.Ensureuchas acousticalrubber, e pr reportne,recomorplam c.endationsCh in,p arerforat followediro. or w re hangers are no OA Outside Air 6.Pipe Testing:All pipingsystems shall be tested and witnessed bythe Owner or General OAT Outside Air Temperature Y OFD Overflow Drain Contractor prior to concealment.Protect equipment and fixtures or equipment,isolating ORS Outdoor Reset Schedule them during the test.Hydronic piping shall be air tested at 150 PSIG;natural gas piping shall P Pump or Pressure be air tested at 30 PSIG.Air tests shall be held for one hour without loss of pressure. - PSI Pounds Per Square Inch 7.Pipe Identification:After completion of the piping or insulation,provide painted,sticker,or PRV Pressure Reducing Valve clip-on descriptive labels,including directional arrows,on piping at equipment and RA Return Air approximately every 25'. RD Roof Drain 8.Valve Installation: RT Rooftop Unit a.Use ball valves for shutoff duty;globe and ball for throttling duty.Use gate valves for REQD Required hose bibs,equipment drains,and fill connections. S Solenoid b.Locate valves for easy access and provide separate support where necessary. SA Supply Air c.Install shutoff valves for each fixture and piece of equipment that can be replaced. SK Sink d.Install valves in horizontal piping with stem at or above center of pipe. SH Shower or Shower/Tub Combination e.Install valves in a position to allow full stem movement. SIM Similar f.Install check valves for proper direction of flow in horizontal position with hinge pin Mechanical General Notes SP Static Pressure or Sump Pump level. and Legend SPEC Specification A SS Stainless Steel A STD Standard SV Solenoid Valve SEE NOTES#1 PLANS T Temperature TBD To Be Determined +$per ,d�y TYP Typical(use at all similar locations UNO) �Ul��a r 15 1 i M 001 UNO Unless Notes Otherwise U VAV Variable Air Volume 07/21/2022 VTR Vent Thru Roof RORGOOt 1110E WBT Wet Bulb Temperature tins °^°E"°- WC Water Closet jusinh WM Washing Machine PMECT -I YH Y,ard Hydrant I 6 I 5 I " I 3 I 2 I , I-9V4°=1'-0" PEssMerrell. 2968"° I I 6 I 5 I 4 I 3 I 2 I I F PR REM ISSUANCE 2022-06-10 COA BUILDING PERMIT 1 FRIDAY DESIGN PO BOX 7928 ASPEN,CO 81612 TEL'970.3000695 CONTACT:DEREK SKALKO E E BLUEGREEN BLD 300 S.SPRING ST.SUITE 202 ASPEN,CO 81611 TEL 940 985.5075 CONTACT:SHERI SANZONE Control Sequence —°E—°" 300 S.SPRING ST.SUITE 202 Fan Coil Sequences(FCU-2 thru 16): Heating Loop Pumps(P-7,8): ASPEN,CO81611 General: 9 TEL.970.925.2855 Setpoints listed shall be adjustable. These fan coils and the associated solenoid valves will operate to provide cooling and These pumps will operate on a call for heating from any associated zone,and will modulate CONTACT:SARA ADAMS Heating DAT setpoint:95F second stage heating to their respective zones.FCU operation shall be interlocked with the pump speed on internal controls to maintain a constant differential pressure across the pump, .,.a,.c.SEA CoolingDAT setpoint:55F radiant zone control for the associated zone to provide second stage heating when the space per the Pump Schedule listed flow.Set pump to"Constant Pressure"mode.Pressure setpoint HIGH COUNTRY ENGINEERING P 1517 BLARE AVENUE,,SUITE 101 Radiant zones shall include an in-slab temperature sensor to allow for maximum and/or temperature drops 2°F below the space temperature setpoint. to be programmed during TAB at full flow to each zone.These pumps shall be off when GLENWOOD CPR co 61801 heating calls have been satisfied. TEL 970.925.2600 SPRINGS, minimum slab temperature setpoints. CONTACT:ROGER NEAL FCU-3 is cooling only and operates on a call for cooling from the AV room. ,.,,,,E,E"°,„EFw Humidifiers(H-1 thru 9): — User Control Interface: —RESOURCE ENGINEERING GROUP The temperature control interface for each zone will be through the BuildingAutomation FCU-6&9 have OA economizer cooling that shall be the first stage of cooling.Enable During calls for humidification from their respective zones humidifiers will power on.An air 426 BELLEVIEW AVE SUITE 1 P 9 CRESTED BUTTE,CO 8122420 System(BAS).The selected space temperature and humidity sensors shall be concealed and economizer cooling when the OSA temp is at least 3F less than than the space temperature proving switch will verify the associated fan coil unit is operating before the humidifiers are TEL:970.349.1216 HASLOOOSON paintable,and approved by the Engineer,General Contractor,Architect and Owner prior to and there is a call for cooling.Open the respective fan coil OA damper and modulate OA allowed to operate.When air proof switch verifies flow,humidifiers shall modulate steam LONTC CONTACT:AUGUSTHARPER S.°..a ordering.The BAS interface will allow the Owner the ability to adjust the heating setpoint damper MD-1 open to a damper position that corresponds to the required fan coil airflow(as delivery into the supply air ductwork and provide humidification to the respective zones. determined byTAB Contractor).Duringeconomizer cooling,modulate the OA damper the Adjust output to ensure discharge air RH does not exceed 80%RH.Place an additional high- U'OBBERVATOIRE INTERNATIONAL onsite and remotely.The BAS will also allow the Owner to schedule setpoint changes.The ) P limit%RH lockout sensor downstream of steam distribution manifoldper manufacturer's Hew AL ERrmw STREET. BAS will have adjustable alarm setpoints to provide email notification if the space maintain a minimum DAT of 55°F.Disable economizer cooling when the OAT is equal to or NEW TOSS.SEW temperature is outside programmed setpoints.Forced air cooling will be controlled to zonesgreater than the space temperature. specifications.Provide a standalone,hardwired humidistat in the return air duct that will P P 63 CONTACT:CARLINA GERACI by the BAS and integrated with the controls for each indoor unit.The air-source heat pump disable the humidifier if the RA RH is>40%.Provide controls to ensure humidifiers do not AV .,N, controls shall be provided with a BACNet or comparable gateway to allow for controls FCU-6&9 In cooling mode mechanical cooling shall be the second stage of cooling.The CW short-cycle. ONEBA oNEBUTTON 67 WEST ST S527 valve shall be allowed to provide hybrid cooling during airside economizer mode.The valve operation thru the BAS. Motorized Changeover Valves(MV-3, BROOKLYN.NEW YORK 11.2 shall modulate to maintain a DAT of 55F in cooling mode.In heating mode the HW valve shall 9 4): TEL:917.39.0025 modulate to maintain a DAT of 95F.If the DAT falls to 40°F or less,close the OA damper, When the heat pumps are in heating mode,the valves shall be in the heating mode position. CONTACT:MATT EMMI System Mode of Operation open the HW valve to 100%,disable the fans and generate a low temperature alarm on the When the heat pumps change over to cooling mode,these valves shall change over to the ENVELOPE ENCLOSURE 0 Heating or cooling mode will be determined by outside air temperature(OAT).Cooling mode BAS cooling mode position. ° ,°,Ps;WETKEN CPRY CONSULTING sure F3oe shall be enabled when the when the OAT is 50°F or greater.Heating mode shall be enabled TEL 84 ON.KEN CARYLDO AVE 0122 when the OAT is 65°F or less.The boiler plant shall be able to provide heating water while FCU-9 shall be interlocked with dryer operation to provide make-up air whenever the dryers Motorized Mixing Valves(MV-1,2): TEL EVERETT VERSCHAVE the heat pumps are providing chilled water.Simultaneous heating and cooling in the same are in operation.On a call for make-up air,open the fan coil OA damper and enable the fan These valves shall modulate to maintain the SWT setpoint in their respective hydronic .°arn°..wL*w= zone shall not be permitted. coil.Modulate the respective control valve to maintain the DAT associated with heating or heating loops. EREMOS ACOUSTICS cooling mode.This fan coil shall also serve the ice machine closet within the laundry room. 12'w°BORK°Hv;oSUITE ;ITS:m Automatic System Feeder(AF-1,2,3): Upon a call for cooling from either the Laundry or Ice Machine Closet,open the respective Mechanical Room Exhaust Fan(EF-2) TEL: 0650..2235 Units will operate on their internal controls to maintain minimum system pressure in the CONTACT:RYAN GRAYS(GLOTZBECKER) associated hydronic loop.Set initial system pressure setpoint to 15 psi.The fill level of this damper and operate the supply fan to provide half of the design airflow per space.Damper Ventilation exhaust fan shall be interlocked with FCU-6 to operate when temperatures in the COLD LT,". unit will also provide a visual gauge to warn of system leaks. positions and fan speeds to be determined during TAB.During a call for heating from the room exceed 85°F. GOLDEN,0 POOL 00804DESIGNS u Laundry space,the Ice Machine Closet damper shall be closed. 11301 w.43RD DR..SUITE A10 C Snowmelt Zones: GOLDEN,308146 DO 80403 Boiler control: TEL 720.663.81. A boiler controller shall alternate boiler operation between B-1 and B-2 for space and Snowmelt zones will be controlled by individual moisture/temperature sensors installed in the NTTAACT:ANDY tACELLE domestic water heating in order to maintain equivalent run hours on each boiler.The Fan Coil Sequence-Kitchen(FCU-1,MD-1,2,P-11,HWC-1,KH-1/EF-1): slab as noted on plans.When slab moisture is detected concurrently with slab temperatures — controller shall also modulate the boilers together for optimal efficiency to maintain the Fan coil unit FCU-1 will operate to provide cooling and second stage heating with make-up air below setpoint the snowmelt zone will be activated.The snowmelt zone valve will open/close required SWT. to the entry level.FCU-1 will be interlocked with KH-1/EF-1 to provide make-up air via a to maintain the slab temperature setpoint of 36°.A warm weather shutdown will be activated ducted outside air supply whenever KH-1/EF-1 is in operation.EF-1 operation shall modulate when the outside air temperature is above 40°.A cold weather shutdown will be activated \ Boiler outdoor reset schedule(ORS): based on a control signal from KH-1.During make-up air calls from KH-1>400 cfm(as when the outside air temperature is below-10°. The boiler supplywaterhetemperature(SWT)will varywith outside air temperature(OAT)as determined by current transducer(CT)on fan and TAB contractor),OA and EA motorized P dampers MD-1 will open to 100%and P-11 will vary its speed to maintain the discharge air Snowmelt Pump-Source Side(P-9): \ \ follows:SWT will be measued on the load side of the hydronic loop,downstream of the temperature at HWC-1.MD-2 shall operate with MD-1 to maintain balanced RA flow per These pumps will operate during a call for snowmelt from any of the associated snowmelt boiler injection.SWT will varyfrom 130°F at 0°F OAT to 100°F at 50°F OAT.A call for heating plans.P-11 will be controlled by a discharge air temperature controller to operate when the zones to maintain a 20°F differential across the S/R piping. from the spa shall temporarily increase the SWT to 110°F to satisfy the heating call if the OAT is<50°F,and there is a call for MUA to maintain a DAT of 50°F.When KH-1 is not in tt ORS has determined a lower SWT.The boilers shall be locked out for space heating as operation,EA damper MD-1 shall be closed,P-11 shall be off.The FCU-1 hot water coil will Snowmelt Pump-Load Side(P-10): /ram determined by the system mode of operation. provide additional heating to maintain the space temperature setpoint upon a call for heat This pump will operate during a call from any of the associated snowmelt zones. from the associated zone thermostat. Boilers(B-1,2): Solenoid valves(zone valves): ..