HomeMy WebLinkAboutFile Documents.213 W Bleeker St.0027-2024-BREP (2) Environmental & Disaster Restoration , Inc .
ECOS Environmental - Glenwood Springs, Colorado
6690 Highway 82
Glenwood Springs, CO 81601
Office - (970) 945-4407
admin@ecosenvironmental.com
www.ecosenvironmental.com
ASBESTOS INSPECTION REPORT
CLIENT: Glickman, Adam
ADDRESS: 213 W. Bleeker
Aspen CO, 81611
EMAIL: adg3@me.com
PHONE: 808-359-8490
Ecos JOB NUMBER A-24-0172-AT
PROJECT LOCATION: Same as above address
DATE OF INSPECTION: 9/27/2024
DATE OF REPORT: 10/9/2024
1
ecos
Environmental Disaster Restoration,Inc.
SUMMARY
ECOS Environmental&Disaster Restoration (ECOS) was contracted to conduct a limited asbestos
inspection at the above referenced location to determine if there is asbestos containing building
material (ACBM),in building materials located in the basement bathroom of the property for a
proposed renovation. The inspection was performed in accordance with the Standards of Practice of
the Colorado Regulation 8 Part B in effect at the time of this Inspection. This inspection is not intended
to be technically exhaustive. The inspection includes all accessible building materials however,should
any additional building materials be discovered during demolition,those materials must be sampled
and analyzed prior to continuing with the work. Five (5) samples were collected of all suspect materials
throughout the partially remodeled area, as listed in the Lab Data Table located on Page 10 of this
report. There was drywall removed upon arrival and some debris present which was sampled along with
remaining drywall.
The Inspector has prepared this written Asbestos Inspection Report for the sole use and benefit of the
client. The asbestos inspection report shall identify,report, and make recommendations for future
evaluation. Client agrees to read the entire Asbestos Inspection Report when received and shall
promptly contact the Inspector with questions and/or concerns regarding the reported findings.The
use of this report and information contained herein by others,in whole or in part,is not authorized
without the written mutual consent of the client and Asbestos Consulting Firm,ECOS Environmental.
INSPECTOR QUALIFICATIONS
This inspection was performed by Brian Guzman,Colorado State Department of Public Health and
Environment Certification Number 21876.
SAMPLE ANALYSIS PROCEDURE
ECOS collected bulk samples,in a random and representative manner, of the homogenous areas as
determined by the above-named Inspector,an EPA/State of Colorado Certified Asbestos Building
Inspector. A simplified sampling scheme was utilized as described in EPA pink book table 2.Samples
were collected by using wet techniques to minimize damage to the suspect asbestos containing
building material (ACBM) and subsequent fiber release. These wet methods may entail wetting the
surface of the material to be sampled with water mist from a spray bottle or contained using a plastic
bag. The sample container is pressed tightly against the surface of the material being sampled and with
a twisting motion,the sampler is slowly pushed into the material for collection. The container is then
labeled with a unique sample ID number and marked on the Sampling Area Diagram. The Inspector
cleans the tools and equipment,following collection of each sample to minimize cross-contamination
between sample collecting. The Inspector assumes materials in inaccessible locations were homogenous
to those in accessible locations,to limit disturbance during the sampling process. All samples were
placed in sealed,labeled containers,with sample descriptions and locations were recorded. Samples
were delivered under a chain of custody for analysis to Aerobiology Laboratory in Golden, CO.
Samples were analyzed by Polarized Light Microscopy (PLM).
2
ecos
Environmental&Disaster Restoration,Inc.
Performance of this asbestos inspection is intended to reduce,but not eliminate,uncertainty regarding
the presence of ACBM in connection with the above referenced property. No guarantee is expressed or
implied that all ACBM was identified in the inspection. Therefore,ECOS Environmental cannot be
held accountable for restrictions placed on us by the client,conditions or information unknown,or
areas inaccessible at the time of the inspection.
