Loading...
HomeMy WebLinkAboutFile Documents.729 Cemetery Ln.0086-2022-BRES 0,000 4011101 CITY OF ASPEN 427 Rio Grande Place, Aspen,CO 81611 (970) 920.5090 www.aspen.gov NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND USE/ BUILDING PERMITS DURING THE EFFECTIVE TERM OF ORDINANCE#27, SERIES OF 2021 AND ORDINANCE #6, SERIES OF 2022 Property Address: 729 Cemetery lane Parcel ID Number: 273512233001 Property Owner: Andrew Katz Representative/email: McDonoughconstruction@comcast.net Scope of Work (Provide narrative here and a separate pdf which is a succinct and clear set of supporting documents, to be attached to this form as Exhibit A, such as Letters of Completeness, Resolutions, Development Orders, Land Use Case numbers, Building Permit numbers etc. If the representation being made is that the work does not involve dimensional changes prohibited by the moratorium provide existing and proposed calculations, floor Plans and and elevations to be attached: Interior remodel Due to the circumstances noted below, the above referenced project as defined by the Scope of Work is exempt from the application of Ordinance #27, Series of 2021 and Ordinance #6, Series of 2022, and is authorized to pursue a land use review and/or building permit review during the effective terms of Ordinance #27, Series of 2021 and Ordinance #6, Series of 2022, ordinances which generally place a moratorium on residential development. This authorization does not guarantee issuance of a building permit or approval of any land use application. The applicant must submit complete information and pursue all authorized approvals in a timely fashion, adhering to all deadlines for submission, terms of Vested Rights, response times required to maintain an active building permit, and all other Land Use Code and Building Code requirements in effect as of December 8, 2021. Any amendments and or additional approvals not addressed or identified in the application, may be subject to Ordinance #27, Series of 2021 or Ordinance #6, Series of 2022. RECEIVED The project described above is permitted to proceed with land use review because (check all that apply): 354-- `�� 0 6/2 7/2 0 2 2 ‘-- --17-11V- ASPEN BUILDING DEPARTMENT o A land use application for a Development Order or Notice of Approval was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be complete by the Community Development Department Director. ❑ The land use application is seeking a Development Order or Notice of Approval for a project consisting of 100% Affordable Housing as that term is defined at §26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for the issuance of Certificates of Affordable Housing for a 100% Affordable Housing project, or as determined by the Community Development Director. o The land use application involves Voluntary AspenModern designation processes that meet the requirements of Section 26.415.025.0 and 26.415.030. o The land use application or administrative request may be necessary to issue exempt building permits as described below, and as determined by the Community Development Director. The project described above is permitted to submit for building permit review because (check all that apply): o A building permit application was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be complete by the Chief Building Official. in It is a building permit for a project that will not increase the gross square footage of development, Net leasable area, or Net livable area of any building and does not meet the definition of demolition. n It is a building permit for a project that will not increase the Height of any building. This includes additions to or replacement of mechanical equipment or energy efficiency systems pursuant to height exemptions as set forth at §26.575.020 of the Aspen Municipal Code, or as determined by the Community Development Director. o It is a building permit for commercial and lodge development as stand-alone uses on a parcel or property. o The project has received or is eligible to receive a Development Order or Notice of Approval on the effective date of this ordinance. o It is a building permit for 100% affordable housing projects as that term is defined at §26.104.100 of the Aspen Municipal Code. ❑ It is a building permit for demolition or repair of non-habitable structures. June 8 22 Issued on , 20 , this certificate is valid through the effective date of Ordinance #27, Series of 2021 and Ordinance #6, Series of 2022, or any nrrlinanne which supersedes a nrovision of these ordinances in a manner which is relevant to the Scope of Work. A copy of this certificate is required when applying for any land use review or building permit. This Notice is not a Development Order or Administrative Determination that is subject to appeal. 47_ 3'�yyygrt, Planning Director, for Phillip Supino Community Development Director Disclaimer: This exemption is given based on the information provided by the applicant. If changes are made, or the scope,after a more detailed review, is found to be subject to Ordinance 27, 2021 or Ordinance #6, Series of 2022, the exemption may be revoked. ! ,�r 1 Exhibit A: Floor plans and elevations representing scope of work ��'' , '� 06/27/2022 ASPEN BUILDING DEPARTMENT ARCHITECT: Exhibit A SEAL: DESIGN ARCHITECT: CONSULTANT: VS Vlnenus SOlio 1 SO We9 231h SIR Sulk 1704 NY NY 10001 1'212.337.2195 7'212.3372194 OWNER KATZ RESIDENCE KATZ RESIDENCE SUBMISSIONS: NO. DATE ISSUE 00 01.14.2022 80%CD SET 01 01.28.2022 90%CD SET 02 02.08.2022 95%CD SET 03 02.11.2022 98%CD SET REVISION 01 03.04.2022 REVISION 1 01 03.11.2022 REVISION 2 KATZ RESIDENCE 729 Cemetery Lane Aspen Colorado 81611 s N� VDRAWING TITLE: k KATZ VIRSERIUTUDIO COVER SHEET INTERIOR ARCHITECTURE + DESIGN SCALE:AS NOTED Project No.01.19 Consultant Project No. ODate:AS NOTED Drawn By Checked By Approved By V/S V/S 1 File Name: al Sheet No: LI iikk ID-0 00 F' EIVEE /I/2022 ASPEN BUILDING DEPARTMENT ARCHITECT: GENERAL CONDITIONS AND SUPPLEMENTARY CONDITIONS 1. The Contractor shall secure,pay for permits and schedule any required Building Department inspections. 27. All work shall be subject to final inspection by the Architect/Designer and Owner. 38. Inspections By Architect/Designer ELECTRICAL AND MI SC. OUTLETS 2. The Contractor shall comply with all applicable building codes,standards,ordinances,rules The General Contractor shall keep the Architect/Designer advised as to the progress of the work and Contractor shall coordinate and review locations of outlets with Architect/Designer and receive Architect's/Designer's approval prior and regulations. 28. The Contractor shall keep the Architect informed of progress of work. No work shall be shall notify the Architect/Designer a sufficient period of time prior to the following stages in the to installation. Contractor to coordinate the installation of outlets and/or switches within millwork and other closed or covered until it has been duly inspected and approved. Should un-inspected work be construction,so that inspection trips may be appropriately scheduled: custom fabricated items with millworker,kitchen equipment supplier and the Architect/Designer. All face plates to be 3. Unless specifically stated otherwise,all applicable portions of the General Conditions(AIA covered the Contractor shall at his own expense uncover all such work so that it can be plastic(color to be determined)or stainless steel where Indicated. #A201,1990 edition)shall apply to all portions of this contract. properly inspected and after Inspection he shall properly repair and replace all work A. When walls are being framed,Contractor shall also notify food equipment contractor interfered with. to check and accept utility stub-outs where applicable. CHANGES IN THE WORK SEAL: 4. The Contractor shall furnish all labor,materials,fixtures,equipment,and services necessary and required to complete all work as indicated on the Drawings and/or specified herein. 29. The Contractor shall provide positive methods and apply dust control materials to minimize B. Before gypsum board is in place(for checking of above ground utility stubs, I. The owner,without invalidating the contract,may order extra work or make changes by altering,adding raising dust from construction operations and provide positive means to prevent airborne placement of insulation,air conditioning ducts,etc.) to or deducting from the work,the contract sum being adjusted accordingly. All such work shall he 5. The Contractor shall order all specified material and fabricated items with sufficient lead dust from dispersing into the atmosphere. executed under the conditions of the original contract except that any claim for extensions of time caused times so as not to delay work in any manner. C. Two weeks or less before completion and opening,preferably after power is thereby shall be adjusted at the time of ordering such change. 