Loading...
HomeMy WebLinkAboutFile Documents.1010 E Hyman Ave.0052-2023-BCHO ASPEN WATER DEPARTMENT 427 RIO GRANDE PL ASPEN,CO 81611 Utility Connection Final Permit(UCP)Number:C-23-080 Building Permit Number,if applicable: 0056-2020-BRES New ECU total: 2.31 UTILITY CONNECTION PERMIT AND WATER SERVICE AGREEMENT(form 20170617) THIS PERMIT EXPIRES ONE YEAR FROM DATE OF ISSUE IF UTILITY CONNECTION HAS NOT BEEN MADE. PROJECT OR BUILDING UCP PERMIT ISSUANCE DATE TAP DATE SFR Interior Remodel Final 5/23/2023 NA OWNER OF SUBJECT PROPERTY MAILING ADDRESS ("Property Owner") 7806 CHARNEY LN SUSI MARILEE E REV TRUST BOCA RATON,FL 33496 PROPERTY ADDRESS LOT BLOCK SUBDIVISION 1010 E HYMAN AVE NA NA PINE GLEN TOWNHOUSE ASPEN,CO 81611 CONDO ACCOUNT NUMBER PARCEL ID NUMBER #OF METERS SERVICE AREA 01-28046300-06 273718147002 1 Subject property located in City Boundaries? yes Irrigated Area Sq Ft: NA New Tap? No Class of Service: Residential Size of fire line tap: 2" Abandon Existing Tap? No Size of domestic line: 1" Abandon Existing Well? NA COMPUTATION OF CHARGE Detail Total UTILITY INVESTMENT CHARGE Charge per ECU Service Area 1(2020)$7,960 x 0 ECU's= SO PAYMENT IN LIEU OF WATER RIGHTS PER ECU NA WELL DEVELOPMENT CHARGES PER ECU NA PREVIOUS UTILITY INVESTMENT CHARGES PAID NA PREVIOUS UTILITY INVESTMENT CHARGES PAID NA PREVIOUS UTILITY INVESTMENT CHARGES PAID NA Total connection charge due: SO UTILITY CONNECTION PERMIT MUST BE SIGNED/PAID WITHA SEPARATE CHECK IN THE AMOUNT INDICATED. ' This fmal utility connection permit reflects$0 in final tap fees due as there was an existing credit on the account from an ADU that was removed previously, and on a different permit according to records on file.Please reach out with questions.Thank you. No more than 1 service line(s)is(are)allowed under this Permit.Each must be controlled separately as its own curb valve.Application must be made to the Water Department for additional service lines. Water Rights Conveyed to the Cty: 1440& £ ,/j44.f .� . 23 St e ven k W ItSDM 5/23/2023 S' atureof Owner o �tject Property ate City of Aspen Date Owner � —._ .� .► ,.». .�.... , _ ,� — — Sub ti ed a sworn to before me this al day of Art,20 by (Owner) I Iv(Pii•.,• ALICE ZAMBERLAN SANANDRES I ? i _. Notary Public-State of Florida Il I ii1� " Commission p HN 371939 j / My commission expires: SUa 1 at:,:aoal •v 'N,oFr� My Comm.Expires Jun 29,2027 I //' ,. �RI ry Public I ��Bonded through National Notary Assn. b 1 ITIONAL TERMS AND CONDITIONS ARE IN THE ATTACHMENT TO THIS UTILITY CONNECTION AGREEMENT. THIS UTILITY CONNECTION AG' EMENT HAS IMPORTANT LEGAL CONSEQUENCES AND PROPERTY OWNER IS ADVISED TO CONSULT LEGAL COUNSEL BEFORE SIGNING. ATTACHMENT TO UTILITY CONNECTION AGREMENT: ADDITIONAL TERMS AND CONDITIONS OF CITY OF ASPEN WATER SERVICE 1. Connection to City Water System. City water service will be connected to the Subject Property in accordance with all requirements and procedures of the Aspen Municipal Code and Aspen Water Department,including but not limited to all applicable standards and specifications for materials and meters,and all required Water Department inspections. 2. Payment for Water Service, Water use charges will be billed on a monthly basis from date of tap unless the Property Owner has received the Water Department's written permission to have the curb valve closed. Should the curb valve be found open without Water Department permission,water charges will be billed back to the date of tap. If the Subject Property is not occupied and construction is being undertaken on the Subject Property,the account for the Subject Property will be billed at a construction rate for nine months from the date the tap is made. At the end of such nine-month period,the higher flat rate will be assessed until a water meter has been installed and passes inspection and the Certificate of Occupancy is issued. Upon issuance of the Certificate of Occupancy,the account will then be billed at the City's water service rates applicable to the Subject Property,as such rates may be changed from time to time. 3. Utility Investment Charge:Utility Investment Charge(Tap Fees)based on water using fixtures will be calculated initially based on the attached worksheet and are subject to revision upon survey of the fixtures in the completed structure.Within 60 days of final survey, Property Owner shall pay any increase in Utility Investment Fees required by the survey,or the City shall refund any overpayment made prior to the final survey.ADDITONAL WATER-USING FACILITIES INSTAL]]D FOLLOWING THE FINAL SURVEY SHALL BE REPORTED TO THE WATER DEPARTMENT AND ARE SUBJECT TO ADDITIONAL UTLITY INVESTMENT CHARGES AS DETERMINED BY THE WA 1'hR DEPARTMENT. 