TRANSMITTAL OF ASBESTOS SURVEY REPORT
One copy of the building or structure asbestos survey shall be immediately transmitted by the owner as
follows:
• One copy of the completed asbestos survey shall be sent by the owner,or their agent,to the
local government entity charged with issuing a permit for actions such as demolition,
renovation,remodeling or repair work under applicable State or local laws.
• The completed asbestos survey shall be kept on the construction site with the asbestos
notification and variance,if required,throughout the duration of the asbestos project and any
associated demolition,renovation,remodeling or repair project.
ASBESTOS SURVEY INFORMATION
The asbestos survey shall, at a minimum,identify and assess with due diligence, the locations,
quantities,friability,and conditions of all building material types at the affected area of the building or
structure. The certified asbestos building inspector is responsible for identification and assessment of
all types of materials within the affected area of the building or structure.
All building materials visually assessed shall be assumed to be asbestos containing building materials
(ACBM) unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies.
The subsequent analysis is performed by a laboratory with the requirements and analyses,which
satisfy both CO STATE ELAP and Federal regulations. This includes multi-layered sample analyses to
document non-asbestos containing material.
The asbestos survey shall also include the building or structure name, address,the owner's name and
address, or the name and address of the owner's agent,the name of the firm performing the asbestos
survey and a copy of the firm's current asbestos handling license. In addition,the names of the certified
inspector(s) performing the survey, a copy of their current individual asbestos handling certificate,the
dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACBM,all
laboratory analysis reports for bulk samples collected,and copies of the appropriate certifications for
the laboratory used for analysis of samples taken during the asbestos survey.
UNIDENTIFIED AND UNASSESSED ASBESTOS
When any construction activity such as demolition,remodeling,renovation or repair work reveals
suspect ACBM not identified in the asbestos survey,or has not been identified by OSHA or EPA
requirements,all activities shall cease in the area where the suspect ACBM is found.Unassessed
suspect ACBM shall be assumed,treated, and handled as ACBM,unless proven otherwise by standard
EPA and OSHA accepted methods. To document non-asbestos containing material, analysis must be
3
ecos
Environmental&Disaster Restoration,Inc.
performed by a laboratory with the requirements and analysis which satisfy both CO STATE ELAP and
Federal regulations.
ASBESTOS ABATEMENT
If the asbestos survey finds asbestos containing building material (ACBM) in the area of the building or
structure to be demolished,renovated,remodeled, or have repair work, the owner or the owner's agent
shall conduct,an Asbestos Abatement performed by a licensed General Asbestos Contractor (GAC) in
accordance with all standards set forth.
All building or structure owners and GACs on a demolition,renovation,remodeling,or repair project
shall inform all trades about the ACBM on the work site.
All ACBM impacted by the demolition,renovation,remodeling, or repair project shall be removed
prior to access of other uncertified trades or personnel. No demolition,renovation,remodeling,or
repair work shall take place by the owner or the owner's agent prior to the completion of the asbestos
abatement in accordance with Regulation 8 Part B. For multi-phased work, access is restricted for
uncertified trades or personnel in the area where the asbestos abatement is taking place.Upon
completion of the asbestos abatement, other trades and personnel will have access to the work site.For
demolition projects exempt from asbestos survey requirements due to being structurally unsound,the
demolition is considered an asbestos abatement.
ASBESTOS PROJECT
An asbestos project is any work involving the removal, encapsulation,enclosure,repair,or disturbance
of friable or non-friable asbestos, or any handling of ACBM which may result in the release of asbestos
fibers. An asbestos project shall include any disturbance of asbestos fibers,planning,asbestos survey,
project design,background air sampling, gross removal,cleanup,the handling of all ACBM,
inspection,final cleaning, air clearance,and final waste removal from site. An asbestos project starts
with Phase I when the planning, asbestos survey,and design work begins as required. The project shall
not be considered completed until Phase II D is complete. (See Table 1 below).
Phase I Phase II
(Prior to Asbestos
Abatement Contractor) Start->Abatement-> End
A B A B C D
Regulated Asbestos Final
Asbestos abatement handling
survey, Background work area(s) including gross cleaning Final waste
planning, air sampling preparation removal or and removal
and design and enclosure abatement,initial clearance from site
construction cleans, and waste air samples
Start->Asbestos Project->Final Clearance
4
ecos
Environmental&Disaster Restoration,Inc.