30. Additional sets of Contract Documents requested by the Contractor,after his initial request connected(for checking of finish work) 6. Standards shown shall apply except when applicable governing codes or regulations are more for copies,shall be paid for by the Contractor. D. Da f the opening for checking f operating t and Anal details). AnyCLAIMS FOR EXTRA WORK restrictive,in which case such codes and regulations shall govern. y o p g( g a p g equipment ) 31. The Contractor shall be responsible to the Owner for the acts and omissions of the malfunctions of equipment will be reported at this time on Architect's punch list. I. If the General Contractor claims that any revision to drawings involve extra cost under this contract,he 7. The Contractor shall verify all conditions and dimensions in the field prior to commencement subcontractors and all persons directly and indirectly employed by him or them in connection shall give Virserius Studio and Owner written notice thereof within a reasonable time after receipt of such instructions,in any of work for any part of the project. Drawings are not to be scaled. Large scale drawings with the work. E. When punch list items are corrected(so that final payment may be released). event before proceeding to execute the work and the procedure shall then be as provided for in the Required on or before this inspection are: DESIGN ARCHITECT: shall be taken in preference to smaller scale drawings. changes in the work. No such claims shall be valid unless so made. Unless otherwise agreed,no 32. All materials required for the performance of this contract shall be new and of the best 1) Certificate of statement of guarantee on all equipment(HVAC,Plumbing, payment on such bills will be made until Anal settlement. 8. Submission of proposal by Contractors will be construed as evidence that a careful and quality of kinds specified,all subject to the approval of the Architect/Designer. The use of old or thorough examination of premises has been made and later claims for labor,materials or second hand materials is strictly forbidden unless otherwise noted. The Contractor shell,if Sprinkler,Electrical Installation), 2. All claims for additional work will be submitted in writing for approval of Oirserius Studio and Owner and should include a CONSULTANT: equipment required or for difficulties encountered which could have been foreseen had such required,furnish satisfactory evidence as to the kind and quality of materials and 2) Operating instructions on all items of equipment. complete description of the work being performed and materials being used. an examination been made will not be recognized. It shall also constitute a representation workmanship. Materials shall be used in accordance with manufacturer's printed that the Contractor has checked and verified oil quantities,work and materials involved and instruction. Upon request the manufacturers representative shall go to the site and instruct Any deviation from the Contract Documents encountered during these inspections shall be \ / that he shall take responsibility for any deficiencies therein. the mechanics in the use of the materials or shall supervise their use. corrected by the General Contractor. Any Change Orders will be processed by the Architect/Designer. V 9. Care shall be token to protect existing conditions to remain,and work done by other trades. 33. For the execution of the work to be performed under this contract,and for the manufacture 39. Changes and Extras The Contractor shall repair any adjacent existing conditions damaged in the performance of or transportation of any of the materials or appliances to be used or installed,the Contractor A. No changes involving anymaterial change in cost can be made without the written GENERAL NOTES this contract. shall employ onlysuch labor throughout as will not interfere with the speedy and 9 g rn 9 vt�.nusxxrra P Y 9 D Y consent of the Owner or his representative prior to commencement of the work. No isow,212.3soaisuimnN72194 m uninterrupted completion of the project. All work shall be done bymechanics skilled in their Psi2a3isitsesifa3ui5a 10. Manufacturer's recommendations and installation instructions shall be adhered to for all trade and shall be installed in apneat and workmanlike manner in accordance with the best Payment shall be made for work done without a written Change Order. materials and processes used. I.G.C.TO NOTIFY MRSERIUS STUDIO IMMEDIATELY OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS OWNER trade practices. CONSTRUCTION NOTES 11. The Contractor shall corny and submit evidence of insurance as required. 2.G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE AND SAFETY CODES. KATZ RESIDENCE 34. Any materials delivered or work performed contrary to the drawings and specifications and 1 The Contractor shall verify all dimensions and job conditions prior to commencing work and 12. All dimensions given are finish dimensions unless otherwise noted. Contractor shall submit approved shop drawings shall be removed by the Contractor at his own expense and the 3.NRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. shop drawings and monufactureis cuts and samples to Architect/Designer for review and approvalsame shall be replaced with other materials or work satisfactory to the Architect/Designer. The shall report to the architect any discrepancies or omissions which would interfere with the satisfactory completion of the work. prior to commencement of such work. Contractor shall also assume the cost of replacing the work which may be disturbed. 13. Upon completion of work contractor shall completely clean the construction area,suitable for 35. The Contractor shall be responsible for properly and accurately laying out the work and far 2. All dimensions are from finish surface to finish surface or from face of columns and existing walls to finish surface unless noted otherwise. the Owner's use,as determined by the Architect/Designer. Such cleaning shall include removal of all the lines and measurements herein. He shall establish necessary reference lines and labels(after Architect's inspection),cleaning of all equipment,construction work,windows permanent bench marks from which building lines and elevations shall be taken. Heights of 3. The Architect shall review field layout of partitions prior to erection of studs. and other work. all work called for"A.F.S."including but not limited to soffits,ceilings,doors. 4. The Contractor shall be responsible for coordination of chopping and patching for all trades. 14. GUARANTEE: The General Contractor shall guarantee all the work under this contract for 36. (a) The premises and the job site shell be maintained in a reasonably and orderly Where drywalls are in conflict with ductwork,plumbing lines,etc.,Contractor shall provide one(1)year from the date of final acceptance. He shall be responsible for and make good, condition and kept free from accumulations of waste materials and rubbish during all necessary bridging and bracing required to secure drywall and to maintain fire or sound without expense to the Owner,any and all defects arising during this period that are due to the entire construction period. Remove crates,cartons and other flammable waste rating where required. imperfect material and appliances and/or poor workmanship. materials or trash from the work areas at the end of each working day. 15. Minor items of work such as patching,blocking,trim,etc.shall be performed os required to (b) Electrical closets,pipe and duct shafts,chases,furred spaces and similar 5. The Contractor shall provide all necessary cutouts for the installation of electrical outlets, make the work complete whether shown or noted on the contract documents or not. spaces which are generally unfinished shall be cleaned and left free from switches and other electrical and/or mechanical devices. rubbish,loose plaster,mortar drippings,extraneous construction 6. The Contractor shall repair or replace existing construction damage in the performance of w 16. Before ordering any material or doing any work each trade shall verify dl measurements at material,dirt and dust. p it p g g p r P the building and shall be responsible for the correctness of some No extra or compensation this contract at no cost to the Client. / will be allowed on account of difference between actual dimensions and the measurements (c) Care shall be taken by workmen as to not mark,soil or otherwise 7. Contractor to coordinate with millworker and install all wood grounds and metal supports in indicated on the drawings. Any discrepancies between the drawings and field conditions de face finished surfaces. In the event that finished surfaces ceiling and partitions where necessary for the installation of other trade work. a which may be found shall be submitted to the Architect/Designer for consideration and clarification become defaced,clean and restore such surfaces to their original E before proceeding with the work. condition. 8. All wood used for blocking or grounds shall be fire retardant treated per Local Building Codes. SUBMISSIONS: 17. All of the Architect's/Designer's drawings and construction notes are complimentary and what is called (d) Clean up immediately upon completion of each trade's work. NO. DATE ISSUE for by either will be binding as if called for by all. Any work shown or referred to an any one 9. The space around pipes,ducts,etc.,penetrating rated walls,shall not exceed 1/2"and shall 00 01.14.2022 80%CD SET drawing shall be provided as though shown on all drawings. Wherever an item is specified (a) Clean areas of the building in which painting and finishing work be packed solid with mineral wool or approved equal and be closed off by close fitting metal or 01.28.2022 90%CD SET and/or shown on the drawings bydetail or reference it shall be considered typical for an is to be performed just prior to the start of this work and / 9 W� Y maintain these areas in satisfactory condition for painting and escutcheons on both sides of the partition as required by Local Building Codes. 