4. Landscaping. If the fixtures authorized for this permit include one or more hose bibs,up to 3,000 square feet of irrigated lawns and gardens are permitted. Additional irrigation will be allowed only if additional ECUs are allocated in the attached worksheet to the Subject Property for irrigation. The total amount of irrigated lawns and gardens authorized by this Utility Connection Permit will be determined by the final ECU survey. Irrigation in excess of the amount allowed by this Utility Connection Permit will require Water Department approval,amendment of this permit and additional connection charges. If outdoor irrigation is permitted by this Utility Connection Permit,and if the Subject Property is subject to the City of Aspen Water Efficient Landscaping Standards(or the pilot project for such standards)["Aspen Landscaping Standards"],all landscaping will be designed,installed and maintained in accordance with,and subject to the requirements of the Aspen Landscaping Standards. 5. No Independent Water Systems. Aspen shall be the sole provider of all treated and untreated water service to the Subject Property for all purposes,including irrigation.Without Aspen's prior written permission,there shall be no use on the Subject Property of raw or treated water from wells,ditches or other sources. The owner of the Subject Property will not develop,allow,or utilize an independent treated or untreated water system,or any wells within or serving the Subject Property. 6. Abandonment of Existing Wells and Use of Wells. Prior to issuance of a Certificate of Occupancy,the Property Owner shall have all wells located on the Subject Property properly plugged,sealed and abandoned as required by the rules and regulations(including any amendments or revisions thereof)of the Colorado State Engineer for abandonment of wells. If any well serves the Subject Property but is not owned by Property Owner,or is not located on the Subject Property,or serves properties in addition to the Subject Project, Property Owner shall permanently disconnect well service to the Subject Property from such well. A certificate of well abandonment or evidence of permanent disconnection,as the case may be,shall be provided to Aspen prior to issuance of the Certificate of Occupancy. Property Owner will record the Certificate of Abandonment and provide a copy of the recorded Certificate to Aspen within 90 days of abandonment. 7. Well Permits and Water Rights Associated with Wells. Well permits and any decrees for exempt wells associated with any wells located on the Subject Property shall be cancelled. Water rights decreed to wells on or serving the Subject Property,other than decrees for exempt wells located on the Subject Property,shall be assigned or conveyed to Aspen,or relinquished by the Property Owner,at Aspen's discretion. The Property Owner shall relinquish any water rights to wells shared with others,which serve the Subject Property. Such transfers,or relinquishments shall be completed before a Certificate of Occupancy is issued. 8. Water Rights or Payment in Lieu of Water Rights:Annexation. If the Subject Property is considered an extraterritorial connection as defined in Section 25.12.020(b)of the Aspen Municipal Code,or any amendment or revision thereof,the Property Owner must,as a condition of receiving Aspen water service(a)either convey water rights acceptable to Aspen or make a payment in lieu thereof as provided in the Aspen Municipal Code,and(b)agree to annex the Subject Property to the City of Aspen when requested by Aspen to do so.Property Owner acknowledges and agrees that the Subject Property will be annexed to the City of Aspen at such time as Aspen requests annexation and Property Owner will pay all costs associated with such annexation. 9. Well System Development Fee. A well system development fee will be assessed if applicable and must be paid upon issuance of this Utility Connection Permit. 10. Abandonment of Existing"Paps,Lines and Meters. All existing Aspen water taps to the Subject Property that are to be abandoned must be physically severed from the City water system,and all service lines and meters to be abandoned must be disconnected in accordance with Water Department procedures. Property Owner shall contact the Aspen Water Department to schedule Water Department inspection of all taps,service lines,and meter installations,as well as all abandoned wells on the Subject Property,prior to receiving City water service under this Utility Connection Permit. 11. Subject to Laws.City Charter and Code. The water service provided pursuant to this Utility Connection Permit is subject to,and the Property Owner,Subject Property,and all occupants thereof,are bound by,all applicable state and federal laws,and all applicable provisions of the Charter of the City of Aspen,the Aspen Municipal Code,and all applicable rules,regulations,policies and ordinances of the City of Aspen now in effect or as may hereafter be adopted. 12. Recording. Aspen will record this Utility Connection Permit and it will be a covenant running with the Subject Property,enforceable against Property Owner and subsequent owners of the Subject Property. 13. Authorization. By signing this Agreement,Property Owner represents to Aspen he/she/it is the owner of the Subject Property and that all procedures necessary to validly contract and execute this Utility Connection Permit have been performed,and that the person signing for Property Owner is duly authorized to do so.