ASBESTOS ABATEMENT TRIGGER LEVELS
An asbestos abatement in a Single-Family Residential Dwelling (SFRD) less than 32 square feet,50
linear feet on pipes, or the volume equivalent of a 55-gallon drum is regulated by OSHA in 29 CFR
1926.1101.An abatement of materials greater than these trigger levels are regulated by the Colorado
Department of Public Health&Environment (CDPHE). These regulations are found in the Colorado
Regulation 8.
In Public and Commercial buildings,the trigger levels are 160 square feet,260 linear feet on pipes,or
the volume equivalent of a 55-gallon drum.
In School buildings,any amount of damage to or removal of ACBM greater than 3 square feet,or 3
linear feet on pipes,must be handled in accordance with the Colorado Regulation 8 and AHERA
regulations.
ASBESTOS SURVEY FLOW CHART
Asbestos Test
- Non Detect < 1% 1 >1%
No Action I OSHA Reg. 8 dditional Reg. 8
Required 1 Requirements Requirements Requirements
>3,000 SF
NO Permit 1 Permit Project Design
Required
I
ECOS provides I I'
clearance (NOT learance Testing Project Manager
I I required) Oversight
Manifested
Disposal at
Approved Landfill
5
ecos
Environmental Disaster Restoration,Inc.
Homogenous areas sampling requirement: SF= Square Footage. LF=Linear Footage
HOMOGENOUS MATERIAL TYPE QUANTITIES MINIMUM#OF SAMPLES
0 To<1,000 SF 3
SURFACING MATERIAL
1,000 TO 5,000 SF 5
>5,000 SF 7
THERMAL SYSTEM INSULATION EACH MATERIAL 3
PATCH<6 SF,LF 1
MISCELLANEOUS MATERIALS EACH MATERIAL 2
ASBESTOS REMOVAL CATEGORIES
Category I Non-Friable ACM:-Asbestos-containing packings, gaskets,resilient floor covering, and
asphalt roofing materials, etc. containing more than one percent 1% asbestos when dry cannot be
crumbled,pulverized,or reduced to powder by hand pressure.
Category II Non-Friable ACM: -Any material, excluding Category I Non-Friable ACM,containing
more than one percent 1% asbestos when dry cannot be crumbled,pulverized, or reduced to powder
by hand pressure.
Class I Asbestos Work: OSHA term-involves the abatement of Thermal Systems Insulation (TSI) and
Surfacing ACBM and PACM.
Class II Asbestos Work: OSHA term-involves the abatement of ACBM which is not TSI or Surfacing
material. This includes,but is not limited to,the removal of ACBM wallboard,floor tile and sheeting,
roofing and siding shingles,and construction mastics.
Class III Asbestos Work: OSHA term-meaning Repair and Maintenance operations,where no more
than a minor quantity of ACBM,including TSI and Surfacing ACBM and PACM,is likely to be
disturbed.
Class IV Asbestos Work: OSHA term -meaning Maintenance and Custodial Activities during which
employees contact but do not disturb ACBM or PACM and activities to clean up non-ACBM dust,
waste and debris resulting from Class I, II and III activities.
6
ecos
Environmental Disaster Restoration,Inc.
DEFINITIONS
AHERA:ASBESTOS HAZARD EMERGENCY RESPONSE ACT
Asbestos Containing Material (ACM): material containing more than 1% asbestos.
Asbestos Containing Building Material (ACBM): means surfacing ACM, thermal system
insulation ACM, or miscellaneous ACM found in or on interior structural members or other
part of a school building or state building.
Asbestos:A generic name given to several naturally occurring hydrated mineral silicates possessing a
unique crystalline structure. They are incombustible in air and are separable into fibers. Asbestos
includes the asbestiform varieties of chrysotile, crocidolite, amosite (cummingtonite-grunerite),
anthophyllite,tremolite and actinolite.