02 02.08.2022 95%CD SET other items which are obviously intended to be the same even though not so designated or 03 02.11.2022 98%CD SET specifically named but do serve the same function. finishing. 10. The Contractor shall not drill holes or chop into existing structural members for the purpose (f) This cleaning includes the removal of trash and rubbish from of supporting any loads,or any electrical and plumbing sleeves unless written approval is 18. The work to be performed consists of furnishing all labor,equipment,tools,transportation, these areas,broom cleaning of floors,the removal of any plaster, obtained from the Landlord or Architect. REVISION supplies,fees,materials and services in accordance with these notes and drawings and mortar,dust and other extraneous materials from finish surfaces 11. The Contractor shall level and patch all floor slobs os required,to the satisfaction of performing all operations necessary to construct and install complete and in satisfactory q of 03.04.2022 REVISION 1 D 9 P Y P Y including but not limited to miscellaneous metals,woodwork, architect and guar contractors(i.e.,file and wood). condition the various material and equipment at the locations shown,and in conformity with plaster,gypsum drywall,masonry,concrete,mechanical and of 03n1.2922 REVISION z the dimensions,design and details shown. It is intended that the drawings include electrical equipment,piping,ductwork,conduit and surfaces 12. Contractor to provide wood or metal grounds at all wall-hung fumiture components,and at everything requisite and necessary to finish the entire work properly notwithstanding the visible after permanent fixture induction,unit covers,grilles, all millwork items. fact that every item necessarily involved may not be specifically mentioned or shown. Any registers and other such fixtures or devices are in place. item which may be reasonably construed as incidental to the proper and satisfactory 13. Contractor,upon completion of work,shall vacuum Floors,clean all walls,doors,etc.,to the completion of the work in accordance with the intent of these notes and drawings is hereby (g) In addition to the cleaning specified above and the more specific satisfaction of Architect/Designer and Owner. included. cleaning which may be required In various sections of the specification, the premises shall be prepared for occupancy by 19. The Contractor shall abide by and comply with the true Alert and meaning of the drawings 1. Thorough cleaning throughout including washing or TEMPORARY UTILITIES NOTES and notes token as a whole and shall not avail himself of any obvious errors or omissions cleaning by other approved methods of all floors and should any exist. Should any error or discrepancy appear or any doubt arise as to the true surfaces on which dirt or dust has collected and by washing 1. Materials,General meaning of the drawing or notes,the Contractor shall bring such items to the attention of the glass,removing all paint,putty and stains therefrom. Architect/Designer before submission of proposal for explanation or correction of same. After the A. Arrange with building Owner and local utility company for the required usage,must submission of proposal the Contractor will be held responsible for all such items. 2. Providing and maintaining adequate runner strips of non- not create unsafe conditions,and must not violate requirements of applicable codes staining reinforced Kraft building paper on finished Floors B. and standards. as required for protection. Install circuit and branch wiring,with area distribution boxes located so that power 20. Full size or large scale details or drawings shall govem small scale drawings which they are intended to amplify. Details or conditions indicated for onion of the work but not caned and lighting is available throughout the construction by the use of construction type P 3. Leaving all fixtures and equipment in an undamaged, C. power cords. out fully for other portions shall apply throughout to all similar portions except as otherwise bright clean,and polished condition. specifically noted. In every case o more expensive item or method shall he assumed over a Provide adequate artificial lighting for all areas of work when natural light is not less expensive one and dimensions shall be figured rather than scaled. 4. Clean and polish all hardware and other metal work. adequate for work,and for areas accessible to the public. 2. Temporary Ventilation 21. The character and scope of the work ore illustrated by the drawings and notes. To interpret 5. Do all other cleaning as required to turn the building and and explain the drawings other information deemed necessary by the Architect/Designer will be premises over to Owner in a spotless and orderly condition. A. Provide temporary ventilation as required to maintain adequate environmental O furnished to the Contractor when and as required by the work and it is to be understood that conditions to facilitate progress of the work,to meet specified minimum conditions l\l said additional information or drawings are to be of equal force with these drawings. 37. Compliance with Codes,Regulatory Agencies for the installation of materials,and to protect materials and finishes from damage ^ KATZ RESIDENCE C.) 729Lane 1. It is the responsibility of this Contractor that all his work be executed and due to temperature or humidity. \ Asp nCemetery Colo Colorado 81611 22. The project has been designed and detailed for specific materials and equipment specified completed in accordance with all state and local laws having jurisdiction over the MILLWORK V No substitutions shall be made without the express written consent of the Architect. If the project. Particular attention is called to the Occupational Health and Safely Act, 1. General Standards: Comply with applicable"Architectural Woodwork Quality Standards"by AWL Lk material is not available the Contractor shall propose on alternate material and which affects work procedure during and after construction,as well as final product. shall provide drawings,samples,specifications,manufacturer's literature,performance data, 2. Provide custom interior finish type,exterior glue Grade A-D plywood and No.1 clear pine for detailed N lell etc.in order that the Architect con evaluate the proposed substitution. If the substitution 2. Contractor must give written warning to the Architect/Designer prior to installation of any custom grade(ADI)woodwork. affects a correlated function,adjacent construction or the work of any other Contractor or portion of work in violation of these regulations. Failure to do so will oblige him to trade,the necessary changes and modifications to the affected work shall be accomplished by make corrective adjustment at no cost to the Owner. 3. Detailed shop drawings required for Architect/Designer approval for aII millwork,cobinelry and hardware in the O DRAWING TITLE: the general contractor at no additional expense to owner. No requests for substitutes will be project to match intent indicated on drawings. Finish samples of all materials specified and hardware 3. In addition to local and state building and mechanical codes,attention is called to shall be submitted for roust byArchitect/Designer. Fy entertained by the Architect/Designer due to Contractor's failure to order materials in a timely approval �l KATZ manner. the local and state agencies,however,installation is also subject to compliance by RESIDENCE these codes. Contractor to review installation with these agencies prior to work, 4. The General Contractor shall closely coordinate his work with that of the cabinet contractor to avoid particularly in regard to cabinets,finishes,inaccessible areas,dead air spaces, roughing discrepancies of appliances and sinks. 23. The standard specifications of the manufacturers approved for use in the project are hereby mechanical and electrical work. Any non-conforming installation disapproved by GENERAL made a part of these notes with the same force and effect as though herein written out in full these agencies shall be corrected at no additional cost to the Owner. 5. The cabinet contractor shall check and verify all dimensions and conditions at job site. NOTES except that wherever the drawings require heavier members and better quality materials these more stringent requirements shall govern. 6. Where members are mitered or butted,they shall be joined and secured in a manner to insure against SCALE:AS NOTED 24. The Contractor shall notify the Architect/Designer immediately if he cannot for any reason comply the pint opening. Project No.01.19 with all the requirements of these notes and drawings. 