="°."nRE Boilers B-1&B-2 will operate to provide heating to the primary hydronic loop and the c Economizer cooling shall be enabled when the OSA temp is at least 3F less than than the The radiant system zone valves will operate open during heating or cooling calls from their c domestic hot water tanks(DHW-1,2).On a call for space heating,the lead boiler shall space temperature and there is a call for cooling.Modulate MD-1 open to maintain a respective thermostats.Provide floor temperature sensors to close valves if the floor operate to maintain the primary loop temperature,based on the Outdoor Reset Schedule minimum DAT of 55°F.The CW valve shall be allowed to provide hybrid cooling during temperatures exceed finished floor Manufacturers recommendations.Bathroom zone valves (ORS).If the lead boiler is not able to maintain the SWT,the lag boiler shall be enabled and airside economizer mode and shall modulate to maintain a DAT of 55F.Disable economizer shall operate to maintain a floor surface temperature of 80°F for a"warm-toes"feel. ;o�°r pD sr/CFHF II modulated together with the lead boiler to maintain the SWT.During a call for heating from cooling when the OAT is equal to or greater than the space temperature. Snowmelt zone valves will operate open during calls from their respective snowmelt �:po° by•.o'rr. DHW-1 or DHW-2,lead boiler operation shall prioritize the call for domestic hot water, TA r controllers/sensors. ,�' y supplying 160°F water to the domestic hot water tanks.The lead boiler shall switch back to Freeze protection:P-11 will operate when the DAT downstream of the coil is<30°F to protect ° 38880 space heating mode once the call from DHW-1 and DHW-2 has been satisfied.The lag boiler . HWC-1 from freezing.A freeze stat located downstream of HWC-1 will have a setpoint of 0°. Spa Source Side Pump(P-18): :.+• Al shall be disabled during a call for domestic water heating. When the t is activated the •. :� 100%speed.The freeze reeze slat shall be capable of an utomatically be turned resetting and -11 will operate at This pump shall operate on a call for heating from the spa equipment(By Others). l�'..$'\,0NA1.EN'' Boiler Pump(P-1): Spa Vault Exhaust Fan(EF-6): / �� This pump will be controlled by boiler B-1 to modulate speed when the boiler is operating to Fan Coil Pump(P-6): This fan shall operate to exhaust the spa vault.Provide the ability to remotely operate fan and provide space heating and maintain a 20°F differential across the inlet/outlet of the boiler. This pump will operate on a call for heating from any associated fan coil unit,and will observe status. 06-10-2022 Boiler Pump modulate pump speed on internal controls to maintain a constant differential pressure across _ B Toil pump will(P-2):be controlled by boiler B-2 to modulate speed when the boiler is operating to the pump,per the Pump Schedule listed flow.Set pump to"Constant Pressure"mode.Initial Spa Vault Unit Heater(UH-1): 234 W.Francis St. pressure setpoint to be programmed during TAB at full flow to each fan coil unit.This pump The heater shall operate to maintain a spa vault space temperature of 50°F. provide space heating and maintain a 20°F differential across the inlet/outlet of the boiler. shall be off when heating calls have been satisfied. 234 W.Francis St. Steam Shower Exhaust Damper(MD-3): Aspen,Co Buffer Tank Hot Water Pump(P-3): Garage Exhaust Fans(EF-3): This damper shall open to provide exhaust to the steam shower.Integrate damper control The buffer tank pump P-3 shall operate to provide heating supply water from BT-1 to the This fan will operate whenever the occupancy sensor is triggered,or the space relative with lighting controls interface. primary hydronic loop.This pump shall be disabled when there are no calls for heating from humidity is>35%RH. REG CROUP the associated zones,or the SWT in the secondary loop is higher than the buffer tank Wine Room Cooling Units(WU-1,2): temperature. Heat Pump Pumps(P-14,15,16,17): These units are redundant and shall alternate operation to maintain equivalent run hours.The R°U P "'" Domestic Hot Water Pumps(P-4,5): These pumps will be controlled by their respective heat pumps to run whenever the heat packaged controls shall maintain the wine room space temperature and relative humidity. "c "r r pump is commanded on. reginc.com•970.349.1216 These pumps will be controlled by the boiler controller to operate when the boiler plant is BAS Points: Consulting engineers B operating to provide domestic water heating on a call from the respective DHW tank. Air Source Heat Pump Sequence(HP-1,2,3,4): Each controlled device shall have the following control points at a minimum: B Mechanical•Structural•Energy Heating mode-Heat pumps shall operate in heating mode as determined by the system • Status Domestic Hot Water Recirculation Pump(P-13): mode of operation.HP's shall operate to maintain the buffer tank setpoint of 122°F.The heat • Start/Stop command(Hardwired) efficiency I sustainability I simplicity This pump will be controlled by its'internal controls to operate when the domestic hot water pump shall be commanded off if the EWT on the load side rises above 125°F.The high/low • Speed return temperature is<110°. temperature limits shall be hardwired to the heat pump to avoid nuisance tripping.Heating • Mode of operation(heating/cooling/economizer) 151ON5 mode shall be disabled when the OAT is above the heating mode setpoint. Dryer Booster Fans(EF-4,5): In addition,numerical values and setpoints listed in the control sequence shall be visible and These fans shall be interlocked with their respective dryer to operate when the dryer is in Cooling mode-Heat pumps shall operate in cooling mode as determined by the system adjustable via the Graphical User Interface(GUI).The boiler plant shall have a networked operation. mode of operation and when there is a call for cooling.HP's shall operate to maintain the connection capable of providing boiler operating parameters. buffer tank setpoint of 50°F in cooling mode.Cooling mode shall be disabled when the OAT is Energy Recovery Ventilators(V-1,2,3): below the cooling mode setpoint. Trends: These units will be controlled by a programmable occupancy timer to operate continuously on Control points listed shall be capable of being trended via the GUI.Trend logs shall be stored low speed.On a call from a control interface located in associated bathrooms,unit will run at Remote chillers-(CH-1,2,3,4)controls shall be integrated with the air source heat pump locally and be accessible remotely.Trends shall be capable of being saved for quick full speed for a minimum of 10 minutes.Integrate ventilator controls with lighting system for a controls to operate whenever the respective heat pump is in operation. reference.Provide local storage capacity to allow for trending of a minimum of 25%of the — common interface. system points at 15 minute intervals for 365 days.Trends shall be capable of being exported Heat pump lockout limits-Install external temperature limit controls in piping thermowells. into.csv format.Commissioning of the HVAC systems shall require a minimum of 14 days HP's will not operate when load side entering water temperature(EWT)at the inlet is>130°F worth of operational data for trending purposes. or<35°F.Upon reaching either the high or low limit lockouts,the units and associated circulation pumps shall be disabled for 24 hours. Alarms: Alarms shall be hardwired to the BAS.Alarms shall be coordinated between Contractor and Ensure a minimum off-time controller is provided to prevent short cycling per Manufacturers Owner and be capable of sending alerts via email.Alarms shall be visible via the requirements. corresponding GUI page of the BAS.Alarm logs shall be stored locally and accessible remotely.At a minimum,alarms provided shall include: • Equipment command does not match status • Space temperature out of range when space temperature is 5°F above/below setpoint for Control Sequences so minutes or greater. SEE NOTES#1 PLANS A A rare 11) 1/2022 9) M001A FORCOMGEMAPIJANCE j ustinh "°. 91/4-=1'-0" Arliss Menell, 2968 I 6 I I I I I I P.E. 1 I 6 I 5 I y I 3 I 2 I 1 I 'Fan Coil Schedule ."EoaoawamE"w,""...a"°FEEEE " Cold Water Cold Water Cold Water S/R Heating Hot Water ID Zone Served Location Manufacturer Model CFM esp(in Voltage Phase Wattage RLA Cooling Cooling Cooling Flow Delta P(ft Cold Water Cold Water Pipe Connection Capacity Heating Heating Hot Water Delta P(ft Hot Water EWT Hot Water LINT Hot Water S/R Pipe Schedule Notes 2020-09-04 Permit Set Number H2O) Capacity(btu/hr) EAT(°F) LAT(°F) (gpm) H2O) EWT("� LWT("F) (In.) (btu/hr) EAT(F) LAT(F) Flow(gpm) H2O) (°F) (°F) Connection(in.) FCU-1 Kitchen Mechanical Room 1 Price FCHG 70 2300 0.5 120 1 2190 19 44,400 80 56 9.1 3.5 50 59 1-1/8 78,500 50 91 13.6 8.7 120 100 7/8 3 row cooling/2 row heating.Provide with extended 1PRIDAY DESIGN drain pan PO Box7928 O 6 row cooling/1 row heating.Provide with extended TEEN.970309066 12 L 95 FCU-2 Theater Mechanical Room 1 Price FCHG 30 450 0.5 120 1 1130 4.9 8,800 80 56 3.9 2.1 50 54 1-1/8 3,000 65 95 0.1 1.0 120 100 7/8 drain pan and steam humidifier in SA duct CONTACT:DEREK SKALKO E FCU-3 AV/IT Mechanical Room 1 Price FCHG 40 760 0.5 120 1 1130 5.1 17,700 85 56 5.6 2.7 50 56 1-1/8 - - - - - - - - 6 row cooling.Provide with extended drain pan E BLUEGREEN BLO 6 row cooling/1 row heating.Provide with extended 3 S. O,.SPRIN6GST SUITE202 FCU-4 Living Room Mechanical Room 1 Price FCHG 30 450 0.5 120 1 1130 4.9 8,700 80 56 3.9 2.1 50 54 1-1/8 3,000 65 95 0.1 1.0 120 100 7/8 ASPEN, drain pan and steam humidifier in SA duct TEL 5sW9 CONTACT:SHERI SANZONE FCU-5 Garage Bedroom Mechanical Room 1 Price FCHG 20 250 0.5 120 1 830 3.3 4,600 80 57 1.6 0.8 50 56 1-1/8 2,100 65 95 0.1 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended „,�,°„E,,A„o" drain pan and steam humidifier in SA duct 6 row cooling/2Provide with extended 300 S.SPRING ST.SUITE 202 row heating. FCU-6 Mechanical Room Mechanical Room 1 Price FCHG 20 350 0.5 120 1 830 3.3 6,700 80 56 3.0 1.6 50 55 1-1/8 7,500 65 95 0.3 0.4 120 100 7/8ASPEN,CO 81611 drain pan TEL 970.925.2855 CONTACT:SARA ADAMS FCU-7 Bedroom Mechanical Room 1 Price FCHG 20 250 0.5 120 1 830 3.3 4,600 80 57 1.6 0.8 50 56 1-1/8 2,100 65 95 0.1 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended ",",E„","E,„ drain pan and steam humidifier in SA duct non UUUrU Vr ENG RUURiRG 6 row cooling/1 row heating.Provide with extended ci'EN6w`A000 SPRINGS,CO a;ao FCU-8 Bedroom Mechanical Room 1 Price FCHG 20 200 0.5 120 1 830 3.3 3,700 80 57 1.5 0.8 50 55 1-1/8 1,700 65 95 0.1 0.1 120 100 7/8 drain pan and steam humidifier in SA duct TEL.970.925.2855 SPRI 1 CONTACT:ROGER NEAL FCU-9 Laundry Mechanical Room 1 Price FCHG 40 700 0.5 120 1 1130 5.1 12,930 80 57 4.3 2.0 50 56 1-1/8 2,100 65 95 0.1 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended s�u�aw.EOE"o..�w - drain pan -RESOURCE ENGINEERING GROUP FCU-10 Bedroom Mechanical Room 2 Price FCHG 20 200 0.5 120 1 830 3.3 3,700 80 57 1.5 0.8 50 55 1-1/8 1,700 65 95 0.1 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended TTEL:7ED 9.1216 AVE, drain pan and steam humidifier in SA duct CON ACT:AUGUST HASv0ORSON HARPER FCU-11 Cabin Mechanical Room 3 Price FCHG 20 350 0.5 120 1 830 3.3 6,700 80 56 3.0 1.6 50 56 1-1/8 6,600 65 95 0.1 0.4 120 100 7/8 6 row cooling/2 row heating.Provide with extended ..,,,,,,...."a drain pan and steam humidifier in SA duct UOBSERU00OIRE INTERNATIONAL 120 WALKER STREET,7E FCU-12 Massage Mechanical Room 4 Price FCHG 20 200 0.5 120 1 830 3.3 3,700 80 57 1.5 0.8 50 55 1-1/8 1,700 65 95 0.2 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended NEW 1o255C4E5 YORK 10o13 drain pan CONTACT:CARLINA°MACI FCU-13 Spa Lounge Mechanical Room 4 Price FCHG 20 150 0.5 120 1 830 3.3 2,500 80 59 0.8 0.4 50 57 1-1/8 1,300 65 95 0.1 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended O drain pan orm 67 WEST n TST 0527 FCU-14 Gym Mechanical Room 3 Price FCHG 20 350 0.5 120 1 830 3.3 6,700 80 56 3.0 1.6 50 55 1-1/8 3,200 65 95 0.4 0.4 120 100 7/8 6 row cooling/1 row heating.Provide with extended RROOU 396.00E 5 YORK 11222 drain pan CONTACT:MATT EMMI o FCU-15 Study Mechanical Mezzanine Price FCHG 20 250 0.5 120 1 830 3.3 4,600 80 57 1.6 0.8 50 56 1-1/8 2,100 65 95 0.2 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended D E1M1RO°�ENCLOS drain pan and steam humidifier in SA duct W ENCLOSURE L AVENUE, LLC 75L WEST KEN CAROL AVENUE,SUITE F308 FCU-16 Master Bedroom Mechanical Mezzanine Price FCHG 20 200 0.5 120 1 830 3.3 3,700 80 57 1.5 0.8 50 55 1-1/8 1,700 65 95 0.2 0.1 120 100 7/8 6 row cooling/1 row heating.Provide with extended TEEL:303.63.186Ls°>URO601T1 drain pan and steam humidifier in SA duct CONTACT:EVERETr VERSCHAVE ACOUSTIC COHSULTMT EREMOSO,NY1 01 SUCS ACOUSTI NEWBRITE 202 TEL:.06502235 CONTACT:RYAN GRAYS(GLOTZBECKER) I Cooling Equipment Schedule SPACONs°"`"' 11301 W.43RD DROSUITE NIo C Heating Capacity GOLDEN,COLORADO 80903 ID Description Manufacturer Model Number Cooling Capacity(Btu/hr) Voltage RLA Schedule Notes TEL:720.693.81ae (Btu/hr) Phase CONTACT:ANDY LACELLE CH-1 Refrigerant to water remote chiller LG ARNH423K2A4 42,100 47,200 1 240 0.1 Provide with packaged controls °. - CH-2 Refrigerant to water remote chiller LG ARNH423K2A4 42,100 47,200 1 240 0.1 Provide with packaged controls - CH-3 Refrigerant to water remote chiller LG ARNH423K2A4 42,100 47,200 1 240 0.1 Provide with packaged controls \�\ CH-4 Refrigerant to water remote chiller LG ARNH423K2A4 42,100 47,200 1 240 0.1 Provide with packaged controls HP-1 Outdoor heat pump LG ARUNO6OGSS4 60,000 64,000 1 240 25.4 Provide with low ambient and low noise kits HP-2 Outdoor heat pump LG ARUNO6OGSS4 60,000 64,000 1 240 25.4 Provide with low ambient and low noise kits \ \ HP-3 Outdoor heat pump LG ARUNO6OGSS4 60,000 64,000 1 240 25.4 Provide with low ambient and low noise kits HP-4 Outdoor heat pump LG ARUNO6OGSS4 60,000 64,000 1 240 25.4 Provide with low ambient and low noise kits WC-1 Wine room cooling unit Wine Guardian DP50 3,820 - 1 120 9.0 @ 90F condenser air inlet temperature,provide with humidifier option N WC-2 Wine room cooling unit Wine Guardian DP50 3,820 - 1 120 9.0 @ 90F condenser air inlet temperature,provide with humidifier option c \VV�/// c Heating Equipment Schedule ID Description Manufacturer Model Number Heating Capacity(kBtu/hr) Voltage Poles RLA Schedule Notes ;-obr oD ST/CF42,;,, B-1 High efficiency modulating boiler Lochinvar WHB399N 377 120 1 4 Provide with condensate neutralization and concentric vent kits . :pJ �9•••• 'r'' B-2 High efficiency modulating boiler Lochinvar WHB399N 377 120 1 4 Provide with condensate neutralization and concentric vent kits 38880 i UH-1 Electric space heater Per Contractor 3.4 240 2 >20 Provide with space temperature control for operation A,,•i• ./ !