Loading...
HomeMy WebLinkAboutFile Documents.213 W Bleeker St.0027-2024-BREP Incident Overview: Date of Incident:August 31 Location of Incident: 10 feet from the residential structure Summary of Event: An outdoor irrigation line, located approximately 10 feet from the residence, broke and caused significant soil saturation near the exterior of the home.The excessive water infiltrated the house by rising above the exterior foundation wall, leading to water damage within the residence. Damage Description: • Affected Areas: The infiltration of water caused damage to multiple areas inside the home, including: o Drywall o Wall materials (some studs) o Flooring o Wooden window frame • Infiltration Path: Water entered through the exterior foundation wall, as visible in the attached photo, showing where the water found ingress. The plywood in this area, along with the drywall that originally covered it, will be removed to assess and repair the damage. • Window Frame Damage: The wooden window frame in the affected area was also damaged by the water.The frame itself will be repaired as part of the restoration process. Repairs and Status: • The outdoor irrigation line has been repaired. • No interior water fixtures were impacted. • None of the structural elements of the home were affected by the water infiltration. RECEIVED 09/23/2024 ASPEN BUILDING DEPARTMENT _ �• ft I I' lipper • , ...i _ _ - . .., . - -:,- . f ot.-..„,,,_ 4 • .. tom!, • t' • ,•., i I' fy ` ; ,A- ,� • .++�- a -4..y� .mar. RECEIVED 09/23/2024 ASPEN BUILDING DEPARTMENT .. . . \ . . . .. .... • / - F i-, - te. • . ,., • 0 , .. . Illik 4.AC,,.• ,...,... .7,,'.., 110:_• ,, ,.‘_: ' t-....,. . . • . . ..„.-- ' .:., 40.4-- ... , . -,...... , .. .......- - --..,..., . ...; . . . .. .._ , .....w., - :, _ ....sir" . , .... . . ' -.. ' . teA - .4.' - . ..-. . • ", 9 1 ' . 1. 1.' . , u_. . . (1,.. ' s, 1.i., . -,. . • , - , . . - •• , .r 1 . . .. . . . ..---% , I; p3dir 1%. . r1/11/11/1/4it • 111F p • .. ...4 . ,, .41/4, 4* ' 4' .-.. . . , . t . •di .14' 'Id' RECEIVED 09/23/2024 ASPEN BUILDING DEPARTMENT