7. All finished work shall,as far as practical,be assembled and finished in the shop and delivered to the 25. The General Contractor shall coordinate and supervise the work of all contractors and building ready to erect in place. CxrsulWm Project No. subcontractors. He shall be responsible for giving all trades such information,plans or O Dace:AS NOTED details as may be required for the proper installation and completion of their work. All 8. All of the work shall be fabricated,assembled,finished and erected in the best method known to the Drawn By Checked By Approved By materials shall be ordered sufficiently ahead of time so work can proceed on schedule. No cabinet trade. Surfoces and arises shall be true,stroight and free from all machine&tool markings, V/S V/S substitutions will be accepted because of failure to do so. bruises,indentations,chips or abrasions. it File Name: al 26. The Contractor shall submit all fabrication shop drawings,samples and fixture cuts for the 9. All finished veneered wood shall be free from knots,shakes or other defects affecting either durability Sheer No: Archilecl's/Designer's review as required and/or indicated on drawings. The Architect's/Designer's review shall not or appearance and shall be carefully selected for grain and color so that there will be no marked I r. be construed as an Indication that submittal complies with the drawings. Except as to matters variation at joints between veneers. �`V of finish,color and other aesthetic matters,action noted above does not relieve the Contractor I D 0.01 and other aesthetic matters,action noted above does not relieve the Contractor Al from responsibility responsibility to coordinate all trades an check quantities and dimensions against conditions in the field. ussv/s//2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT - EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. 7 -ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. -G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL 8 • AND NATIONAL FIRE&SAFETY CODES. -G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD �' CONDITIONS AND DIMENSIONS. �����\ -VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. } DEMO PLAN NOTES: MECHANICAL Al EXANDER'S ROOM: ` 6 3 1.G.0 TO REMOVE EXISTING BEDFRAME,NIGHTSTANDS&LAMPS. 5 2.G.0 TO PREPARE CLOSET TO RECEIVE NEW PAINT. 1 © 4 3.G.0 TO PREPARE DOORS AND MOLDINGS TO RECEIVE NEW PAINT. CI 4.EXISTING CARPET TO REMAIN. DESIGN ARCHITECT: \ 1 2 JASON'S ROOM: 1' CONSULTANT: ANDREW'S I� F� In' C` 1.G.0 TO REMOVE EXISTING BED,NIGHTSTANDS&LAMPS. in 2 Al V D \E yy'S 2.G.0 TO DISMANTLE AND REMOVE EXISTING METAL DESK. II OFFICE 3.EXISTING CARPET TO REMAIN. V/J` L 1 4.G.0 TO PREPARE CLOSET TO RECEIVE NEW PAINT. LA U V D R 5.G.0 TO PREPARE DOORS AND MOLDINGS TO RECEIVE NEW 0 PAINT. VIIRnus SWdo II 150 WPL 11..Snm 5UD:1704 NY NY DU72194 1 II R.EXISTING BOOKSHELF AND BACK STANDING MIRROR TO wP12P31P195FP1PA3u194 u 3 4 REMAIN. _OWNER -if _ JACK & JII L BATHROOM: KATZ RESIDENCE UP 1.G.0 TO REMOVE EXISTING COUNTERTOP,FAUCET,SINK, PLU\ - G.0 NG FIXTURESO AND HARDWARE. ' Q111t'^\ • 2.G.0 TO REMOVE VANITY WALL-TO-WALL MIRROR,MEDICINE v 1 CABINET,FACTOCRECEIVE AND LIGHT FTILE, R TO DREPARE WALL 11./N\` SURFACE TO RECEIVE NEW MOSAIC TILE,MIRRORS AND WALL SCONCES. n 4 3.G.0 TO REMOVE EXISTING TOILET. 4.EXISTING TUB TO REMAIN.G.0 TO DEEP CLEAN JETS AND DRAINS.G.0 TO KEEP EXISTING SHOWER HARDWARE. u UP 5.MILLWORKER TO PREPARE ALL MILLWORK TO RECEIVE NEW STAIN. / 6.G.0 TO PREPARE DOORS,WALLS,CEILINGS&MOLDINGS TO111 RECEIVE NEW PAINT. - 7.OTHER EXISTING FLOOR AND WALL TILE TO REMAIN. P 2 3 - � 1 \ �` ICI'S�` LAUNDRY ROOM: w I J AS O N /� 1.G.0 TO DEMOLISH EXISTING WALL AND DOOR TO INSTALL E II • 5 ROOM ;i WINE CABINET. SUBMISSIONS: 2.G.0 TO DEMOLISH EXISTING CABINETRY AND REMOVE EXISTING NO. DATE ISSUE WASHER&DRYER.EXISTING SINK TO REMAIN. 00 01.1a20zz e0%CD SET J� % -a 3.G.0 TO REMOVE EXISTING IRONING BOARD SYSTEM. 01 01.28.2022 90%CD SET 4.G.0 TO REMOVE LAUNDRY CHUTE. 02 02.08.2022 95%CD SET 03 02.11.2022 98%CD SET II 1 2 HALWAY: 1.G.0 TO REMOVE EXISTING STORAGE PIECE. REVISION E F 3 5 01 03.04.2022 REVISION 1 2.EXISTING FAMILY PHOTOS AND HIDE ON FLOOR TO REMAIN. 01 03.11.2022 REVISION 2 2 • / 6 3.G.0 TO REMOVE AND REPLACE EXISTING WALL SCONCES. C ANDREW'S OFFICE & BATHROOM: 1.G.0 TO REMOVE EXISTING SOFA&CARPET. © 2.MILLWORKER TO PREPARE ALL MILLWORK TO BE REFINISHED. ✓ 11.`0_11 3 PATCH&REPAIR AS NECESSARY. -�----- 3.G.0 TO REMOVE EXISTING WINDOW TREATMENT. a 4.G.0 TO PREPARE ALL DOOR TRIMS AND WINDOW CASINGS TO 5 RECEIVE NEW PAINT. 5.G.0 TO INSTALL ACCENT WALLCOVERING. 6 _ 6.G.0 TO REMOVE EXISTING COUNTERTOP,WALL SCONCE, FAUCET,SINK AND HARDWARE. 7 7.G.0 TO REMOVE EXISTING TOILET. 8.G.0 TO REMOVE VANITY WALL-TO-WALL MIRROR AND / ' PREPARE SURFACE TO RECEIVE NEW MIRROR&BACKSPLASH. 9.EXISTING SHOWER TO REMAIN. o ALEXS = ROOM O KATZ RESIDENCE 1 3 4 V 729 Cemetery Lane Aspen Colorado 81611 111 NED _�1 2 O DRAWING TITLE: / 2LEVELk LOWER O DEMO PLAN K SCALE:AS NOTED Project No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By n V/S vs'IV 1 File Name: al Sheet No: LEVEL DEMO PLAN �D-I •00 SLOWERN.T.S o EIVEE� utu/c//2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT - EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. 1 9 -ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. -G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL 8 10 AND NATIONAL FIRE&SAFETY CODES. -G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIESOIO FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. -VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: �� \ I \ OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. \\MECHANICAL 4r..\ / BASE PLAN NOTES: Al EXAN DER'S ROOM: 0 it \ - ♦ 2 6 1.G.0 TO INSTALL NEW BED,NIGHTSTANDS&WALL SCONCES ABOVE NIGHTSTANDS.G.0 TO COORDINATE WITH ELECTRICIAN • 7 FOR POWER. 1/,I �` 2.G.0 TO INSTALL NEW ART LEDGES.REFER TO IE&SPECS 6 A N D R E V V S 5 - FOR MORE INFORMATION. DESIGN ARCHITECT: 7 OFFICE 4 3.G.0 TO SPRAY PAINT EXISTING CLOSET WHITE. 4.G.0 TO INSTALL NEW CLOSET LIGHT.G.0 TO COORDINATE CONSULTANT: WITH ELECTRICIAN FOR POWER. 3 5.G.0 TO PAINT DOORS AND MOLDINGS TO MATCH HALLWAY 4444444 Electrolux T PAINT. ,,,,y • V/S TV Wit 6.G.0 TO INSTALL NEW ACCENT WALLCOVERING ON HEADBOARD •-,\ 2 rOfTle WALL. I-II 7.EXISTING CARPET TO REMAIN. \ J © O 525i0 150 We9 231h&reel Sulk 1704 NY NY I0001 JASON'S ROOM: P'21233721112195 1:F'212.3312194 /I. OWNER - �, LAUNDRY 1.G.0 TO INSTALL NEW BED,NIGHTSTANDS&LAMPS. 2.EXISTING CARPET TO REMAIN. KATZ RESIDENCE UP 3.G.0 TO SPRAY PAINT EXISTING CLOSET WHITE&INSTALL NEW HARDWARE. • 4.G.0 TO INSTALL NEW CLOSET LIGHT.G.0 TO COORDINATE WITH ELECTRICIAN FOR POWER. 5.G.0 TO PAINT DOORS AND MOLDINGS TO MATCH HALLWAY PAINT. /\ 3 4 A 6.G.0 TO BUILD NEW LEDGE&INSTALL WALL MOUNT N.WALL NEEDS TO BE SCORED FOR THE CABLING DUE TO A WALL MOUNTED TV UNIT. ( 7.MILLWORKER TO BUILD AND INSTALL NEW FLOATING SHELVING. UP �O G'F• 8.G.0 TO INSTALL NEW ACCENT WALLCOVERING ON HEADBOARD11 1 _ ^ 6 x� WALL. o 1 / \ 9.EXISTING BACK STANDING MIRROR AND BOOKSHELF TO w E-- �` c REMAIN. B \ JASON'S 7 JACK & JILL BATHROOM: 2 I \ ROOM /� 1.G.0 BIGINSTALL IXTNEW STONE SLAB ON VANITY,FAUCET,SINK, E •I i PLUMBING FIXTURES AND HARDWARE. 5 2.G.0 TO INSTALL NEW MOSAIC TILE,MIRRORS AND WALL SUBMISSIONS: SCONCES ON VANITY BACK WALL. NO. DATE ISSUE 00 01.14.2022 80%CD SET 3.TO INSTALL NEW TOILET AT EXISTING LOCATION. 01 ot.ze.zozz so%cD SET \ a 4.MILLWORKER TO RESTAIN EXISTING MILLWORK TO A WHITE 02 02.08.2022 95%CD SET 2'-1, / 1 2 WASH. 03 02.11.2022 98%CD SET �\ 5.G.0 TO PAINT DOORS,WALLS,CEILINGS&MOLDINGS. • 1 ' 5 9 c n LAUNDRY ROOM: REVISION 01 03.04.2022 REVISION 1 1.G.0 TO BUILD NEW WALL AND BUILD St NEW WINE 01 03.11.2022 REVISION 2 / CABINET. • 2 8 2.MILLWORKER TO INSTALL NEW MILLWORK CABINETRY.EXISTING SINK TO REMAIN. i C - \ 3.G.0 TOT CLOSE OFF OPENING OF LAUNDRY CHUTE. JO 4.G.0 TO INSTALL NEW POCKET DOOR TO SEPARATE THE 3 • LAUNDRY ROOM FROM THE WINE AREA. HALLWAY: 1.G.0 TO LEATHER WRAP EXISTING STAIR HANDRAILS WITH 4 6 CONTRASTING STITCHING. 2.G.0 TO INSTALL NEW WALL SCONCES AT EXISTING LOCATIONS. 5 ANDREW'S OFFICE & BATHROOM: _ 1.MILLWORKER TO PATCH AND REFINISH MILLWORK TO EXISTING \a FINISH. / 2.G.0 TO INSTALL NEW WINDOW TREATMENT,NEW WINDOW 0 I 1 2 5 7 TREATMENT TO BE INSTALLED AT A HIGHER LEVEL THAN THE O INITIAL WINDOW TREATMENT. - 3.G.0 TO INSTALL NEW TV WITH FRAME.TV TO BE FLUSH 1\ �/ C` MOUNTED. E(�` KATZ RESIDENCE 1 ALEX'S 4.G.0 TO INSTALL WOODEN PAINTED KICKPLATE BELOW DESK , Aspen729 Cemetery Colorado Lane 81611 TO HIDE WIRING.WIFI HARDWARE TO BE KEPT OUTSIDE J NOM oKICKPLATE. \'Z `O5.G.0 TO REINSTALL EXISTING ART(TO BE REFRAMED BY ' ry�FRAMING COMPANY).G.0 TO CHECK WITH DESIGNER FOR ART °� LOCATIONS. 6.G.0 TO PAINT ALL DOOR TRIMS AND WINDOW CASINGS. O DRAWING TITLEs\'f' 7.G.0 TO INSTALL NEW ACCENT WALLCOVERING ON CONTINUOUS / WALL STARTING FROM ENTRY DOOR TO WINDOW WALL. LOWER LEVEL 8.G.0 TO INSTALL NEW COUNTERTOP,WALL SCONCE, FAUCET, O BASE PLAN UNDER-MOUNTED SINK AND HARDWARE. 9.G.0 TO INSTALL NEW TOILET AT EXISTING LOCATION. k 10.G.0 TO INSTALL NEW MIRROR AND 3"BACKSPLASH ON VANITY WALL BACKSPLASH TO BE SAME MATERIAL AS VANITY '' SCALE:AS NOTED TO' Project No.01.19 ADDITONAL NOTES: �I Consultant Project No. -ALL POWER AND SWITCH PLATES TO BE REPLACED WITH NEW Date:AS NOTED WHITE PLATES INCLUDING SWITCHES AND POWER HUBS. O Drawn By Checked By Approved By I\I -SWITCH PLATES IN BEDROOMS TO BE FITTED WITH NEWEST y/5 V/S USB.