�,/ONAL fN��_�'. Hydronic Zone Schedule 06-10-2022 - ID Description Floor Finish Floor Substrate Tubing Area Radiant Tube Zone Loop Length Loop Hot Water EWT Zone Flow Zone Pressure - 1st) Load(btu) Spacing Tubing ID (ft) Count SIR Pipe ID (°F) (GPM) Drop(ft hd) 234 W.Francis St. 1 Bathroom tile slab 34 635 12" 1/2" 40 1 1/2" 100 0.1 0.2 234 W.Francis St. 2 Bedroom carpet slab 191 3055 6" 1/2" 140 3 3/4" 120 0.3 0.4 Aspen.CO 3 Bedroom carpet slab 2535 6" 1/2" 5 3/4" 120 0.30.3 R E G 4 Bathroom 42 95 1 tile slab 42 875 6" 1/2" 1 1/2" 100 0.11 0.5 5 Theater/Hall wood slab 608 7384 12" 1/2" 170 4 3/4" 100 0.6 0.7 6 Powder Room tile slab 18 360 12" 1/2" 20 1 1/2" 100 0.1 0.1 __r.... R N CROUP 8 Laundry/Storage wood slab 231 5614 12" 1/2" 130 2 3/4" 100 0.4 0.8 10 Bedroom carpet slab 336 4368 6" 1/2" 185 4 3/4" 120 0.5 0.7 reginc.com•970.349.1216 11 Bathroom tile slab 41 993 12" 1/2" 45 1 1/2" 120 0.1 0.2 consulting Engineers B 12 Gym mats slab 358 4654 6" 1/2" 200 4 1" 120 0.5 0.7 B Mechanical•Structural•Energy 13 Spa Lounge tile slab 75 1073 12" 1/2" 85 1 3/4" 100 0.1 0.3 efficiency I sustainability I simplicity 14 Powder Room tile slab 16 363 12" 1/2" 20 1 1/2" 100 0.1 0.1 ,°„ 15 Sauna tile slab 42 410 12" 1/2" 50 1 1/2" 100 0.1 0.2 16 Steam Shower tile slab 38 475 12" 1/2" 45 1 1/2" 100 0.1 0.2 2021-04-02 COA BUILDING PERMIT 17 Massage tile slab 114 2870 12" 1/2" 130 1 3/4" 100 0.2 0.4 2022-01-07 COA BUILDING PERMIT 2022-06-10 COA BUILDING PERMIT 18 Powder Room tile gyperete 11 385 6" 1/2" 25 1 1/2" 120 0.1 0.1 19 Entry tile gyperete 106 3450 6" 1/2" 120 2 1" 120 0.4 0.2 20 Kitchen tile gyperete 296 7000 12" 1/2" 165 2 1" 120 0.6 0.3 21 Entry Hall tile gyperete 289 6231 6" 1/2" 160 4 1" 120 0.7 0.7 22 Garage concrete slab 468 8217 12" 1/2" 175 3 1" 100 1.0 1.7 - 23 Living Room tile gyperete 367 9175 6" 1/2" 205 4 1-1/2" 120 1.3 1.4 24 Bathroom tile gyperete 42 1470 6" 1/2" 95 1 1/2" 120 0.2 1.1 25 Bedroom tile gyperete 372 4836 6" 1/2" 205 4 1" 120 1.0 1.9 26 Master Bathroom tile Warmboard 59 1788 12" 1/2" 65 1 1/2" 120 0.1 0.6 27 Study carpet Warmboard 257 6425 12" 1/2" 95 3 1" 120 0.3 0.2 28 Master Bedroom carpet Warmboard 137 1781 12" 1/2" 75 2 3/4" 120 0.1 0.2 29 Bedroom carpet Warmboard 300 3900 12" 1/2" 85 4 3/4" 120 0.3 0.3 30 Bathroom tile Warmboard 35 885 12" 1/2" 40 1 1/2" 120 0.1 0.2 31 Steam Shower Walls tile Warmboard 206 1689 12" 1/2" 60 4 1/2" 100 0.2 0.8 Mechanical Schedules A SEE NOTES#1 PLANS A Snowmelt Zone Schedule IREVEWV � ID Description Finish Material Substrate Tubing Area Zone Load Tube Zone Loop Length Loop Hot Water EWi Zone Flow Zone Pressure Material (sf) (btu) Spacing Tubing ID (ft) Count S/R Pipe ID (°F) (GPM) Drop(ft hd) 07/21/2022 M002 S1 Entry snow slab slab 111 27250 9" 5/8" 110 3 1" 100 2.0 3.8 S2a Garage paving snow slab slab 302 37750 9" 5/8" 150 3 1-1/2" 100 2.7 3.6 FORctEXMLIANCE S2b Garage beyond property line snow slab slab 43 5375 9" 5/8" 65 1 1-1/2" 100 0.4 0.9 iustinh S3 Spa snow slab slab 436 54375 9" 5/8" 160 4 1-1/2" 100 3.9 5.8 "°",.- S4 Cabin snow slab slab 123 15625 9" 5/8" 90 2 1" 100 1.1 1.8 _ - - Arliss Merrell, 2968"o I 7 I 6 I 5 I 4 I 3 I 2 I 1 I P.E. 1 7 I 5 I s I 4 I 3 I 2 I 1 1 Ventilation and Exhaust Fan Schedule 2022-06-10 COA BUILDING PERMIT ID Description Location Manufacturer Model Number N20) CFM Voltage Phase Watts Notes ,PRIDAY DESIGN PO BOX 7928 EF-1 Kitchen hood fan Mechanical Mezzanine Greenheck SQ-140-VG 0.5 2265 120 1 1840 Provide with Vari-Green speed controller integrated with KH-1 operation ASPEN,CO895 16612 TEL'97EF-2 Mechanical room exhaust fan Mechanical Room Greenheck CSP-A390-VG 0.5 300 120 1 80 Interlock with FCU-6 operation CONTACT:DEREK SKALKO E EF-3 Garage exhaust fan Garage Panasonic FV-10NLF1 E 0.2 120 120 1 30 Provide with humidity and occupancy sensor control E BLUEGREEN BLO EF-4 Dryer booster fan Mechanical Room Fantech DBF110 0.5 100 120 1 80 Interlock with dryer operation 3300 S.SPRIgG611 ST SUITE 202 EF-5 Dryer booster fan Mechanical Room Fantech DBF110 0.5 100 120 1 80 Interlock with dryer operation TEL.0 50575l SANzoNE EF-6 Spa vault exhaust fan Spa vault Fantech FR100 0.5 50 120 1 20 Provide with relay for two speed operation based on space temperature " R..,,,,,,oR KH-1 Kitchen hood Kitchen Per Architect 2265 120 1 0 300 S.SPRING ST.SUITE 202 V-1 Energy recovery ventilator,serves FCU-2,7,8,10 Mechanical Room Greenheck Minicore-5-VG-FM 0.5 300 120 1 667 Operate continuously on low speed to meet ventilation requirements ASPEN,CO81611 TEL 970025.2855 V-2 Energy recovery ventilator,serves FCU-4,5,15,16 Mechanical Room Greenheck Minicore-5-VG-FM 0.5 200 120 1 667 Operate continuously on low speed to meet ventilation requirements CONTACT:SARA ADAMS V-3 Energy recovery ventilator,serves ECU-11,12,13,14 Mechanical Room Greenheck Minicore-5-VG-FM 0.5 300 120 1 667 Operate continuously on low speed to meet ventilation requirements """"'"`o) HIGH COUNTRY ENGINEERING 1517 BLAKE AVENUE,SUITE 101 GLENWOOD .PRANGS,CO 81601 TEE: Diffuser Schedule CONTACT:ROGER NEAL wepoo —RESOURCE EENGINEERING GROUP ID Description Manufacturer Model Number Notes CRESTED BUTTE,CO SUITE244201 TEL:970.J49.1216 EA1 Bathroom exhaust grille Price SDS100,2 Slots,Type 8 Concealed fasteners and mud flange T HAsz°0°SON HARPER .A.ovvEpo EA2 Open to duct - - Open to duct 0 PORSERVATOIRE INTERNATIONAL EA3 Kitchen hood exhaust air louver Greenheck ESD-603 Coordinate finish with Architect,provide with insect screen 120 WALKER STREET,7E NEW YORK5 NEW YORK 10013 EA4 Exhaust air louver Greenheck ESD-202 Coordinate finish with Architect,provide with insect screen TEL:212.25.4463 CONTACT:CARLINA°MAC! EA5 Garage exhaust air grille Price LBPHISA Coordinate frame and finish with Architect ..CT„,,..µ. OA1 Outside air louver Greenheck ESD-202 Coordinate finish with Architect,provide with insect screen ONESUTTON RA1 Stamped lattice return air grille Kees Lattice LA050 Brass frame and finish with concealed fasteners and flange,coordinate details with Architect,dimensions called out are minimum associated with core area of grille BROOKLvs w YORK 11222 TEL:9176.0025 RA2 Open to duct - - Open to duct CONTACT MATT EMMI SA1 Stamped lattice supply air diffuser Kees Lattice LA050 Brass frame and finish with concealed fasteners and flange,coordinate details with Architect,dimensions called out are minimum associated with core area of grille `""'°"CONSUL-DM ° SA2 Open to duct - - Opening in bottom of duct ° nSTKENCOEUEsE WE ENCLOSURE u r F308 SA3 Stamped lattice supply air diffuser Kees Lattice LA050 Brass frame and finish with concealed fasteners and flange,coordinate details with Architect,dimensions called out are minimum associated with core area of grille LTEL:ITTL Ta°8'3.186 COOLORADO80127 CONTACT:EVERETr VERSCHAVE ACOUSTIC COHSULTMT EREMOS ACOUSTICS 1270 BROADWAY,SUITE 202 NEW YORK,NY 014 Hydronic Loop Schedule TEL:696650.2235CONTACT:RYAN GRAYE(GLOTZBECKER) Auto-Fill %Antifreeze by Operating Relief ""`°'su`TµT ID Description Manufacturer Model Number Feeder volume F.P.(°F) B.P.(°F) pressure(psi) pressure(psi) 1i301 w.a3ae POOL DESIGNS XT-1 Heating water loop expansion tank State ET-20 AF-1 30 9 -10 12 30 GOLDEN,COLOR DO 80403 XT-2 Snowmelt loop expansion tank State ET-10 AF-2 50 -27 -60 12 30 NTTAACT:ANDY tACELLE AEA A — XT-3 Chilled water loop expansion tank State ET-20 AF-3 30 9 -10 12 30 — XT-4 Domestic water expansion tank State ETC-10X - - 32 32 55 80 \E\ Additional Mechanical Equipment Schedule \ ID Description Manufacturer Model Number Notes AF-1 Heating loop glycol feeder Axiom MF200 N AF-2 Cooling loop glycol feeder Axiom MF200 AF-3 Snowmelt loop glycol feeder Axiom MF200 4/// AS-1 Hydraulic air/dirt separator Caleffi NA549082A ;-^.."°"^TIRE AS-2 Magnetic air/dirt separator Caleffi NA546080AM C AS-3 Magnetic air/dirt separator Caleffi NA546080AM _BT-1 Heating buffer tank Lochinvar SBT119 o`o..•p ust/CF.y'rFrii BT-2 Cooling buffer tank Lochinvar SBT119 ;cI.,'" po° by;o r� CS-1 Circuit setter Caleffi Quicksetter 321 Line size for the corresponding flows listed in the equipment schedules,provide submittal for Engineer's review i 'c 38880 T•1 DHW-1 Sidearm domestic water heater Lochinvar SIT119 ; .. Alij DHW-2 Sidearm domestic water heater Lochinvar SIT119 t o•• H-1 Steam humidifier seving FCU-2 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) 4'-1l!'\/Oryp•EN_G\ H-2 Steam humidifier seving FCU-4 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) 3� H-3 Steam humidifier seving FCU-5 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) 06-10-2022 H-4 Steam humidifier seving FCU-7 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) — H-5 Steam humidifier seving FCU-8 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) 234 W.Francis St. H-6 Steam humidifier seving FCU-10 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) H-7 Steam humidifier seving FCU-11 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) 234 W.Francis St. Aspen.CO H-8 Steam humidifier seving FCU-15 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM) H-9 Steam humidifier seving FCU-16 Neptronic SKR14 120V,12A,1400W,Provide with modulating control and short absorption manifold(SAM)HWC-1 OA hot water coil Temptrol 5WC-8-21x20x4-8AL 120F EWT,50F DAT,2900 CFM,197 MBH _ R E G CROUP HX-1 Snowmelt heat exchanger Triangle Tube TTP4-30 137 MBH,120F/100F EWT/LWT,10 gpm source side;100F/70F LWT/EWT,10 gpm load side MD-1 Thermally broken control damper and frame Greenheck ICD-45 Provide with 0-10V modulating actuator R°U P MD-2 Opposed blade control damper Greenheck VCD-33 Provide with 0-10V modulating actuator reginc.com•970.349.1216 MD-3 Spa exhaust control damper Greenheck VCD-33 Provide with 0-10V modulating actuator Consulting Engineers L MV-1 3-way motorized mixing valve Belimo B312 Provide with 0-10V modulating actuator B Mechanical•Structural•Energy MV-2 3-way motorized mixing valve Belimo B317 Provide with 0-10V modulating actuator MV-3 3-way motorized diverting valve Belimo G765 Line size,provide with programmable MFT actuator efficiencyaMetainability simplicity MV-4 3-way motorized diverting valve Belimo G765 Line size,provide with programmable MFT actuator .E..aC ST-1 Wye strainer Per Contractor Per Contractor Line size for the corresponding flows listed in the equipment schedules,provide submittal for Engineer's review 2022-06-10 COA BUILDING PERMIT SV-1.typ. Solenoid valve Per Contractor Per Contractor Line size for the corresponding flows listed in the equipment schedules,provide submittal for Engineer's review Pump Schedule ID Description Manufacturer Model Number Voltage Phase