Asbestos Abatement:Procedures to control fiber release from asbestos material. This includes
removal, encapsulation,enclosure,repair,and disturbance of friable asbestos or any handling of
asbestos material that may result in the release of asbestos fibers.
Asbestos Consulting Firm (ACF): any person who performs or offers to perform any of the following
activities, as required by Regulation 8,Part B,in the state of Colorado: asbestos building inspection and
bulk sampling, development of asbestos management plans,air monitoring for asbestos fibers,
development of asbestos project designs, and project management.
Asbestos Laboratory:any person who performs or offers to perform asbestos analysis of bulk or air
samples as required by Regulation 8,Part B in the state of Colorado.
Asbestos Spill: any release of asbestos fibers due to a breach of the containment barrier or an
abatement project,or due to any cause other than asbestos abatement.
Assessment: an evaluation of the condition of ACM or ACBM, or suspected ACM or ACBM,which
determines the need for a response action.
Building Owner:The person in whom legal title to the premises is vested unless the premises are held
in land trust,in which instance building owner means the person in whom beneficial title is vested.
Certified:holding a certificate issued pursuant to this regulation.
Emergency: An unexpected situation or sudden occurrence of a serious and urgent matter which
demand immediate action and constitutes a threat to life,health or may cause major damage to a
property. Delay of a contract does not constitute an emergency,nor are demolition projects
emergencies unless the facility has been declared in imminent danger of collapse by a government
entity.
7
ecos
Environmental Disaster Restoration,Inc.
Friable:the material,when dry,may be crumbled,pulverized,or reduced to powder by hand pressure.
Friable includes previously nonfriable material after such previously nonfriable material becomes
damaged or disturbed to the extent when dry it may be crumbled,pulverized, or reduced to powder by
hand pressure.
General Abatement Contractor (GAC): any certified person who performs or offers to perform
asbestos abatement.
Homogenous Area:an area of surfacing material,thermal system insulation material, or miscellaneous
material uniform in color,texture, and after due diligence on the part of the Certified Asbestos Building
Inspector, appears or has been confirmed to have the same date of application,and is unlikely to
consists of more than one type, or formulation, of material.
Inspection: an activity undertaken to determine the presence or location, or to assess the condition of,
friable or non-friable ACM or ABCM or suspected ACM or ACBM,whether by visual or physical
examination,or by collecting samples of such material. This term includes re-inspections of friable and
non-friable known or assumed ACM or ACBM which has been previously identified.
Major Asbestos Spill: an asbestos spill involving the disturbance of friable ACM in an amount greater
than the trigger levels.
Minor Asbestos Spill: an asbestos spill involving the disturbance of ACM in an amount less than or
equal to the trigger levels.
Miscellaneous Material -building material on components, structural members or fixtures,
such as floor and ceiling tiles, and does not include surfacing material or thermal system
insulation.
Nonfriable: material which, when dry, may not be crumbled, pulverized, or reduced to
powder by hand pressure. Damaged nonfriable material or nonfriable materials in poor
condition may become friable.
OSHA: Occupational Safety and Health Administration
Polarized Light Microscopy (PLM):An optical microscopic technique used to distinguish between
different types of asbestos fibers by their shape and unique optical properties.
Project:planned work or activity to be finished over a period of time and is intended to achieve a
particular purpose. Calculation to determine if activities required under Regulation 8,Part B,will
exceed trigger levels id done by summing up all quantities of ACM present in the building will be
directly impacted/damaged by the planned work will occur during a particular project. Building
owners or contractors may not avoid the requirement of Regulation 8,Part B by breaking up a project
to remain below trigger levels.
Repair: Corrective action using required work practices to control fiber release from damaged asbestos
material.
8
ecos
Environmental&Disaster Restoration,Inc.
Surfacing Material - material sprayed on, troweled on, or otherwise applied to surfaces, such
as acoustical plaster on ceilings and fireproofing materials on structural members, or other
materials on surfaces for acoustical,fireproofing, or other purposes.
Thermal System Insulation (TSI) - material applied to pipes, fittings, boilers, breeching,
tanks, ducts, or other interior structural components to prevent heat loss or gain, or water
condensation, or for other purposes.
