April 22, 2022 "Exterior" category.
RE: 1010 East Hyman: Change Order#2
TO: Sydney Fallon
Dear Sydney,
The following describes the scope of work for 1010 East Hyman Change Order#2.
CIVIL:
• GRADING—SEE CIVIL
• INSTALLATION OF (2) DRY WELLS
• SHORING TO INSTALL DRY WELLS.
EXTERIOR:
* INCREASE ELECTRICAL AMPS FROM 200 TO 400
* DELETE (3) WINDOW WELLS
* REPLACE (3) WINDOW WELLS
• REVISIONS TO THE HARDSCAPE SHEET A1.0
• TRASH ENCLOSURE AND CONDENSOR PAD SHEET A0.1C
INTERIOR:
• REMOVE AND REPLACE STAIR
• NEW STAIR LANDING AT ROOF
• NEW HOSE BIB AT LIV ROOM BALC
• NEW SPRINKLER SYSTEM
• LIGHTING CHANGED TO KETRA
• NEW FIRE TABLE AT ROOF
• STEAM SHOWER IN MASTER BATH
• REMOVE 1 SINK AND ADD 1 SINK
• DELETE 1 SKYLIGHT OVER KITCHEN REMOV E &REPLACE 1 SKYLIGHT OVER STAIR
• ADD GLASS RAILING AT WEST WALL OF ROOF DECK
Please let me know if you have any questions about our proposed scope of work
Respectfully submitted,
Monique Agnew, AIA LEED AP