(FOR MOBILES AND IPADS) 1 File Name: al Sheet No: V LEVEL BASE PLAN ��-I •0 1 SLoWER N.T.S o F'_ _ EIVEE uttu/c1/2022 ASPEN BUILDING DEPARTMENT I PF-100 I CG-200 GENERAL NOTES: ARCHITECT: L — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. PF—XXX -ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE PF—XXX CODES AND STANDARDS. -G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE&SAFETY CODES. MR-200 \)41 -G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY LTGH—ZOO DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. -VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES � Po AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: , `\it p� OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. MECHANICAL / ( s,0, FURNITURE PLAN NOTES: aP 1.G.C.TO INSTALL ALL FURNITURE,ACCORDING TO DESIGNER'S SPECS.REFER TO SPECS FOR MORE INFO. CPT-ZOO 2G.C.TO DISPOSE OF ALL FF&E WRAPPING Se BOXES -V Y LTGD-200 FROM SITE. ANDREW'S\ / �� UP-200 DESIGN ARCHITECT: \\ --L OFFICE \�(/ O UP-201 CONSULTANT: I EQ-100 I _444444 Electrolux ' V S N Wit I p same \ In II ) 0 Rent,Sam Do we want a _� / OW PLP91h51TIINF:,SO4 NY 372194 OW, P012331e Ste 14.3312191 LAUNDRY N DRY OWNER side table here /iKATZ RESIDENCE or just the UP chair? �� . • CGI-301 EQ—XXX UP �O�F CGI 302 EXISTING N,,, o _ BOOKSHELF G ALL EXISTING A \ AND BACK ARTWORK TO REMAIN w \MIRROR TO JASON S o XX XX REMAIN Rn �/� IV. SUBMISSIONS UP-101 •' \ — NO. DATE ISSUE �J� \ �,�—��i a UP-304 00 01.14.2922 BO%CDSET Al 01.28.2022 9o%CDSET / I 02 02.08.2022 95%CDSET XX—XX • 03 02.11.2022 98%CD SET PF-XXX �o 'LOWER BED SINCE I• UP 301 REVISION PF-XXX ) �JINDOW SILL IS LOW' of 03.06.2022 REVISION' 01 03.11.2022 REVISION XX—XX • / I Ir_________ I Y Y lI_ CG-301 g __ `-- -'° ©• — LTGD-301 I PF-100 1 • :0 01 'E _ 5_____.___I LTGH-300 I I I I • I CGI-300 I I I I I. I UP-300 I _ I I 0 �PF — k.7. KATZ RESIDENCE ALEX'S 729 Cemetery Lane [\. Aspen Colorado 81611 'OOM VVk I xx-xx (/) "' ED 4 4,!t \)- , PF—XXX PF—XXX O DRAWING TITLE: XX XX / I UP-303 lk LOWER LEVEL CG 302 FN PLAN LTGD-300 k SCALE:AS NOTED Project No.01.19 Consultant Project No. O. Date:AS NOTED Drawn By Checked By Approved By n File 5 '\ it, File Name: al Sheet No: LI O� LOWER LEVEL FN PLAN k ID-1 .02 N.T.S o RECEIVED ,,t./�//2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE&SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO St ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: _ \ ij OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. • \\MECI MECHANICAL ` FLOOR FINISH PLAN NOTES: 1.G.C.TO PREPARE FLOOR TO RECEIVE NEW TILE/CARPET/VINYL FLOORING THROUGHOUT.REFER TO FINISH PLAN St SPECS EXISTING FOR MORE INFO. FLOORING TO 2.GC TO REFER TO ALL SPECS OF FLOORING FOR CLEAR REMAIN UNDERSTANDING OF TILE SPECS. A N D R EW S 3.G.C.TO ENSURE THAT FLOORS ARE APPROPRIATELY LEVELED DESIGN ARCHITECT: \N., OFFICE 4.ALL VINYL FLOORING MUST COME WITH AN ACOUSTICAL PAD TO PREVENT SOUND TRANSMISSION BETWEEN FLOORS. CONSULTANT: 4444444 TV Wit v s : EXIST NG frame EXISTING\ Ir—FLOORING FLOORING TO "'a"ASS°I° \ 1S0 we92alo&reel Sulk 1704 NYNY10001 TO P.2127 332195F.212.3312194 REMAIN REMAIN / LAUNDRY OWNER -,f KATZ RESIDENCE UP UP Ft EXISTING 1 FLOORING \ JASON S L. s TO , REMAIN ROOM i SUBMISSIONS �` NO. DATE ISSUE EXISTING -a 00 0124202290%CD SET CARPET 01 01 29 2022 90%CD SET 02 02092022 95%CD SET / TO REMAIN 03 02.11.2022 98%CD SET REVISION 01 03.04.2022 REVISION 1 01 03.11.2022 REVISION 2 C EXISTING FLOORING TO REMAIN EXISTING / CARPET TO REMAIN =O izz KATZ RESIDENCE V729 Cemetery Lane • [\. Aspen Colorado 81611 ROOM k. r^ N ED V. DRAWING TITLE: / LOWER LEVEL O FF PLAN SCALE:AS NOTED Project No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By it V/S 5 '\1 1 File Name: al Sheet No: LI LOWER LEVEL FF PLAN O �D-1 •03 N.T.s o F _ IVEL .u/ //2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. T 1 2 VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: 0_1 1 3 OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. DEMO PLAN NOTES: 4 FOYER: 4 } _ , 1.G.0 TO REMOVE AND REPLACE EXISTING FRONT DOOR. • 11,1i __• GUEST ROOM 2.G.0 TO REMOVE EXISTING FOYER LIGHT. I 3.G.0 TO RELOCATE EXISTING WATER FEATURE AT FOYER TO I THE OUTSIDE WALL ON THE TERRACE ADJACENT TO THE 1 MIND ROOM. DESIGN ARCHITECT: 4.G.0 TO REMOVE EXISTING MIRROR. \ \ S.EXISTING FLOORING TO REMAIN. CONSULTANT: N. KITCHEN: V/S 1 1 \ 1.G.0 TO REMOVE EXISTING WINDOW. A 1 \� © 2.G.0 TO REMOVE EXISTING TRACK LIGHTING. 3 _ 3.G.0 TO REMOVE EXISTING STOVE HOOD,REFRIGERATOR AND 2 DISHWASHER. mlRnus swain GARAGE __~ 1 "\--- 130We9291h 9hal SON You NY NY 10001 P'212337.2195 F.212.3372194 ,.41., � , LIVING & DINING ROOM: OWNER X , ` 1.G.0 TO REMOVE EXISTING SOFA,COFFEE TABLE,CONSOLE KATZ RESIDENCE MUD I D I , _ AND CHAIR IN LIVING ROOM AND STORE ELSEWHERE AS PER ROOM II OWNER'S DECISION. 2.G.0 TO MOVE EXISTING MIRROR TO OUTDOOR WALL AT GUEST ,, i ROOM DECK. /1 L i 3.G.0 TO WIDEN FRAMING AROUND EXISTING FIREPLACE FLUTE. 11`/\ OUTDOOR 4.G.0 TO REMOVE EXISTING CHINESE CABINET IN DINING ROOM ril ✓ \ DECK AND STORE ELSEWHERE AS PER OWNER'S DECISION. S.G.0 TO REMOVE EXISTING MIRROR,CONSOLE AND ARMOIRE IN n DINING ROOM AND STORE ELSEWHERE AS PER OWNER'S DECISION. 6.G.0 TO REMOVE EXISTING LIGHT FIXTURE ABOVE DINING J L UP TABLE. ii DN 5 MUD ROOM: ai‘ 1.G.0 TO REMOVE EXISTING MILLWORK. 2.G.0 TO COVER UP EXISTING LAUNDRY CHUTE. o UP — DINING ' U.S.0 TO REMOVE AND REPLACE EXISTING WALL SCONCES. E SUBMISSIONS: • 1 3 POWDER ROOM: NO. DATE ISSUE 6 �� 1.G.0 TO REMOVE&REPLACE EXISTING TOILET,VANITY, 00 oBMISz I80%CDONS: KITCHEN ♦ MIRROR,PLUMBING FIXTURES AND WALL SCONCES.G.0 TO 01 01.28.2022 so%CD SET A_ KITC EN ENSURE SECURITY SYSTEM FREEZE PROTECTOR REMAINS AND oz 02.08.2022 ss%CD SET / // IS NOT DAMAGED WHILE REMOVING EXISTING VANITY. 03 02.11.2022 98%CD SET 'Z 2.G.0 TO REMOVE EXISTING WALL TILE AND PREPARE SURFACE TO RECEIVE NEW TILE. UP /V,. REVISION \\ // 3.G.0 TO STONE. REMOVE EXISTING CURVED LEDGE AND REPLACE WITH 01 03.04.2022 REVISION 1 01 03.11.2022 REVISION 2 rt // \ / ♦ 4.EXISTING VINYL FLOORING TO REMAIN. GUEST BEDROOM: / LIVING ROOM 1.G.0 TO REMOVE EXISTING BED,NIGHTSTANDS AND LAMPS. /� tl © 2.G.0 TO REMOVE EXISTING CLOSET. 1 I i U.S.0 TO PREPARE EXISTING CLOSET TO RECEIVE NEW PANT. y 2 \ 1 2 GUEST BATHROOM: �/ UP / 1.G.0 TO REMOVE EXISTING COUNTERTOP,BACKSPLASH,WALL FOYER 5 O E R SCONCES,FAUCET,SINK,TOILET AND HARDWARE. 2.G.0 TO REMOVE VANITY WALL—TO—WALL MIRROR AND • PREPARE SURFACE TO RECEIVE NEW TILE. / 3.MILLWORKER TO PREPARE THE INSIDE OF THE CURRIES TO ` RECEIVE NEW PAINT. 4.MILLWORKER TO PREPARE ALL MILLWORK TO RECEIVE NEW 4 STAIN. 5.G.0 TO REMOVE EXISTING TILE AND PREPARE SHOWER FLOOR AND SHOWER WALLS TO RECEIVE NEW MOSAIC/TILE.EXISTING UP SHOWER FIXTURE SYSTEM TO REMAIN. 1....:„."-.... 6.G.0 TO REMOVE EXISTING SHOWER ENCLOSURE AND SHOWER KATZ RESIDENCE ' FIXTURE SYSTEM. V 729 Cemetery Lane \y Aspen Colorado 81611 �j GARAGE: r� �/� 1.G.0 TO REMOVE EXISTING STORAGE SYSTEMS&MILLWORK IN N ED �/� THE GARAGE. 3 \ // DRAWING TITLE ` ROOF DECK k MAIN LEVEL O DEMO PLAN K SCALE:AS NOTED Project No.01.19 I\/ O Consultant Project No. DAB NOTED Drawn By Checked By Approved By V/S V/S itFile Name: al Sheet No: LLI MAIN LEVEL DEMO PLAN kt �D-I •04 01 N.T.S o RECEIVED ,,./�//2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT - EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. -ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. -G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. -G.C.TO NOTIFY VIRSERIUS STUDIO Sc ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD 5 2 3 CONDITIONS AND DIMENSIONS. -VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES �, r-1a•�'-r r r-m �, AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. I, BASE PLAN NOTES: Q t J i I © FOYER: 1.G.0 TO INSTALL NEW FRONT DOOR.DOOR VENDOR TO 3 4 ENSURE ASPEN CODE COMPLIANCE AND STRUCTURAL "' '� 1 5 STABILTY OF DOOR. 't 2.G.0 TO INSTALL NEW SCULPTURAL CEILING ART PIECE AT EXISTING FOYER LIGHT LOCATION. DESIGN ARCHITECT: I* ` k � 3.G.0 TO INSTALL NEW MIRROR. \ I I 4.G.0 TO REPOSITION&CENTER EXISTING ART PIECE ON WALL. CONSULTANT: ,. I GUEST 6.STONE MILLWORKER TO BUILD&INSTALL NEW COAT CLOSET. 6.STONE WALL AND STONE LEDGE BY G.C.G.0 TO COORDINATE \• ROOM WITH MILLWORKER. \ / 2 1'•z f 1-10'F` • // 7.G.0 TO LEATHER WRAP EXISTING STAIR HANDRAILS WITH V ,• \41 /� // /S CONTRASTING STITCHING. 3 • KITCHEN: m�.nm swain GARAGE 130 SIeel 2ID 7294NY NY p], P:YI2331 YI93 F:e 12.3312194 • 2 1.G.0 TO INSTALL NEW WINDOW&SCREEN. -OWNER x 2.G.0 TO INSTALL NEW TRACK LIGHTING AND REPAINT CEILING. MUD 3.AMUNEAL TO BUILD&G C TO INSTALL NEW SHELVING INKATZ RESIDENCE • • KITCHEN.ROOM Im _ J 4.G.0 TO INSTALL NEW STOVE HOOD,REFRIGERATOR AND M A e'-s' M DISHWASHER. fa''N -\ OUTDOOR LIVING & DINING ROOM: \ DECK 1.G.0 TO WIDEN FRAMING AROUND EXISTING FIREPLACE FLUTE. „ s-s r-r \ REFER TO ELEVATIONS FOR MORE INFORMATION. /\ \ DECK 2.JULIAN CHICHESTER TO BUILD&G.0 TO INSTALL NEW SHELVING ON BOTH SIDES OF THE FIREPLACE. 5 \ 3.G.0 TO LEATHER WRAP EXISTING STAIR HANDRAILS WITH ,. \ CONTRASTING STITCHING. lil DN UP \ 4.AMUNEAL TO BUILD&G.0 TO INSTALL NEW BAR WITH _ _ SHELVING.G.0 TO COORDINATE WITH CLIENT,AMUNEAL& - a ELECTRICIAN FOR ALL POWER FOR EQUIPMENT.G.0 TO \`\\\"`\\\\\\\\\... ENSURE THERE IS POWER ON WALL FOR COFFEE MACHINE AT COFFEE STATION AND POWER FOR BLENDER ETC.AT THE BAR AS REQUESTED BY THE CLIENT. A UP 73 4 S.G.0 TO BUILD AND INSTALL ROD DISPLAY FOR RED WINE. E 6 6.G.0 TO INSTALL NEW LIGHT ABOVE DINING TABLE AT EXISTING SUBMISSIONS: • 1 4 LIGHT LOCATION. NO. DATE ISSUE 00 01.14.2022 80%CD SET MUD ROOM: 01 01.28.2022 90%CD SET KITCHEN02 02.11.202298%CLD SET 1.LOCKER TO BUILD&INSTALL NEW LOCKER UNIT. 03 02.11.2022 NB%CD SET / //// 2.G.0 TO KEEP EXISTING HOOKS AND PAINT TO MATCH NEW ` \ 2 / LOCKER UNIT. i� \ / UP /// 3.G.0 TO INSTALL NEW WALL SCONCES AT EXISTING LOCATIONS. REVISION 01 03.04.2022 REVISION 1 / \ \ 3 •v DIN I N G . / POWDER ROOM: 01 03.11.2022 REVISION 2 6 / \ \ / DINING V 1.G.0 TO INSTALL NEW TOILET,VANITY,MIRROR,PLUMBING •\/ -co / / FIXTURES AND WALL SCONCES AS PER DESIGN.REFER TO /\� / / �iQ ELEVATION AND SPECS FOR MORE INFO. // 4• n\ - / 2.G.0 TO INSTALL NEW WALL TILE. 3.G.0 TO PAINT INTERIOR SIDE OF DOOR AND BASEBOARD TO I MATCH HALLWAY. L / EO R X2 J /4 LIVING 4.G.0 TO INSTALL NEW WALLCOVERING(ON ALL WALLS EXCEPT Z UP ) ROOM VANITY WALL)IN POWDER ROOM. 5.G.0 TO INSTALL NEW STONE LEDGE. • GUEST BEDROOM: • • ,1 1.MILLWORKER TO BUILD&INSTALL NEW CLOSET 2.G.0 TO SPRAY PAINT EXISTING CLOSET WHITE. 