Transmission Electron Microscopy (TEM):an analytical technique used for the definitive
identification of asbestos. This technique can be used for both air and bulks sample analyses as allowed
by this regulation.
Trigger Levels: The minimum amounts of ACBM required to trigger the state and OSHA
regulations
9
ecos
Environmental Disaster Restoration,Inc.
HOMOGENOUS AREAS SAMPLED DURING INSPECTION
a� H o Z w
:'-' MATERIAL LOCATION w U 4 m O P4 a w
Material
ct TYPE w o Q u OI
cn Q o f� U R cQ
Al S Drywall and texture Ceiling NW end N F G L 3 200
A2 S Drywall and texture N wall N F G L
A3 S Drywall and texture SE wall N F G L
AA1 M Texture,tape,joint N corner N F G L 2 200
compound, drywall
AA2 m Texture,tape,joint S corner N F G L
compound, drywall
KEY:
MATERIAL TYPE
S= SURFACING
TSI= THERMAL SYSTEMS INSULATION
M=MISCELLANEOUS
CONDITION
G= No VISIBLE DAMAGE
D= VISIBLE DAMAGE<10%OVER ENTIRE MATERIAL OR 25% LOCALIZED
SD=VISIBLE DAMAGE>10%OVER ENTIRE MATERIAL OR 25%LOCALIZED
FRIABLE CATEGORY
F=FRIABLE MATERIAL;MATERIALS THAT CAN CRUMBLE OR BE REDUCED TO POWDER BY HAND PRESSURE
NFI=CATEGORY I NON-FRIABLE MATERIAL;MATERIALS THAT CANNOT BE CRUMBLED OR REDUCED TO
POWDER BY HAND PRESSURE THAT DO NOT INCLUDE CATEGORY I NON-FRIABLE MATERIALS.
POTENTIAL FOR DISTURBANCE
L= Low POTENTIAL FOR DAMAGE
D= POTENTIAL FOR DAMAGE
SD=POTENTIAL FOR SIGNIFICANT DAMAGE
ASSESSMENT CATEGORIES
1=DAMAGED OR SIGNIFICANTLY DAMAGED TSI ACM
2=DAMAGED FRIABLE SURFACING ACM
3=SIGNIFICANTLY DAMAGED FRIABLE SURFACING ACM
4=DAMAGED OR SIGNIFICANTLY DAMAGED FRIABLE MISC.ACM
5=ACM WITH POTENTIAL FOR DISTURBANCE
6=ACM WITH POTENTIAL FOR SIGNIFICANT DISTURBANCE
7=ANY REMAINING FRIABLE ACM OR FRIABLE SUSPECT ACM
10
ecos
Environmental&Disaster Restoration,Inc.
INVENTORY
w
a
0* HOMOGENOUS AREA LOCATION/FUNCTIONAL SPACE DESCRIPTION
d
cn
A DRYWALL BATHROOM WALLS AND
CEILING
CONCLUSION
A visual inspection was completed of building materials within the residence of the proposed remodel
area. Five (5) samples were collected and sent to Aerobiology Laboratories in Golden, CO,for analysis
using Polarized Light Microscopy (PLM). All samples came back non-detect for asbestos.
11
e c o s
Environmental Disaster Restoration,Inc.