Wafts RLA Delta P(ft — Flow(GPM) H20) P-1 Boiler B-1 pump Grundfos UPMXL(with boiler) 115 1 0 >7 38.0 7.0 _P-2 Boiler B-2 pump Grundfos UPMXL(with boiler) 115 1 0 >7 38.0 7.0 P-3 Buffer tank HW pump Grundfos Magna340-80F 115 1 285 2.6 40.0 5.0 P-4 DHW-1 pump Grundfos UPS 26-99FC,Speed 2 115 1 179 1.5 14.0 11.5 P-5 DHW-2 pump Grundfos UPS 26-99FC,Speed 2 115 1 179 1.5 14.0 11.5 P-6 Fan coil HW pump Grundfos Magna3 40-80F 115 1 285 2.6 18.2 20.7 P-7 Radiant zone pump Grundfos Alpha2 15-55F 115 1 45 0.7 2.9 9.7 P-8 Radiant zone pump Grundfos Alpha2 26-99F 115 1 120 1.7 6.7 10.2 P-9 Snowmelt HX source side pump Grundfos UPS 26-99FC,Speed 2 115 1 179 1.5 12.6 10.1 Mechanical Schedules P-10 Snowmelt HX load side pump Grundfos UPS 26-99FC,Speed 2 115 1 179 1.5 9.9 13.6 SEE NOTES#1 PLANS P-11 HWC-1 pump Grundfos Alphal 26-99FC 115 1 197 1.8 20.8 8.8 A P-12 Fan coil CHW pump Grundfos Magna3 40-80F 115 1 285 2.6 42.7 14.7 r,„'l..a- �{}��'P-13 Domestic hot water recirc pump Grundfos Alphal 15-55SF 115 1 45 0.7 5 10Lam, 'L�P-14 HP-1 pump Grundfos Alpha226-99F 115 1 120 1.7 10.4 18.7 21/2022 liM003 P-15 HP-2 pump Grundfos Alpha2 26-99F 115 1 120 1.7 10.4 18.7 _P-16 HP-3 pump Grundfos Alpha226-99F 115 1 120 1.7 10.4 18.7 -justinh P-17 HP-4 pump Grundfos Alpha226-99F 115 1 120 1.7 10.4 18.7 P-18 Spa source side pump Grundfos Alpha2 26-99F 115 1 120 1.7 15 13.2 P,°,a SOPIE Miss Merrell, 2988"O I 7 I 6 I 5 I 4 I 3 I 2 I I I P.E. I 7 I 6 I 5 I 4 I 3 I 2 I— 1 I O Chillers mounted on rack attached T • ,"a�oawam"wa ...a�"o°'E�oarGLxwm. '"11 22to floor,coordinate vibration2 5 6 M202 isolation requirements with 2020-09-04 Permit Set Acoustical Engineer Fan coils in main mechanical room are primarily _ horizontal units hung from above in order to provide t1� Coordinate duct routing to avoid ducts above Lo«.6ax,R floor space and ease of access from below 410 electrical panel locations,typ.Reference I 1FRIDAV DESIGN electrical drawings for additional information PROJECT NOTES Po Box 7928 IASPEN.CO.061z Q __ -1 �11� __ 380 CFM 1 •Dashed line represents outline of in-floor radiant heating zone.See Hydronic Schedule for �rcsrcuxo \ Provide rack mount above II `7� '-' , ®®®®®� 30x8 --r -•II additional information.Omit radiant tubing under refrigerators,coolers,freezers or other CONTACT:o E floor for glycol feeders - CH 1 ;CH 3 r 11 similar appliances.Omit mdiant tubing from mechanical,wine storage or AN spaces,typ E Soo n SPRING aLo ��1xCCC}TTT 11 BLUEGR CO01611 SUITE 202 Distribute SA for c I, CH-2 CH-4+®% IiG9 /,1,11 O2 Install boiler per manufacturer's recommendations,including:access clearances,vent ASPEN o 81611 ' rA -- 99®"-I� "- . 80 CFM pipe sizes/materials,system fill water quality,electrical disconnect.Slope vents back to TEL:alosass0n 1 Mechanical Room cooling 0 3- Electrical/AV �� CONTACT:SNERI SANZONE 1 q•F-3 III v ■ FCU-3 z'• j boiler.Provide condensate neutralitation kit and route to nearest floor drain/sink in H1f0000 ca,,aos 1 ---_ ■ ■ _ r 0(8^ Mechanical Room. 4.394 Refer to view references at II 12"x6" aspen.ADAMS each fan coil for detailed duct II • ®_� 1 .. III O 1 b,{�¶¶ 300 S.SPRING ST.SUITE 202 ■ ■lam H 2 L - ■ {¶ O3 Clearly label equipment with ID tags shown in these plans and provide appropriate access ASPEN,,CO 81611 routing of each fan coil system ii Imo. I 41 - 1 o - TEL:e7.azs.zass ■, - for installation and maintenance,typ. CONTACT:SARA ADAMS �� ^ H-q 380 CFM r 80 C_FM Connect OA to Mechanical Room FCU,provide ......,".. • -1 EF-2 Ir=, ,,,,, OA damper at connection[o main OA trunk iliii. 'C7, -• r.'._ q Symbol represents a typical flush-mounted rediant zone manifold with access panel. NicN courvnn ENciNEERwc with economizer noolin for ' =J >,/�1I-�,II30'x8" ®il 30"x8" O Arrows denote recommended access direction.Coordinate locations and access panel 1517 BiAKE AVENUE,SUITE 101weIr601 Mechanical Room fan gil I t r - �= G 17BLAK O VENUE,,coa101IIIII11-16"x10'" �',;,p Coordinate duct routing in field with steel column in this area detailing with Architect,typ.space and wine unit heat 3,f - HW01 CONTACT:ROGER NEAL reaction 'hanical 1 0 Hi. a''- Direct bury OA duct,BlueDuct or similar. 850 CFMG MEpE oN�• rejection) .= x ® �� e m OA in window well •5 Hatched area represents outline of in-slab radiant snowmelt zone.See Snowmett Zone Iti P- . 1 .. I _ s,/ Y ® 30"x48" 1 1 Schedule for additional information,typ. — '�•I rSJ■I.1 lC7LR.11♦�w I`N �- —4260URCEWAENGINEERING,SUIT GROUP Ir B 1 i_ IaJ:YL IG1R1:� `x',�' �' �'�II N��� c .♦• .. Electric heat trace in .0. 4z6 aeuEv ew AVE SUITE 1 L III F_S CU 7 FCU 1 i. 20 x20 ■il � snowmelt moisture and temperature sensor location,place control wire in conduit to allow caEsrEo eunE co 61224 p •^F IIIIV d © 4 for replacement of sensor.2 ♦ window wells,reference TEL:W03491216 B 0 _ _ �-7 ITi ll 'till ■ Ir,Ze�■G��1� � �rr�7■`� ■ _ electrical tans for - - - - - - L �SGG raAsvDoosory HARPER :_••Mao2 ,-:.-_ -�Ih. �w..cl.� p CONTACT:AUGUST Nral9E■�L��Jlr'■r1 �I��!■ e0' • additional information 7 Coordinate grille,diffuser and sensor locations and elevations with Architect and Interior D er boosterfans, DHW1 •'='-'11 8mtl h1293/8 6 _,y,i.�1� _� .�� v��l ,.' ^� UOBSERVATORENTERNARONAL rY !l111---4{ill - -_ _ iii Designer.typ. �/ 1mwAucER STREET 7E provide notation of total .1111 N J I +�'r I� 400 CFM ,$�4 0 r. _ •/ %�/ ° t _ NEW YORK NEW YORK 10013 1�. - _ oe», _ _II [ .l_ ■ r a� ,��Ili installed equivalent length 1 r■= 20- s /� RA .' 12 x6 ®Connect OA to RA of Laundry FCU,provide - - - � - - g Install temperature sensors on interior walls,away from sources of heat.Coordinate final TEL.23M = at dryer location IlyI�'-,DHW-2 • 6d1 —' motorized OA damper connection to main -'.,1 \ - O corvrncr CARE rvA GERAa rY µ{«;;_ 116• �„8';IIp�I;i EF-5 14 xo10 1811� 1 pe _ I "._ locations with Architect and Engineer. •�.mu,•,�, ffIHHH • ,; _ ohm ri `O - g �1' I�� OA trunk I I - Route below grade to outdoor MD 8' XT- L L '' - _ Il �G� \ mechanical enclosure,terminate within • oNEBUTrON 111E ^-101.' Emilia 75 CFM- g Provide cable actuated balancing damper at each take-off from trunk duct or a maximum e7wesr sr esz7 T �1 �Il�i1!�1 ..� - i IJ■ a Laundry RA in millwork above I �: -• enclosure above snow line or 36" of 10'from Title.Mount damper actuator end of cable behind face of Rile. H 11 ���!!!�' �1 � � IN� binets) b d hih i tg P 9 tYP XII Steamhumdifie utmo1 Dcts routd in/throghtructure above.® • II! EI •I ! ® �I L i .; down maintain l0 clearance from D avuE '9uL*^•^ 4' ■ 'I I. i�r t,■• I t �a• L. intakes to the building 11 Ducts routed In dropceiling cave above. D ENCLOSURE CONSULTING LLC P pumps `` • - _12"16 4 FCU-9 . I ® I I I JI.. 9 cavity LITTLETON.COLORADO 80127 AVENUE,11757 WEST KEN CARYL SURE F306 Pipes and um s ` 't 12"x6" mounted on wall here I • 1 U-8 Maoa L ,� 300 CFM I 1 C Terminate make-up air duct above grade within 1 12 Provide 1/2"min.duct liner in rectangular ducts,or per acoustical report TEL:303.763.1863 ■ \ IMaDZ'-�� r a -_ Sz-., Bedroom I I Balh I,.., O lansca in with gooseneck and insect screen CONTACT:EVEmRErr vERscRAVE / 19 P 9 9 recommendations,whichever is more restrictive.Ducts to be 26 ga min.,continuous for la -1 2 j�— - �i`* 36"x5" I"■ .�r�� N444FFF ICI■ ■' Laundry �r 6;i I t 0 1 11 I EF-6 ant re system Duct dimensions shown are inside clear,typ.Air-side equipment must have II III[.,,71 IIp�Nr 1 Route vault exhaust and rectan duct for 10'downstreamlu pp y EREMos Acousr cs Lower Level ERV �A ■111iiJhI guar pstream of unit su Irelurn connections before 1z7o Baonownv su TE 2oz II �Q�• ��_„■ M I 1 I make-up air ducts with PVC transitiomng to round duct is permitted. NEW YORrc NY 10014 1 ,.� �_ , I TEL 6466502235 Redundant wine M30 �,�I CONTACT RYAN GRAYE(GLOTMECKER) cellar units on rack i e. p O. Insulate OA duct with a minimum of 2"duct wrap(R-6)to avoid condensation. sP. :"L..,. H 1 �11 •200 CFM ''b SA diffuser in face of millwork above cabinets 11 , ( I` 'iUH-1 • .T -' Provide access panel for h dronic ®�� C c1301 W.2 POOL DESIGNS 410 1 manifold in Laundry millwork 1 , 14 Install air-side equipment per manufacturer's and acoustical report recommendations. •�� _I p y �kill -a • 11301 w.a3RO OR.,SUITE IRO 1 rli 1 , I mil' �• Provide 1"min.deflection springs rated for unit weight as vibration isolation,electrical GOLDEN COLORADO 80403 '�I't_�G■ e""' \M 30"x5" - r q ry I -, , disconnect,condensate drain,flexible duct connections at unit,adequate coil,filer and TEL:7z0ssa.aias Wine units are redundant, r�T \ 1u - - - / Route exhaust to within l2"of finished vault floor q CONTACT:ANDY LACELLE provide backdratt dampers 1 �!, ■ ! Route ductwork around sleet column I motor access,and condensate drain(where required).Where needed,coordinate ceiling ^ - access panel in field and with Architect,typ. - at duct connections to each . ilk, Ir 12"x8" t40"x8" { ®250 CFM' - unit to allow for alternating 1 e� r Line of spa equipment vault,spa operation II Wine Cellar I •iga"- �r� �� I ® pt. design and equipment by Others O. Provide 4'of flex duct or acoustical lining at duct connect ons to grilles. p ®10i i O •111.71tiiL tIi1111111 200 CFM a � p ' - - - O. Fireplace system by others.Provide exhaust,combustion,and make-up air as necessary N ( ('` 1 "x4'. - - III �__ r - C -_ _ - -- -. �� _ - —for the specified equipment to meet code and manufacturer requirements,tyP IU - TI.1.17,11!.. 300 CFM r� ..,1 11:1 SA1Insulate wall 1•''!, • I „ 17 Space reserved for hydronic equipment(pumps,radiant man'rfolds,valves,expansion `•I •• 10'x8" I20"z10" I r tanks and appurtenances.) \ \. .. C 100 CFM Wig'.,._II 1117It1] Ir.It.1 1■1IF � 1' II\ -- 300 CFM •1 I O. Terminate vents a minimum of 36"above adjacent grade.Maintain minimum separation of N 1 12"04" •- - . I� 10 linear feet between EA vent terminations and OA intakes. 1•�B 1 I 36'x5" ®I El 1 I I �--RA grille in ceiling,centered above door Wine Cellar grilles in bottom j. . �I , I Laundry SA d ff SETS g 1 I I 0r 19 Spa design and detailing by others. of ducts above lattice ceiling 1•)` 100 CFM r alp Red with face f pp cabinets -- Route duct in drop above Theater entry,locate �i}y�� 1 -•b.©�� - - I SA diffuser high on face of wall 1 'VIV' .L.....,,,. 0 c 1 °-• ,p 12�x4„ _ 1 _. I_ 7 9 I c I: __ r Provide temp sensor for ice - A m wall at floor 1i�v I 1 x machine closet in RA duct I B I I ' li I��~ - F-� m' G m ventilator 8"e __�pNDO IICFti'i1 1 Hall RA m ceiling 520 CFM -� y 1 x18 - Lfl i I I \ r so CFM el ❑® 5 ❑® ` 0 " •: t/ i °I° I ® 1e'xz^ NI 0 Thor �1r�1 10 1a I*N 't'% 38880 1 ) ' Roo;er T Keep ducts off wall to maintain — :I.: i M� D.5 �o I `�V-� m e �a� D.5 ��i L��iauni EH__ ° 1 panelclear nce erencabove a lectri al �I , FC i 12 r 1 014 panels,reference electrical r, _ 1 �� ��r.,. I p m 06 10 2022 ■ �II 0 drawings for additional n _I _� @@@ I s11I� rl • I 1� " m 1 L information I - P 450 CFM �.mi Aim . l � IF' ■L l,�.. — I RA1 llllllluuiul 9 e zs' 4'`; [4^i FCU 13� 234 W.Francis St. ,.--_IJ 1- �� 1 Provide amiable temperature sensors Steam shower ezhaust = p1 air. -,7,..-TA.„ -I ' 40"x8"- .i'♦♦.,O" .1 1 ",tp®-- -I in bathrooms/or'/at control ---- damper CFtMn _ ' 'dI--'hanJcal4 t y 1 Bedroom It e� ��� .I[. ! g _ .. .:., MD ..� L�- �i 2s4 W.Francs St. ® - "� I ���� ♦ t h��I-- Surface mount manifold on wall per C Aspen,CO I r 11■d I■ © acoustical report recommendations �@ !�.__ 10 x4" IL-- I �����O ''© �'�. ' powder Roo RA2 I . "Y`e■ Os. - � 14.► ..nova xa .._ J _ 'OM i� . J I - ter. .._..._..___- r I r - p���. ►— — 50 CFM �ii�3 .�� m R E G Mil 0'x4 i r I i•�1°� LIB' L 718 x2 �� >s 11 w L 1 / _ ,—/� I 12"x6' ` I I , Provide 1'acoustical liner on CROUP ,u^E N 0 ® ®200 CFM- - , L ".�V/ RA duct per acoustical report 8 x26 "rLbL 1 ■ reginc.com•970.349.1216 "1 Al I '' 30"I s" Bath 1 ,1 I 400 CFM Center SA diffuser in I 150 CFM ��^��' _ 1 ■L� ,I x I I -- -W_ ` I millwork above door 100 CFMI t- r 150 CFM F_I1I 150 CFM �r / 1 T,, 10"x10" Cons tn9 En9rneers I I 11IY - - - - - O /' O ® 48"z5" ® ® Spa Lounge In B Mechanical ui Structural•Ener9Y mmu B a n r 30"x5" r 1 coordinate detailing with Architect 12k6 ��x5 �� ✓� M ssag= 24"z4" 1 vV 1 1■ n IJ ' efficiency I susta nobilit Cl simplicity a .� , 1 1 Provide access anal far h dronic _ �� - - CFM L - - �, I ,� 10 x6-®- . '�'L�. r of9 Gym millwork, 1 �ii._I ,� 3B�IL.: _ •J 12 I �- 5 z.x4" ...1 r-` 8 `� l d• o i �4^I 2 I Electric in ttrace in window wells,typ. x 1 9 9 ,/ U I f r� - t 0 T 1 ceilin g e RA and EA of recessed lighting cove 2G5 `.