Loading...
HomeMy WebLinkAboutFile Documents.1010 E Hyman Ave.0025-2022-BCHO (8) A0.0 TITLE SHEET Zoning Comments 1 - 1010 E Hyman Ave - 0025-2022-BCHO 10. CHANGE ORDER SCOPE OF WORK_04_22_2022_.pdf(1) Page Label: 1 Please update the Page Index: 1 1 , Please update the scope of work so that all scope of work so that xt'erier scope;,f wcr:'is ,a„dor the"Exterior" all exterior scope of File Name: 10. CHANGE ORDER SCOPE OF WORK "" '' Etteror"category. 04_22_2022_.pdf — category. 1.SEE UPDATED SCOPE ON sheet A0.0 Title Sheet 90. CHANGE ORDER#2_ARCHITECTURAL_04_24_2022_(1).pdf(19) Page Label: A0.0 TITLE SHEET Please fill out a zoning checklist _` Page Index: 1 2, File Name: 90. CHANGE ORDER#2 https://www.cityofaspen.com/DocumentCenter/Vie ARCHITECTURAL_04_24_2022_(1).p-df w/4660/Residential-Zoning-Checklist:�: 3. SEE sheet A0.3 DemoPlease provide updated demolition calculations 2.Complete-SEE 1%.i (square footage and estimated percentage of ATTACHED above grade structure should suffice). 4. River City Consultants " 4 Please provide a current survey per City of Aspen Sheet Cl and C2 standards. Please provide zoning summary sheet. Note that 5.Pine Glen TH Plat reception 5 umber 358407-SEE due to the lot size,the allowable floor area is n limited to that of a single family residence. SUBMITTED DOC Page Label:A0.0 TITLE SHEET - Page Index: 1 6. Please update the scope of work so that all ��aw� File Name: 90. CHANGE ORDER#2 exterior scope of work is under the"Exterior" -M ARCHITECTURAL_04_24_2022_(1).p-df category. 16.SEE UPDATED SCOPE ON Sheet A0.0 Title Sheet MO L Page Label:A0.1 C TRASH ENCLOSURE AND Condensi units reauire screenina if visible from „„a„pm,�„-„ °rern CONDENSER PAD Sheet A0.1 C add notes about 7' the street. 7•THE UNITS ARE NOT VISIBLE FROM THE selbs.The image puellry=oleoe° Page Index: 2 the allowed 32'exempt STREET Meeta Is too low W...". mR""` File Name: 90. CHA0 trash enclosure Please add note regarding the height of the ARCHITECTURAL_ _<<+_4v«_k 1),IJUI $ mechanical e equipment in the setback.The image 9 quality of the c�8.SEE UPDATED CUT SHEETS specifications. ON HIGHLIGHTED SHEET Page Label:A1.0 APPROVED& PROPOSED SITE PLAN Ih! Per 26.575.020(e)(5)(h),window wells are only Page Index: 4 File Name: 90. CHANGE ORDER#2 9 allowed in the sideyard setback if they are required ® OrARCHITECTURAL_04_24_2022_(1).p-df for building code. Replacing the non-conforming window wells would require Special Review for replacing a non-conformity(26.312.030(f)(2); 26.430). '9.THE WEST ELEVATION WINDOW WELLS ARE NOT IN THE 5'SETBACK Per 26.575.020(f)(4)(j), no height exception is granted for window wells in the setback that are not required for building code. Variances to height are a council-level review. ---•--'-' -- Page Label:A1.0 APPROVED& PROPOSED SITE PLAN '°°^°°`°°°` °� Page Index: 4 Please reference the zoning checklist as to what is cM1acklisr as ro wM1ar. required on the site plan.With the increase in aWIrM1tmea^°'°ac°aa• File Name: 90. CHANGE ORDER#2 ' ' =a''e - eaks ARCHITECTURAL_04_24_2022_(1).pdf 10 scope, additional information is necessary, such as set backs. ivEr Noted,see attached Sheet A1. i 12/19/2022 ASPEN BUILDING DEPARTMENT Page Label:A1.0 APPROVED& PROPOSED SITE P • Page Index: 4 Please show existing and proposed area well in J File Name: 90. CHANGE ORDER#2 the front., ARCHITECTURAL_04_24_2022_(1).pdf SOUTH WINDOW WELL TO HAVE NORMAL MAINTENANCE The existing (and proposed)area well do not meet the height exception language in 1.Normal maintenance to non-conforming structure. 26.575.020(f)(4)(j): Sec.26.312.030.-Non-conforming structures. (a)Authority to continue.A nonconforming structure devoted to a use permitted in the zone district in which it is located may be continued in accordance with the provisions of "On street facing facades the minimum size this Chapter. lightwell entirely recessed behind the vertical plane (b)Normal maintenance.Normal maintenance to nonconforming structures may be established by the portion of the building fagade(s) performed without affecting the authorization to continue as a nonconforming structure. closest to any Street(s), and enclosed on all sides (c)Extensions.A nonconforming structure shall not be extended by an enlargement or to within eighteen (18)inches of the first floor level expansion that increases the nonconformity.A nonconforming structure may be (e.g. not a walk-out style light well)shall not be extended or altered in a manner that does not change or that decreases the counted towards maximum permissible height' nonconformity. Page Label:A3.0 EXISTING &PROPOSED SQUARE FEET Please show trash LAYOUT Please show trash enclosure on plan and table and enclosure on plan 12. and reference the code as to why it is