3.G.0 TO ADD ACCENT WALLCOVERING ON HEADBOARD WALL. 5 6 3 7 4.G.0 TO INSTALL FULL LENGTH MIRROR BEHIND DOOR. B, 5.G.0 TO INSTALL NEW BED,NIGHTSTAND AND LAMP. ,' U P O \/// GUEST BATHROOM: I� KATZ RESIDENCE 729 Cemetery Lane ,� . 1.G.0 TO INSTALL NEW COUNTERTOP,BSI K,TOIL,HANGING gspen Colorado 81611 PENDANT,BACKLIT MIRROR,FAUCET,SINK,TOILET ANDHARDWARE. L� 2.G.0 TO INSTALL NEW SHELLY TILE ON VANITY WALL. ^� N9 S, \ / 3.MILLWORKER TO PAINT INTERIOR OF EXISTING CUBBIES. kc 9° 4.MILLWORKER TO RESTAIN EXISTING MILLWORK TO A WHITE // O DRAWING TITLE: 2 WASH. f. 5.G.0 TO INSTALL NEW HEXAGON THASOS MOSAIC FLOOR TILE V \ ROOF DECK ON SHOWER FLOOR&NEW SHELLY TILE ON THE SHOWER k MAIN LEVEL WALLS.REFER TO SPECS FOR MORE INFO. Ql BASE PLAN 6.G.0 TO BUILD NEW GLASS SHOWER ENCLOSURE AND INSTALL NEW SHOWER FIXTURE SYSTEM. E`.. �. O a° GARAGE: SCALE:AS NOTED 1.MILLWORKER TO BUILD AND INSTALL NEW STORAGE SYSTEMS Project No.01.19 &MILLWORK IN THE GARAGE. 1\1 2.GC TO INSTALL 220V POWER FOR ELECTRICAL CAR- Consultant Project No. O Date:AS NOTED LOCATION MUST BE CONFIRMED BY OWNER. Drawn By Checked By Approved By ADDITONAL NOTES: V/S VS File Name: -ALL POWER AND SWITCH PLATES TO BE REPLACED WITH NEW WHITE PLATES INCLUDING SWITCHES AND POWER HUBS. al Sheet No: NBEDROOMSD ADD TO BE FITTED WITH NEWEST USB.(FOR MOBILES A L O� MAIN LEVEL BASE PLAN ID-1 .05 N.T.S o F''- --EIVEt /0//2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. CG-500 —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE /� CODES AND STANDARDS. X4 LTGD-500 —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL UP 500T i AND NATIONAL FIRE Sc SAFETY CODES. CCI-600 ��\•� —G.C.TO NOTIFY VIRSERIUS STUDIO St ARCHITECT OF ANY PF—XXX / , CONDITIONS DISCREPANCIES FOUND DIMENSIONS. IN REGARDS TO FIELD ,,, /�,! \ —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES PF—XXX ����, \i� \ AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: ��/ �> V OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. b \ ,.. '� \ FURNITURE PLAN NOTES: 4 -1—i— 1.G.C.TO INSTALL ALL FURNITURE,ACCORDING TO \ DESIGNER'S SPECS.REFER TO SPECS FOR MORE INFO. PF-100 •.O p \ I CG-500 I 2.G.C.TO DISPOSE OF ALL EF&E WRAPPING&BOXES f FROM SITE. DESIGN ARCHITECT: MR-600 \ PF—XXX Q0 I UP-502 CONSULTANT: LTGH-500\ I I LTGH-600 I 1 G.PF—XXX I UP-503 MR-500 ` _ CPT-100 \ /1 3X 3-0 �O \ ROO k // CPT 500 \ v /S • \ U P 100 0(4 a' / v�nuawdo GARAGE , PI —100, 150 We9291h 51ittl Sulk 1704 NY NY 10001 P.212 337 2195 F.212.3372194 O OWNER a < MUD '1 1 Pr1101111111pr KATZ RESIDENCE • ROOM PF—XXX \ OUTDOOR \I CGI-401 I \ DECK \ J \ CGI-400 0 DN UP 401100 .D • N. EQ-400 w \ I _ I w UP a a EXISTING AREA • RUG AND 401 SUBMISSIONS: ISSUE DINING TABLE NO. DATE 80%C TO REMAIN 3 4111111' .� . 01 01.14.2022 80%CDSET — UP-403 02 02.08.202295%CDSET KITCHEN // 02 02.08.202295%CDSET / 03 02.11.2022 98%CDSET \ / UP / REVISION \ / 01 03.04.2022 REVISION 1 \ I XX-XX I / CPT 400DIN///// 01 03.11.2022 REVISION 2 AE 101 / \ / � • / CL Sub—zero / - //\,.„,_ — refrigeratoriiik / GG 401 /j .� / LTGD 40E' •�/ i FOYER EXISTING LIVING ROOM LIVING • ��� ��SOFA AND COFFEE \\ UP TABLE TO REMAIN UNTIL ROOM \ POo NEW FURNITURE Fs' ARRIVES. R • -\,- �\ LxIaTIN� SI � tits � STANDING iEXISTING �400 DESK TOCONSOLE TO REMAIN REMAIN UP 4.► P-400 MR-100 IIIII,UP-103 UP O KATZ RESIDENCE 729 Cemetery Lane \ Aspen Colorado 81611 CGI-402 V \. N O DRAWING TITLE: NGpiL1-40021 ROOF DECK MAIN LEVEL OFN PLAN K SCALE:AS NOTED Project No.01.19 ICGI-402 I Conaultant Projen No. I\I O Draw B NOTED Drawn By Checked By Approved By V/S VS itFile Name: al Sheet No: V O MAIN LEVEL FN PLAN I D-1 .06 N.T.S o1 D F'_ _ IVEE� uu/ //2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO Sc ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. /I FLOOR FINISH PLAN NOTES: 1]-1 / 1.G.C.TO PREPARE FLOOR TO RECEIVE NEW TILE/CARPET/VINYL EXISTING L� / FLOORING THROUGHOUT.REFER TO FINISH PLAN&SPECS FLOORING FOR MORE INFO. TO REMAIN I 2.GC TO REFER TO ALL SPECS OF FLOORING FOR CLEAR UNDERSTANDING OF TILE SPECS. I I EXISTING 3.G.C.TO ENSURE THAT FLOORS ARE APPROPRIATELY LEVELED. I I r .\ FLOORING DESIGN ARCHITECT: 4.ALL VINYL FLOORING MUST COME WITH AN ACOUSTICAL PAD TO REMAIN TO PREVENT SOUND TRANSMISSION BETWEEN FLOORS. \ I I CONSULTANT: _ GUEST ROOM / V/S EXISTING EXIS N\� /// FLOORING FLOORIN // GARAGE TO REMAIN TO w,. y�lSae17o 1SOWPL12337.al 20.33 W, L. &219 REMAI?AIIIII 9 `i,I w lt,I OWNER MUD /� iiii . TL 5O2 KATZ RESIDENCE ROOM EE„EBBIy£II ° 'NI OUTDOOR mo\ \ DECK \ DN UP \ _ I U P �i o EXISTING �� Nou�BMISS�ONs: FLOORING TO REMAIN 00 01.28.202280%CD SET . Al 01.28.2022 90%CD SET �- 02 02.08.2022 95%CD SET KITCHEN / EXISTING //: 03 02.11.2022 98%CD SET \\ // UP TO FLOORING REMAIN /// REVISION 01 03.04.2022 REVISION 1 / \ / DINING" i 01 03.11.2022 REVISION / /\ — / / 1 I / W\ / FOYER LIVING EXISTING EXISTING ROOM FLOORING FLOORING TO UP TO REMAIN REMAIN UP Oo ' I� KATZ RESIDENCE 729 Cemetery Lane Q� Aspen Colorado 81611 /�// r^ N ED \ /// O DRAWING TITLE: ROOF DECK p MI PNLLANVEL SCALE AS NOTED Project No.01.19 I\I g DConsultant Project No. OAB NOTED Drawn By Checked By Approved By V/S VS 1 File Nama: Sheet No: V O� MAIN LEVEL FF PLAN ct ID-1 .07 N.T.s o IVEL tu/ //2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. RCP NOTES: 1 J 1. ALL DECORATIVE LIGHTING FIXTURES,JUNCTION BOXES AND WIRING TO BE INSTALLED BY G.C.AS NOTED.REFER TO V/S SPECS AND LIGHTING MANUF.DRAWINGS FOR MORE INFO. 2. FIXTURES FOLLOWED BY'N'DENOTES NEW LIGHTING FIXTURE AND NEW POWER LOCATION.IF NEW FIXTURE IS REPLACING EXISTING FIXTURE,EXISTING POWER CAN BE USED. 3. GC/EC TO PROVIDE DIMMERS SIZED FOR THE LIGHTING ZONE L— AND COMPATIBLE WITH THE LIGHTING LOAD.DIMMERS TO ALLOW DESIGN ARCHITECT: flFOR SMOOTH FLICKER FREE DIMMING.SHOULD HAVE ABILITY TO FACILITATE DIFFERENT SETTINGS AS REQUESTED BY CLIENT. 1 1 4. QUANTITIES FOR REFERENCE ONLY.GC/EC TO VERIFY ALL CONSULTANT: COUNTS OF FIXTURES AND SWITCHES/DIMMERS. \ CuEST 5. EC/GC TO COORDINATE HOUSING TYPE WITH ON SITE CEILING EST CONDITIONS AND CONFIRM HOUSING PRIOR TO ORDER. � ^ROOM S//// RlSsvdo GARAGE 1S0WPL337ial SUD,1N7.2194 NY 01 // P.212 102115 F.212A312IN / OWNER MUD KATZ RESIDENCE ROOM == —H OUTDOOR REFER TO LIGHTING \ DESIGNER'S DRAWINGS -- �I \ DECK FOR ARCHITECTURAL ,�LIGHTING LAYOUTNpP N I UP ., \\ Ft a ° CL CL CL �` • i��7.1 LTGH 400 Si • ••�•An � ,,,,\. U P4t� 0 0 0 0 0 CL o SUBMISSIONS: NO. DATE ISSUE 00 01.16.202290%CD SET 111 CL I- IIIIr 0101.28.202290%CDSET KITCHEN ° J 02 02.11.202298%CD SET S / L 03 02.11.2022 90%CD SET CL o // U" REVISION ° / J 01 03.11.2022 REVISION 1 DI I N/\ 01 03.11.2022 REVISION 2 / ///, / / (LTGH—XXXILTGH-100 °/ //N / cl►�j� / N orjj�,9YER LIVING UP ROOM %P. U Oo • Izz KATZ RESIDENCE • V729 Cemetery Lane \ Aspen Colorado MlWOO / Cr),,V� N ED // O DRAWING TITLE: ROOF DECK O RCP lk MAIN LEVEL SCAL NOED Project E:No.AS 01.19T Date:OS Checked. ODrawn B NOTED Drawn By checked By Approved By V/S V/S 1 File Name: al Sheet No: V O� MAIN LEVEL RCP PLAN �D-1 •08 N.T.S o F'_ _ IVEE orru/c//2D22 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE&SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. DEMO PLAN NOTES: MASTER BEDROOM: 1.G.0 TO REMOVE EXISTING BEDROOM DOOR. 2.G.0 TO REMOVE EXISTING WOODEN WINDOW AT THE BEDROOM ENTRANCE. 3.G.0 TO REMOVE EXISTING BALCONY DOOR SYSTEM AND FRAME. DESIGN ARCHITECT: 4.G.0 TO REMOVE CASING ON WINDOWS&DOORS. 5.G.0 TO REMOVE EXISTING CARPET AND PREPARE FLOOR TO CONSULTANT: RECEIVE NEW CARPET. 6.G.0 TO REMOVE EXISTING BED,NIGHTSTANDS AND ARMOIRE. \ / MASTER BEDROOM CLOSET: V S 1.G.0 TO REMOVE EXISTING CLOSET SYSTEMS AND MILLWORK& WALL FOR EXISTING STACKABLE WASHER/DRYER. Vllunm Swaio 130 Wes1 231h&reel Sulk You NY NY 10001 2.G.0 TO PREPARE BASEBOARDS AND DOORS TO RECEIVE NEW O2123312195F312.3312194 PAINT. _OWNER 3.G.0 TO RELOCATE EXISTING DOWNLIGHTS. 4.G.0 TO REMOVE EXISTING IRONING BOARD SYSTEM. KATZ RESIDENCE '\ 5.G.0 TO REVISE ENTRYWAY AND MAKE SURE DOOR IS 34" WIDE.REFER TO BP FOR MORE INFORMATION. ' 6.G.0 TO REMOVE EXISTING CARPET AND PREPARE FLOOR TO 4 5 6 RECEIVE NEW CARPET. 7.G.0 TO PREPARE WALLS TO RECEIVE NEW 1 2 PAINT/WALLCOVERING. Q' MASTER BATHROOM: VASTR 3 6 7 �' 1.G.0 TO REMOVE EXISTING VANITY,FAUCET AND SINK. T CLOSET VAST R 2.G.0 REMOVE EXISTINGVATOILET AND PARTITION WALL — T7„,, BETWEEN TMILEE END VANITY. l I� I� 3.G.0 TO REMOVE EXISTING BATHTUB AND PLUMBING FIXTURES.�2-6 1 BE9ROO \/ 4.G.0 TO REMOVE EXISTING SHOWER ENCLOSURE&HARDWARE, PLlV BENCH,SHOWER FIXTURE SYSTEM AND TILE ON CEWNGABOVE SHOWER.,�co S.G.0 TO REMOVE EXISTING FLOORING IN BATHROOM AND 'o PREPARE SURFACE TO RECEIVE NEW FLOORING. 