�i 1 \ I O I - 7 7 �� `D g grille g 022 06 10 COA BUILDING PERMIT 021 04-02 COA BUILDING PERMIT ▪ I • I 1 i I MI I ® EZEIII■ � .�200 CFM I ; 1 o I Gym , 1 0 i 411) i IL - _ 30'x1 � !�� Bedroom4����� ',� 1 9 ••I -_I ' Shower/Steam' I ` V 3 _ 12"x6' 0 75 CFM I • I e0♦ 12 1 Eo x ry Bathroom I1 I ��IJ�i At' n I ♦� 2 - I ..�J..,. I I 16 77 i.'E ',."►'a " t-: _ Surface mount manifold on wall per ®•y'2q^x2" ,I I V O ei�i��i�i�� 9 9' I I J ai'_�� acoustical report recommendations V 1 . 1 1 7 0 IMI '., ®® I \\ m -- concealedin cove I D I - Center EA grille above door,locate in Q�.— ►_� 25 CFM _ _ %• i ® - a I I g 30"x4" V V{ 9 • EA2 -_ • a '- :. '. I .t ceiling of recessed lighting cove 9 F a 1 7®r (DTI ■ 1�-_` Open RA lighting de a'I 1�}� Fs71er ` 150 CFM :.11 'r111r' I �� ® 200 CFM v®. � _ -11 r •300 CFM 4.111yI� 1 Mechanlcal2 F, I 30"x5" ® 30"x5" I I I J��� ■Ilrr' t_■1,�. ..i..1., 11 Open EA concealed in cove lighting detail) 3 14 FCU-10 _ - -- - _08 - - J �r I 30 X4 ®/•11 Ill 11�■ M303, ceiling r I Route ducts below steel beam in drop ® WEE ■ �., ��inow 0�' I � i.. , FCU 14 14 H-7 Provide l"acoustical liner on 12 xu' . f ® 1 i� Reserve space for water treatment equipment RA duct per acoustical report .,M303 -: �. • �1 - _ �� Basement Mechanical Plan .2 L <, sm I�Lw�144 et= Locate steam generatorforteam �+ A — ..'..� --'-;, '�--. -r . _ .-. .... is ,•.it - - -shower along back walltof ) - — — SEEJ �� #M304-M201 P _ m: -• -."7",',"'-., mechanical room(by O hers A NOTES#1 PLAN 12"x4" --. 20"z10" � FCU-14 located below FCU-11,bottom of fan coil at-T-6"AFF Tap duct into RA plenum above P,-l'c�ttyk �7.""�� 3 V�' '1 Hold ducts tight to structure above to maintain lighting cove detail at ceiling Ft6�1y/61t 1 1.2 2 I © O LocateRA opening in ceiling of recessed lighting cove M 101 `ififir \� �% II 07/21/2022 ® •Basement Mechanical FORCOMCUMMNICE justinh 1/4" = 1'-0" _ — —91/4"=1'-0" Arlies Menell, 2968�� I 7 I 6 I 5 I 4 I I 2 I I I P.E. 1 ] I 6 I 5 I 4 I 3 I z I 1 I =°TroTEEMIZERE=I=7,77cTras.FT. k.....44 ...............................• r0.........•..♦•...•♦�! Provide se orate Snowmelt loopwith isolation valves '^ ':�i•♦•i•••`•i•♦•iii♦•iii♦•iii♦•iii♦•iii♦•iii♦•iii♦•iii♦•iii♦•iii♦•ii��ii♦•iii♦•iii♦•i•••i.•O•i.i p '"`°"'°"w"""""°'"°"°"'°"°rsr"°°"r "r"'. _____ .�♦ .♦ ♦ ♦♦ ..♦♦.♦ • ♦.. • , ..�.A9A. __ located in mechanical room below ter portion of \ / \ I' G �/ i.A'. isi00000000000000000000000000000000i•JiOiii0i•JiOiii0ii00•Ji� �i��i� ?iv ♦� ♦iiii sowmelt zone that is outside of property line 5 V i"i.i-.♦ isiii:iii:iii:iii:iii:iii:iii:i❖i:i❖i:i❖i:i❖i:i❖i:i❖��I.�� � �i:•: / • :i•��♦•����:ii♦•J•i:•J•i:•:ii:•J•i:•J•i:•:ii:•J•i'♦i;p.•i;p.•i;p.•i;p.•i;p.•i;p.•i�I.® ® ® ®•� ®•' Propertyline,reference Civil for additional information °2020-09-04 Permit Set 4►.04 JJAA ♦♦ ♦J ♦J ♦♦ ♦♦♦::••i♦♦::•i♦♦::•iJ::•iJ::•i0::•i.0::♦�iI♦�♦�� ♦�•♦��♦ ♦ 4 l - ��;®♦.� �I�,:.•��:.•��:.•��:.•��:.•��:.•��:.•�1:• f1:• f1:• f1:• f1:• • •�;1, ♦�♦®®•/®� ® ♦®�♦®® I iFRIDAY DESIGN •JJ�'JJA'JJJJJJJJJJJJJJJ���������♦�r .�♦��� • ® ♦��♦ Provide additional 25 cfm exhaust fan for trash enclosure I PROJECT NOTES PO BOX laze r0•i•�i•A J...•iA.•iA.•ii.•ii.•ii.•i♦.®®®®®®®®®®®® O♦J®® :p•♦OO•♦;O�;♦;O.;♦;O.•♦;O.;♦;♦O.;♦;♦O.•♦;♦O.•J♦••®•®•®•®•®•®O•♦•O•®♦®♦®♦®. ®i ASPEN.C061612 ♦�•��♦���♦•i•��♦•i•��♦p•��♦;0��♦p•��♦pi;�♦�w�®�®w�®�®�®�®••••�®w�®w�®w�♦ ,•-a. -"ii Electrical equipment,reference electrical plans for additional information 1 Dashed line represents outline of in-floor radiant heating zone.See H dronic Schedule for •......... Y. W. . : .I�•. .IDD..W.W. ®pit�,. a �' "♦..S_ _ i- _ \ — — — �Q_ P 9 Y TEL:ACT:D.ERE EF-;;• 1 /_��♦ REK srcuxo 96 A ®��i I® �%p ;%i;i� !;!—1.;:� additional infonna6on.Omit radiant tubing under of refrigerators,coolers,freezers or other �°aGPE E % ®�'�®/�® _ similar a liances.Omit radiant tubing from mechanical,wine storage or AN s aces,t E awsu s aLo • _ •'•S,C '-'�•��♦.4►yer v If I \ / c300 ope SPRING ST.SUITE 202 ®, -1rr._.Op;J 4.AK.Dryer vents �i Acoustic detailing of fence by Others 2 Install boiler per manufactureYs recommendations,including:access clearances,vent I •, ' - r• • s a ! e sizes/materials,system fill water quality,electrical disconnect.Slope vents back to TEL:ao.eee76 e �o��►®®®�►®®®�®� ¢� pipe Y q Y. P CONTACT:sHER NZONE I J/I f����r♦♦♦♦e�I��®,®®�®®®®� `I \ j \ \boiler.Provide condensate neutmlitation kit and route to nearest floor drain/sink in "s,O ,"E,E,,,"+�, ✓i- �,�♦ ,..4®♦�♦� ° el \ Mechanical Room: 1 i I �.' .::!r, ®�!.A!I \ 3005 SPRING ST.SUITE 202 Ducts routed thru framing,maintain -Al Is♦ i;p��r® �i -r0,( h 'b < Clearly label equipment with ID tags shown in these plans and provide appropriate access ASPEN co e1611 I manufacturers required spacing for penetrationsI I �p�✓�i�i O•-r�� • - -� ®lt for installafon and maintenance,typ. 4-4' CONTACT SARA ADAUS q P 9 P r,�•��c 0��� ` I Dryer ducts routed tight to bottom �_ I F -` _� ,.,,�♦�o♦�%�T-;f(' of stair framingupp into joist bay s _^+'•"°'"•'" 1 1 n�iH��♦�4 ❖®AOA�.•�i•�•��®®I �li Arrowsldenoteeecommelndeda cessud'vedcBon Coordina ealooatonls andcaccessn anal HIGH COUNTRY ENGINEERING 1 \I/ ■ - ������'s�,����.♦♦♦;• — lf \ / P 151]BIAKE AVENUE,GSUnE 101 VY TTT p� 0: ����'=�•c �i�( detailing with Architect,typ. GLE:WOOD.SPRING,co a1601 I ®150 CFMii:O I'�i;%iNiii i•�•i ! - 1171 � \ \ 2855 CONTACT:ROGER NEAL '� �: <Jr �r 5 Hatched area represents outline of in-slab radiant Snowmelt zone.See Snowmelt Zone1 12'5,6" } �i�"�r-♦s♦.k �i0 i:__,t,... .1/,,�. .,, ,.,,.E°E"°,"�" - I �N.l�®\,S' I����•�:•sO�s♦•.alb —_ Schedule for additional information,typ. —RESOURCE ENGINEERING GROUP � ��•� : Snowmelt moisture and tem erature sensor location, lace control wire in conduit to allow c26 sEEo eu ,coo n4 zm Garage l0, `.O A4•iiii3" i-•-`ii 1 lam i O P P TEL:970.349.1216 B - 0 �® ®��•�♦'�♦�♦♦♦•♦p♦•pp♦•,' I - - - for replacement of sensor. CONTACT: Rcrews sory HARPER �I, Irsr� .�it:L.T♦SacS�iy------- --- -- -- IIIIIIIII�IIIIIIIII� _ n ,'��`s between steel beam and ---`®�z N - - --_.-— -/ Install temperature sensors on interior walls, cr A �6chaust rills located in joist �P% ® _ 7 Coordinate grille,diffuser and sensor locations and elevafons with Architect and Interior coasaavATOIRE INTERNATIONAL 1m WALKER STREET.7E I NEW YORK5NEW YORK 10013 U LVL framing for stair box ! 1 Ol O P away from sources of heat.Coordinate final TEL: GERAa I M201 locations with Architect and Engineer. ® IZI 1 225 CFM 1 e>"wE noN I I 1 ® ® �� 1,1C91f1„, Providecableactuatedbalancingdamper at each take-off from trunk duct or a maximum sr sr asz] 1 1 1 . Header off as required to route ducts to above 44"x5" I of 10'from grille.Mount damper actuator(end of cable)behind face of grille.typ. BROOKLYN.NEW YORK 11222 1 ��^/\ CONTACT:MATT EN. ® I 12 y ,0i, Ducts routed in/through structure above. E °EE ,g°Lr6^x,2^ �e No p1 / 6"z12", / © O I 4, Ducts routed in drop ceiling cavity above. o API"oED ENCLOSURE CONSULTING uc 11767.EST KEN CARYL AVENUE,SURE F3ae ®� \ LITILET083cOLORPD0801TJ v""91� - ®'+i� 1 I * Provide 1/2"min.duct liner in rectangular ducts,or per acoustical report LITTLE COL• ►1 II Living Room CONTACT:EVERETT VERSCHAVEA *iii L ® A .1863 , 40 - -- 'ittg w I I I recommendations,whichever is more restrictive.Ducts to be 26 ga min.,continuous for �agnC ,wTT.,Ty—� �♦,� 23 Stamped su diffusers inentire system.Duct dimensions shown are inside clear,typ.Air-side equipment must have �„�I ®y 1 O I Floor with su ortive bar rectan ular duct for 10'downstream/u t am of unit su /return connections before ERENwsACOUSTICS �� PP 9 Ps re PPY 1270 BROADWAY,SUITE 202 �i��1' _ - - 1 O I grillebelowper transifoning to round duct is permitted. ) rvew vonrc rvv l ouManufacturersinstallation1TEL:sncsso 223s ��Il�®IrA: �� I ® CONTACT:RYAN GRAYE(GLOTZBECKER)®l® recommendations.Center Insulate OA duct with a minimum of 2"dud wrap(R-6)to avoid condensation g°"�s"0.11- � ''r�®�'oid Provide concentric vent rd l• on windows and 1 : I ® ��_ Icoordinate framin la out 0 Install air-side a ui ment a manufacturer's and acoustical re rt recommendations. COLORADO POOL DESIGNS LL�,�® ' I .nnection for boiler Due Q®>; 1 I ��■ - Jog EA dud in roof framing g y q p p r pO n3o+w.cvrvnc,v svccl L® to allow space for SA Provide 1"min.deflection springs rated for unk weight as vibration isolation,elecrical G1301W.46.DR.SUITE O;•• 1 - " RA below o en stair treads, ♦�^ plenum boz in fan - disconnect condensate drain,flexible duct connections at unit,adequate coil,flter and TEL:]zo.sa.aiafi �p♦♦i. P 225 CFM II framing close to windows. �Oi♦�a�J . motor access,and condensate drain where required).Where needed,coordinate ceilingcoNTACT:ANor ucELIE 11 1 coordinate detail with Architect �� g 004 • ( i i❖:��• 1 •/ Boiler vents in corner •�i � access panel in field and with Architect,typ. ` 44"x5" ♦♦I 0•i•:Wi❖i•®®®® 11101 400 CFM ♦�`^ ;•'• ®♦ ���♦;•♦��♦ ®♦ ♦' I 1 �♦• ♦ 15 Provide 4'of flex duct or acoustical lining at duct connections to Titles. pJ♦pJ �®®® Z - L J II �•;. V� ®�: O Fire 9 \`\��♦♦��!�, , I 4 ♦�♦�♦� . place system by others.Provide exhaust,combustion,and make-up air as necessary _ •�t>•�®®®® ` — -Ent Hall— - - +"-`+ ` ` `+"- + ` `+ ` ®®®�®® 4 `�� �t�♦.� 17 Space reserved for h dronic equipment and manufacturer requirements,typ. G`� - - • •��L ®� 1— _Entry ��_ .® ♦ .•!- for the specfied equipment to meat code ppgip' ♦�♦® I 21 I V V V ' V -' V V di •♦�♦�j�♦� ®•i O Y (pumps,radiant manifolds,valves,expansion \ \ H♦♦♦♦4 I® ® ®i®®i®®i®��i®®ism.®.♦.m.♦.m m♦ iii4 ♦♦♦I♦ i® tanks and appurtenances.) \ H04;♦�a .® 1 .: ®�� ®vriTivri\ors\ors:eeTeMe sar :sar srisr :sr \•r :sr :s••w •i ;4♦��®� H;:�.q:•i •1 ••® �` =� IOL ®• 18 Terminate vents a minimum of 36"above adjacent grade.Maintain minimum separation of N ♦♦r��♦ 11 - - - - - - - • • • • • ypI® 10 linear feet between EA vent terminations and OA intakes. MM =0i•n.i•11 • '�. ♦®♦®♦�ii:❖i:4 10 �®=. ®W®W®W®W®W®W®W®W®W®.,.— ♦ ♦ ♦®• ♦�♦� ♦Ri♦•ui••,iiiiii0 •�• i 19 Spa design and detailing by others. gstz O ii:iiDi':♦1�®®•O• ♦�♦�♦• . � ®:........ - ♦ ♦ ♦��•. • ..�•:e�.•. i :Route EA duct t•ht to ceiling c :•O:n❖♦.��•® ®®®®®®®®®•.®®®®®�4�•;i;♦•:;:;:�i �i �i �i �i �i;� �i �i �i ii�®®®®®®®®®®®�♦�i!iii❖i:•:l ••iidi `:l i❖ •l____ • 300 CFM '® ®. ®�®�®��®®®® � p ® 18"x12" _�PpDOIICF`4i OD p 0..;♦•.i�® '— .®i♦�i♦®�2� ♦���®♦o�♦®����♦�i��®♦ ♦�®����♦�i��®�♦�♦�®���♦�i��®�+� 4"x10" D Soo:3l0 ze:`o''r ,•.,•• :.•;?:�I 300CFM moo___ N ®woe O r" G:t ipppJppp pp�0ip.1 'h ,a $W®��►®® ��� ����►®��►®��►®��►®��►®��►®®®�®®��►®��►®��►����®��®�•®i 18"x12" '.AA• 1112221/5 l� , -A ,! O ® r �a _ 1/ O� I♦ IM l ®�3 � O ` ,'r\/ONAL E_N_G\ ®�A®vA � �8"x26 - - • -20"x24"clear chase ���®� r uired for ducts \���" to above,coordinate foal 0�1 r I Carom below 06 10 2022 Property line,reference Civil ,itchen hood sizing and duct 1 I I �r Make-up air in face of upper soffit for additional information i _ '� 8x12" •outing with Architect and I I � - / I n.Ineer I 1 ® I ®1050CFM , i ` 1 a 234 W.Francis St. I,I � - .CFM P I I ` �� I �v 6o"x8" 1 Fl �.� __ _- - — . .co I 1 � I © � II/ \ / �,g.x4— • ® ®L2s4w.FanDss,1 �, � r nB en 11o^xza^ IJv — — — ��� � '� WI V I 1 K I I II O r — — O 1 RAl 350 CFM !, - - -� R E G __ 1p^xq" NiP� Kitchen Aiiilz I < I l l 36"x8" 7i�F __u soUR r �G - ..' j, .\ 1 I 20 I ®®�®� 1 I 7 6 I CROUP • 140CFM Qo73491216 I 050 CFM 1 RAgrillelocatedon topofmllwork I 8"x26" I 1 :z. i••Vii.�iJi�'.•i00'.:•i JiiOi�Di�i 0Ji00'. i•i0'�i•O' Mechanica— p♦/Oyp♦ .�♦• A 10.•�!.1:....0..• .••0.•• .'�• .♦�A�♦ 1_-—m .._... ,,.. ^ 9 I �9' '®®♦® ♦BOA♦®,,�QOi•:��®p��®�i�ii':ii:i �o':!:i�i':•:iii•:i�i':;i';'�; -' --- Cabin- �� II - I erFciencylsustainabilitylsimpliciry I I 11 I 0s ��®�1�0�-'a, ♦ •i�e•-O��...s. !sl:e'!iep::aS1:;::d►❖:•i:•:i' 1 ,axs ili ,111- 9® ®�.�i01'►40i♦♦4��Q�iii ::::::w��♦,.-.y._...• c+:♦•♦.7E I 25 i6 ® I II I 0 ®•�. �O��Ad��: •i:'4ii.A�:•::p♦♦.>�♦ -,- i�.11��i�•®�i 1 6'►'®/���%/�/�/�.--.-.--.--. _ I • � ®. 1:N..• •' •• .4.,•• 'E O:.♦4�.•...❖Js..A .A►.A:,®_ _<" 1 ♦♦p♦♦ • - 2021-04-02 COA BUILDING PERMIT ®•®• ®•�i4.•ii�iii•:ii:•O• • iiii:•J� tamped SA diffusers in floor 4 - Q�'� T - ERV ducts to/from above, 0 -,.,,,, 2022-01-07 COA BUILDING PERMIT - o around beam above 0 ith su ortive bar Title �19 jog 1 ®®® PP g 2022-06-10 COA BUILDING PERMIT r — — — — 19 I I �'-.-®-.