LAB RESULTS
AERObiOLOgy� LABORATORY ,40 Simms street
ASSOCIATES, INCORPORATED Sine IW
Oo)deq CO,80/01
3303 323146
A Pace Analyticala Laboratory Certificate of Analysis now serateenuint
Client Name ECOS Environmental Date Collected: 9272024
Street Address 6640 HWY 4. W V' '%1') Date Received: 9202024
Caw.State ZIP Glenwood Spemes,CO 81601 TESIWG V Date Analyzed: 1022024
Arm: gram Gomm NVI8PIab Cade R07600 Date Reported: 1072024
Client Project Name: A-240172-AT+213 W.Bkekes Project TIL 24038344
Test Requested. 3002,Asbeaw IR.&Samples
Method: EPA 600 R-93116:Method for Asbestos to.Bulk Bandana Mammals,EPA-40 CPR?.ppemdeo E to Subpart E of Pan 763,Interim Method for Asbestos m Bulk Insulation Samples
Noo-Aobeeeoe Non-Fi Mat
rix
trix
Sample ldentificati0m Lases -.-m� :kma-eaoeous
PscP''''''''' Phy=$Ical Dc. on of Sample lays Asbestos Asbestos
os Detected Aestos Personage Fiber Simnel Material �.�
Chem Number Sample Numb Pscenteoe Percenro9e-Composition
24038544-1A 10 White Tame with Rate Paint ND 100 C N
Al - -
24038544-1B 90 Gray Tan Drywall ND 10 CELLFG 90 G N
24038544-2A 10 White Teabae with'White Paint ND 100 C N
A; .
24038544-2B 90 Gray Tan Drywall ND 10 CELLFG 90 G N
24038544-3A 10 White Table with White Paint ND 100 C N
A3 - •
-
24038544-3B 90 Only Tan Drywall ND 10 CELLFG 90 G N
24038544-4A 10 White Temo<e with White Paint ND 100 C N
24038544-4B 5 Wive Tape ND 99 CELL 1 Y
AA1 •
24038544-4C 10 Utile faint Ctmpoatd ND 100 C Y
24038544-4D 75 Gras-Tan Dtanall ND 10 CELLFG 90 G N
'7����//,, AC—ActotoOe All—Ae®al lIae' B—Belle Q—Queetz
h /i��`V INN' a �s Av=Amesae CII.L=coma vie C-onito T=7er
e/1 .1. �i...11._c-16.M� ALM=Am site CMs ELL
=Cellueses. O—niamte T=Tarmicnfoo
4(f5 (/�^ R "^ t CFRY—Cbry sot& MW=Mammal Wool G—Gypsum
CR—Crocidol6 OT—Other M—Mica
Nock Aivakh Duds Tbtp-.c TRM—TnenoMe SIR—Synthetic OR—Organic
Laboratory.Analyst Asbestos Lab Super-mot Tr=Trace TL=Talc OP=Opaques
AT)—Now Deeded W—W Mestarite P—Petite
Page of3
12
e c o s
Environmental Disaster Restoration,Inc.
AERObIOLOqy� LAbORATORy nosi�,sueet
Suite ASSOCWES, INCORAORAIED Golden, 0101
303.132.3746
A Pace Analytical Laboratory Certificate of Analysis AVM aeubiolow net
Client Name ECOS Evonmeml -m Dare Collected: 9272021
Street Address 6630 FPII-92 -— Date Received: 9,30,2024
City,State ZIP Glum-cod Springs,CO 81601 Date Analysed: 10,72024
Atm. Brun C _.:-___-_r_ .tom Date Reported: 1022024
Clint Project Name: A-24-0172 A- 213 W_Meeker Project ID: 2403834/
Test Requested: 3002,Asbestos u Bel Samples
Method: EPA 600 P.iS 116.Method Me Asbestos in Bak Boaldme]fatenalL EPA-40 CPR Appendix E to Subpart E of Pan 763.Imetim Method for Asbeves in Bulk Insulmnm Samples
Sample Identification _net Non-Asbestos Nan-Fibrous ]terra Homo-mom
PerceBa•e Apnical Desaipooa of Sample layer Asbestos Detected:Lbessos Peres.. Fiber Slatenal Material (7120
Cheer Lab Sample Number Percentage Percents. Camposmoo
24038544-5A 10 R'hioe Texture with White Paint ND 100 C N
24038544-5B 5 White Tape ND 99 CELL 1 Y
AA2
24038544-5C 10 While Joint Compound ND 100 C Y
24038544-5D 75 Gray Tan Drywall ND 10 CQiFG 90 G N
AC-AditoBle All-Aninudllnn B-Dodo- Q-Q11.2
�a iretit /� ^ yy�t AN=Ameie CELL=Cellum.,Ha C=Diatoms
T=Tin'
9 `+ 5.11._D I � AM Awe..*n CELL=Mru:ose C=Cikite l'-letmic doe
/1�/VJeGe �YMV}1 R.� I'tA„'� , CHRY=Ckysoiie )dW=Mineral Weol G-Gypsum
CR-Coseidolik OT-Other M-Mice
Nisi,K.reta:h Cads l lovu),.., TR\I-Demob. SYle-S)vie into OR-Os-untie
Laboratory Analyst A.teerce Lab Supenieco Tr=Trace TL=Talc OP=Opaques
l)-Nome Delecaet W-WdoVnnite P-Pe1Re
Page 2 of 3
13
ecos
Environmental Disaster Restoration,Inc.