6.G.0 TO REMOVE EXISTING TILE AND PREPARE SHOWER FLOOR SUBMISSIONS: \\\� / M 2 I, NO. DATE ISSUE \\ AND SHOWER WALL(ON SHOWER WALL THAT HAS THE WINDOW AND THE SHOWER SYSTEM)TO RECEIVE NEW 00 01.14.2022 e0%CD SET �i' r , © / \ MOSAIC/TILE. 01 otze.zozz so%CD SET A a 1 oz oz.oe.z0zz ss%CD ser L-� \ , \ / 7.G.0 TO REMOVE EXISTING FINISH ON VANITY WALL AND BACK \ f r • /+L.y 4 '� &SIDE WALLS OF TOILET AND PREPARE SURFACE TO 'L 03 02.11.2022 NB%CD SET 2—5 \ a`/ RECEIVE NEW TILE.REFER TO BP FOR MORE INFO. 4 j I �; B.G.0 TO PREPARE ALL DOOR TRIMS AND WINDOW CASINGS TO it! 6 1 1 RECEIVE NEW PAINT. REVISION I 1 j 01 03.04.2022 REVISION 1 _�,' 00> , 9.G.0 TO RELOCATE EXISTING DOWNLIGHTS. \�,{ I _ 01 03.11.2022 REVISION 2 6 • 6., 7 I r I HO % l t0 I is 6'-6" m / / a I = ' 5 8 9 DN / \ X ,9 \ I VASTER `� _ — 3 BAT- ROOM 'I , SECT 2 a 7 7-3'-0"- �� L J ,"'m� )'` cV �� J l d :—Ili \ KATZ RESIDENCE 729 Cemetery Lane \ • \ Aspen Colorado 81611 N ED4'-5 1/2" 1'-0" dr •t' 13'-1" 2 X / .f r DRAWING TITLE: t UPPER LEVEL ODEMO PLAN 1\ SCALE:AS NOTED VProject No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By V/S V/S 1 File Name: al Sheet No: LLI UPPER LEVEL DEMO PLAN ID- •09 01 v2'=1 r-o° o E. -EIVEE us,/ //2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT: — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. BASE PLAN NOTES: MASTER BEDROOM: 1.G.0 TO BUILD&INSTALL NEW BARN DOOR SYSTEM AT BEDROOM ENTRY.G.0 TO FILL IN OLD WINDOW OPENING AND CREATE A SOLID WALL. 2.G.0 TO INSTALL NEW BALCONY DOOR SYSTEM WITH SCREEN. 3.STARK(CARPET VENDOR)TO INSTALL NEW CARPET. DESIGN ARCHITECT: 4.G.0 TO INSTALL NEW LAMPS ON NIGHTSTANDS.G.0 TO COORDINATE WITH ELECTRICIAN FOR POWER. CONSULTANT: S.G.0 TO INSTALL NEW SPLIT SYSTEM AC UNIT AT WINDOW. HOSE&CABLE ENCLOSURE ON THE SIDE OF THE HOUSE THAT CONNECTS THE TWO UNITS TO BE PAINTED TO MATCH \ / COLOR OF THE HOUSE. VJ 6.G.0 TO ADD HANGING LIGHT AT CIRCULAR NICHE IN CEILING. G.0 TO COORDINATE WITH ELECTRICIAN FOR POWER AT NICHE. REFER TO RCP FOR MORE INFO. waits swain 7.G.0 TO INSTALL NEW ACCENT WALLCOVERING ON INSIDE 130 we923:I soalAN 1704 NYNY1m01 4 CORNER WALLS. P.212337.2195 F.212.3372194 OWNER AC MASTER BEDROOM CLOSET: KATZ RESIDENCE 5 • 1.MILLWORKER TO BUILD&INSTALL NEW CLOSET SYSTEMS. 0 n n 2.MILLWORKER TO FRAME OUT NEW AREA FOR STACKABLE '` Yil. WASHER/DRYER SYSTEM.MILLWORKER TO ENSURE SPECIFIED NEW WASHER/DRYER WILL FIT. 3.G.0 TO PAINT BASEBOARDS AND DOORS TO MATCH THE REST OF THE HOUSE. 1 3 4.G.0 TO REPAINT CEILING DUE TO RELOCATION OF y, DOWNLIGHTS.REFER TO LIGHTING DESIGNER'S DRAWINGS AND `�., SPECIFICATIONS FOR MORE INFO. 4 6 7 N A S T E R 5.G.0 TO BUILD NEW DOOR AT CLOSET ENTRY,DOOR TO BE 4 3 6 34"WIDE. \` 6.STARK(CARPET VENDOR)TO INSTALL NEW CARPET. C 0 —T 7.G.0 TO INSTALL ACCENT WALLCOVERING ON ONE WALL AND w PAINT OTHER WALLS IN THE CLOSET.G.0 TO CHECK WITH Ft 7—2'-6"� \ CLIENT TO CONFIRM THE WALL WITH THE ACCENT WALLCOVERING. \ 2'-8" le__ 2 /// / S. 8.G.0 TO BUILD&INSTALL BUILT—IN MIRROR IN CLOSET.G.0 rc / / \ / I o /// TO COORDINATE WITH CLIENT FOR FINAL MIRROR SIZE. E Le Electrolux // SUBMISSIONS: IN 8 / 5 • 1 /// MASTER BATHROOM: NO. DATE ISSUE 2 00 01.14.2022 80%CD SET 8 6 1.G.0 TO INSTALL Sc COORDINATE WITH MILLWORKER FOR NEW Al 01.28.2022 90%CD SET 2 \ • —� • // BUILT—IN VANITY,FAUCET AND SINK.G.0 TO INSTALL NEW 02 02.08.2022 95%CD SET -•- VASTER / MIRRORS AND WALL SCONCES ABOVE VANITY.GC TO 03 02.11.2022 9s%CDSET \ �� • N. / COORDINATE WITH ELECTRICIAN FOR POWER. I I • \ 2.G.0 TO INSTALL NEW TOILET.MILLWORKER TO INSTALL NEW SHELVING ABOVE THE TOILET. 5 7 a V /// sliding doors REVISION 1st • O EJ 3'-3" 3'-3" 3.G.0 TO BUILD NEW WALL DIVIDER WITH KNEE WALL AT THE 01 03.04.2022 REVISION 11 1 Q / / / / / BOTTOM AND FLUTED GLASS AT THE TOP. 01 03.11.2022 REVISION n 7 — :,4"---,--„,,,,,,______,,,,,,,,,,,,, i / 4.G.0 TO INSTALL NEW JAPANESE SOAKING TUB AND PLUMBING 7 • '" �� FIXTURES. "' 5.G.0 TO INSTALL NEW SHOWER ENCLOSURE WITH SPECIFIED 7 /// HARDWARE AND SHOWER FIXTURE SYSTEM.REFER TO SPECS / FOR MORE INFO. 8 6 9 11 12 DN 6.G.0 TO INSTALL NEW TILE FLOORING IN BATHROOM.G.0 TO • \ • "1y INSTALL WALL TILE ON VANITY WALL,KNEE WALL AND BACK AND SIDE WALLS OF TOILET.REFER TO ELEVATIONS AND _ \ SPECS FOR MORE INFO. Ell V A S T E RCO: G C TO INSTALL NEW MOSAIC ON SHOWER FLOOR AND ON SHOWER WALL(ONLY ON SHOWER WALL THAT HAS THE O BAT- R 0 0 � C E C HASWINDOW)S TO INSTALL NEW TILE ON SHOWER WALL WHICH HAS THE SHOWER SYSTEM. 8.G.0 TO BUILD SHOWER NICHE IN SHOWER WALL.REFER TO ELEVATIONS FOR MORE INFO. r� ,Y / \ 9.G.0 TO PAINT ALL DOOR TRIMS AND WINDOW CASINGS WHITE. 3 * 10.MILLWORKER TO BUILD&INSTALL NEW TOWEL CLOSET AND BENCH AT WEST WALL. a / 11.G.0 TO ENSURE WATER HEATING SYSTEM IS LESS / �. X TEMPERAMENTAL AND MORE EVEN. O I 2 w \/ 12.G.0 TO REPAINT CEILING DUE TO RELOCATION OF _ I� KATZ RESIDENCE DOWNLIGHTS.REFER TO LIGHTING DESIGNER'S DRAWINGS AND f.\v 729 Cemetery Lane • -I SPECIFICATIONS FOR MORE INFO. Aspen Colorado 81611 \ S. \ ADDITONAL NOTES: Lti^—ALL POWER AND SWITCH PLATES TO BE REPLACED WITH NEW � N 1 0 k' °/ WHITE PLATES INCLUDING SWITCHES AND POWER HUBS. C 13'-1" —SWITCH PLATES IN BEDROOMS TO BE FITTED WITH NEWEST / USB.(FOR MOBILES AND IPADS) O DRAWING TITLE: UPPERLEVEL O I\I 4.. SCALE:AS NOTED Project N. 01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By V/S V/5 1 File Name: al Sheet No: V UPPER LEVEL BASE PLAN ID-1 •1 0 01 v2°=11-0° o IVEC ttu/ //2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. FURNITURE PLAN NOTES: C G—7 O 0 1.G.C.TO INSTALL ALL FURNITURE,ACCORDING TO DESIGNER'S SPECS.REFER TO SPECS FOR MORE INFO. LTG 0—7 0 0 2.G.C.TO DISPOSE OF ALL FF&E WRAPPING&BOXES FROM SITE. DESIGN ARCHITECT: UP—7 O O CONSULTANT: I V s �j \ AImnus SOlio I30 We9 231h SIR Sulk 1704 NY NY 10001 P:212.337 2195 F:212.3372194 f1 / \ OWNER rf V � \'\<S KATZ RESIDENCE f \N V 700 fvASTER �> \\\ �, CG702 �� �/i� UP-703 COST �� M 1 // \ • UP-701 / ` — /i I I /of Electrolux \ 1 1 /// SUBMISSIONS: /:// N0. DATE ISSUE 00 01.16.2022 00%CD SET fV -701 CleI \/ /A� 01 01.28.20229o%CD SET V / \ TER / 08.2022 95%CD SET 03 02.11.2022 98%CD SET • n PF-702 r II �F XXX • a 0 B-�ROOv /�/ sliding doors REVISION II U• I / Al 03.04.2022 REVISION 1 P —XXX Q �— / 01 03.11.2022 REVISION 2 AE-700 i,�✓/ AE-702 LTGH-702 '• F-700 ri, P R-702 • DN vAST`ROlt ® BAT- R00 V DEC,< LTG -701 UP-702 �F-701 CG-701 0:7 o �� rzz • _ V 2729 Cemetery TZ DENeE Aspen Colorado 81611 Cr)� N ED P F— 1 00 V DRAWING TITLE: PPER LEVEL O F I\I AIL Li. SCALE:AS NOTED Project No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By V/S V/S itFile Name: al Sheet No: V LEVEL FN PLAN ID-1 .11 SUPPER 1 i2°=l t-o° o -EIVEC t,t,/ //2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —C.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO Sc ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. FLOOR FINISH PLAN NOTES: 1.G.C.TO PREPARE FLOOR TO RECEIVE NEW TILE/CARPET/VINYL FLOORING THROUGHOUT.REFER TO FINISH PLAN&SPECS FOR MORE INFO. 2.GC TO REFER TO ALL SPECS OF FLOORING FOR CLEAR UNDERSTANDING OF TILE SPECS. 3.G.C.TO ENSURE THAT FLOORS ARE APPROPRIATELY LEVELED. DESIGN ARCHITECT: 4.ALL VINYL FLOORING MUST COME WITH AN ACOUSTICAL PAD TO PREVENT SOUND TRANSMISSION BETWEEN FLOORS. • CONSULTANT:V s Vllunm SkSio 150 WeL 231h&rM Sulk 1704 NY NY 10001 P.2123312195 F'212.3372194 OWNER KATZ RESIDENCE NEW • CARPET • VASTER CTOS=T r/ NEW W / or . CARPET // SUBMISSIONS: p �/ N0. DATE ISSUE (/\ \ • (\mi • l / 00 01.14.2022 SO%CD SET V ASTER T E R //• 01 02.08.2022 95%CD SET 02 02.08.2022 95%CD SET CUSTOM , 03 02.11.2022 98%CD SET cNI B DR00V r M O S A C V REVISION 01 03.06.2022 REVISION 1 / 01 03.11.2022 REVISION 2 TL-700 �/ TL-701 , / DN • V AST-R BAT- '00 V 3EC,‹ B 0 \/ 729 CemeteDEN ry eE \ Aspen Colorado 81611 ti NED VDRAWING TITLE: O U PER LEVEL F I\I 44.. (!1'.-.. SCALE:AS NOTED Project No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By V/S V/5 itFile Name: al Sheet No: V 01 UPPER LEVEL FF PLAN % ID-1 .12 1i2rt=1t-ort o RECEIVED ,,t,/.<//2022 ASPEN BUILDING DEPARTMENT GENERAL NOTES: ARCHITECT — EXISTING HEATED FLOORS TO REMAIN THROUGHOUT THE HOUSE. —ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. —G.C.TO ENSURE THAT ALL WORK COMPLIES WITH ALL LOCAL AND NATIONAL FIRE Sc SAFETY CODES. —G.C.TO NOTIFY VIRSERIUS STUDIO&ARCHITECT OF ANY DISCREPANCIES FOUND ON SITE IN REGARDS TO FIELD CONDITIONS AND DIMENSIONS. —VIRSERIUS STUDIO IS NOT LIABLE FOR ANY DISCREPANCIES AND CONTRACTORS ARE RESPONSIBLE FOR ALL THEIR OWN TAKE SEAL: OFFS AND VERIFICATIONS OF THE SITE CONDITIONS. RCP NOTES: 1. ALL DECORATIVE LIGHTING FIXTURES,JUNCTION BOXES AND WIRING TO BE INSTALLED BY G.C.AS NOTED.REFER TO V/S SPECS AND LIGHTING MANUF.DRAWINGS FOR MORE INFO. 2. FIXTURES FOLLOWED BY'N'DENOTES NEW LIGHTING FIXTURE AND NEW POWER LOCATION.IF NEW FIXTURE IS REPLACING EXISTING FIXTURE,EXISTING POWER CAN BE USED. 3. GC/EC TO PROVIDE DIMMERS SIZED FOR THE LIGHTING ZONE AND COMPATIBLE WITH THE LIGHTING LOAD.DIMMERS TO ALLOW DESIGN ARCHITECT: FOR SMOOTH FLICKER FREE DIMMING.SHOULD HAVE ABILITY TO FACILITATE DIFFERENT SETTINGS AS REQUESTED BY CLIENT. 4. QUANTITIES FOR REFERENCE ONLY.GC/EC TO VERIFY ALL CONSULTANT: COUNTS OF FIXTURES AND SWITCHES/DIMMERS. 5. EC/GC TO COORDINATE HOUSING TYPE WITH ON SITE CEILING CONDITIONS AND CONFIRM HOUSING PRIOR TO ORDER. V/S I J` waits Sdio 130 We9 231h&reel SON 1704 NY NY 10001 1'212.337 2195 F'212.3372194 OWNER KATZ RESIDENCE EQ 4. EQ 4. EQ 4. /' REFER TO LIGHTING CL o VASTER 1t�r0 \� ILTGH-7001 DESIGNERS DRAWINGS • C 0 S T \` ` yI � FOR ARCHITECTURAL \\�'—"_1 LIGHTING LAYOUT N 1LTCH-701 // ° 1 1 /of CL // SUBMISSIONS: / // NO. DATE ISSUE 00 01.14.2022 80%CD SET VASTER //// 01 01.28.2022 90%CD SET 02 02.08.2022 95%CD SET / 03 02.11.2022 98%CD SET �I B-SROOV �;/ O C L t REVISION O 01 03.04.2022 REVISION 1 J� /// 01 03.11.2022 REVISION 2 W /// ///REFER TO LIGHTING DN DESIGNERS DRAWINGS L • FORLIGHTING LAYOUT O CJ LIGHTING LAYOUT 0 o g BAT- ROOD 1_ JiT SECT O O CL O ------ KATZ RESIDENCE O (` 729 Cemetery Lane J Aspen Colorado 81611 NED VDRAWING TITLE: ER LEVEL ORCP 1\ 0 SCALE:AS NOTED VProject No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By V/S V/S 1 File Name: al Sheet No: V UPPER LEVEL RCP PLAN ID-1 .13 01 v2°=1t-o° ,I:: IVEC t,t,/ //2022 ASPEN BUILDING DEPARTMENT ARCHITECT: 10'-9" 9'-6" f f f f \ \ SEAL: 10" 1'—1 0" X X X 1.25" shelves by millworker ' / DESIGN ARCHITECT: CONSULTANT: • WC-301 I I CO VS co JASO \ 9 \00 VI 43" EXISTING N y2195E�al CCI-302 1slwelPamslMSulhlloa lrlrloom P'Y12331Y113 e14.3311194 '00OWNER I KATZ RESIDENCE I I k CD, ED i LTGD-301 \ 1 "1 CGI-301 o + ! 