-� I below per Manufacturers 1 p�♦�♦♦;,♦ ♦♦; installation re.mmendations. 1 I 1 - Canter on windows and II J I I 2"x10"wall framing required I �g• �� .ordinate framing layout to 1 for SA ducts to kitchen I allow space for SA plenum 140 CFM 140 CFM I I I box in floor framing close to J Q O , I _I ® 24"x5" — — — —O 121 24"z5— — J 8 I ® }SA diffuser centered high on wall windows. • IL •h-AM - - - - - � 1� 1 I _y .'=- ."°"I 200 CFM I i� fastening detail with Architect 1 Entry 0 CFM 1�y 30"x5" . FM 1 Route to V-2 on level below L 1 (Powder-•• IS 1150 CFM IOIu /.... L — —Po r r �� na^xs^ lot ® First Floor Mechanical Plan I SEE NOTES#1 PLAN 440 Q1-12) i .... „„ . ... .,„, — 4,7 iv 2 3 0 0 0I� '��t[ �1 M102 Ft 07,2„2o22 j ® \First Floor Mechanical Plan ROROCMCOMPI 1/4" = 1'-0" 'justo,nh - -9,/4"=1'-0" Miss Merell, 2900 N0 I 7 I 6 I 5 I 4 I 3 I 2 I 1 I P.E. I i g i g i q i g I I I / � / , \ \ \ ,�°�a"oa pam�wao°��o'E�O,r,ACKTrm....„,..„ 11.2 2 T.., i 0 �" \ 40 I 5 \ 0ISSUNCE \ \ / / \ 2020-09-04 Permit Set . , PROJECT NOTES 1BRIDAT DESIGN PO BOX 79B8 ® f /,�\ - - - �1_Dashed line represents outline of in-Floor radiant heating zone.See Hydronic Schedule for CoeTAE REK SKAuco — /p/® ���®��®��� ��®��®� �i� /// // •I additional information.Omit radiant tubing under refrigerators,coolers,freezers or other EL:ASPEN. 7 PliCHIECT .309E E _ _ _ _ _ %(��( •\�� i \ similarpliances it radiant tubing from mechanical,wine storage or AN spaces,typ E appliances. 3300 E S SUITE 202 \ \ Install boiler per manufacturer's recommendations,including:access clearances,vent pipe sizes/materials,system fill water quality,electrical disconnect.Slope vents back to TEL..0..5.8675 ,CO 81611 1 / CONTACT: I SANZONE I i \ \ '\ / I \ boiler Provide R condensate neuValitation kit and route to nearest floor drain/sink in arvoory AOAMs Mechanical Room. 300 S.SPRING ST,SUITE 202 Clearly label equipment with ID tags shown in these plans and provide appropriate access ASPEN.CO 81611 RA located above bathroom door O TEL:37.32s.23ss I• 200 CFM \ / far installation and maintenance,typ. CONTACT:SARA ADAMS 1 30"x5" _ \ q Symbol represents a typical flush-mounted radiant zone manifold with access panel. Q� - I /detailing motewith rec ect,typed access direction.Coordinate locations and access panelreiLNe".� — lii - \ COUNTRY ENGINEERING LAKE AVENUE,SSUITE 101 ®250 CFM 5.2855 CONTACT: NEAL 8160 y \ in-slab radiant snowmelt zone.See Snowmelt Zone s vusw E„s448 " T _Bedroom _ _ 3 I ' �� _���� \ \ additional ature sensor locate p ce control wiremwndmt to allow 3 q 1 ,- O forreplacement elt of and te,pe taco typ. - - - 20 - . 1� 8 x4 / 5 Hatched area represents outline of -RESOURCE ENGINEERING GROUP 311 r \ - - - 'on. la c�aESEEo eu .cosizz \ — — — - I \ / TEL:970.349.1216 SUITE 211 I -_ �� _ / _ li •, +140 Ba[h -—-- '/ / 7 Coordinate grille,diffuser and sensor locations and elevations with Architect and Interior Designer, RAsz000sory HARPER LIGIline I DOBSERVATOIRE INTERNAPONAL Designer.typ. �� 1mwAucER SIREEr.7E I - / \_ _ — 9 NEW YORK.NEW YORK 10013 1 8 Install temperature sensors on interior walls,away tram sources of heat.Coordinate foal :21E25..463 CERACI �,I Box out duct boot I I - I locations with Architect and Engineer. ,,CONTACT: around column , Prode cable blagdmper at ehtake-offfrm truk dctm67 WEST O of 10'from grille.Mount damper actuator(end Gf cable)behind face of grille.typ. BROOKLYN.NEW YORK 11222 IIVI• m ) corvrncr9M�Tr EMMI L - 1� - - — © RE3a 1— - - tar ducts,or per acoustical report reL.a9a 76a 1a6a ® / r , recommendations,whichever is mare restrictive.Ducts to be 26 ga min.,continuous for �N nAc.EVE�RETr vERscRAVE iIPrcde zr: 11 entire system typmthave rectanguuctfor 10'downsVeamlupstream ofeturn connectons before REMosAcousnt chase for ducts to/from below * Q TEL 6966602236 U U © CONTACT:RYAN GRAYE(GLOTZBECKER) EA from lower level thru roof Insulate OA duct with a minimum of 2"duct wrap(R-6)to avoid condensation. •P. :"LIMIT 0 Install air-side equipment per manufacturer's and acoustical report recommendations. ii3oi w��IxPooa.c onxloc Provide 1"min.deflection springs rated for unit weight as vibration isolation,electrical cote N0..3co8146 eoao3 /Ehdisconnect,condensate drain,flexible duct connections at unit,adequate coil,filter and CONTACT: tACELLf Mechanical room exhaust terminationgip motor access,and condensate drain(where required).Where needed,coordinate ceiling access panel in field and with Architect,typ. Boiler vent terminations with concentric vent kit all15 Provide 4'of flex duct or acoustical lining at duct connections to grilles. \�(`'•`�\/� _ 16-Fireplace system by others.Provide exhaust,combustion,and make-up air as necessary \`\ - - - - - - - - - - - - - - - - -I - - for the specified equipment to meet code and manufacturer requirements,tyP.,C l Space reserved for hydronic equipment(pumps,radiant manifolds,valves,expansion/17 \ \ tanks and appurtenances.) 18 Terminate vents a minimum of 36"above adjacent grade.Maintain minimum separation of N I I I I 10 linear feet between EA vent terminations and OA intakes. OO. Spa design and detailing by others. G D �.on� r 1,.;1 O I I CFtiT i1 Provide 1"acoustical liner on U ) I I I I I • 38880 IA ''1, 4 ®2265 CFM ' i 9top alignplaner I/ Angle corn cl to with roof a -1 24"x48" O o•' <•f ' RA duct per ace 'cal repo D.5 _ _ — D.5 �1" .��v Ir /__ 117 1�11�17 �, E.r "ENG rr��®orr�®orr�® `r .y ONAL �111 `\`IS �•\1 �/ D 06-10-2022 \� i1`IL ,�` I) _, Route kitchen hood exhaust to dormer above bedroom _ l\��`I,�"RA ^I 200 CFM I 234 W.Francis Si, r- ��P Is"xs"'' CD I �� ���\�o�l N 36"x5" I "_ ■iR 234 W.Francis St. n - - r%\ le r Bedroom - - - - - - - - - - - - - - - - - Aspen.CO `\i` ®RI^1/ SA7 50 CFM - Hatched area represents from l mezzanine y 2$ r R E G above ceiling,accessed Vom hall ceiling in Study 4 IY11111 I 36"x5' I NI 4vo oirtalmil 4--- I I I I l * lb-ma 1� II , -tem I RA high on vertical face,aligned with SACROUP AE E R N c Manifold in mechanical mezzanine on wall face 1 I 3 ®� Remote fan for kitchen hood located above hall reginc.com•970.349.1216 where ceiling below steps up above the bathroom ,1="�g�M^� I O�_ _ < J 1 Consulting Engineers B '; y,� _ RAi 225 CFM- w'AI 8 l/ ,. I I B Mechanical•Structural•Energy ,.0351. •Z- ':!��36 x5 SA ;\ 1 1- efficiency sus[ainability simplicity 12"x6" SA diffuser hi h on vertical face,aligned with RA �i� HAD-12„x6„ 9 _ _ _ 0 dr. _ -sine!® !)jr-1` I I I l"III a= ^, M 11�0 250 CFM SA above cabinetsII 2022-06-10 COA BUILDING PERMIT l•5CFM lilt ' a I ik, ',24,x2 i41 1$1 Rift I�. 36 x5 kli 1111 6"g \ Study I Bathroom 1I \!— I _`_�__,jr I -RA in ceiling of hallway I i�1��® 4�I� Access hatch in ceiling,coordinate detailing with Architect I I I I — - ar.1 16 I 1 I I 1 _ -EAdtramemint. I es tag Mlle IPl1n®ilp'I L ;- iifll�9[PIpinsisii 9 I iI Second Floor Mechanical '� -i1n91P1Ii®PiPitniliNIPI L J c O 4 1 1 1 I Plan •'.L irei iIIIIEM11PIPtP1f181PP®IPII — — ��\ A — — II�1Lfi lP1RI®1PIP5!�1P1 lP_ -r Y//...%// Y//.:9!®<r'=r-1�(ee arc .•/:':444 - -. - - - - - - - - V ''.11111i}IGi P-• iI11••fit lei t li SEE NOTES#1 PLANS O ® O0 0 0 1 2 j:r) 6 Filk) v/ D M 103 ® O Second Floor Mechanical PlanFORCOMMFIANCE PAGE NO 1�a °, 1/4" = 1'-0" 7ustinh - -•1/4"=1'-0" Arliss Merrell, 2968"4. I 7 I 6 I 5 I 4 I I 2 I 1 I P.E. 1 T I 6 I 5 I 4 I 3 I 2 I 1 I 2020-09-04 Permit Set Copper pipe sloped back to humidifier at 10°minimum. `°"""`".*" Provide 1"min.insulation rated to 220°F. ao eox DESIGN Avoid bends in piping within 12"of humidifier. ASPEN.CO81012 TEE Airflow proving switch installed in duct system. REKSKAuco LANDSCAPE APCIIIECT E E 300 SG SPRING ST.SUITE 202 ASPEN,CO 81611 TEL:.0..5.8675 CONTACT:SHERI SANZONE Hydronic loop MN "'srONCs""""""°" a 300 S.SPRING ST,SUITE 202 TEL 9N,CO 810011,r D Ball Valve I• CONTACT:SARA ADAMS GIVILEHGNEER ,"- / Flanged Fittings '• straight duct HIGH COUNTRY ENGINEERING V 1517 BLAKE AVENUE,,SUITE 101 f- A, GLENWOODSPRING SPRINGS,It% —/, TEE 970.9usa xosx�w Low loop pressure I Ball valve CONTACT:ROGER NEAL ii.r� measurement point i / Duct RA high limit RH%sensor. �'4 Duct high-limit humidistat installed t", 4 Stone walkway/driveway(if poured Set to 40%and label clearly as 20"min.down stream of distribution manifold —REsouaon ENGINEERING caouP CO 81224 Ball Valve u concrete, lace tubes in "Space High-Limit Humidistat" to ensure adequate steam absorption. �,//� / Expansion tank _ P csEEoeu rHSAsv ODsoNR HARPER Hose II for system fill.Connect walkway/driveway) Provide 36"of un-lined stainless steel straight duct TEL:970.3461216 Pump ` auto-fill feeder kit here(if specified,see ,� •.,, Potable water supply downstream of distribution manifoldrvALIGIline Bu.Gus I�,� lir hydronic loop schedule).Do not leave c �p (RO not acceptable, permanent connection to domestic .!:.¢:!':!33:!E3w '.0'!: 33:!33:!:•:!:6>\� softened water preferred) cosvERVATOIRE INTERNATIONAL Condensate drain routed back to humidifier.Install P-trap as shown. 120 NEW VvsER ea vv.7E supply system. > ' Varies,see schedule Snowmelt tubing placed in NEW YORK5 NEW YORK 10013 sand 2"rigid foam @ edges Indirect drain,provide with air gap and cut humidifier drain line at 45 TEE 212ors.urs GERACI Note:Wet rotor pumps must be mounted with motor drive shaft horizontal Vaneand below degrees. ,,,,„sung. ONEBUTrON WEST ST%527 O Pump Installation Detail CD,Expansion Tank Detail CD,Snowmelt Detail n Humidifier Detail D BTEE ROOKLYN.NEW YORK 11222 CONTACT:MATT EMMI EI.I.OPE CONSUL-DM N.T.S. N.T.S. N.T.S. N.T.S. D ENCLOSURE CONSULTING LLC WEST KEN CARYL AVENUE,SURE F308 LITTLETON.COLORADO 00127 TEL:303.763.1863 CONTACT:EVERETT VERSGNVE 2x enclosure,coordinate size with ww,==...a g. mechanical installer based on size and EREMOS ACOUSTICS Minimum bending radius number manifolds 1270 BROADWuV.sulTE 202 =6 x tube O.D.Use YORK,NY bending spring to TELLN'646.6501235014 d'//M/pi/MN/NM/MN////A nlir V///////////// P 9 CONTACT:RYAN GRATE(GLOTZBECKER) support tube for bends with radius of 6"or less. 2x framed Tube spacing / C � wall SPA CONSULTMIT 11301 W atnDO ooa..SUITE DESIGNS per plans 1 / GOLDEN,COLORADO 80403 3.8146 C \ t\ CONTACT ANDY LACELLE F97— Provide bird/insect screen on Use"serpentine" Access panel.Coordinate Manifold exhaust pipe outlet. layout pattern detail/spec with Arch for '� aesthetics and fire rating — \�\ E \ � ) Finish floor iiiiiiii� i Fasten tubing at Provide shut-off Support bend with plastic or N Waterproofing detail per Arch. \ curve edges ) II" per loop metal sleeve.6"minimum \ \ Concrete,gyperete, radius .. iIjI I i dgtubing Transition ducting from metal to PVC / 1 I' — .N Insulated roof curb \ — in framing cavity. / I + _ ,A1 o.oO0000 00: 11 ,� Run supply side Tubing to In- c 1 (hottest)tubing along floor loops c Roof deck insulation Fasten tubing every I exterior walls �— 18"(max)on straight Supply/return piping to 'NOI__:"" runs y mechanical roam , o PppO ttc `` Distribution manifold Floors stem �,x�puSr...... Ps' ••"• rr SIR to/from % 1,' `I``? ti Boiler exhaust from Finished Gelling mechanical room 38880 Elevation Section ,, Al basement o < r1 Boiler Vent Detail Roof Exhaust Detail Radiant Tubing Layout Manifold Detail `'` G'-` N.T.S. CD N.T.S. O N.T.S. ()Radiant .%„oNA EN N.T.S. 10-2022 234 W.Francis St. 234 W.Francis St. Aspen,CO __.....AA p E s o u p c E,,,c REG Provide vibration isolation springs rated Provide flexible duct connections or for 1"deflection at unit operational weight flex duct at unit,typ. reginc.com•970.349.1216 Unit configuration shown is schematic B fory.mostunl ttion nots are applicable confgurafi ons.Coordinate s Consulting engineers Mechanical•Structural•Energy any changes to installation detail with efficiency I sustainability I simplicity Horizontal unit configuration shown is schematic only. \ REG. Provide vibration isolation springs rated for From Outside OA EA To Outside 1"deflection at unit operational weight Vertical unit is similar.Installation to comply with Provide DAT sensor in supply air duct Rectangular Duct \ ___ Rectangular Duct °""'°"` Manufacturer's Installation Manual.Coordinate any — chan es to installation detail with Mechanical Engineer. Provide 10'of lined rectangular duct and Round 2022-06-10 COA BUILDING PERMIT See Mechanical Plans for 9 9 '-' Round one lined elbow,or 5'of lined duct and duct sizing information,typ. \ Duct Duct O ��� ———— two lined elbows at ducts to/from T Provide R-3 minimum insulation to I t)° q� occupied spaces unless noted otherwise - - O �� prevent condensation on OA intake duct -,_ Ventilator Provide 10'of lined rectangular duct and p•! 