exempt. co reference the de Page Index: 5 as to why it s — File Name: 90. CHANGE ORDER#2_ exempt. ARCHITECTURAL_04_24_2022_(1).pdf '12.SEE COA Administrative PolicyResidential Trash/Recycling Enclosure November 6, 2015 Page Label:A3.0 EXISTING &PROPOSED SQUARE FEET Provide complete floor area calculations for both LAYOUT Page Index: 5 13. halves of the duplex. Please provide a table EA File Name: 90. CHANGE ORDER#2 showing both mitigation floor area (no exemption ARCHITECTURAL_04_24_2022_(1).pdf for subgrade exposure)and allowable (calculated) floor area. If the proposed floor area(with the stair 13.SEE UPLOADED DOC FOR enclosure)is over allowable floor area, it requires Mitigation AreaPDF Plat with Allowable Special Review for replacing a non-conforming FA structure(26.312.030(f)(2); 26.430). Page Label:A3.0 EXISTING &PROPOSED SQUARE FEET LAYOUT The vertical circulation exemption only applies for Page Index: 5 14. the top-most level of the stairs. It can be helpful to File Name: 90. CHANGE ORDER#2 think of the vertical circulation exemption not ARCHITECTURAL_04_24_2022_(1).pdf exempting the stairway but exempting the hole in the floor. 14.SEE Sheet A3.0 Existing:the portion of the stairs on this level with stairs above it shown as exempt counts as floor area. Proposed: The main level of the stairs counts as floor area. The upper level of the stairs also counts as floor area in the areas where there are stairs above it. The landing on the roof level counts as floor area. Page Label:A3.0A SUBGRADE CALCULATIONS Page Index: 6 15. Show natural and finished grades. =naan�as. File Name: 90. CHANGE ORDER#2_ ARCHITECTURAL_04_24_2022_(1).pdf 15.Sheet A4.10 WEST ELEVATIONS Page Label:A3.0A SUBGRADE CALCULATIONS I=romde elevations r°r ail Page Index: 6 ,�6. Provide elevations for all sides. Clear, labelled, ai°ea°iear•lane°e°, File Name: 90. CHANGE ORDER photos may be provided in lieu ofelevations. pnoroa may ne promaea m #2_ or eie°a°°aa. ARCHITECTURAL_04_24_2022_(1).pdf '16. SEE Sheet A3.OA Sub-grade calcuations RECEIVED 12/19/2022 ASPEN BUILDING DEPARTMENT SKYLKiHI Kt Page Label:A3.1 ROOF PLAN Page Index: 7 17. Provide height over topography sheet. Please be �m•m°° """ File Name: 90. CHANGE ORDER#2 sure to include height points for the railing as well ARCHITECTURAL_04_24_2022_(1).pdf s•a.,,.,,,Amm„„,,, °m°°~•• as the mechanical enclosure. Please also reference the comments on A1.0. N/A NO RAILING OR CHANGES TO The addition and mechanical enclosure are more STAIR ENCLOSURE than 15'from the perimeter of the building so it is SEE SHEET A 3.1 FOR MECH SHED 1 8• only measured from natural grade DORMER (26.575.020(f)(3)(b)). nu NI „= IT Page Label:A4.0 EXISTING &PROPOSED WEST ELEV. The proposed elevation doesn't reflect the site Page Index: 8 19. changes with regards to the entry and stairs. °�.�.. File Name: 90. CHANGE ORDER#2_ ARCHITECTURAL_04_24_2022_(1).pdf 20.Sheet A4.0 WEST EXTERIOR Elevations Page Label:A4.0 EXISTING &PROPOSED WEST E FV Page Index: 8 20 Please reference zoning checklist regarding what File Name: 90. CHANGE ORDER#2 should be shown on elevations. Please show ,augre ARCHITECTURAL_04_24_2022_(1).pdf offset natural and proposed grades, as well as the maximum height offset. 20.Sheet A4.0 WEST Add on existing stair enclosure and proposed stair EXTERIOR Elevations enclosure. Page Label:A4.2 EXTERIOR LIGHT EFFICACY CALCS& CUT SHEETS Please add labels to lights, corresponding with Please add labels to ligMa, 21 • light plan. ZRea,�°d;asw„„, Ln. Page Index: 10 File Name: 90. CHANGE ORDER#2 21. Sheet A4.2 EXTERIOR LIGHT ARCHITECTURAL_04_24_2022_(1).pdf CUT SHEETS & SHEETS El AND E2 Page Label. 22. Provide details regarding the mechanical Page Index: 27 enclosure. How is this accessed? Is it fully File Name: 90. C enclosed? Required screening was previously Sheet DORMER Roof Plan WITH N. ARCHITECTURA g�„� SHED MECH approved; it was to remain open to above.This ENCLOSURE roof must comply with the 25' height limit. Page Label:A8.5 ARCADIA DOOR DETAILS @ ROOF Please provide sheet A8.1A. Page Index: 29 23. File Name: 90. CHANGE ORDER#2_ �°°•°°°� ARCHITECTURAL_04_24_2022_(1).pdf 23. N/A THIS SCOPE IS DELETED na- Page Label: JJY w=ge Page Index: 38 24. Per 26.575.020(E)(5)(m), permanently installed File Name: 90. CHANGE ORDER#2 barbecues cannot be between a street and a ARCHITECTURAL_04_24_2022_(1).pdf structure. Please revise location of bbq. °°a""" 24. N/A BARBEQUE IS DELETED e E Page Label: 25. The scope shown on the sheets created by Land Page Index: 41 shown ue the �m ( File Name: 90. CHANGE ORDER#2 Design 39 need to be integrated into the ARCHITECTURAL_04_24_2022_(1).pdf architectural sheets. 25. N/A THIS SCOPE IS DELETED FROM THE PROJECT RECEIVED 12/19/2022 ASPEN BUILDING DEPARTMENT