1 1 ' i 1 •\ CG 301 N N __L - 1 \ N — \ N 0:07)\ \ h SUBMISSIONS: NO. DATE ISSUE 01 JASON'S'S HEADBOARD WALL 02 JASON'S TV WALL A 00 01.14.2022 BO%CD SET 01 01.28.2022 90%CD SET 1"=1'-0" 1"-1'-0" 02 02.08.2022 95%CD SET 03 02.11.2022 98%CD SET REVISION 11 —3 01 03.04.2022 REVISION 1 _( X 01 03.11.2022 REVISION 2 AL-X'S ROOV • WC-300 KATZ RESIDENCE I \ 729 Cemetery Lane I Aspen Colorado 81611 ,r 5'-7" ,r I �1 LTGH-300k N IEBI loll 01 , ODRAWING TITLE: DELANEY BED • • UP-300 lk lk LOWER LEVEL BEDRO MS IE Ii t O I C I C G—3 0 0 SCALE:AS NOTED Project No.01.19 N — 1— ` — ` N ,,..".1 Consultant Project No. Date:AS NOTED I Q I I O Drawn By Checked By Approved By II II ` ` II ` VS lit File Name: al Sheet No: ILI LEX'S HEADBOARD WALL I D-2.0O 03 1°=1'-0° o F- - EIVEt t,t,/ /72022 ASPEN BUILDING DEPARTMENT ARCHITECT: 2 options 5'-i 1" - Left side 36" 5'-5" 2 round )( )r PIE -Right side I II SEAL: I -- - - TL-300 27.75" with - - - I II IL-300 __ _ I -_ -_ Mil strap from II - -�- - = - = - XX XXX Kichler - - r XX XXX - I - --7- 191 I 11j - - - _ II ::I::L::ITT : - , = I XX-XXX = �I XX XXX YY I 4 I — !� I I \ _ I II130 weLP2.337.al3uik11W72194 NY 001 P'YI2331YI95F'Y14.3311191OWNER I I - --iI -iIh� - PE—XXX I I III_ _ PE-XXX KATZ RESIDENCE i Imo■ - I�II•1. • 1 ST-100 - ST-100 P 1 0 OJASON'S VANITY WALL 02 •LEX'S VANITY WALL SUBMISSIONS: NO. DATE ISSUE 1"=1'-0" 1"-1'-0" 00 01.14.2022 80%CD SET 01 01.28.2022 90%CD SET 02 02.08.2022 95%CD SET I. 1, 03 02.11.2022 98%CD SET WC-200 ST-100 WC-200 MR-200 LTGH-200 WC-200 REVISION 01 03.04.2022 REVISION 1 01 03.11.2022 REVISION 2 IM Ii li • l7 • • �• • • 0I 1, 1 l 11 1, 1 l 1, I \ (Th(Th(Th(Th(Th( _ l(Th(Th(Th(Th(Th( SIDE WALL innnnni EQ-100 • nnnnn( l ---)(- (Th ( I^^^^ S KATZ RESIDENCE i--, ^ ^ ^ ^ i n(Th n re-)n( \ 729 Cemetery Lane Aspen Colorado 81611 1 PF-XXX 41E nnnnn( K • i� ;Backsplash- • ST 1 00 1t1 n n(1 n( N • ST-100 lnnnnn DRAWING TITLE I 1(Th nn(Th(Th/ nnnnn/ LOWER LEVEL nnnnn( 4 IE - ln(Th n(Th(Th( 1 nn(Th(Th(Th( SCALE:AS NOTED Project No.01.19 -A L LWAY ConaNantPmjeci No. O Draw B NOTED Drawn By Checked By Approved By V/S VS ,I 4 L —0" 1�l File Name. Sheet No: 01 NDREW'S VANITY WALL WINE COOLER ELEVATION ID-2 01 uu/ //2022 ASPEN BUILDING DEPARTMENT ARCHITECT: A 1We received new SEAL: heights today, the 6'-3" �, foyer and door is a lot 3'-0" 3'-0" taller 1'-1 1/4" Li X X 1'-10 1 -1 0" DESIGN ARCHITECT: -co CONSULTANT: \/ V S min Mio I50we9 12 337219 S5:k1204 NY NY 33011IOWI P'YI2331YI95 F'Y14.3311191 \ / OWNER KATZ RESIDENCE — I' 'r00 / I \ / \ LIGHT BY G.0 / \ ZN / \ 2'-107 \ • AE-101 / \ / \ 1 / \ W / \ CUSTOM / \ NO. DATE ISSUE / \ I MILLWORKER 00 01.14202280%CD SET N 01 01.28.2022 90%CD SET / \ 02 02.08.2022 95%CD SET / \ 03 02.11.2022 98%CD SET / N \ REVISION \ 01 03.04.2022 REVISION 1/ 01 03.11.2022 REVISION 2 C \ Q / \ / \ / \ / \ / / \ / • \\ // MARBLE \ / \ / N\ _ CO1A / O \\ // ..1 rI\ KATZ RESIDENCE v 729 emetery Lane Aspen CColo Colorado 81611 NIEBI VDRAWING TITLE: (CS FOYER IE MAIN ENTRANCE DOOR ELEVATION FOYER ELEVATION 01 LkJ'I 1"=1'-0" 02 1"=1'-0" O SCALE:AS NOTED Project No.01.19 Consultant Project No. IC) Date:AS NOTED Drawn By Checked By Approved By V/S VS itFile Name: al Sheet No: V k ID-2.02 o RECEIVED ,,./�//2022 ASPEN BUILDING DEPARTMENT ARCHITECT: SEAL: e DESIGN ARCHITECT: CONSULTANT: SS mrgnu:swam 1 SO We9 Palo Slial Sulk 1704 NY NY 10001 P,212.337.2195 F,212.3372194 OWNER KATZ RESIDENCE 6'-4" X X 6'-4" ♦ • CGI-402 • SUBMISSIONS: NO. DATE ISSUE r-r) 00 01.14.2022 80%CD SET 01 01.28.2022 90%CD SET 02 02.08.2022 95%CD SET ART ART 03 02.11.2022 98%CD SET • REVISION O 01 03.04.2022 REVISION 1 Ti ♦ 01 03.11.2022 REVISION 2 0 CD CD T V/ O O SD0 S KATZ RESIDENCE 729 Cemetery Lane Aspen Colorado 81611 ♦ ♦ ♦ ♦ N DRAWING TITLE: LIVING ROOM IE 01 LIVING ROOM FIREPLACE IE • SCA ProjectLE:No.as 01.19NOTED Consultant Project No. ODate:AS NOTED Drawn By Checked By Approved By V/S V/S itFile Name: al Sheet No: i ID-2.03 EIVEC //2022 ASPEN BUILDING DEPARTMENT ARCHITECT: SEAL: DESIGN ARCHITECT: CONSULTANT: SS mionu:Swain 150 We9 231h Snel Suit 1704 WRY. 6'-4 1/2" 1 0'-1 3/4" 1'212.337.2195 7'212.3372194 OWNER KATZ RESIDENCE CCI-401 CCI-401 CCI-400 CGI-400 • • 0 • _. o e 0 r-r , ,_-O O O O P j l o I I 0 0 0 0—,L 7777 ^^ �/ SUBMISSIONS: a Y Y NO. DATE ISSUE 00 01.14.2022 80%CD SET 0 0 01 01.28.2022 90%CD SET ' —r r r r r— r— 03 02.11.2022 9%CD SET I 03 02.11.2022 98%CD SET YYY V ,, l�l( rS'Y up REVISION 01 03.04.2022 REVISION 1 0 I I ' I (� Q 0 Q 01 03.11.2022 REVISION 2 7 S S S S S r>I I Inte.rated li.htin. I _, I I o bo torn she L Lp. EQ-400 I I _ I I I, — Al_ i IN • `_ I � 1 1 , Drawer n Drawer Drawer Drawer Drawer / ^ WINE I ; 1 1 1, i � / 7 / 7 7 FRIDGE 7 - - 7 7 - - 7 J1 I. � 7 7 7 7 o `~� < o < Adjustable Adjustable > < Adjustable Adjustable > _ I--I_' I _ I I I c 1 sh lving shelvv ri slglving shel09 O c N \ 7 7 7 k KATZ RESIDENCE 7 / - 729 Cemetery Lane 7 ` � `� \ Aspen Colorado 81611 • J L \` • \ \ "J /y 2'-0 3/4" yr 1'-7" EQ EQ EQ 2'-0" N� 4 �I 4( K 4 K 9( / v DRAWING TITLE: 1 1/4" 1 1/4" 1 1/4" 1 1/4" k DINING ROOM 2'-2" 8'-7 1/2" O IE )( X X X A lk 01 DINING ROOM BAR IE Z • SCALE:AS NOTED Project No.01.19 Consultant Project No. O. Date:AS NOTED Drawn By Checked By Approved By V/S V/s itFile Name: al Sheet No: ki k ID-2.04 o RECEIVED ,,v/...//2022 ASPEN BUILDING DEPARTMENT ARCHITECT: Mirror and sconces will change based on final selection SEAL: 3'-10" WC-600 2'-9" 2'-3" 2'-11" \ \ \ N. ‘i,frii„,... : TL-600 MR-600 • MR-600 • WC-600 • DESIGN ARCHITECT: • CONSULTANT: k r� LTGH-600 OPEN \ / c V J yrglosvdo lsowassamsoalsulmisoa NYNY10001 - kr/ — P.2123312ve.2127oz194 O :,` O O O ` OWNER e KATZ RESIDENCE I- \ -- , PF-XXX • PF XXX r / z_10 /_ i — \ = CGI-600 ?i • CGI-600 1—ffE 1 00 .e - m,• PF-100 I ,- -0l yal) 1'-10" 3'-3" 1'-10" E k k k SUBMISSIONS: NO. DATE ISSUE 00 01.14.2022 80%CD SET 01 POWDER ROOM IE 02 POWDER ROOM IE 03 POWDER ROOM IE 04 POWDER ROOM IE 01 02.08.202295%CD SET 1"=1'-0" 1"=1'-0" � 1'-0" 1"=1'-0" 03 02.11.2022 9%CD SET 03 02.11.2022 98%CD SET REVISION 01 03.04.2022 REVISION 1 4 —�tt 01 03.11.2022 REVISION 2 X X \ - per_ — — _ _ _ - _ TL-500 -_ —c MR-500 _1 LTGH 500 � --- Ik KATZ RESIDENCE _ E=.= r` Cemetery— Aspen Colorado 81611 � _,—' PF-XXX - - \--- - •- • UP-500 -- ------ --. -zI !t ,. C,^ NED BackwlasH-3 SICiS 0 ` 11', /11 1�, 'i • O DRAWING TITLE: \ ST-100 • �I. = LTGD-500 V k POWDER& I o C.3O GUEST ROOM IE o I CG-500 P T-5 0 0 N Z SCALE:AS NOTED N I- J Project No.01.19 .J Consultant Project No. Dace:AS NOTED ODrawn By Checked By Approved By ( VSFile Name: al Sheet No: LLI GUEST BATHROOM VANITY GUESTROOM HEADBOARD WALL ID-2.05 05 1"=1'-0" 06 1"=1'-0" O F IVE uL,/ i/2022 ASPEN BUILDING DEPARTMENT ARCHITECT: 1 15 _v, X SEAL: • WC-700 DESIGN ARCHITECT: CONSULTANT: SS I ViRnwswam I I • • U P-7 0 0 150 WeL 231h&rM Sae 1704 NY NY10001 P:2123312195F'212.3311194 r-I 1. r"1 OWNER KATZ RESIDENCE 41 4� Lie LIIJ LTGD-700 II ;-------- — `, ;--------— — II 1 \ \ I 1 I 1 A, A I n, I ) j I I I L.. I I I I I • CG-700 1 1 - 1 I P • UP-701 w a SUBMISSIONS: 01 MB1.-0"HEADBOARD WALL ISSUE ao DATE 80%CD SET 01 01.28.2022 90%CD SET FOLD 0\V/ R 02 02.08.2022 95%CD SET 03 02.11.2022 98%CD SET REVISION 01 03.04.2022 REVISION 1 `y 01 03.11.2022 REVISION 2 N 111 N O FIXED FIXED 729 Cemetery Lane I� KATZ RESIDENCE 03 PANEL PANEL / Aspen Colorado 81611 j N� I--••-- ODRAWING TITLE: lk 4 MASTER 'I O BEDROOM IE 4 • 11 ' V O " SCALE:as NO1E°BYVedBY 7----' • IProject No.01.1 ltant \ / O Date:AS NOTED V/S VSL �\ ❑ i./0 V — • ` 1 I File Name: • L`��11 Sheet No: V MB EXTERIOR DOORS IE CG 702 UP-703 AE-702 CG 701 UP-702 LTGD 701ikk ID-2 06 02 1n=1I-o° o F- -EIVEt L,u/ //2022 ASPEN BUILDING DEPARTMENT 9 -2 1/4 ARCHITECT: > \ • I PF-702 \ A> / SEAL: shelves z/ \ > MR-702 • by \N \ millworker / \ \ • TL-700 > / \ \ // \ \ DESIGN ARCHITECT: > I / N \b CONSULTANT: > O \ // O Schluter stripH / j� / / > PF—XXX • / at top of tile �� \ // / °o V/S •/ y�l58svdo \ ` I Iwel PlmslM h12 10001 0 �. .�4 �. .� \ // PF-702 OWNEsRansllses123nz1sa PF XXX / • TL-702 � o / > v o v \/ / KATZ RESIDENCE 0O D0 • PF-100 - / > o o / N O o o O lUll / /TL 702 • N / 7' 6" / 4'-4" / w P > I 1 PF-701 PF-700 > 01 MASTER VANITY WALL 02 MASTER BATHROOM IE SUBMISSIONS: N0. DATE ISSUE > 1"=1'-0" 1„=1'-o" 00 01.14.2022 80%CD SET 01 01.28.2022 90%CD SET > 02 02.08.2022 95%CD SET 03 02.11.2022 98%CD SET > 3'-4" T X . I l REVISION > 01 03.04.2022 REVISION 1 NII 01 03.11.2022 REVISION 2 I _ 3 9, C> Shelves &loset PF-702 frame > � by bench > rt millworker by • TL-702 0 > millworker 1,_0" I \ 0 0 0 0y / f uteri > PF 702 g ass > C it 7/ > 1 C Schluter strip 1'-0" at top of tile > o729> ~ KATZ CemeteryRESIDENCEe > \/ \—I ' \ Aspen Colorado 81611 : TL-7�2 Vk > I L-/U" I Cr) "� - 2 7„ > 1. / •o N Ov DRAWING TITLE ,I( > MASTER of J �/ I I OO BATHROOM IE > SCALE:AS NOTED \ Project No.01.19 > N� Consultant Project No. \ \ \ \ \ ` \ 6" 3'—�" Date:AS NOTED X X Drawn By Checked By Approved By > 3 -� / / I.W� F le Name:VAS > Sheet No: ILI YA E- -•O' I •� - 1 "_ •IL I• 1 v 'LL AIL ID-2.07 r_ r 1r r1_•r t1A 03 1 -1 -0 04 1 -1 -0 05 1°=1'-0° o FIVE! uu/.//2022 ASPEN BUILDING DEPARTMENT