00 kJ SA / one lined elbow,lined 5'of lined duct and RA Fan Coil O �� See Mechanical Plans for % two lined elbows at ducts to/from pep, 0e.. sizing information, Round q• - Round �� 00 ` 9 tYP _ occupied spaces unless noted otherwise � _ ___ \ Duct I Duct / 1/2"duct liner,typ. From Interior RA SA To Interior Provide Manufacturer's recommended access Provide flexible duct Rectangular Duct / \ Rectangular Duct for maintenance and repair of motor and filter connections at unit,typ. J ---Y \_ Provide electrical disconnect Reference equipment schedules within site of unit for coil connection sizes Provide Manufacturer's recommended 1/2"duct liner,typ.Units serving as bathroom Where needed,coordinate Provide drain pan and route access for maintenance and repair of exhaust should not include lined ducts access panel with Architect condensate drain to nearest motor and filter Provide condensate drain(where required), hub drain with P-trap via air gap and electrical disconnect CDFan Coil Installation Detail C)Ventilator Installation Detail Mechanical Details A N.T.S. N.T.S. SEE NOTES#1 PLANS A rEWLg M201 1/2022 J FoRcoutcuigomee justinh `"".. xo. — —As indicated Miss Merrell, 2968 I 7 I 6 I 5 I 4 I I 2 I 1 I P.E. 7 I B I 5 I 4 I 3 I I I 2020-09-04 Permit Set 1FRIDAY DESIGN PO BOX 7928 ASPEN.CO 81612 TEL:970.309.0695 REK SKALKO E E 3cOSGS TER T.SUITE 202 ASPEN,CO 81611 TEL:.0.5.8575 O 1 O HLYTORIC PRESERVATION BEN ONAOAMG SANZONE 1 1.2 � T T 300 S.SPRING ST SUITE 202 1.211 ELASP 9GIMEERN,CO 6°56 LEN • H COUNTRY ENGINEERING le l q 1 1617 BLAKE AVENUE,,SUITE 101 1 GLENWOOD M�02 TEL:970.925.2855 SPRINGS,C08180 CONTACT:ROGER NEAL _ �I I — Smw,uaw MEP ENowEER J I _ _ _ . .'WTI�' Liviny_Room 1 _ I LI Qom _ O -426 BERCEENGINESUITRING GROUP ® _ �i - J ® _ TO Slab at Trench u t � �� 'O Slab a T9e ` _ —=lll L�98 LIGHTING T H• 'TAGSIGN.AVE,,SUITE o, — — CRESTED BUTTE,Co 81220 • _ - u[ '-6" 970.3499.12116 HASLOOOSON HARPER L = _ eiMnq ■I _-�1 ."mW _ TO Slab at Trench LOBSERVATOIRE INTERNARONAL �ouiifi0 =— V-2 i — '� 120WALKERSTREET.7E �r 96_3, If 96-3 =MI .ram •_ 2 6-3 rFCU-7 ' ��� J :- •. FCU-8 '. I •FCU-7� ' I NEW YORK5NEW YORK 10013 �■ ._ ei _�. .. CONTACT:CARLINA GERACI 11322 ���� 111�� \ FCU-6 jilirI. 1 —0 FCU-9! L 11 oNEBu oN ] �■� I� _ �■ FCU- OA�II�II� I_ U2 ■ IEr■1/ ONEBU67 TO a27 BROOKL'I J SA ' YORENVELOPE CONSULiNfr SA t CONTACT: EMMI O — O O ENCLOSURE CONSULTING LTC B-1 CH-2 FCU-1 RA. ® FCU-1 _ ,nn RA� i EST OLORADO 8012NUE,suIrE F306 LITILETON.3COLORAD08012J CH-4' l I CONTACT:EVERETr VERSCHAVE .Y BT2 4 , I �wsnc wT.. CH-1 CI-3 I NEEMos ACOUSTICS z7o BlxonowAvo su ITe zoz TELL:60.502235 014 I CONTACT:RYAN GRAYS(GLOTZBECKER) '— Level 0�85 Gl n Level Oi85 " n aI� Level 0$5 O COLORADOPOOLDESIGNSL I — - - coili W.coioenoo eloaoa°G 3.8146 CO NTTAACI DANDY IACELLf Mechan cal Room Section-North 2 Mechan cal Room Section-East Mechan cal Room Section-South \ \ CD 1/4" = 1 -0 0 1/4 = 1 -0 CD 1/4" = 1 -0 tt C C 40�ppUBT;y'•.;rF�II, l 38880�/s OO 14 Y,%ONAl.ENS" 06-10-2022 AI — 1 — 0 gillP 1 2 234 W.Francis St. I.M2U2 234 W.Francis St. _ — — — 1Q� Aspen,CO 100'-0" _ Living Room E I R E G �■ II= I— 1_,Nn,--. 98'_6„ ,1—=. �� -�- - J — Roof(REG) ►-�= I,. „I�^ a _�1� TO Slab at Trench 126'-6�r %o PE E a N Al FCU-8 , I I •4 ���F���� 96'-3" V — �V A reginc.com•970.349.1216 ,,��, FCU-16 — ' '1, ll •- — — . .Me_,- ` Consulting Engineers OliNL ± : ,� / —_ — \ I B Mechanical•Structural•Energy Nam` �I• r�rr��a� \ _►�®�• efficiency sus[ainability simplicity II III �� �� I 1 \ ■i�l—I I ,..efficiency 265 CFM +. ��� • \ EA3 _�®� i Fr : 51 ' . 2022-06-10 COA BUILDING PERMIT �za"Xas° Z�/,!���� • Mech Platform � � ��I�-�I� Mech Platform ® s111 ,,. a • 118'-5-5 7/8" V f l —___ q 7/8" J oHw-z II AF-1AF-z, • zso cFM Existing Plate- wC sA1x_ Verifiedin FiXT-4AF-3 AI CFM_ _ LI -___ . 1 _ Level 0(REG) n I 1�1 36"x5" — I 85'-0�/ OMechanical Room Section-West O Mech Platform-East O Mech Platform-North 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" Mechanical Sections A A SEE NOTES#1 PLANS rL� e/W M202 07/21/2022 Eopco0ECUMi IMM lustinh PAGE.. — —91I4"=1'-0" A.:Merrell, 2988 xo. I 7 I 6 I 5 I 4 I 3 I 2 I I P.E. I T I 6 I 5 I 4 I I 2 I 1 I 2022-06-10 COA BUILDING PERMIT 1FRIDAY DESIGN PO BOX 7928 ASPEN,CO 81612 TEL:970.309.0696 REK SKALKO IANDBCPPEPPCHTECT E E BLUEREEN BUD 300 SG SPRING ST.SUITE 202 ASPEN,CO 81611 TEL:W0.045.8675 ry,O,IcmEx"vs ON R SANZONE © G G O T BENDONADAMS 300 S.SPRING ST.SUITE 202 AI e TEL eN,CO 816611 '1''��F' Wes• CONTACT:SARA ADAMS TC Garagge �k TC Gara e� <"LLEN IMEER - 99'_7" 'Jr I Alb r I 99'_71 AP HIGH COUNTRY ENGINEERING 1517 BLAKE AVENUE,,SUITE 101 FCU-10 GLENWOOD TO Green Roof TO Green�Roof'' TO Green Roo'f1 _ TO Green Roof TEL:970.925.2855 SPRINGS,C0818D1 97'-� — — 9797'-8 `-1 — — 97'8" _1:"x6'i— — I. 97r8" CONTACT::IIPU M ROGEREP �NE4L ea MI— +1 6"G RESOURCE BELLES ENGINEERING SUIT GROUP — I FCU-11 csEEo c.eu3wiE�,coa n4 zal FCU 11 I oaerAcinocas II FCU-10 .�ONTCT:AU T HASZ'DODSON HARPER 30"x4 I. L•o6sERVATOIRE INTEIwnnoNu 120 NEW YORK�NEW YORKE 0013 I FCU-14 couucrrcnRUNA GERAa mert ONEBUTfON 87 WEST ST as27 I♦I♦ BROOKLYNBNEW YORK 11222 H-6 H-6 ` H-7 H-7 corvrncr9nwrr EMml D D D ENCLOSURE CONSULTING LLC 11757 WEST KEN CARYL AVENUE,SURE F308 I TELL 03.763.1863 D08012J — Level 0 LEGI n Level 0 REG Level 0(REG) n Level OSRE ) n LITc° cr:'E ER °ERscHA E 85'-0" _ 85'-0" 85'-0" 85'-0" ,NWan«wLT<NT REmos ACOUSTICSE270 BROADWAY,SUITE 202 L YORK,NY 014 L:646 650 2235 TEL: CONTACT:RYAN GRAYS(GLOTZBECKER) II "P.CON:ULT.NT O POOL ESIGNS 11301 W.D02RD DROSUITE 410 C GOLDEN,COLORADO 80403 TEL:720.693.8146 CONTACT ANDY LACELLf WV KAN QMech Room 2-South CD,Mech Room 2-West CD,Mech Room 3-East CD,Mech Room 3-North \ \ 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" N C C r-.'Pp00 UCFti h i 40�p rgi.L;'1.rF 1, • 38880 •/ `•r.%ONALENG" 06-10-2022 234 W.Francis St. ak ' Ye D.5 OD 234sn.COSt. O ® O Aspen.CO e TiF _ Living Room I Living Room /� Living Room Livi99 Room �I �iirrCROUP ,Ill 98-6 T I 98'-6 98-6 �� 98-6 �r/J R � ', reginacom•970.349.1216 'I 7 'IM,II® /,, I LFCU-13 ■`RRtt��ee[[..ss 31 III I��1 • , B Consulting SrEngineers 4a Mechanical•Structural•Energy 1 .`! 'FCC-13 ii. &_, �- efficiency I sustainability I simplicity IIIIIIIIIII■Ii11Nte II T U.�•'a -'I 111.� V-3 •/:4 II V-3 `` LFcu-iz,►JLI I 1 MIL I nisi".: Fcu-12 I 1 I 1 — Level0 REG I Level REG _ _ LevelO REG _ I I Level') REG 85( 00"" = 85'-0" 1 85'-0" \ (85'-0" Mechanical Sections A CD1 Mech Room 4-North CDIMech Room 4-East Mech Room 4-South CD,Mech Room 4-West SEE NOTES#1 PLANS A 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0° aEW07/20 2022 M202A FOROOMMIFIANCE justinh "1/4"=1'-0" Arliss Merrell, 2988'. I 7 I I 5 I 4 I I 2 I 1 I P.E. 1 7 I 3 I B I 4 I 3 I 2 I 1 I 2020-09-04 Permit Set Spa heat exchanger and associated piping in vault,by Loo.„„c",rrR Others.Basis of Design:Carlson 7.5 ST,130F EWT 1RRIDnv DESIGN PO Box 7928 Piping routed below grade,transition within mechanical TEL:9770Cana008895 Secondary loop SWT measurement sensor location space to pre-insulated pipe rated for direct bury, I C,,,,OZ,ROT2EREKssuxo Ecoflex or approved equivalent E AS-1 r IE 300 SG SPRING ST.SUITE 202 7--\T CONTALT:SHERI SANZONE I I 1 3" 3" 3" I' 3 l �" 3" r--1-1/2" 3 r 1-112" 3" 1 P-11 P 18 1 J coeincr snag (1 ST.SUITE 202 f Y 55 i PDAMS 2 1I I ~ 'LJ LJ 0- MV-, o- MV-2 V CH CANLENGI"EER L-I- ►�1 AS-2 HWC-1 HIGH COUNTRY r 1 181]BtAKE AVENUES SUITE�Ot 2" I� - T - p_g T HX-10 1 2"V 11 ■1I1717I IT�1 TEE:9]0.92GLENWOOD 2855 SPRINGS, I M201 \/p_g 11Z11-1/2" L 11 '� C04'wTA�:"ROGER�NE4L /1 II i P-7 P-S ,r —RESOURCE ENGINEERING GROUP r y.Lf _/1_ 426 BELLEVIEW AVE SUITE 1 CO 1224 B-1 B-2 O it I, _ y_i__ TEL:W0.3 BUTTE,rRBAszl000sosI vursn XT-1 TEL: AUGUS 1 1 4— 1 I uranixeoesir�m //Imo:, 11 Imo;, / \ O O P_10 . i 1 120 E•GBSERVATOIRE INTERNATIONAL 1-1/2" 1-1/2" 1" NEW PORK. EWYORK1 I AF-1 2 NEW YORE.NEW ET.710013 FCU-1 CON TEL:ACT:C44s3 / L ( $ I • n I - CONTACr:CARLINA GERACI i— — _ ____ —__' - --_ _ 0 F- ---i -MI-- r AV w,auum AF-2 /j� ���yyy I I I ONEBUTrON Imo)P-1 1 P-2 I 1/2" 1-1/2" 1 1" I BROOKL67 WESTk Y I��,�L�F— FCU2 F- - I -0 L LP3 1 CONSULTING LLC 1-1/2" I I - 11757 WEST KEN CARYL AVENUE,SURE F308 -= 1-1/2" LITTLETON.COLOR.°80127 _� 1^ FCU-3 1" I �L��I I▪ -MI-- CONTELTACT:3.1863 EVER 1 T1 1 -0 I �� CONTACT:EVERETT vElxSGvwE ACOUSTIC C01.41,01,7 M201 I 0 L _--�-- I EREMOS ACOUSTICS 1/2" 1-112" I L--- 1270 NEWBRon,NY 10014 202 NEW voarc,NY toou 0 I --0 CONTELTACT:RYA35 • CONTACT:RYAN GRAYE(GLOTZBECKER) Hot water supply line 4 Q P lT Hot water buffer tank Cold water buffer tank 1,._ MN--GI--M----- -H ` 0F - _ •""ems"Lr�r COLORADO POOL ESIGNS i ., T O I 1/2' 1 ! ^ 11301 W.433RD DROSUITE k1OC 0 • i31 M I- 1"I - 3.8146 FCU-5 _ i_ C� 0 \O) _® O Iti GI CONTACT ANOT�IACELLfDO 3 MV-3 J•T,L�T�_rIL T .nTil_ ,`1/ �rr ��rr T _ ___ ___ IN _ F_ ___ V✓V L DHW-1 1 i 3/4" - 1-1/2" --- I ---i/4" 3/4" 0 2,1/2' - FCU-6 --- 1 ® \�� P-4 C _ 0 T I BT1 I I F- -� __-_ -I F- i M-�i -41) F- ___,_ �_ L \ I ; (j 8 I 1 -' i CS-1, - _ ItyP I�\\\\ __ I MV-4 I 1/2" 1" I I tYP ` O 11 � _�__.1-1/2"__E___ r 1:.1 J i =(=l FCU-7 - r(g��____ ___1 i 0 -0 \ 1 `- ytk :DI P�� 21/2" .. F_ •,�T�/I - - i 1 F- - \ N 1 Cold water supply line O I 1/2 1 I I 1 FCU-8 I , W-410 1-1/2" 21/2" F_ _ _- -> ____ ___� 'VA-- 0 T I I -__ c Y C r n • 1- .-- -� I 1/2" 1-1/2" 1 3/4" I th ' I . 4I--- CH 1/2"T I I FCU-9 1 J, . -� �04- _ 1 ) 8 I I DOII \ w✓'�rT^ -� \*--1- :� _ _- _ _ ___ F_ ___r_ ___ 7- _0 ` -0 ;,O.�p pUsT2"y.TF�I1,, O • G�1 P-14 I/ 1 1 T I 1/2' 1" 1 i f `-`t ', Fcu-m ' 1' r' 4110 38880 DHW-2 T \ - - -�T---- ---; �- -- �ui�� -0ThiIr- a 11/2. giu 1-1/21/2" \FCU-114111 P 6--- 31� _ t " I 234 W.Francis St. lU O .� T 1^ ::: 23Ir- '4 F 1 CH3 �yrT '; = 4 3/4 1-1/2" 3/4 LAG I 100E heating loop €11 R E G --T---� Hot water recirc line F_ __r_ _ M1JI� I I L Resou Rcs ri - 1 3/4" 1-1/2" I CIO sNCINss RING ROUP XT-4 MIN 1S r • f-1/2 \ i - FCU-13 - 1 /I T 1" __ _ 492• -1-1/2".i I 3l4"t B Mechanical•Structural•Energy I.-- / 1 3/4" 1" \ Fan coils located in Mechanical Room 1 1 P-17 FCU-15 $ efficiency sustainability simplicity Refrigerant piping routed below grade,typ. I F- - - ---- ---' I ▪ y -0 ,as I Fan coil located in Mechanical Room 2 /, I\ I 3/4" - - /I Fan coils located in Mechanical Room 3 _ --- -0 2022-06-10 COA BUILDING PERMIT FCU-16 II J_J _L Fan coils located in Mechanical Room 4 b rat l AS-3 `•--- XT 3 .__, J _0 l J r Piping Diagram Notes Fan coils located in Mechanical Mezzanine AF-3 — 1.Clearly label all equipement,zones,valves,pumps,direction 3" 120E heating loop of flow,etc.Display cutsheets,owners manuals and laminated P-12 copies of these plans showing any as-built changes in mechanical room. 2.See Hydronic Schedule for supply and return pipe sizing and zone flow.Balance circuit setter to flows listed and provide Testing and Balancing(TAB)report to engineering for review. 3.Provide visible gauge with appropriate operating range for all pressure and temperature gauges shown. 4.Locate all temperature sensors for system control(not shown) in thermowells with thermally conductive grease.Install Piping Diagram thermowells as needed. SEE NOTES#1 PLANS 5.All heating supply and return piping to be insulated with 1" A minimum insulation.(See the specifications on M1.0 for more s•� ) 'fp' " detail.) s'1 { 9 r1 6.Provide isolation ball valve for pumps,boiler,zones,and Pipng Diagram - Mechanical 07/21/2022-1 DHW tanks for service and maintenance. C) 7.Provide 12"minimum heat trap on DHW tank supply port and N.T.S. i1D(ic011ELX1L 1I cE M 203 CW inlet. justinh PROJECT"o. 310"=1'-0" Miss Merrell, 2968 -I 7 I B I B I a I 3 I 2 I I P.E. I r I 6 I 6 I 4 I 6 I 2 I 1 1 cp — —ti,FF41,7,71711:cifik T 2020 09-04 Permit Set I _\ I I I I - 11 - I I I I I 1FRIDAY DESIGN PO BOX T928 I ::fi BedroomI Beth1ASPEN,CO 81612 i - TEL:970.309.0695 2 `� FCU- ■ rJOLaundry 10I 111corvrncr:DEREK SIwxoE __ I $ I ,) I I E BLUEGREEN BUJ 300 S.SPRING ST.SUITE 202 I H-5 I I I I TEL MO904seeE5 H-1 SHERI I L 1 m H-0 CJ�J- I I - B oN AD0.AMS "" I - 300 S.SPRING ST.SUITE 202 Y 0. _ _ _ _ ASPEN CO 81611 z I Q L 1 — `; ICGGrdinate duct routing in field with steel column in this area T /- - I - CONincr SARA ADAMS - - - HWCl10 .. �IIC, 1 I us..