HomeMy WebLinkAboutFile Documents.1010 E Hyman Ave.0056-2020-BRES (4) 40/0
CITY OF ASPEN
WATER EFFICIENT LANDSCAPING STANDARDS (WELS) ORDINANCE
Pre-Submission Information & Documentation Checklist
IMPORTANT:This checklist does not constitute approval of the WELS review.When signed by City staff City of Aspen
Parks&Open Space
this document simply acknowledges that an applicant has presented to City Staff the necessary 585 Cemetery Lane
Aspen,Colorado 81611
documentation to enter the WELS review process. 970/920-5120
Effective August 13, 2018, the City of Aspen Water Efficient Landscaping
Standards, Ordinance 17, Series 2018, shall apply to the following projects that use City of Aspen potable
water:
WELS Section 2.1.1- Landscaping, grading, installing or disturbing hardscapes, additions to
structures, etc. that has a disturbance area greater than 1,000 square feet and greater than 25% of the
entire site.
WELS Section 2.1.2- All new construction with internal work only that demolishes greater than 50%
of the existing structure (based on the entire square footage of rooms where floors, ceilings, or walls
are exposed over the square footage of the structure).
Links to the Water Efficient Landscaping Standards, the Water Budget Analysis & Calculation Sheet, the
WELS Documentation Requirements, and Example Plans can be found at:
www.cityofaspen.com/199/Landscape-Ordinance.
For assistance in compiling required documentation package, including water budget calculations, please
contact Rick Magill, WELS Plans Reviewer, City of Aspen Parks Department at 970.920.5582 or at
rick.magill@cityofaspen.com.
WATER SUPPLY INFORMATION
If water is to be provided by City of Aspen,the Applicant must answer the following questions:
1. Is the property already receiving City of Aspen water service? Yes ❑ No
2. Is there a well or wells on the property? ❑ Yes No
3. Are there other water sources/supplies on the property? ❑ Yes 11 No
If yes,name other water sources/supplies:
4. Will raw water be used for irrigation on this property? ❑ Yes XI No
If yes,provide proof of a raw water agreement, an account number, and/or proof of right.
5. Are there existing city water taps to be disconnected? ❑ Yes 21 No RECEIVED
REQUIRED INFORMATION AND DOCUMENT CHECKLIST ''
Doc last updated: 5/9/2019 07 Page onn3 O
ASPEN
BUILDING DEPARTMENT
WELS Pre-Submission Information and Documentation Checklist continued
PROJECT INFORMATION
Date: 06/30/2020
Project Address: 1010 EAST HYMAN,ASPEN CO 81611
Project Type(e.g.New Construction,Redevelopment,Remodel,Addition):RENOVATION
Total Property Sq. Ft.: 3,000 *Disturbance Area Sq. Ft.: PROPOSED: 186
*Disturbance Area is defined as the external area of the building site where the ground is disturbed,which includes,but is not
limited to: soil grading,landscaping,removing impervious area,adding impervious area,replacing impervious area,layback
areas,and stock pile areas.
Total Landscaped Area Sq.Ft.: EXISTING: 873 Total Irrigated Area Sq. Ft.:EXISTING: 873
THE BUILDING FOOTPRINT IS NOT
BEING DISTURBED.THE **Affected area is the building square footage plus the
**Affected Area Sq. Ft.: DISTURBED AREA THAT IS NEW IS SNOwMEL41sturbance area,with the building square footage equaling the
PAVING WHICH IS building footprint alteration plus the new square footage.
186 SQ.FT-SEE SHEET A0.1
Zone District: R/MF
Irrigated Right-of-Way Area: 0 Total Non-Irrigated Native Area: 0
Non-Irrigated Right-of way Area: g
rea that.is to remain &proposed: 928 0
Total Exterior Hardscape(aImpervious)Area: Structure(s)Area:
AT.T FTNTSHFS AND SHFFT
INTERNAL ALTERATIONS ROCK REPLACE ALL FIINIS TOS Current Existing Interior Sq. Ft: 3022
ELECTRICAL AND HVAC TO BE
Summary of Interior Work: REPLACED NO SQUARE
FOOTAGE IS ADDED Proposed Interior Sq. Ft.: 0
Total Interior Demolished Area: 9.5%see sheet A0.4
AUTHORIZED PROJECT/OWNER REPRESENTATIVES
Project/Owner Representative Name: Project/Owner Rep. Ph: 646 554 6362
MONIQUE R AGNEW Project/Owner Rep. Email:MO@MAARCHDESIGN.COM
N/A THERE IS EXISTING
Irrigation Designer Name: IRRIGATION THAT Irrigation Designer Email:N/A
WILL REMAIN
Landscape Designer Name: N/A Landscape Designer Email: N/A
PROPERTY OWNER INFORMATION
Owner Name: MARILEE SUSI
Mailing Address: 1010 EAST HYMAN ASPEN CO City Water Acct.Number:
Phone:561 445 2502 Email: marileesusi@gmail.com
PRE-SUBMISSION DOCUMENTATION PACKET CHECKLIST(Due at time of building permit application, if compliance with WELS is required) RECEIVED
Doc Last Reviewed: 5/9/2019 07 Page2 ot3O
ASPEN
BUILDING DEPARTMENT
WELS Pre-Submission Information and Documentation Checklist continued
REQUIREMENTS: COMMENTS: SUBMITTAL COMPLIANCE Checked
by Plan Reviewer:
Site Development Plan Identify Development/Disturbance Area 0 Yes ONo
Landscape Design Plan, and Soils/Soil Required Components Listed in the WEL 0 Yes ONo
Amendment Information Standards
Irrigation Design Plan, and Required Components Listed in the WEL 0 Yes ONo
Hydrozone Information Standards
Water Budget Calculation Worksheet Required Component Listed in the WEL 0
Standards Yes ONo
Pools&Water Features(spas,pools, Is there a pool,spa or water feature? 0 Yes ONo
ponds, fountains, etc.)
Are pool and spa covers proposed? 0 Yes 0 No
Do features use a recirculating water
system and/or recycled water? 0 Yes 0 No
APPLICANT ACKNOWLEDGEMENT
I/we agree to comply with the requirements of the City of Aspen Water Efficient Landscaping Standards and submit a
complete Landscape, Irrigation, and Water Budget Documentation Packet for review by City Staff
•
Novtertz ,RG r JUNE 30 2020
Applicant Signature Date
MONIQUE R AGNEW
Print Name
FOR INTERNAL USE ONLY:
PRE-SUBMISSION CHECKLIST REVIEWED&ACCEPTED BY:
DATE:
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
WELS REVIEW IS NOT REQUIRED (Pre-submission Documentation reviewed by the signatory below)
AUTHORIZED BY:
DATE:
RECEIVED
Doc Last Reviewed: 5/9/2019 07 Pagers or s O
ASPEN
BUILDING DEPARTMENT