An obiology A LAboluvoRy
soOr use
ASSOCUICS. IVCORPORAIED r..1404 r»Ywri
irlr:1:17M
A Pace AnaryUcal'Laboratory Certificate of_Aaahm meaner Cmemcole
•
t Irer Wee ke lad For v32 .�.��^(� Dale M40et 1 4111024
S.r 0 Mao,. WOO mwY IQ W%LJp.�.,r\{VJ1J1 Ib4 NarnN 'l 4112024
lrM1-.Sc4 LIP Glartmed Sinop.CO a[WI /ISM. Dar NuWnd 107 2024
vrn IelO Lima "-rr -'.1.38see Use eepaeed 10 1 2024
Chat Project blue: A-2,401T2-AT'711 w'Moan 1.1.0nl fl/ :40)11444
7M2.Aeendon /ha bogies
N-YS 110 weave Me A.Mru t.Y leolioo Miami CPA- ilI Apimen e to Step t t d Pan Tap.Immp Mild Or*Arm lo W\Motion rr Sample.
Ge.erel Notes
•ND manna oo asbestos tam darcmt t s e*od deeam:ate a I`.
•True or"<:':aM:ate limes ewe hletf5ad m tbe letapit.be the:oe::eesatee a Ass 7a:'.aa::arat be 4F.so±ed w:thoo.II post:....r=
•Samples:Sectfied as adgmllsoous:mare tee are:zyr"are separated ma 2:'v1 'men.and epl'ma afi ud aad retorted seprately.
•AS reputed asbestos amends!1 a ctaysotle.&made.=ado:at asat opts tram4t ed ac000 W,awe toga s vary lays of mch samph tat mh-those asbestos tnmerals detected an Laud
Amours a the conaou name far the labeso:arm 1Y.et\of to 00001..ar'ru CrocbLae a t e comas LAW used fec to Isboodam swear of the=sera:neb1late
TI:t.\m-L foam.plasm.tad fore powder snap*au cot=esbesem Veen of tut seat.Mamma•::f asanal x tammer that these Ebert ca=I0 be dmernd by PL\7 9e ova samples.aces
•maw'aalrtcai methods:t I TEN. S_'h.sal kP::::•1 r»tecasoeoded:pease cam=stomas al0etos cauem a rec-ue1 Sam{-.amartar bails TEN!rasa tie aaah'lts a accepted nada
NESHAP mamma
These results me lubcred mama to Arot:o.op\:stamp Aseocj1e Doc l=MI eras r:f:or::.ocs of ma.armdorp taw ca=pus• standard warmly sod tamton=of Labi rs praruons
•No tespanrb111Dl a Lab1:In.1 assumed fa toe amp. .c wttnh the reab at mod a atrprond
•tin!esI wafted s wtlticf to tehm the samp:es:a eta as:Ls rem A0*..o:ols:tartan Assoc:an 1rO w-_slat 7a sa...es for a name' prod of Nor'i=0?days before astatdmf A
Ihtpplef aed handlor7 charge wtC N rtteflel tat the tenors of em IarGpit
Art a:alop don not=oars=m the rt....,of rap Yb.=uus u.mot tad or dew worm A::une ens\U:arson by pa-forma Ma to prr.:cie sat.teach 14ed,and a atrA130 of smarm]S\er.
