HomeMy WebLinkAboutFile Documents.213 W Bleeker St.0027-2024-BREP Incident Overview:
Date of Incident:August 31
Location of Incident: 10 feet from the residential structure
Summary of Event:
An outdoor irrigation line, located approximately 10 feet from the residence, broke and
caused significant soil saturation near the exterior of the home.The excessive water
infiltrated the house by rising above the exterior foundation wall, leading to water damage
within the residence.
Damage Description:
• Affected Areas:
The infiltration of water caused damage to multiple areas inside the home,
including:
o Drywall
o Wall materials (some studs)
o Flooring
o Wooden window frame
• Infiltration Path:
Water entered through the exterior foundation wall, as visible in the attached photo,
showing where the water found ingress. The plywood in this area, along with the
drywall that originally covered it, will be removed to assess and repair the damage.
• Window Frame Damage:
The wooden window frame in the affected area was also damaged by the water.The
frame itself will be repaired as part of the restoration process.
Repairs and Status:
• The outdoor irrigation line has been repaired.
• No interior water fixtures were impacted.
• None of the structural elements of the home were affected by the water infiltration.
RECEIVED
09/23/2024
ASPEN
BUILDING DEPARTMENT
_ �• ft I I'
lipper
•
, ...i _ _ - . .., . - -:,- .
f ot.-..„,,,_
4 • .. tom!, • t'
•
,•., i I' fy ` ; ,A- ,� • .++�- a -4..y� .mar.
RECEIVED
09/23/2024
ASPEN
BUILDING DEPARTMENT
.. . . \ . .
. .. .... • /
-
F i-, - te. • . ,., • 0
, .. .
Illik 4.AC,,.• ,...,... .7,,'.., 110:_• ,, ,.‘_: '
t-....,. .
. • . . ..„.-- ' .:., 40.4--
...
, .
-,...... ,
.. .......-
- --..,..., .
...; . .
. .. .._
, .....w., -
:, _ ....sir"
. ,
....
. . '
-.. ' .
teA - .4.' - . ..-. . •
", 9
1 ' .
1. 1.'
. ,
u_. . . (1,.. ' s,
1.i., .
-,. . • , - ,
.
. - •• , .r
1 .
. .. . . . ..---%
, I;
p3dir
1%. .
r1/11/11/1/4it
•
111F p • .. ...4 . ,, .41/4, 4* ' 4'
.-..
. . ,
. t .
•di .14'
'Id'
RECEIVED
09/23/2024
ASPEN
BUILDING DEPARTMENT