�x.� Mechanical 0 07 - -,1 �,� Direct bury OA duct,BlueDuct or similar 850 CFM 1 P- NCN COUNTRY ENGINEERING L �' N - I 161T BLAKE AVENUE SUITE 101 \ _ In\I m 11 .. - �, r GLENWOOD SPRINGS,CO 8160 e' Wine Cellar x A r ` n �IM� ������� 30"x48" ^ .♦.♦♦ 5.2855 �, _ _ __ CONTACT:TEL 2ROGER NE4L CFcu 1,I I - - O zox 1 IN�I, �P•s... ` ®, 1' _,® 0�- —J\\�(V`II _.EO E.o.�w _ ////////f//// O I ICI 1 II, —_ G //////// ///////%//////UJ/U!/////////l//l////l//l/////l//////l//l///////l//G _RESOURCE ENGINEERING GROUP � Meue ��`FCU 1 w� J� e 0 — B 1 4 B M VI V 11 I D I— CRESTED BUTTE CO 81224m fb_ +I „„ >,,, �V P I A I I� I CONTACT:AUG'USTHA�DODSON�PER 20x2O ;I I i I 0 1 11 I 1 — V 1 I 9 I I r 1 '� e.o.m.... Ili I �I Lr MD2" I � - II - LossERVATO RE INTERNATIONAL I LA1 _ _ — J L DWAoRG�EErTE x I I 0 I Route duct in drop above Theater entry,locate NEW YORK NEW YORK 10013 —— EL.2,2266 63 I _ �� " �� I SA diffuser high on face of wall CONTACT:CARLNAGERACI A ` ��1 �i _ = L AI_ emu. - ' e"w srs°Na62T I ■I■I 1 / 2 I TEL.917.398.0025 I /may BROOKL ST NEW YORK 11222 N I u Hall 520 CFM CONOPE D I Bedroom T 5 ❑® O D APP- Laundry iir'1II 10 r 5 Theater iiinETON. OLOcr�A�w27 smrE F3D6 _ 1 mI 0 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,)L,,,,,,,,,,,,_,,,,,/ „ 1�IMA1 ® r D.5 TEL. ar µR VER6GnA E EE r EREMOSACOUSTICS H 5 6 1 ■.....\�_...... I _,. I r 1 M 1 Room 1zTo o .sulTe zoz / —J ' ' � 1� I TEL YORK,NY1014 ' ' I I yr 0 I 2235 CONTACT RYAN GRAVE(GLOTZBECKER) SPA®�®A®��� I I I r L O J r — — ✓ phi 1H �I I., i - I I opoii—� i000d 54... Route ductwork around steel column _ _ I cOLORaoo Pool DESIGNS uc I - ~^y 0 L GOLDN COLORADO 8040(710 3 I I 10,NI li 1 �{ I Bedroom I iJ�����i' L3.8146 CONTAC TEL T ANDY LACELLf my KEN II rq C i i III m = 1.1 m /,,,,,,, e ®Fcu2sYstem 2 3 `� 1` 1 O r 380 CFM p�q�] kl .i CH-1 H H _ J 2 __ �w =l':J: I H-2 H-0 16'x10 V I IL� FM - - - - - - - - - Electrical/AV 80C J ■ FCU-3—■I. ` Ir *3 III ■ I p„z8„ _ I �' II O9 L I0' ....ow.n. D Hall _ _ - - - - - _ El 80 �H 4 _ 40, rr ® 80 CFM 'P_0./44`1 ® _ - _ ®_ G 1 ,0 PO IICF 1 D.5 I _ �-m PGw er1 D.5 ° ...... k T 30 x8" �' ST'••'rF 6 _ 0 I V1 I MI 6"X1aA0 %�.�°°d ti,•.:°'rr Roo 9 �.� ' 38880� ® 1 O I Mechanical 1 /; I - - - o �w �l o �A ml _ 6 I 2 3 O FCU-3 System O 1 ioi000a000i 1 1/4" = 1'-0° oe_>o_� I °„x26" I 1 �� —— — J1 © I __' - ll i C 1 234 WFrancisSt- ��ii - - - 1�© r , Jr1 I - - L ,H-2L. _ - - 234Aspen W. a CO ncis St F oaaeB 68 l%/%%///9 '- _ ' L-I= I .,-. , H-4 L R E G 3°zs" I II\:I'i' 1 Fcu�ao uJ • III I PVC) I Will I I" " I_ _ _0 _ LL 1 -l1i _ I CROUP ,,,c i, "J — — — — J y'"p 0 up°J I I awe a� - a. ° 491 B .®//,ELL" / II V 1 I ® T - - 1 ������ Bs reginaconL•Engineer 1216 ii i®®® X������. © a�1. ..- �` 4 •..:� ��� Mechan cal Consu•lling Strructural�r Energy - T _�. I9 - - - 1 • " Tr < i 1 J i - O efficiency I susta nability I simplicity Electric heat trace in window wells,typ. �,r — _ _ I__ _ _ II — I . ////////////O{///.////�' I I II - 2022-06-10 COA BUILDING PERMIT ,� Gym I 410 �� ' iBedroom I ".::' iv, 12 — I ®e 1tI i Mr% r -'II — r J I .2. I I q• :._ — 1 • I �� 0.;_ Bedroom I I Bath I - V • I I — Laundry I II pit I I 10 I I 11 I Hi IL, H1H6 I ' I— , I I IIII 1 11 "� /� 4 ` — .I4. L — - - ox I o Fan Coll Systems �.._c S st I I - FCU-1 System 3 c - - —- — A 1 � O — I %o I I - - � �I%Hai:®�n®�r.- ,-r.,���m, _ - - _ _ - - �EE�N®�ES#1 PLANS 1/4" = 1-0" FCU-4 System I I I rfiewig�1 M301 4 ff _ f " 1 O /4 1 -0 21/2022 L 2 3 �Rcoot tinh „„e„0 justinh - -91/4"=1'-0" Miss Menell, 2968"o I T I 6 I 6 I 4 I 3 I 2 I 1 I P.E. I 7 I 6 I 5 I 4 I 3 I 2 I 1 I 2020-09-04 Permit Set 1 DESIGN2 PO BOX ASPEN.C8161 2TEL.970.309.0696 REK SKALKO E / \ / II I E 3005GSPRING 6T SUITE 202 ASPEN,CO 81611 `•/ `•/ TEL:.0.5.8676 CONTACT:SHERI SANZONE I 1 12"x6" 0 �(T Er, eI L O I F-' ,r' O 3005 SPRING ST.SUITE 202 IUV, -H-4 G 4 a (; -a•" H' CH 3 ASPEN C081611 XT i TEL.9709252855 XT_2' CH 2 CH-4 Y"r CONTACT SARA ADAMS L 1; MIII 1 L _ W I D UGH COUNTRYENGINEERING 1517 BLAKE AVENUE,,SUITE 101 FCU-5 Mechanicall -- I' AF-3 I GLENWOOD SPRING CO81601 ;,a._ '4�-2 �H_2� CONTACT?ROGER NEAL 1 s .EP EXIMEEw 11� CRESTED BUTTE,CO 81224 ' 0 r UITE 201 T Hi —RESOURCE ENGINEERING GROUP I M202 .- O 1+±:'� I L:9'r0.34.1m216 THSASLDODSON HARPER ) '.; L L CONTACT:AUGUST I:'( Mechanical 1 o0 1Fi tir2— - 62 gsv 12"x6" "« _ D d I2 x6 1 D APPrEn rcnroSURE CONSULTING LLC l a I•l'0 W-2 1157 WEST KEN CARTL AVENUE,SURE F308 %�//////O ,I XT. :�Q L urnEm 83coLoanoo wm r _ J Laundry V l H_3 II+ `1 CONTACT:EVEREW VERSCHAVE RCUS i I $ 1i II .Dr 1�1 EEMOS ACOUSTICS 1220 BROADWAY,SUITE 202 N YORK,NY 014 '646..0 2235 TELL CONTACT:RYAN GRAYS(GLOTZBECKER) WADWISIDWIT 11301 W 431RD DRO C SUITE k10 TEL GOLDEN,6C3.8146 0 80403 II I \\\1 CONTACT ANOT IACELLf /I I I _ o — FCU-6 Fr a I I II \`� I :" 1 r _ Laundry CD,FCU-5 System O FCU-6 System --5, I O I I 1/4 - 1 0 1/4 - 1 0 çii H I H I D c Wine Cella I u 7 I " i _---Q,N00 UQFti h VO,,,.. T..,.., ".;rF�lilr T T 4 � - - I I _ O , "3ssaoT` t% O I `1. �'/�' I41„, — — — Ial� / • `~ TONAL ENG\ ,. J 1 I I //�' 10 - A r.:®iiii IIIIIIIIIIIIIIIIIIIIII,'....-.. -. 06-10-2022 1 .•••441� - — FCU-7I 234 W.Francis St. ti ` I d �r�ii■ •:e � - L I Hall 234 W.Francis St. Mm1 i293/8'x6 ��i19. J� .cp, :::. "1 - aa , <. O— — — — — — — — O �� ., S�YO :a-i — Aspen,CO i��l1lrs - - - - � - CDI r - REG 1 I I I D.5 I- , D.5 CROUP R N II I - 1 f I I -_ iI I reginacom•N 970.349.1216 I ik I II I I I E I I I c0nsultn9En9meere B - I I I I _ I I B Mechanical•Structural•Energy �ia I 300 CFM 1 I Bath I - I l eMlc�ency susta naminy simpl city A I II ok I ® Bedroom I _ I Bedroom i 0 2a= I % r _ Laundry I ® I Div 36"x5" 10 I I 11 I - — i r J ® — — I — i 022-06-10 COA BUILDING PERMIT i SA diffuser in face of millwork above cabinets I 1 T I I I L _ 1 11 ©�� ®200 CFM 'Jl��////i �. 'I I I I Provide access panel for hydronlc I - ®1[ �I li 30.x5' manifold in Laundry millwork - 1 I I �� �� 250 CFM- 1 _ = J P I O M� RA1 36'x5' I IL1SCFM '� i�� V-1 �� v J L � I;OI 2 CO O Fan Coil Systems A O FCU-7 System C.) FCU-8 System SEE NOTES#1 PLANS 1/4" = 1'-0" 1/4" = 1'-0" ri„E.-0 21/2022 M302 FORCOOtatilelJNICE justinh — —91/4"=1'-0" Arliss Menell, 2968 xo. 6 I 5 I 4 I I 2 I 1 I P.E. I 7 I 3I a I 4 I 3 I 2 I 1 I —roi.,„„,-",,,,„,"..„ T 3ISSUNCE 2020-09-04 Permit Set 1FRIDAY DESIGN PO BOX 7928 ASPEN.CO 81612 TEL.970.309.0895 R.SKALKO E q L — _ 1_ — ': E a UEGREEN BUJ 0 n ; g00E5 SUITE 202 N,CO 81611 • CONTACT ISANZONE — O —d, Y _ TEL 91 r rir�ur� — — �I1 0 ! �•ipi••i• ego .••�..•1 300E CO81 SUITE 02 ...•... ASPEN,C08161111 CONT I iil i ili r ::•:::. MIL ENGINEER ��AMs I 400 CFM 161]BLAKE AVENUE SUITE 101 RA1 0 r Connect OA to RA of Laundry FCU,provide— 1 1 �] ry cry COUNTRY ENGINEERING 18"X8" ; / I y G CgNTACT2 ROGER NE4L 54"x5" Q �� motorized OA damper at connection to main GLENw000 SPRINGS,Ncs co a,6o, OA trunk El .,,,..,,, E.o�..w 4°X10°I a"X,o" m', I II RESOURCE��ir I426 RESOURCE ENGINEERING GROUP J .,.. UITE 201 II1II IIFCU9 l d I i 1Bedroomiim wuxEa smEEriRNnnoNAL il� Bathroo� I O I NEW YORK NEW YORK 10013 M302I I p_ Bedroom / O � H- - --® T5.63 Landry I 'I . 10 �s1/�K�I61pwv�-emu �q8 ,_ — _ —I ,.I� [� �% 67 RW ST STKLYN.NEW RK 11222 NI BR ®200 CFM I I I�_ ....... 01�SLT, ._ w W m vLl ®_ 150 CFM 200 CFM '�Yr L.91]39 00025 Y0 IIII rib J (}`} CONEIMMa�CaM41EMM o 11 30"z5" I I Mechanical. 1/ 30"z5" S( IAPR).ENCLOSU. 1 ill' 1101, FCU-16 • _ _ 36"X5" JOLITTLETON COLORAD08012]LT NG LLC IY 67 WEST KEN cA nL A ENUE sunE F 66 1 0 ��,� — v CONTACT:EVEa TT VERNOIAVE Route ductwork around steel column I I III 12 zi I .� .cwan«wsuL.µ. 0 - - ►R Mill. 5 m EREMos ACOUSTICS ��\ CONTCT:RYv ORATE 202 1 I ® 30CF II,p,0 _1_- -vm a © - -a a -. — \ / 2235 GRAYE(GLOTZBECKER) \\\���---////// ice:. �/ 200 CFM_ _ _ 4 �300 CFM r �� �� I u O ������% ^4�.' co0G 3 LDPSGN6u ' 20"xl0" D 11301 - SUITE OHO EOMGOLDEN COLORADOe 0303 r _ 1 � TEL CONTACT. LACELLE I L,4L!TJ'1J, . I 1 Jm1 Provide temp sensor for ice / 'SA in wall at 60 \ \ machine closet in RA duct 2 /1 \I J RA in ceiling- OFCU-9 System 2 FCU-10 System N 1/4" = 1'-0" 1/4" = 1'-0" CD 1-7.'..-,.." -e- O ..omn� 6 _-_Q,p00llcFti t, O O - - 1 'x,3,pJ66"0 ;rS1irl 38880 Powder Roo 14 V _ -i - CD y ONAL N= �� l f r — — -i IL. L FCU 12 ` m0 Ill I I r % I 1 I 06 10 2022 f I s p''-.- -- ��I e e I_ - . 234 W.Francis St. G — + I ©©1��}77.� G ,- Spa Lounge v< `r1. e1•G I , 234 W.Francs St io 13 Massage '1I�r . Me hanicel4 Aspen,CO ok J 9 III �C .. L ,l - - .t - ,�wwe 1 2 r ps.,E_,G— - 1A318'1 iii�, ��;11 �', Q 1 1 Nc Ali ISauna imi�` (i '1.v v■ I `selYi� f regin onom•Engine 9.1216 B I 15 II_ y_3 \ I NS I B Mechanicalm'sn Engineers •rEnergy 11 —Shower/Steam I L - - Massage I 1 I 111 16 I Mi 17 I efficiency I susta nobility I simplicity I I 1 . tliltill I .. • / T/ 7/ 2ioL / of IL 2022-06-10 COA BUILDING PERMIT 49 — 'i fI1 r 1I, r1 t -A ytOv ®m,m� 200CFMI.' Q L ..:I V-3 ® 30.,x5., ®1 r — — L — 12„x6„ I ® 4 E Ea IL IY -.�R_7 • Fl9. echanical 3...- _ j� — iii� ii :p/ ,�B — �1�' 1 I � f i I I • �� e CD) 16 OFCU-11 System O FCU-12 System Fan Coil Systems 1/4" = 1'-0" 1/4" = 1'-0" A SEE NOTES#1 PLANS rEvorg n M303 07/21/2022 PORCookaMPLINCE iustinh PROJECT xo. — —91/4"=1-0" Adiss MCCCII, 2988 I 7 I 6 I 5 I 4 I 3 I 2 I 1 I P.E. I T I 5 I B I 4 I 3 I 2 I 1 I � amµ E s05 0 O poEm g 2022-06-10 COA BUILDING PERMIT 1 1 e I Loc....noxrrEcr PO BOX DESIGN5 ASPEN,CO 81812 TEL.970.309.0695 • E I I- r 9 ® ® _ E SUITE 202 D.5 D.5 SSS��� ems 1SA \ �a � L � ® PwdeR 1 L: sseNZONE I I _ LI' ' L lei 13ENDON ADAMS 3005 SPRING ST.SUITE 202 I I • i v P I 1 V ASPEN SCO PRING SR I I I;:I — Ca 55 I I FCU 13 I I CONTACT:�snan ADAMS _ AA 1 ®400 CFM I _ _ _ _ MIL J © n HIGH COUNTRY ENGINEERING ISP - -Ihanl cal 4 I 48x5 ..o�oios�ro�® 100 CFM „ — P�� TEL Powder Room(I MEE ,. I ❑0 I I CONTACT:SROGER NGLENWOOD E4L081801 7 wiii.vim 4'x4" ®i®®®i®®®i®® u, = m =i �/ — I I IKILlik/MEP ENGINEER D Ldr - - �� _ 12x6" �� = I -- -- —- I // ,/ - OS ' W -,�I I I I r - - - - - CRESTED B0 GGB TEC 'CONTACT:AUGU3 PER W3, 1 •w , I I © I ' I !AII// - Sauna LOBSERVATORE NTERNnnoNu150 CFM — J I "'� I WIimi I I I \ TEL AD2E 44N2EWYORKRN W EYEOrR TK E1 0013 24"x5" Spa Lounge ® I Massage I • -„ Gym 12 1 1 CONTACT:CARLNA GERA.- ®. , I (-1-) I 12 I tL� 1 BROOKLYN NEW YORK 11.2 e-®®�®AI 1-4 3/8 Imo. wee.j . r..k, 3980025 — — — — .I,. I1 I L ®��®�® E..00EsMLTT ENa I I `. g . m © ��\/ ter,,,... D I I I 30x4 V 3 0 t �'s D CONTACT: ENCLOSURE CONSULTNGUC 1T5r WEST KEN cAmL AVENUE SURE P308 LITTLETON COLORADO 80127 Sauna 1 ACOUSTIC 15 I 01 I I 9OV 3 I . I \300 CFM , 0 CoNTAcr EVERET VERSCHAVE Shower/Steam L J RA2 ��.�I 1 Ohl O I 30"x4" Eel/ /I I �`II 16I ✓ ! . II ' I II, NERENws Acousr cs EZTo eaonownv SUITE 202 — qW YORK,NY 10014 �q //// / // _.,U J_ ///. /_ //// l /iz L J eons Cal 3' CONTAOTSPA �RYAN GRAYE(GLOTZBECKER) //,m///mn// fF, r,-r;--'jam, �-rr` `1 i h 1 '� `r 'r — - �y air C /p 7B// / /o — GGLG DESIGNS 0 Open RA concealed In cove lighting detail / _ 11301 .SUITE/HO C I . 1 l 1 I 11 1 1 7 1 1 11 1 f I GOLDEN C3.8146 O BO 03 TEL r a CONTACT.ANDY LACELLE O O O CI \�• FCU-13 System FCU-14 System C) „ , „ 1/4 = 1 -0 C) ,, t4 143 c c r1-�Pp00 UCFti h :::•UBT�y'•.;F�II, r 1.2 ` . 38880Y�/s 5 Eh M202 06-10-2022 — / C \ `11`�� ��,� kl I O200CFM `_�� ° ► � ? � — —Bedroom— — ' % �-�--,—,' , I Rq1 234 W.Francis St. `�0El N, , I 28 I IKVN 90 36.,x5., �`,` I \ I I". I I I 234 W.Francis St. I► 11 ��11��� I I - 1s I Bedroom - Aspen,co "\ I I 250 CFM E I `�, ..e� _ 36.,z5., 28 R E G ��� ! r It I ��. x12"x6" E e,N O 1 ��+1_. 225 CFM T — —J `A. 'IY CROUP i '�,ILI iIH 36"x5' 2S �[ / �M\— _ ticu-16 J N� •I\\. Mari, _ \\0! I,_` a_ '� L regL Consulting• 0.349.1216 I g Engineers `�'424, m` o �. 1 1 1` , I S � v B Mechanical•Structural•Energy B ' 1.R7 — ` _ � ��®®�®®®�®®®®®®®��� efficiency I Structural •simplicity ����C 'I IC —��SA above cabinets. 1 ., P �250 CFM u�l�� �' 1 I 36"x5" 1 ' gh 01_j u— — ''os i 27I Aol �ti I iv-2 Study \Bathroom I _._e I t` I RA in telling of hallway I �! 27 \ NI�E, I Access hatch in ceiling,coordinate detailing with Architect C Ba ` Study r Bathroom 1 Access hatch in ceiling,coordinate detailing with Architect C[31 Fan Coil Systems A OFCU-15 System O FCU-16 System SEE NOTES#1 PLANS A 1/4" = 1'-0" 1/4" = 1'-0" iMV � 07/21/2022 d M304 FORCOOEGV PLIANIX justinh PAGE HO PMECT—91/4"=1'-0" Arliss McTell, 2968 xo. I 7 I 6 I 5 I 4 I 3 I 2 I I P.E.