•Asa1N as of these raarra:s aha1L be perfat=ed br a:'EM A revolt of ND ilea net mime don t4 MsyL urn am nor coomue one ntea Ir WSW don wtahyer could Noe idnult1 aodnrot rn At
sprryJfc sample fir rho'mow barrel above
'nee;am Compamd and or tap a app1ed M a ma:Moira a becomes re saga:pet ate wa:^*ord Lod a effect croon toe one fo"1*0.r 1 a u-s;ssstm-EPA 01 CFR Pan d.Arob.oto,
roma thsver nh loam Com9oued•tom the same teaerts reed to Ana wee?hereftre._:s sun apor'aa the z!.y:y:210 C0110Cnr_the snap..-.ease:2 des:rlbe the se11 14 Cmcpow:or so
•.Amobalon'Mom that the dmn1:swam ae be Compwd If eels mmet seeps{reap show a,en eat::'.asbestos,am-,•m...s ma:ompm:a4:f sump:es from both:o:ar samp:a f area and
non;oorr areas show paten ma::'•asbesos.tee to mama:sine'.'.be:anodeed'sue toe ec addma rtra-
Netes Angered bs MlAP
•:'ha report mat am be used by the cams!m:rot;max:rem:E:ara mama.ce mama=bs N=17,N1S7,a on etch-Mae Tereus Gammon
•Thin test report rnstes ar_t to the cars sated or aLtraed
•Thu report in toot salad nrie. d burs the race of a\1=a?-epfra?2 La-mat
•Any roproductcm of du 42Cd4r mui:.t:i2±01201:,toc-=arx at.or :d't`s repast ae bt T•.d
Pate s et
14
ecos
Environmental h Disaster Restoration,Inc.
CERTIFICATIONS
- t �' >
(•lit,u.lrat1k'r/1ii i1t V.
_'' of Public i faith r -'
and Fi irontnt0tt ,�
.r!
- ASBESTOS
CER'I•IF ICATION* •
`�' I hat ceniftcs that i 'is
Brian (Guzman
Certification No.:21876 k, •
1. •
- l►.i and the requirements of 25-'.507,C'.R S and :\tr t;urlrt} ( nn;n l ,
t' • C'urnmission Regulation No A,Part D,and it hcrrby crnrfir(1 by she
o. stare in Color.,3n in the folks init discipline '-1
~, Building Inspector*
I
04, _P 4-`,.
_
Issued: Jammu) 26, 20:41 (..
j I %parrs: Frbruars 19. 2025
,i
41 .owe//w ygw,.d truieme.wrr...yira..■
it Y
• -J
ecos
Environmental Disaster Restoration,Inc.
! :}, - �?-r -rrx ,t 1. • ;1f. s _ -
f _ , . . .
r' ,,4, i •J 6• n
. -. ;- Colorado Department
1 `-.,: of Public Health
--.I` and Lrnimnmcnt : /{
:i.. )t.S.;\;'.'
ASBESTOS CONSULTING F1RMI
yam,.-/, ,
„1''
This certifies that i
Ecos Environmental and Disaster Restoration, Inc ! 94:44%d'tr.
y Registration no.: ACF- 1400) y"•':-,'`'`'
has met the registration requirements of_25-7-507. C.R.S. and the Air Quality Control
• '_7c;
- B 1
Commission Regulation No, K•Part B.and is hereby authorized to perfomt asbestos consulting
actin itie. as required under Regulation No R. Part B. in the state of Colorado- ��''" ''
tb =i ..,...• ..:
<)
Issued: August l x.2023
Expires: October 09,2_024 T-- -
Al....,hm nPCO Reumsotit e..., r ';.,
Y� SEAL
16
ecos
Environmental Disaster Restoration,Inc.
FINAL NOTES
This report represents the opinion of the Certified Asbestos Building Inspector at the time of the
asbestos assessment survey. If you have any question,concerns,or if additional information is needed
please do not hesitate to call.
Sincerely,
Brian Guzman
Colorado State EPA Asbestos Inspector#21876
ECOS Environmental&Disaster Restoration,Inc.
(970)945-4407
17